Attch 24ii- Coburn Gore -Funding Responsibility Tool 2025 12 10.xlsx

XLSX spreadsheet 143 KB Posted

Attached to
Construction Manager as Constructor (CMc) Requirement for a New Land Port of Entry (LPOE), Coburn Gore, Maine
Solicitation number
47PB0025R0044
Issued by

About this file

This is a comprehensive CBP Land Port of Entry (LPOE) Funding Responsibility Tool Excel spreadsheet for the Coburn Gore, Maine project. The document provides detailed guidance on funding responsibilities for various infrastructure, equipment, and furnishings, with a focus on delineating which items will be funded by Building Infrastructure Law (BIL) funds, Customs and Border Protection (CBP) Reimbursable Work Authorization (RWA), or tenant improvements. The tool breaks down funding and installation responsibilities for items across multiple facility areas including inspection zones, network and communications equipment, audio/visual systems, security infrastructure, detention areas, office spaces, and specialized operational areas.

The spreadsheet accompanies a related federal contract opportunity for a Construction Manager as Constructor (CMc) services contract valued between $125-$135 million for constructing a new Land Port of Entry in Coburn Gore, Maine. Key requirements include a mandatory pre-proposal conference and site visit on 10/21/2025, limited to four representatives per offeror, with strict identification and pre-registration requirements. Offerors must submit a CBP Short Term Contractor Information Sheet and a Non-Disclosure Agreement to access controlled unclassified information related to the solicitation. The project is being managed by the General Services Administration Public Buildings Service Region 1.

View the file

Other files

File Type Posted
RFP Document 2 V2 - Contract Price Form 47PB0025R0044 2026 02 26.pdf PDF
Coburn Gore 47PB0025R0044 QA V4 2026 03 02.pdf PDF
47PB0025R0044 Amendment 0005 SF30 2026 03 02.pdf PDF
Attach 29v1 Coburn Gore LPOE FFE Proposal Worksheet 2026 02 26 .xlsx XLSX spreadsheet
RFP Document 4 V1- Agreement CMc REVISED 2026 02 26.pdf PDF
47PB0025R0044 Amendment 0004 SF30 .pdf PDF
47PB0025R0044_0003 Amendment SF30 .pdf PDF
Attach 28 Coburn Gore Parcel Acquisition 2026 01 13.pdf PDF
Attach 25 Divison 1 Template Sections 2025 07 02.docx DOCX document
Attach 26 Coburn Gore Division 01 - Table of Contents 2025 07 02.docx DOCX document
RFP Document 2 - Contract Price Form 47PB0025R0044 2026 01 22.pdf PDF
Coburn Gore 47PB0025R0044 QA V3 2026 01 22.pdf PDF
47PB0025R0044 1442 dated 2026 01 22.pdf PDF
Attach 11 Wage Determination ME20260007 2026 01 02.pdf PDF
Attch 11 - Wage Determination ME20250007 2025 12 05.pdf PDF
Attch 24 Coburn Gore 47PB0025R0044 QA V2 2025 12 10.pdf PDF
Attch 24i. DS Quick Reference Guide- 2023 LPOE DS Overview 2023 12 06.pdf PDF
Attch 24iii. Coburn Gore Final Geothermal Study 2025 09 06.pdf PDF
Amendment 0002 to 47PB0025R0044 Final 2025 12 10 .pdf PDF
Amendment 0001 to 47PB0025R0044 Final 102725.pdf PDF
47PB0025R0044 QA Document 102725.pdf PDF
Coburn Gore Attendance Sheet 102225.pdf PDF
Pre-Proposal Meeting Final.pdf PDF
RFP Document 12 - CBP Non-Disclosure Agreement Form.pdf PDF
15. Coburn Gore LPOE_Final Concept Submission_Combined_REV 08-11-25.pdf PDF
RFP Document 5 - Reps and Certs CMc MAY 2025.pdf PDF
RFP Document 14 - Proprietary Information Agreement - Sample Template.docx DOCX document
11. GSA Commissioning Guide September 2020.pdf PDF
1. Coburn Gore LPOE CMc SOW Final 2025 03 27.pdf PDF
6. P-120 Public Buildings Service Cost and Schedule Management Policy Requirements, October 2022.pdf PDF
RFP Document 2 - Contract Price Form 47PB0025R0044.pdf PDF
2. Coburn Gore Three phase SOW Final 2025 04 04 (1).pdf PDF
RFP Document 10 - Bid Bond SF24.pdf PDF
RFP Document 6 - Past Performance Questionnaire.docx DOCX document
3. Coburn Gore AE SOW_FINAL 2024 08 06.pdf PDF
7. Coburn Gore LPOE 15Aug25- LPOE POR at final concept.pdf PDF
RFP Document 4 - Agreement CMc MAY 2025.pdf PDF
16. Coburn Gore LPOE_Spec TOC_Final Concept_Combined 08-11-25.pdf PDF
RFP Document 1 - SF1442-22.pdf PDF
5. Colby Coburn Gore Three-Phase Final Report 2022 12 22.pdf PDF
RFP Document 3 - Solicitation CMc MAY 2025.pdf PDF
RFP Document 11 - Wage Determination ME20250007.pdf PDF
17. Coburn Gore Housing_Preliminary Concepts 13June25.pdf PDF
RFP Document 8 - CASB DS-1.pdf PDF
RFP Document 9 - UNIFORMAT II - Level 3 Detail Reference Guide.xlsx XLSX spreadsheet
RFP Document 7 - SB Sub Plan - Individual Model - May 2025 - 508 Compliant.docx DOCX document
14. Coburn Gore LPOE - Design Narrative_Final Concept REV 08-11-25.pdf PDF
4. Coburn Gore LPOE - CMa w CxP SOW 2023 10 12.pdf PDF
10. PBS Core Building Standards Memorandum 2025 02 24.pdf PDF
RFP Document 13 - CBP Short Term Contractors- Visitor Form_BLANK - Short Term Contractors Template.pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INSTRUCTIONS

Instructions on the Use of the CBP Land Port of Entry (LPOE) Funding Responsibility Tool
Program Delivery Alert - LPPDA-2024-0002a/b/c Funding Responsibility Tool
The Funding Responsibility Tool includes the following tabs:
1REFERENCES TAB - Corresponding PDAs (Program Delivery Alerts) and source documents, along with policy, requirements, and corresponding training documents and resources.
2DEFINITIONS & CLARIFICATIONS TAB - CBP and GSA Specific acronyms and definitions applicable to Column E - Recommended By, Column F - Furnished By , along with example Funding Responsibility Clarification to be applied to COLUMN A - Items.
3MASTER-FUNDING TOOL - UNEDITABLE/LOCKED version of the Funding Responsibility Tool as developed by GSA Pricing Policy and CBP determined the correct categories and the corresponding funding responsibilities teams will fill out.
4CBP Design Standard (DS) & CBP Purchased Only - Examples of equipment and other items ONLY CBP is authorized to purchase.
Instructions:
1Make a COPY of the BIL CBP LPOE Funding Responsibility Tool Workbook.
1a In the upper left hand corner of the workbook, click FILE, MAKE A COPY
1b Rename the copy to "BIL LPOE Funding Responsibility Tool_Project Name_City, State"
2Navigate to the "MASTER-FUNDING TOOL TAB" for your specific project updates.
2a ITEM - The furniture, fixture or equipment listed by systemIf you do not see your ITEM, add it at the end of the Sheet in ROW 194 with an explanation
2b REAL PROPERTY OR PERSONAL PROPERTY - Approved and required categorization per GSA Pricing Desk Guide.Select how your team has categorized these items on your project documents - Cost Estimating Workbook (CEW), design documents, statement of work (SOW), or request for proposal (RFP).
2c FURNITURE OR FIXTURE OR EQUIPMENT - Approved and required categorization per GSA Pricing Desk Guide.Select how your team has categorized these items on your project documents - Cost Estimating Workbook (CEW), design documents, statement of work (SOW), or request for proposal (RFP).
2d FUNDING RESPONSIBILITY - Approved and required fUNDING RESPONSIBILITY categorization per GSA Pricing Desk Guide.Select how your team has categorized these items on your project documents - Cost Estimating Workbook (CEW), design documents, statement of work (SOW), or request for proposal (RFP).
2e. RECOMMENDED FURNISHED BY PER POLICYDO NOT DELETE, Keep as a guide to determine how your project team is doing it.
2f. RECOMMENDED INSTALLED BY PER POLICYDO NOT DELETE, Keep as a guide to determine how your project team is doing it.
2g. PROJECT FURNISHED BYDetermine how your project team is doing this, and use the drop down to select a choice.
2h. PROJECT INSTALLED BYDetermine how your project team is doing this, and use the drop down to select a choice.
2i. POLICY TREATMENT SOURCEApplicable corresponding requirement
3NOTES 1Specific notes based on BIL Policy and other applicable policies.
4Regional Comments/FeedbackProvide comments so we may approve the accuracy and usefulness of this tool.
5Additional NotesCBP Additional Notes
6Contact the CIPMO team when entries are completed, and email a copy to the CIPMO Program Manager, and Program Coordinator

https://docs.google.com/document/d/1N2zaR7S4ctCPHxukNTBFsXe0jN-irbG7FWEHAWf6OF0/edit

REFERENCES

BIL Applicable References

Program Delivery Alert - LPPDA-2024-0002a/b (Supplement to LPPDA-2022-0001), BIL Land Port of Entry Funding Responsibility Matrix Tool

Program Delivery Alert - LPPDA-2022-0001, RWA Acceptance and Funding Availability CBP Furniture, Fixture, and Equipment Guidance

Program Delivery Alert - LPPDA-2024-0003b, Scope and Budget Alignment Updated Requirements and PMO Approval Process

GSA Pricing Desk Guide, 5th Edition, 08-01-2020

Pricing Desk Guide 5th Edition - Implementation Guide 7.14.2022 (INTERNAL TO GSA ONLY)

GSA Pricing Training Resources

Shell, TI, BSAC + Funding Responsibility Matrix: GSA/CBP Workshop El Paso Feb 2024
LPOE Pricing Component Breakout - Used to build this tool

Design Intent Drawing Review Guide

PBS Reimbursable Services National Program

FINAL Reimbursable Work Authorization National Policy Manual - PBS 1000.2D - 7/3/2024

Reimbursable Work Authorization (RWA) Client Enrichment Series | GSA
Pricing Desk Guide Training
RWA Policy & Process Fundamentals
Cost Estimating & Cost Management Training

GSA Internal RWA Standard Operating Procedures (INTERNAL TO GSA ONLY)

Signed-PBS _ FAS Memo_ when PBS may accept RWAs.docx - PA0A 7/2/2024

PBS Internal Policy and Guidance for Standalone Options for Furniture Acquisitions (SOFA) 2/15/2022 (INTERNAL TO GSA ONLY) : [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

LPOE funded by IIJA received blanket waiver for the SOFA policy.

P-120, Public Buildings Service Cost and Schedule Management Policy 11/7/2022

P100 FACILITIES STANDARDS

GSA P100 Submittal Matrix (2021)

GSA PM Hub Statements of Work

2018 & 2023 Customs & Border Protection Design Standard (not linked as Non Disclosure Agreements required) https://docs.google.com/document/d/1N2zaR7S4ctCPHxukNTBFsXe0jN-irbG7FWEHAWf6OF0/edithttps://insite.gsa.gov/system/files/2023-07/PBS%201000.2C%2C%20Reimbursable%20Work%20Authorization%20National%20Policy%20Manual.pdfhttps://www.gsa.gov/about-us/events-and-training/our-training-programs/training-for-federal-employees/client-enrichment-series?gsaredirect=ceshttps://docs.google.com/document/d/1Z-GyEwrUrHFs58__M27qv_czBrOoVE5e4Z1nD4NFSis/edithttps://drive.google.com/file/d/1gT258E3gpO1MKOFm7XkHeeUK9HDTuTiJ/view?usp=drive_linkhttps://insite.gsa.gov/system/files/CC045362%20FINAL%20-%20SOFA%20Policy%20Guidance%20-%20January%202022%20%281%29docx%20%281%29%20%281%29%20%281%29%20%281%29.pdfhttps://insite.gsa.gov/system/files/2023-06/Final%20Directive_PBS%20Cost%20and%20Schedul%20Management.pdfhttps://www.gsa.gov/system/files/P100%202022%20Addendum%20Final_.pdfhttps://www.gsa.gov/system/files/P100%20Submittal%20Matrix%20v10.pdfhttps://sites.google.com/gsa.gov/project-management-pm-hub/resources-tools/statements-of-workhttps://drive.google.com/file/d/1pX2Junm1yfAG0TyCxZ_ndgZLlHRo40VN/view?usp=sharinghttps://drive.google.com/file/d/1ZdrTf9sTu9Azt0QXK1A3zvgMNeA6xn19/view?usp=sharinghttps://insite.gsa.gov/system/files/Pricing%20Desk%20Guide%205th%20Edition%20August%201%2C%202020.pdfhttps://insite.gsa.gov/system/files/Pricing%20Desk%20Guide-%205th%20Ed-%20Final%20Adj%20Implementation%20Guide-508.pdfhttps://insite.gsa.gov/services-and-offices/public-buildings-service/portfolio-management-customer-engagement/pt-ce-training-info-sharing/training-by-disciplinecommunity/pricing-training?term=pricing+desk+guidehttps://docs.google.com/spreadsheets/d/1ZI_2Q_cc393fQsuhJj6j03KMaVFg9kZqEiDD0yT6mpM/edit?gid=0https://www.gsa.gov/system/files/DID_Review_Guide_Final.pdfhttps://insite.gsa.gov/services-and-offices/public-buildings-service/office-of-project-delivery/reimbursable-services-national-program

DEFINITIONS & CLARIFICATIONS

DEFINITIONS
GSA = General Services AdministrationRFID = Radio Frequency IdentificationAPHIS = Animal & Plant Health Inspection ServiceLV-CBP = Low Voltage Contractor through CBPOMB A11 = CIRCULAR NO. A–11 PREPARATION, SUBMISSION, AND EXECUTION OF THE BUDGET
CBP = Customs and Border ProtectionLPRs = License Plate ReadersCBSA = Canada Border Services AgencyLV-GSA = Low Voltage Contractor through GSAPDG = GSA Pricing Desk Guide, 5th Edition, 08-01-2020
NII = Non-Intrusive Inspection DivisionLED = Light Emitting Diode SignageFDA = Federal Department of AgricultureCBP OIT = CBP Office of Information and TechnologyPDG IG = Pricing Desk Guide 5th Edition - Implementation Guide 7.14.2022 (INTERNAL TO GSA ONLY)
RDE = Radiation Detection EquipmentBSDP = Border Security Deployment ProgramCMC = Construction Manager as Contractor or General Construction ContractorCBP-V = CBP hired or approved vendors
BSI = Border Solutions Integration DivisionIDENT = Automated Biometric Identification SystemCMa = Requirements & Construction Manager as AgentCBP LBI = Land Border Integration
EXAMPLE BELOW TO APPLY TO COLUMN A ITEMS - INFRASTRUCTURE FUNDED BY BIL AND TENANT IMPROVEMENT BY RWA FOR CONDUIT ONLY, AND REMAINING INFRASTRUCTURE BY RWA, AND EQUIPMENT FUNDED AND BOUGHT BY CBP.
ItemReal Property

or Personal Property Furniture or Fixture or

EquipmentFunding ResponsibilityRECOMMENDED Furnished By?RECOMMENDED Installed By?
-X-Ray Machine (equipment)Personal PropertyEquipment or FixtureTenant AgencyCBP/ GSA/OITCMC/GC
- X-Ray Machine (infrastructure - everything except conduit )Real Property - Tenant ImprovementDoes Not ApplyTenant AgencyCBP/ GSA/OITCMC/GC
- X-Ray Machine (infrastructure - conduit only )Real Property - Tenant ImprovementDoes Not ApplyBIL - Building Infrastructure LawCBP/ GSA/OITCMC/GC

https://www.whitehouse.gov/wp-content/uploads/2018/06/a11.pdfhttps://insite.gsa.gov/system/files/Pricing%20Desk%20Guide%205th%20Edition%20August%201%2C%202020.pdfhttps://insite.gsa.gov/system/files/Pricing%20Desk%20Guide-%205th%20Ed-%20Final%20Adj%20Implementation%20Guide-508.pdf

MASTER-FUNDING TOOL

Coburn Gore DRAFT LPOE Funding Responsibility Tool - CBPVersion 2 - 12/10/2024PREVIOUS versions of this tool are no longer valid.
ItemReal Property

or Personal Property Furniture or Fixture or Equipment Funding Responsibility

BIL = IIJARECOMMENDED Furnished By?RECOMMENDED Installed By?PROJECT Furnished ByPROJECT Installed ByPolicy Treatment SourceNotes 1:Regional Comments/ FeedbackAdditional Notes
Lane/Operational Technology
- Cabling for IT lane technologyReal Property - Tenant ImprovementDoes Not ApplyBIL - Building Infrastructure Law

: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

IIIJACMC/GCCMC/GCCMC/GCCMC/GCPDG 3.6.2Can be funded via TI allowance or CBP FFE RWA - dependent upon TI funding allowance balance. Which contract CBP chooses to execute this work is up to CBP. Once TI allowance is extinguished, CBP FFE RWA will be used to fund.Need verification who will design cabling for each specific lane tech item. Typically pull strings are provided by the project and cabling is design and pulled by CBP vendor.
- Conduit for Inspection Plaza Electrical (infrastructure)Real Property - Tenant ImprovementDoes Not ApplyBIL - Building Infrastructure LawCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.6.2Infrastructure funded by CBP TI allowance of the BIL funding.
- Conduit for Inspection Plaza IT cables (infrastructure)Real Property - Tenant ImprovementDoes Not ApplyBIL - Building Infrastructure LawCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.6.2Infrastructure funded by CBP TI allowance of the BIL funding.
- Conduit - empty for future IT/electrical at Inspection PlazaReal Property - Tenant ImprovementDoes Not ApplyBIL - Building Infrastructure LawCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.6.2Infrastructure funded by CBP TI allowance of the BIL funding.
- Dynamic Signage (located over lanes which is LED signage and needs to be changeable)Personal PropertyFixtureTenant AgencyCMC/GCCMC/GCCMC/GCCMC/GCOMB A-11Funded by CBP RWA if GSA contractor/subcontractor is hired to execute the work. Which contract CBP chooses to execute this work is up to CBP. Regional teams shall follow the National RWA Policy.Designed and provided by the project with CBP RWA funds.
- Dynamic Signage Infrastructure (everything except the wiring)Real Property - ShellDoes Not ApplyBIL - Building Infrastructure LawCMC/GCCMC/GCCMC/GCCMC/GCOMB A-11Signage = BIL shell funding
- LBI (Land Border Integration) Inspection cameras infrastructure - conduitReal Property - Tenant ImprovementDoes Not ApplyBIL - Building Infrastructure LawCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.6.2Infrastructure funded by CBP TI allowance funded by BIL project funds.
- LBI Inspection cameras infrastructure - wiringReal Property - Tenant ImprovementDoes Not ApplyBIL - Building Infrastructure Law

: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

Review if IIJA or Tenant AgencyTeam decisionTeam decisionCMC/GCCMC/GCPDG 3.6.2Can be funded via TI budget or CBP FFE RWA - dependent upon TI funding allowance balance. Which contract CBP chooses to execute this work is up to CBP.
- LBI Equipment - Cameras & SensorsPersonal PropertyEquipmentTenant AgencyDB/GC or CBP-VTeam decisionCMC/GCCMC/GCPDG 3.6.9Cameras are paid for as equipment by CBP FFE BIL funding. If CBP chooses to use GSA contractor/subcontractor to perform the work, CBP FFE RWA funding will be provided. Who performs the work is up to CBP & the project team. Regional teams shall follow the National RWA Policy.
- NII - commissioning of systemNeitherDoes Not ApplyTenant AgencyCBP-V or CBP"CBP-V, LBI, CBP"CBP-V or CBP"CBP-V, LBI, CBP"OMB A-11This is a service supporting CBP NII and not a tangible item = CBP NII RWA if GSA contractor/subcontractor performs the work. Who performs the work is up to CBP.
- NII - equipment only - LEPs, MEPs and LPRsPersonal PropertyEquipmentTenant AgencyCBPTeam decisionCBPCBPPDG 3.6.9All NII elements are OMB A-11 item to be funded via CBP NII RWA (not CBP FFE BIL RWA) if GSA contractor/subcontractor to performs the work. Who installs is up to CBP & the project team. NII funding has a different appropriation.Designed by CBP NII vendor.
- NII - infrastructure (power but not oversized due to future LEP/MEP equipment)Real Property - Tenant ImprovementDoes Not ApplyTenant AgencyCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.6 & 6.2.2Infrastructure funded by CBP TI allowance funded by BIL project funds.Designed infrastructure/conduit for future LEP/MEP installation
- NII - infrastructure - conduit onlyReal Property - Tenant ImprovementEquipmentTenant AgencyCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.6 & 6.2.2Infrastructure funded by CBP TI allowance funded by BIL project funds.
- NII - wiring/cablingPersonal PropertyEquipmentTenant AgencyCBPTeam decisionCBPCBPPDG IG, Appendix 1All NII elements are OMB A-11 item to be funded via CBP NII RWA (not CBP FFE BIL RWA) if GSA contractor/subcontractor to performs the work. Who installs is up to CBP & the project team. NII funding has a different appropriation.
- Port Runner Suppression SystemPersonal PropertyEquipmentTenant AgencyCMC/GCCMC/GCCMC/GCCMC/GCPDG IG, Appendix 1All NII elements (CBP states port suppression systems are not NII items) are OMB A-11 item to be funded via CBP NII RWA (not CBP FFE BIL RWA) if GSA contractor/subcontractor to performs the work. Who installs is up to CBP & the project team. NII funding has a different appropriation. Regional teams shall follow the National RWA Policy.
- RPMs - commissioningNeitherDoes Not ApplyTenant AgencyCBP-V or CBP"CBP-V, LBI, CBP"CBP-V or CBP"CBP-V, LBI, CBP"OMB A-11This is a service supporting CBP FF&E and not a tangible item = CBP RWA if GSA contractor/subcontractor performs the work. Who performs the work is up to CBP.
- Radiation Portal Monitors (RPMs) - equipmentPersonal PropertyEquipmentTenant AgencyCBP-V or CBPCMC/GCCBP-V or CBPDB/GCPDG IG, Appendix 1OMB A-11 item to be funded via DHS CWMD RWA if GSA contractor/subcontractor is performing the work. Who installs is up to CBP & the project team - typically installed by GSA's contractor/subcontractor.
- RPMs - infrastructure (bolts in the concrete, etc.)Real Property - Tenant ImprovementDoes Not ApplyBIL - Building Infrastructure LawCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.6 & 6.2.2CBP TI allowance funded by BIL project funds - typically installed by GSA's contractor/subcontractor.
- RPMs - wiringPersonal PropertyEquipmentTenant AgencyCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.6.9OMB A-11 item to be funded via DHS CWMD RWA if GSA contractor/subcontractor is performing the work. Who installs is up to CBP & the project team - typically installed by GSA's contractor/subcontractor.
- Radio Antenna (could be radio tower - team to verify with CBP if a tower is needed)Personal PropertyEquipmentTenant AgencyCMC/GCCMC/GCCMC/GCCMC/GCPDG IG, Appendix 1OMB A-11 item to be funded via CBP FFE BIL funding. If CBP chooses to use GSA contractor/subcontractor to perform the work, CBP FFE RWA funding will be provided. Who performs the work is up to CBP & the project team. Regional teams shall follow the National RWA Policy.CBP provides antenna and pull wire to antenna but the mounting/infrastructure provided by project funds.
Radio Antenna conduit, mount and grounding infrastructureReal Property - Tenant ImprovementDoes Not ApplyBIL - Building Infrastructure LawCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.6 & 6.2.2OMB A-11 item to be funded via CBP FFE BIL funding. If CBP chooses to use GSA contractor/subcontractor to perform the work, CBP FFE RWA funding will be provided. Who performs the work is up to CBP & the project team. Regional teams shall follow the National RWA Policy.CBP provides antenna and pull wire to antenna but the mounting/infrastructure provided by project funds.
- Shipping back of existing LPOE LPRs and RPMs: all packaging/labor/shipping will be done by CMc/DB/DBB contractor. Coordinate with PNNL to reuse crating/materials, etc.NeitherDoes Not ApplyTenant AgencyCMC/GC with CBP-V / CBPCMC/GC with CBP-V / CBPCMC/GC with CBP-V / CBPCMC/GC with CBP-V / CBPOMB A-11This is a service supporting CBP FF&E installation and not a tangible item = CBP RWA if GSA contractor/subcontractor hired to ship the LPRs/RPMs.Spec package will be provided by CBP/PNNL
- Z PortalsPersonal PropertyEquipmentTenant AgencyCBP-V or CBPCBP-V or CBPCBP-V or CBPCBP-V or CBPPDG IG, Appendix 1All NII elements are OMB A-11 item to be funded via CBP NII RWA (not CBP FFE BIL RWA) if GSA contractor/subcontractor to performs the work. Who installs is up to CBP & the project team. NII funding has a different appropriation.
- Z Portals infrastructure to support Z Portal equipmentPersonal PropertyEquipmentTenant AgencyCBP-V or CBPCBP-V or CBPCBP-V or CBPCBP-V or CBPPDG IG, Appendix 1All NII elements are OMB A-11 item to be funded via CBP NII RWA (not CBP FFE BIL RWA) if GSA contractor/subcontractor to performs the work. Who installs is up to CBP & the project team. NII funding has a different appropriation.
CBP Security Equipment
- CablingReal Property - Tenant ImprovementDoes Not ApplyBIL - Building Infrastructure LawCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.6.2Can be funded via TI allowance or CBP FFE BIL funding - dependent upon TI funding allowance balance. Which contract CBP chooses to execute this work is up to CBP. Once TI allowance is extinguished and CBP chooses to use GSA contractor/subcontractor, CBP FFE RWA will be used to fund. Regional teams shall follow the National RWA Policy.
- Cameras (approved list) for site securityPersonal PropertyEquipmentTenant AgencyCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.6.9Cameras are paid for as equipment by CBP FFE BIL funding. If CBP chooses to use GSA contractor/subcontractor to perform the work, CBP FFE RWA funding will be provided. Who performs the work is up to CBP & the project team. Regional teams shall follow the National RWA Policy.Reference CBP approved camera list
- Card Readers Access Control (building entry)BSACDoes Not ApplyBIL - Building Infrastructure LawCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.10.2.BBuilding entry card readers are shell items funded by BIL project funds = BSAC
- Card Card Key systems (Readers Access Control (tenant areas)Personal PropertyEquipmentTenant AgencyCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.6.9Pricing policy indicates card readers in tenant areas = CBP FFE BIL funding. If CBP chooses to use GSA contractor/subcontractor to perform the work, CBP FFE RWA funding will be provided. Who performs the work is up to CBP & the project team. Regional teams shall follow the National RWA Policy.
- Commissioning (cameras and microphones)NeitherDoes Not ApplyTenant AgencyCBP-V or CBPCBP-V or CBPCBP-V or CBPCBP-V or CBPOMB A-11This is a service supporting CBP FF&E and not a tangible item = CBP FFE BIL funding. RWA if GSA contractor/subcontractor performs the work. Who performs the work is up to CBP.Verify security cameras and microphones are working properly before CBP contractor connects to CBP network
- Door Hardware (building entry doors)BSAC - SecurityDoes Not ApplyBIL - Building Infrastructure LawCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.10.2.BBuilding entry door hardwardware = shell items funded by BIL project funds = BSAC
- Door Hardware (tenant suite entry and interior tenant doors)Real Property - Tenant ImprovementDoes Not ApplyBIL - Building Infrastructure LawCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.6 & 6.2.2CBP TI allowance funded by BIL project funds.
-Duress buttons/systemReal Property - Tenant ImprovementDoes Not ApplyBIL - Building Infrastructure LawCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.6 & 6.2.2CBP TI allowance funded by BIL project funds.
- Programming and Configuration of CBP security equipmentPersonal PropertyEquipmentTenant AgencyCBP-V or CBPCBP-V or CBPCBP-V or CBPCBP-V or CBPPDG 3.6.9CBP FFE BIL funding. If CBP chooses to use GSA contractor/subcontractor to perform the work, CBP FFE RWA funding will be provided. Who performs the work is up to CBP & the project team. Regional teams shall follow the National RWA Policy.
- Security Panel HardwarePersonal PropertyEquipmentTenant AgencyCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.6.9CBP FFE BIL funding. If CBP chooses to use GSA contractor/subcontractor to perform the work, CBP FFE RWA funding will be provided. Who performs the work is up to CBP & the project team. Regional teams shall follow the National RWA Policy.
- Video Management Software - for CBP camerasPersonal PropertyEquipmentTenant AgencyCBPCBPCBPCBPPDG 3.6.9CBP FFE BIL funding. If CBP chooses to use GSA contractor/subcontractor to perform the work, CBP FFE RWA funding will be provided. Who performs the work is up to CBP & the project team. Regional teams shall follow the National RWA Policy.
Network & Communications
- Communication TowerPersonal PropertyEquipmentTenant AgencyTeam decisionTeam decisionCBP OITCBP OITPDG IG, Appendix 1OMB A-11 item to be funded via CBP FFE BIL funding. Regional teams shall follow the National RWA Policy.Not in Scope
- Network CablingReal Property - Tenant ImprovementDoes Not ApplyBIL - Building Infrastructure LawCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.6.2Can be funded via TI allowance or CBP FFE BIL funding - dependent upon TI funding allowance balance. Which contract CBP chooses to execute this work is up to CBP. Once TI allowance is extinguished and CBP chooses to use GSA contractor/subcontractor, CBP FFE RWA will be used to fund. Regional teams shall follow the National RWA Policy.Not in Scope
CBP IT Equipment (Switches / Computers / LAN equipment)
- Racks/CabinetsPersonal PropertyEquipmentTenant AgencyCBP OITCMC/GCCBP OITCMC/GCPDG 3.6.9CBP FFE BIL funding. Regional teams shall follow the National RWA Policy.GC would install the racks
- Switches / Computers / LAN equipmentPersonal PropertyEquipmentTenant AgencyCBP OITCBP OITCBP OITCBP OITPDG 3.6.9CBP BIL FFE funds to OIT for purchase and installation. GSA contract will not be used to execute this work. Regional teams shall follow the National RWA Policy.
- UPS for CBP equipmentReal Property - Tenant ImprovementDoes Not ApplyBIL - Building Infrastructure LawCBP OITCBP OITCBP OITCBP OITPDG 3.6.2CBP TI allowance of the BIL funding if GSA contractor/subcontractor is hired to execute the work. Which contract CBP chooses to execute this work is up to CBP.Under Ch. 19 of LPOE DSCBP to provide
- Wireless Access Points (WAPs)Personal PropertyEquipmentTenant AgencyCBP OITCBP OITCBP OITCBP OITPDG 3.6.9CBP BIL FFE funds to OIT for purchase of WAPs. Installation of WAPs may or may not performed by GSA contractor/subcontractor; if GSA contractor, will be funded by CBP BIL FFE RWA. Regional teams shall follow the National RWA Policy.
GSA & CBP IT Equipment (Switches / Computers / LAN equipment)
- BAS network GSAReal Property - ShellDoes Not ApplyBIL - Building Infrastructure LawCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.5 & 6.2.2
- Commissioning (terminating and testing)NeitherDoes Not ApplyBIL - Building Infrastructure LawGSA ITGSA ITGSA ITGSA IT
- Contractor NetworkNeitherDoes Not ApplyBIL - Building Infrastructure LawCMC/GCCMC/GCCMC/GCCMC/GC
- Incoming fiber to siteNeitherDoes Not ApplyBIL - Building Infrastructure LawGSAVendorGSAVendor
- Programming and Configuration - CBPNeitherDoes Not ApplyTenant AgencyCBPCBPCBPCBPThis is a service supporting CBP FF&E and not a tangible item = CBP RWA if GSA contractor/subcontractor performs the work. Who performs the work is up to CBP. Regional teams shall follow the National RWA Policy.
- Programming and Configuration - GSAReal Property - Tenant ImprovementDoes Not ApplyBIL - Building Infrastructure LawGSAGSAGSAGSAPDG 3.6 & 6.2.2Who pays for - Programming and Configuration - GSA
- Racks/CabinetsPersonal PropertyEquipmentTenant AgencyCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.6.9CBP FFE BIL funding. If CBP chooses to use GSA contractor/subcontractor to perform the work, CBP FFE RWA funding will be provided. Who performs the work is up to CBP & the project team. Regional teams shall follow the National RWA Policy.
- Switches / Computers / LAN equipmentPersonal PropertyEquipmentTenant AgencyGSACMC/GCGSACMC/GCPDG 3.6.9CBP FFE BIL funding. If CBP chooses to use GSA contractor/subcontractor to perform the work, CBP FFE RWA funding will be provided. Who performs the work is up to CBP & the project team. Regional teams shall follow the National RWA Policy.
- Telecom pathways & cabling - VOIP (CBP) and POTs (CBP)Real Property - Tenant ImprovementDoes Not ApplyBIL - Building Infrastructure LawGSAVendorGSAVendorPDG 3.6 & 6.2.2CBP TI allowance of the BIL funding if GSA contractor/subcontractor is hired to execute the work. Which contract CBP chooses to execute this work is up to CBP.
- Telecom pathways & cabling - VOIP (GSA) and POTs (GSA)Real Property - Tenant ImprovementDoes Not ApplyBIL - Building Infrastructure LawGSAVendorGSAVendorPDG 3.6 & 6.2.2GSA TI allowance of the BIL funding.
- Uninterrupted Power Supply for telecommunications/GSAPersonal PropertyEquipmentBIL - Building Infrastructure LawGSACMC/GCGSACMC/GCPDG 3.6.9GSA TI allowance of the BIL funding.
- Wireless Access Points (WAPs) CBPPersonal PropertyEquipmentTenant AgencyGSACMC/GCGSACMC/GCPDG 3.6.9CBP BIL FFE funds to OIT for purchase. Installation might be through GSA contract = CBP BIL funding via RWA.Duplicate?
- Wireless Access Points (WAPs) for GSANeitherDoes Not ApplyBIL - Building Infrastructure LawGSACMC/GCGSACMC/GC
Audio/Video Systems CBP specific
- AV equipment (teleconferencing equipment, conference room smart screens, TV/display monitors, etc.)Personal PropertyEquipmentTenant AgencyCBPCMC/GCTeam decisionCMC/GCPDG 3.6.9CBP FFE BIL funding. Regional teams shall follow the National RWA Policy.
- CBP Radios Consolette (the base that plugs into the CAT6 jack in the wall) - typically furnished and installed by CBPPersonal PropertyEquipmentTenant AgencyCBPCBPCBPCBPPDG 3.6.9CBP BIL FFE funds to OIT for purchase and installation. GSA contract will not be used to execute this work.
- Display (TV & CBP Info Display System (IDS) CAT6 connection) private, breakroom, etc.Personal PropertyEquipmentTenant AgencyCBPCMC/GCTeam decisionCMC/GCPDG 3.6.9CBP FFE BIL funding. Regional teams shall follow the National RWA Policy.
- Display (TV/display monitor, etc.) public facing at TT and HH TBDPersonal PropertyFixtureTenant AgencyCBPCMC/GCTeam decisionCMC/GCPDG 3.6.9CBP FFE BIL funding. If CBP chooses to use GSA contractor/subcontractor to perform the work, CBP FFE RWA funding will be provided. Who performs the work is up to CBP & the project team. Regional teams shall follow the National RWA Policy.
- Intercoms (All-call function via the phone system can be used as intercom) - this item is not a part of the public address system (should be part of the fire alarm system)Personal PropertyEquipmentTenant AgencyCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.6.9CBP FFE BIL funding. If CBP chooses to use GSA contractor/subcontractor to perform the work, CBP FFE RWA funding will be provided. Who performs the work is up to CBP & the project team. Regional teams shall follow the National RWA Policy.
- Any other LED Signage NOT including the lane signageReal Property - Tenant ImprovementFixtureBIL - Building Infrastructure LawCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.6.2CBP TI allowance of the BIL funding if GSA contractor/subcontractor is hired to execute the work. Which contract CBP chooses to execute this work is up to CBP.
- Video Conferencing Equipment - anything not listed above that will be on the CBP networkPersonal PropertyEquipmentTenant AgencyCBPDB/GCCBPCMC/GCPDG 3.6.9CBP FFE BIL funding. IRegional teams shall follow the National RWA Policy.
Other Requirements
- Trailer (if needed while construction is ongoing/for storage/potential temporary trailer for CBP, etc.)Real or Personal PropertyDependsCMC/GCCMC/GCTeam decisionTeam decisionPDG 3.6 & 6.2.2Real if permanently affixed to land/site; personal if not. What is the purpose for the trailer? If for CBP & affixed to land, it is a CBP TI allowance item.

If the CBP trailer is not affixed to land, it is CBP FFE BIL funding. If CBP chooses to use GSA contractor/subcontractor to perform the work, CBP FFE RWA funding will be provided. Who performs the work is up to CBP & the project team. Regional teams shall follow the National RWA Policy.

If the trailer is temporary during construction, it is BIL shell funded.It will be discussed later on, "N/A" for now.
Exterior & Site
- BollardsBSAC - SecurityFixtureBIL - Building Infrastructure LawCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.10.2.BBollards = shell items funded by BIL project funds/BSAC
- Fencing - Perimiter to LPOEReal Property - Tenant ImprovementBIL - Building Infrastructure LawCMC/GCCMC/GCCMC/GCCMC/GCPDG 6.2.2
- Employee parking fence and sliding gateReal Property - Tenant ImprovementBIL - Building Infrastructure LawCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.10.2.BEmployee parking fence + sliding gate = shell items funded by BIL project funds/BSAC
- Pipe gates / gate arm that closes a lane that is not in use (infrastructure equipment)Real Property - ShellEquipmentBIL - Building Infrastructure LawCMC/GCCMC/GCCMC/GCCMC/GCOMB A-11Pipe gates = shell items funded by BIL project funds/BSAC
- Wayfinding / SignageReal Property - ShellFixtureBIL - Building Infrastructure LawCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.5 & 6.2.2Wayfinding/signage = BIL shell funding
Signage
- Inter-changeable (recommended by CBP to allow for flexibility)Real Property - Shell or Tenant ImprovementBIL - Building Infrastructure LawCBPDB/GCCBPCMC/GCPDG 3.6.2See PDG for distinction.
- PermanentReal Property - Shell or Tenant ImprovementBIL - Building Infrastructure LawCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.6.2See PDG for distinction.
- Statutory signage - located internal and externalReal Property - Tenant ImprovementBIL - Building Infrastructure LawCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.6 & 6.2.2Legally obligated signs CBP has to post - different than identity signage. Can be funded via TI allowance or CBP FFE RWA - dependent upon TI funding allowance balance. Which contract CBP chooses to execute this work is up to CBP. Once TI allowance is extinguished, CBP FFE RWA will be used to fund.
Miscellaneous
- DryerPersonal PropertyEquipmentTenant AgencyCBPCMC/GCCBPCMC/GCPDG 3.6.9CBP FFE BIL funding. Regional teams shall follow the National RWA Policy.
- FurniturePersonal PropertyFurnitureTenant AgencyCBPGSA, CMC/GCCBPCMC/GCPDG 3.6.9CBP FFE BIL funding. If CBP chooses to use GSA contractor/subcontractor to perform the work, CBP FFE RWA funding will be provided. Who performs the work is up to CBP & the project team. Regional teams shall follow the National RWA Policy.
- Identity signage on the outside of the building and inside the buildingReal Property - ShellBIL - Building Infrastructure LawCBPCMC/GCCBPCMC/GCPDG 3.5 & 6.2.2BIL shell = GSA contractor/subcontractor performing the work.
- Impound FreezerPersonal PropertyEquipmentTenant AgencyCBPCMC/GCCBPCMC/GCPDG 3.6.9CBP FFE BIL funding. Regional teams shall follow the National RWA Policy.
- TimeclockPersonal PropertyFurnishings/DecorTenant AgencyCBPCMC/GCCBPCMC/GCPDG 3.6.9CBP FFE BIL funding. If CBP chooses to use GSA contractor/subcontractor to perform the work, CBP FFE RWA funding will be provided. Who performs the work is up to CBP & the project team. Regional teams shall follow the National RWA Policy.
- Trophy/Display CasePersonal PropertyFurnitureTenant AgencyCBPCMC/GCCBPCMC/GCPDG 3.6.9CBP FFE BIL funding. If CBP chooses to use GSA contractor/subcontractor to perform the work, CBP FFE RWA funding will be provided. Who performs the work is up to CBP & the project team. Regional teams shall follow the National RWA Policy.
- Wall Hung Display CasePersonal PropertyFixtureTenant AgencyCBPCMC/GCCBPCMC/GCPDG 3.6.9CBP FFE BIL funding. If CBP chooses to use GSA contractor/subcontractor to perform the work, CBP FFE RWA funding will be provided. Who performs the work is up to CBP & the project team. Regional teams shall follow the National RWA Policy.
- WasherPersonal PropertyEquipmentTenant AgencyCBPCMC/GCCBPCMC/GCPDG 3.6.9CBP FFE BIL funding. Regional teams shall follow the National RWA Policy.
- Waste/Recycling BinPersonal PropertyEquipmentTenant AgencyCBPCMC/GCCBPCMC/GCPDG 3.6.9CBP FFE BIL funding. Regional teams shall follow the National RWA Policy.
- Whiteboard/Tack BoardPersonal PropertyFixtureTenant AgencyCBPCMC/GCCBPCMC/GCPDG 3.6.9CBP FFE BIL funding. If CBP chooses to use GSA contractor/subcontractor to perform the work, CBP FFE RWA funding will be provided. Who performs the work is up to CBP & the project team. Regional teams shall follow the National RWA Policy.
Lobby/Waiting Area - no free standing items in lobby/waiting area
- Chairs (bolted down)Personal PropertyFixtureTenant AgencyCBPCMC/GCCBPCMC/GCPDG 3.6.9CBP FFE BIL funding. If CBP chooses to use GSA contractor/subcontractor to perform the work, CBP FFE RWA funding will be provided. Who performs the work is up to CBP & the project team. Regional teams shall follow the National RWA Policy. •CBP TI allowance BIL funding if built in and removal would damage the floor or wall. •CBP FFE RWA fixture if bolted down to floor/wall and can be removed w/out damage to floor/wall. Regional teams shall follow the National RWA Policy
- Chairs (NOT bolted down)Personal PropertyFixtureTenant AgencyCBPCMC/GCCBPCMC/GCPDG 3.6.9CBP FFE BIL funding. If CBP chooses to use GSA contractor/subcontractor to perform the work, CBP FFE RWA funding will be provided. Who performs the work is up to CBP & the project team. Regional teams shall follow the National RWA Policy. •CBP TI allowance BIL funding if built in and removal would damage the floor or wall. •CBP FFE RWA fixture if bolted down to floor/wall and can be removed w/out damage to floor/wall. Regional teams shall follow the National RWA Policy
- Literature Display / artifacts case (attached/bolted down)Personal PropertyFixtureTenant AgencyCBPCMC/GCCBPCMC/GCPDG 3.6.9CBP FFE BIL funding. If CBP chooses to use GSA contractor/subcontractor to perform the work, CBP FFE RWA funding will be provided. Who performs the work is up to CBP & the project team. Regional teams shall follow the National RWA Policy.
Office Areas
- Command Center StationsPersonal PropertyFurnitureTenant AgencyCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.6.9CBP FFE BIL funding. If CBP chooses to use GSA contractor/subcontractor to perform the work, CBP FFE RWA funding will be provided. Who performs the work is up to CBP & the project team. Regional teams shall follow the National RWA Policy.
- Ergonomic Task ChairsPersonal PropertyFurnitureTenant AgencyCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.6.9CBP FFE BIL funding. If CBP chooses to use GSA contractor/subcontractor to perform the work, CBP FFE RWA funding will be provided. Who performs the work is up to CBP & the project team. Regional teams shall follow the National RWA Policy.
- Lateral File StoragePersonal PropertyFurnitureTenant AgencyCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.6.9CBP FFE BIL funding. If CBP chooses to use GSA contractor/subcontractor to perform the work, CBP FFE RWA funding will be provided. Who performs the work is up to CBP & the project team. Regional teams shall follow the National RWA Policy.
- Mobile Storage PedestalPersonal PropertyFurnitureTenant AgencyCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.6.9CBP FFE BIL funding. If CBP chooses to use GSA contractor/subcontractor to perform the work, CBP FFE RWA funding will be provided. Who performs the work is up to CBP & the project team. Regional teams shall follow the National RWA Policy.
- Office equipment (printers, copiers, fax, ten-print, etc.)Personal PropertyEquipmentTenant AgencyCBPCBPCBPCBPPDG 3.6.9CBP FFE BIL funding. If CBP chooses to use GSA contractor/subcontractor to perform the work, CBP FFE RWA funding will be provided. Who performs the work is up to CBP & the project team.
- Workstations/cubiclesPersonal PropertyFurnitureTenant AgencyCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.6.9CBP FFE BIL funding. If CBP chooses to use GSA contractor/subcontractor to perform the work, CBP FFE RWA funding will be provided. Who performs the work is up to CBP & the project team.
Conference Rooms
- ChairsPersonal PropertyFurnitureTenant AgencyCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.6.9CBP FFE BIL funding. If CBP chooses to use GSA contractor/subcontractor to perform the work, CBP FFE RWA funding will be provided. Who performs the work is up to CBP & the project team. Regional teams shall follow the National RWA Policy.
- Conference TablePersonal PropertyFurnitureTenant AgencyCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.6.9CBP FFE BIL funding. If CBP chooses to use GSA contractor/subcontractor to perform the work, CBP FFE RWA funding will be provided. Who performs the work is up to CBP & the project team. Regional teams shall follow the National RWA Policy.
- Media CredenzaPersonal PropertyFurnitureTenant AgencyCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.6.9CBP FFE BIL funding. If CBP chooses to use GSA contractor/subcontractor to perform the work, CBP FFE RWA funding will be provided. Who performs the work is up to CBP & the project team. Regional teams shall follow the National RWA Policy.
Breakroom/Kitchen
- Café ChairsPersonal PropertyFurnitureTenant AgencyCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.6.9CBP FFE BIL funding. If CBP chooses to use GSA contractor/subcontractor to perform the work, CBP FFE RWA funding will be provided. Who performs the work is up to CBP & the project team. Regional teams shall follow the National RWA Policy.
- Café TablesPersonal PropertyFurnitureTenant AgencyCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.6.9CBP FFE BIL funding. If CBP chooses to use GSA contractor/subcontractor to perform the work, CBP FFE RWA funding will be provided. Who performs the work is up to CBP & the project team. Regional teams shall follow the National RWA Policy.
- Coffee MakerPersonal PropertyEquipmentTenant AgencyCBPCBPCBPCBPPDG 3.6.9CBP FFE BIL funding. If CBP chooses to use GSA contractor/subcontractor to perform the work, CBP FFE RWA funding will be provided. Who performs the work is up to CBP & the project team. Regional teams shall follow the National RWA Policy.
- Commercial Refrigerator/Freezer - no icemakerPersonal PropertyEquipmentTenant AgencyCBPCMC/GCCBPCMC/GCPDG 3.6.9CBP FFE BIL funding.Regional teams shall follow the National RWA Policy.
- Commercial Refrigerator/Freezer - with icemakerPersonal PropertyFixtureTenant AgencyDB/GCCMC/GCCMC/GCCMC/GCPDG 3.6.9CBP FFE BIL funding. If CBP chooses to use GSA contractor/subcontractor to perform the work, CBP FFE RWA funding will be provided. Who performs the work is up to CBP & the project team. Regional teams shall follow the National RWA Policy.
- DishwasherPersonal PropertyFixtureTenant AgencyCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.6.9CBP FFE BIL funding. If CBP chooses to use GSA contractor/subcontractor to perform the work, CBP FFE RWA funding will be provided. Who performs the work is up to CBP & the project team. Regional teams shall follow the National RWA Policy.
- Ice Machine/DispenserPersonal PropertyEquipmentTenant AgencyCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.6.9CBP FFE BIL funding. If CBP chooses to use GSA contractor/subcontractor to perform the work, CBP FFE RWA funding will be provided. Who performs the work is up to CBP & the project team. Regional teams shall follow the National RWA Policy.
- Microwave (integrated exhaust fan above stove)Personal PropertyFixtureTenant AgencyCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.6.9CBP FFE BIL funding.Regional teams shall follow the National RWA Policy.
- Microwave (free standing plug in)Personal PropertyEquipmentTenant AgencyCBPCMC/GCCBPCMC/GCPDG 3.6.9CBP FFE BIL funding.Regional teams shall follow the National RWA Policy.
- StoolsPersonal PropertyFurnitureTenant AgencyCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.6.9CBP FFE BIL funding. If CBP chooses to use GSA contractor/subcontractor to perform the work, CBP FFE RWA funding will be provided. Who performs the work is up to CBP & the project team. Regional teams shall follow the National RWA Policy.
- Toaster OvenPersonal PropertyEquipmentTenant AgencyCBPCBPCBPCBPPDG 3.6.9CBP FFE BIL funding. Regional teams shall follow the National RWA Policy.
- Vending Machines - (Other than Randolph Sheppard Act)Personal PropertyEquipmentTenant AgencyCBPCMC/GCCBPCMC/GCPDG 3.6.9CBP FFE BIL funding. If CBP chooses to use GSA contractor/subcontractor to perform the work, CBP FFE RWA funding will be provided. Who performs the work is up to CBP & the project team. Regional teams shall follow the National RWA Policy.
Lactation Room Furniture
- Mini refrigeratorPersonal PropertyEquipmentTenant AgencyCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.6.9CBP FFE BIL funding. Regional teams shall follow the National RWA Policy.
- ReclinerPersonal PropertyFurnitureTenant AgencyCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.6.9CBP FFE BIL funding. If CBP chooses to use GSA contractor/subcontractor to perform the work, CBP FFE RWA funding will be provided. Who performs the work is up to CBP & the project team. Regional teams shall follow the National RWA Policy.
- Side tablePersonal PropertyFurnitureTenant AgencyCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.6.9CBP FFE BIL funding. If CBP chooses to use GSA contractor/subcontractor to perform the work, CBP FFE RWA funding will be provided. Who performs the work is up to CBP & the project team. Regional teams shall follow the National RWA Policy.
- Wall HooksPersonal PropertyEquipmentTenant AgencyCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.6.9CBP FFE BIL funding. If CBP chooses to use GSA contractor/subcontractor to perform the work, CBP FFE RWA funding will be provided. Who performs the work is up to CBP & the project team. Regional teams shall follow the National RWA Policy.
Restroom/Locker Room
- Feminine Napkin DisposalReal Property - Shell or Tenant ImprovementFixtureBIL - Building Infrastructure LawCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.6 & 6.2.2BIL Shell funding if common area bathrooms; CBP TI allowance BIL funding if tenant area bathrooms.
- Grab BarsReal Property - Shell or Tenant ImprovementFixtureBIL - Building Infrastructure LawCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.6 & 6.2.2BIL Shell funding if common area bathrooms; CBP TI allowance BIL funding if tenant area bathrooms.
- Hand Sanitizer DispenserReal Property - Shell or Tenant ImprovementFixtureBIL - Building Infrastructure LawCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.6 & 6.2.2BIL Shell funding if common area bathrooms; CBP TI allowance BIL funding if tenant area bathrooms.
- Locker Bench (bolted down)Real Property - Shell or Tenant ImprovementFixtureBIL - Building Infrastructure LawCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.6 & 6.2.2Real Property CBP TI allowance BIL funding if permanently attached or not easily removable to floor/wall; CBP FFE RWA funding furniture if freestanding, mobile; CBP FFE RWA. Regional teams shall follow the National RWA Policy.
- Locker Bench (not bolted down)Real Property - Shell or Tenant ImprovementFixtureTenant AgencyCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.6 & 6.2.2Real Property CBP TI allowance BIL funding if permanently attached or not easily removable to floor/wall; CBP FFE RWA funding furniture if freestanding, mobile; CBP FFE RWA. Regional teams shall follow the National RWA Policy.
- Lockers (built in/bolted down)Real or Personal PropertyFurnitureBIL - Building Infrastructure LawCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.6 & 6.2.2Real Property CBP TI allowance BIL funding if permanently attached to floor/wall;

Personal Property CBP FFE RWA funded fixture if not permanently attached to floor/wall and can be removed w/out damaging floor/wall;

CBP FFE RWA furniture if freestanding. Regional teams shall follow the National RWA Policy.

- Lockers (not bolted down) Real or Personal Property Furniture Tenant Agency CMC/GC CMC/GC CMC/GC CMC/GC PDG 3.6 & 6.2.2 Real Property CBP TI allowance BIL funding if permanently attached to floor/wall;

Personal Property CBP FFE RWA funded fixture if not permanently attached to floor/wall and can be removed w/out damaging floor/wall;

CBP FFE RWA furniture if freestanding. Regional teams shall follow the National RWA Policy.

- Lockers - weapon safe Real or Personal Property Furniture Depends CMC/GC CMC/GC CMC/GC CMC/GC PDG 3.6 & 6.2.2 Real Property CBP TI allowance BIL funding if permanently attached to floor/wall;

Personal Property CBP FFE RWA funded fixture if not permanently attached to floor/wall and can be removed w/out damaging floor/wall;

CBP FFE RWA furniture if freestanding. Regional teams shall follow the National RWA Policy.

- Mirrors Real or Personal Property Depends CMC/GC CMC/GC CMC/GC CMC/GC PDG 3.6 & 6.2.2 Real Property CBP TI allowance BIL funding if permanently attached to floor/wall;

Personal Property CBP FFE RWA funded fixture if not permanently attached to floor/wall and can be removed w/out damaging floor/wall;

CBP FFE RWA furniture if freestanding

- Seat Cover DispenserReal Property - Shell or Tenant ImprovementFixtureBIL - Building Infrastructure LawCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.6 & 6.2.2BIL Shell funding if common area bathrooms; CBP TI allowance BIL funding if tenant area bathrooms.
- Shower CurtainPersonal PropertyEquipmentTenant AgencyCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.6.9CBP FFE BIL funding. Regional teams shall follow the National RWA Policy.
- Shower Curtain Rod/HooksPersonal PropertyEquipmentTenant AgencyCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.6.9CBP FFE BIL funding. Regional teams shall follow the National RWA Policy.
- Soap DispenserReal Property - Shell or Tenant ImprovementFixtureBIL - Building Infrastructure LawCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.6 & 6.2.2BIL Shell funding if common area bathrooms; CBP TI allowance BIL funding if tenant area bathrooms.
- Toilet Paper DispenserReal Property - Shell or Tenant ImprovementFixtureBIL - Building Infrastructure LawCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.6 & 6.2.2BIL Shell funding if common area bathrooms; CBP TI allowance BIL funding if tenant area bathrooms.
- Toilet PartitionsReal Property - Shell or Tenant ImprovementFixtureBIL - Building Infrastructure LawCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.6 & 6.2.2BIL Shell funding if common area bathrooms; CBP TI allowance BIL funding if tenant area bathrooms.
- Towel DispenserReal Property - Shell or Tenant ImprovementFixtureBIL - Building Infrastructure LawCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.6 & 6.2.2BIL Shell funding if common area bathrooms; CBP TI allowance BIL funding if tenant area bathrooms.
Detention Area - this section is all built in/bolted to the floor
- Detention Area door hardwareReal Property - Tenant ImprovementBIL - Building Infrastructure LawCMC/GCCMC/GCCMC/GCCMC/GCPDG 3.6 & 6.2.2•CBP TI allowance BIL funding if built in and removal would damage the floor or wall. •CBP FFE RWA fixture if bolted down to floor/wall and can be removed w/out damage to floor/wall. Regional teams shall follow the National RWA Policy
- ChairsPersonal PropertyFurniture or FixtureTenant AgencyCBPCMC/GCCBPCMC/GCPDG 3.6.9•CBP TI allowance BIL funding if built in and removal would damage the floor or wall. •CBP FFE RWA fixture if bolted down to floor/wall and can be removed w/out damage to floor/wall. Regional teams shall follow the National RWA Policy2025-06-13: Chairs are not built-in / bolted in