This is a Statement of Work (SOW) for architectural and engineering (A/E) services for the modernization and expansion of the Coburn Gore Land Port of Entry (LPOE) in Maine. The project, awarded by the U.S. General Services Administration (GSA), will involve designing a new facility for U.S. Customs and Border Protection (CBP) using a Design-Bid-Build delivery method. The estimated construction cost is $93,840,000, with project duration spanning from October 2024 to September 2029.
Key project objectives include creating a fully operational LPOE that meets CBP's mission requirements, incorporates sustainable design elements, and is climate-resilient. The scope encompasses developing three design concepts, conducting environmental assessments, and achieving LEED Gold and SITES Silver certifications. The project will modernize the existing port facilities, include new housing for CBP officers, and implement advanced technologies. Critical design considerations include net-zero energy readiness, all-electric systems, low embodied carbon materials, and integration with the Canadian port of entry at Saint-Augustin-de-Woburn, Quebec. The A/E team will be responsible for comprehensive design services, stakeholder coordination, and adherence to multiple federal and agency-specific standards throughout the project lifecycle.
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Coburn Gore Land Port of Entry (LPOE) MODERNIZATION and EXPANSION
DESIGN EXCELLENCE PROSPECTUS PROJECT
ARCHITECT-ENGINEER (A/E) SOW | DESIGN-BID-BUILD PROJECT
DELIVERY
PROJECT NAME Coburn Gore Land Port of Entry (LPOE)
SOLICITATION NUMBER TBD
REGION New England Region (Region 1)
DIVISION GSA OFFICE OF DESIGN & CONSTRUCTION
BUILDING NAMES Coburn Gore LPOE - ME- ME05551BE, ME0552BE , ME0553BE, ME0554BE, ME0555BE
BUILDING ADDRESS 6092 Arnold Trail - Route 27, Coburn Gore, ME 04936-999
CONTRACTING
OFFICER
Paul Murphy - 1PQE
PROJECT MANAGER Li-hang Wang, 1PCTA
LAST REVISION February 7, 2024August 6, 2024
A/E Statement of Work (v 2022/06) - DBB Delivery U.S. General Services Administration U.S. Land Port of Entry, Coburn Gore ME 04936 New England Region (Region 1) Project No. NVT: TBD Design & Construction Division (1PTC) Contract No. TBD February 7, 2024
Table of Contents
1.THEPROJECT
1.1.Background/Location 1.2.PriorStudiesandProgramDiscussions 1.3.EstimatedCostofConstructionatAward(ECCA)
2.LPOEEXISTINGCONDITIONS
2.1.BuildingBackgrounds 2.2.ProposedActionandSiteAcquisition 2.3.TenantAgencies 2.4.AdditionalStakeholders 2.5.ContinuousOperations&Phasing
3.PROJECTGOALSANDOBJECTIVES
3.1.General 3.2.CBPGoalsandObjectives 3.3.GSAGoalsandObjectives
4.PROJECTTYPEANDDELIVERYMETHOD
4.1.ProjectType 4.2.DesignBidBuildDeliveryMethod 4.3.ContractPartiesandContractWork 4.4.ProfessionalEthicsandStandardsofPractice 4.5.ProjectTeamRolesandResponsibilities
5.A/ETEAM(ARCHITECTofRECORD) 5.1.A/ETeamSubstitution 5.2.A/E’SDocumentManager(DM)
6.PROJECTDURATIONandSCHEDULEMILESTONES
7.PROJECTDELIVERYTEAMROLESandRESPONSIBILITIES 7.1.Owner’sQualityAssuranceDesign(SME)Reviewers 7.2.Owner’sOperationsandMaintenanceStaff(OMS) 7.3.ConstructionManagerasAdvisor(CMa)RoleandResponsibilities 7.4.CommissioningProvider(CxP)-SubconsultanttotheCMa 7.5.GeneralContractor(GC)RoleandResponsibilities 7.6.EnvironmentalConsultant(NEPA/EA) 7.7.ArtInArchitecture(AiA)ProgramArtist 7.8.GSARegionalFineArtsOfficer(RFAO) 7.9.RegionalHistoricPreservationOfficer(RHPO)
Project No. NVT: TBD Design & Construction Division (1PTC) Contract No. TBD February 7, 2024
7.10.GSARegionalFireProtectionandLifeSafetyEngineer-ResponsibleinCharge(RIC) 7.11.GSARegionalEnvironmentalCoordinator 7.12.GSANationalAccessibilityOfficer 7.13.GSA’SBuildingTechnologyServicesDivision 7.14.IndependentScheduler 7.15.OccupantAgency(ies)Representative 7.16.VendorsandInstallersbyOtherContracts 7.17.OtherContracts
7.17.1.EnvironmentalConsultingServices(NEPA/EA) 7.17.2.GeothermalandThreePhaseElectricalstudies
8.PARTNERING
8.1.Background
9.ENERGYandSUSTAINABILITY 9.1.EnergyandSustainabilityGoals 9.2.GuidingPrinciplesChecklist(GPC) 9.3.EnergyModelingandPerformance 9.4.LEED®andSITESCertifications 9.5.GSAHighPerformanceBuildingTracking
9.5.1.Net-ZeroEnergyPerformance 9.6.InflationReductionAct(IRA)2022-EmbodiedCarbonReduction
9.6.1.LowembodiedCarbonAsphaltStandardsforallGSAProjects 9.6.2.LowEmbodiedCarbonConcreteStandardsforallGSAProjects 9.6.3.LowEmbodiedCarbonGlassStandardsforallGSAProjects 9.6.4.LowEmbodiedCarbonSteelStandardsforallGSAProjects
9.7.IRA2022-EmergingandSustainableTechnologies(E&ST) 9.8.LifeCycleCostAnalysis
10.RISKMANAGEMENT
10.1.ProjectDefinitionRatingIndex(PDRI) 10.2.CostandScheduleRiskAnalysis 10.3.SafeguardingAssets 10.4.FederalFloodRiskManagement
11.GENERALREQUIREMENTS
11.1.Tenant’sProgramOfRequirements(POR) 11.2.SpatialDataManagement(SDM) 11.3.ReferenceMaterials 11.4.StandardsandCriteriaDocuments 11.5.CommunicationsPlan
Project No. NVT: TBD Design & Construction Division (1PTC) Contract No. TBD February 7, 2024
11.6.HSPD-12SecurityRequirements(SeealsoSection7.5) 11.7.ElectronicProjectManagementInformationSystem(PMIS)Kahua 11.8.ProjectCollaborationandDocumentation 11.9.ContentsofPMIS 11.10.Equipment 11.11.Training 11.12.Support 11.13.HSPD-12SecurityRequirementsforPMIS/Kahua
12.BUILDINGINFORMATIONMODELING(BIM)
12.1.GSACommonDataExchange(CDX):
12.2.BIMCoordination
12.2.1.PreliminaryConceptPhase:
12.2.2.ConceptDevelopmentPhase:
12.2.3.DesignDevelopmentandConstructionDocumentPhases:
12.2.4.Pre-ConstructionPhase:
12.2.5.ConstructionPhase 12.2.6.DesignReviews
13.BUILDINGTECHNOLOGYSERVICES
13.1.BuildingDesignStandard(BDS)
14.ACCESSIBILITYPROGRAM
15.ARTinARCHITECTURE(AiA) 15.1.Background:
15.2.ExistingArtwork:
15.3.A/EParticipation:
15.4.ArtinArchitectureMeetings:
15.5.ArtinArchitectureBudget:
16.COSTMANAGEMENT
17.HISTORICPRESERVATION
18.COMMISSIONING
18.1.PhasedConstruction,Commissioning,SubstantialCompletion
19.OPERATIONALEXCELLENCE
20.REGIONALandCOMMUNITYPLANNING
21.SCOPEofSERVICES 21.1.DesignStage–GENERAL
Project No. NVT: TBD Design & Construction Division (1PTC) Contract No. TBD February 7, 2024
21.1.1.ProjectMeetings 21.2.DocumentSubmissionandReviewProcess
21.2.1.DocumentReviewProcess–Dr.Checks 21.3.DesignQualityReviews(DQRs) 21.4.ValueManagementReviews 21.5.NationalEnvironmentalPolicyAct(NEPA) 21.6.CommissioningduringDesign 21.7.Pre-DesignPhase 21.8.RegionalandCommunitySupportServices
21.8.1.CommunityEngagementActivities-optionalservice 21.9.ReviewReferenceMaterials
21.9.1.PropertySurveys 21.9.2.GeothermalStudy 21.9.3.ThreePhasePowerStudy 21.9.4.ExistingConditions 21.9.5.AdditionalStudies 21.9.6.BIMWorkshops(SeeSection7.14) 21.9.7.RiskAnalysis
21.10.ConceptDesignPhase 21.10.1.Kick-OffMeeting 21.10.2.OperationalExcellence(OE)Requirements
21.11.ProjectManagementInformationSystem(PMIS) 21.12.BIMCoordination 21.13.IntegratedDesignReviewWorkshopIDR 21.14.DesignExcellencePeerReview 21.15.DesignReviews-ProcessandProcedures
21.15.1.ClimateRiskManagementStatement 21.16.NationalEnvironmentalPolicyAct 21.17.Section106ComplianceReport 21.18.RiskAnalysisReview 21.19.Commissioning 21.20.P-100Concurrence&ComplianceMatrix 21.21.GSAConcurrence 21.22.PresentationoftheFinalConceptDesign 21.23.Commissioner’sBriefingPresentation 21.24.FinalConceptApproval 21.25.DesignDevelopment(DD)Phase 21.26.Meetings,reviewProcedures,andDeliverables 21.27.DesignRefinement
Project No. NVT: TBD Design & Construction Division (1PTC) Contract No. TBD February 7, 2024
21.28.SpacePlanning 21.29.Furniture,Fixtures,andEquipment(FFE)Installation 21.30.Mock-Up’sandTesting
21.30.1.LPOEInspectionBooth 21.31.AdditionalData,Services,orTesting 21.32.SystemsSelectionsAnalysisMeetings 21.33.Commissioning 21.34.FireProtectionCertification 21.35.AccessibilityReview 21.36.ArtinArchitectureCoordination 21.37.PhysicalSecurityReviewMeetings 21.38.HistoricPreservation(NHPA)Section106Compliance 21.39.LEED&SitesRegistration
21.39.1.LEEDCharrette 21.40.OperationalExcellenceReview 21.41.DesignReviews 21.42.SafeguardingAssetsCoordination 21.43.P-100Concurrence&ComplianceMatrix 21.44.GSAConcurrence 21.45.PresentationoftheDD 21.46.DesignDevelopmentApproval 21.47.ConstructionDocuments(CD)Phase
21.47.1.MeetingandReviewProcedures 21.47.2.ConstructionDocumentsCoordination-SpecialEmphasisCoordination 21.47.3.65%CDSubmission 21.47.4.Pre-FinalCDSubmission(95%) 21.47.5.IssuedforConstruction(IFC)Submission(100%) 21.47.6.P-100Certifications&ComplianceMatrix 21.47.7.BestPractices/LessonsLearnedSession(LL)Workshop 21.47.8.GSAConcurrence 21.47.9.PresentationoftheConstructionDocumentSubmissions 21.47.10.COApproval 21.47.11.Division01Specifications 21.47.12.ConstructionDocumentsProcess
21.48.ConstructionProcurementPhase
22.CONSTRUCTIONPHASESERVICES
22.1.ConstructionKickoffMeeting 22.2.ConstructionProgressMeetings
Project No. NVT: TBD Design & Construction Division (1PTC) Contract No. TBD February 7, 2024
22.3.PartneringMeetings
22.4.BIMCOORDINATION
22.5.CONSTRUCTIONADMINISTRATION
22.5.1.ProjectfilesandRecordKeeping 22.5.2.BIMRequirements 22.5.3.PeriodicSiteWalk-Through 22.5.4.ConstructionInspections 22.5.5.SpecialInspections 22.5.6.RequestforInformation(RFI) 22.5.7.ProjectRecordDocuments
22.6.Commissioning 22.7.ConstructionExcellencePeerReviews(CEPR) 22.8.LessonsLearned/BestPracticesDebrief 22.9.ArtworkInstallationCoordination
23.CLOSEOUT&TURNOVERSTAGE
23.1.InspectionandTesting 23.2.RecordModels(BIM) 23.3.As-BuiltDrawings&FinalRecordDocuments 23.4.Pre-TurnoverProcess 23.5.TurnoverProcess 23.6.PunchList 23.7.SubstantialCompletion 23.8.ProjectAwards&Certifications 23.9.FinalProfessionalPhotography&FinalDesignPresentationRendering
24.CONTRACTFINANCIALCLOSEOUT
AttachmentsandReferenceDocuments
CBPAdditionalDesignStandards,Referencedrawingsanddocuments
Measurementand Verificationreferences
Project No. NVT: TBD Design & Construction Division (1PTC) Contract No. TBD February 7, 2024
1. THE PROJECT
The purpose of this document is to provide an overview of the Project and the A/E requirements that are required for the project’sselectedDesign-Bid-Build(DBB)projectdeliverymethod.Thisdocumentcombinedwiththedocumentationcontained intheAppendix, andhyperlinksprovidedconstitutesthescopeofwork(SOW).Forconflictsorambiguitieswithinoramongthe contract documents the A/E shall refer to the terms under the Contract Agreement Document.
1.1. Background / Location
Thisprojectisforarchitecturalandengineering(A/E)servicestodesignthemodernizationoftheexistingLPOEanddesigna new LPOE at Coburn Gore border crossing for U.S. Customs and Border Protection (CBP) and the General Services Administration (GSA).
The Coburn Gore LPOE is located in Coburn Gore, ME, a small unorganized township in Franklin County. Coburn Gore is an isolated setting about 20 miles northwest of thesmall townof Eustis, Maine. Coburn Gore is across the border from Woburn, Quebec. The LPOE consists of a Main Building and four stand-alone residences on 3.6acresofproperty; whichstraddle both sides of State Route 27.
TheCoburnGoreLPOEisbisectedbyStateRoute27(alsoknown asHighway27).Thesouthernhalfofthesiteconsistsof1.38+/-acres of land and contains the Main Building and paved driveways.Thenorthernhalfofthesiteconsistsof2.18+/-acres oflandandcontainsfour(4)residencesthathousegovernment staff (also known as the CBPresidences). The main LPOE and the two 1932 residences arelistedontheNRMulti Property NominationNR#14000558,whilethetwo1967Residencesarenotlisted,butpertheMESHPOareconsidered*eligible*sothey mustbetreatedashistoric.Thereisminimallandscapinglocatedonthesiteexceptforgrassyareasandmaturetreeslocated atthenorthandsouthperimetersoftheproperty.Thefacilityislocatedinaruralarea;adjacentlandusesincluderesidential homes, a gas station, and undeveloped wooded areas.
The topography ofthesiteisrelativelyflataroundthemainbuildingbutslopesdowntothesouthintherearofthebuilding.
BasedonavailableUSGSinformation,theexistingLPOEsiteisatanapproximateelevationof1,420feetMSL.Thesitegenerally slopesdownfromthenorthtosouthwithelevationsrangingfromapproximately1422to1410givingapproximately10feetof elevation difference across the site.
TheCoburnGore LPOEisinanareaunmapped for floodplains/ floodways. There are no wetlands on the LPOE property; however, delineation activities contracted by GSA under the National Environmental Policy Act (NEPA) processhaveidentifiedwetlandareasnorthand south of Route 27 are provided with this document under the appendices.
Under theNo streams or water bodies were observedwithintheLPOEproperty;however,two ponds- Arnold Pond, and Crosby Pond - are locatedwithinaquartermiletothenortheastof the LPOE, and accessible via State Route 27 .
Project No. NVT: TBD Design & Construction Division (1PTC) Contract No. TBD February 7, 2024
A majority of the Coburn Gore area is used for commercial logging. The surrounding neighborhood consistsofresidences, logging company facilities, a general store and a gas station. Beyond the LPOE and neighborhood there aremanyacresof undevelopedwoods.TheCanadaBorderServicesAgencyOfficeofWoburn,QuebecisdirectlyacrosstheborderfromtheGSA residences.
TheLPOEprocessesbothcommercialandnon-commercialtraffic.Commercialtrafficisgenerallycomposedofloggingtrucks, and non-commercial traffic is generally touristrelated.TouristsareoftenaccessingskiresortsorotherattractionsinMaine.
There is also occasional bus traffic at this Port along with occasional pedestrian hikers and/or snowmobilers.
Commercialinspectionsareperformedinonelanelocatednorthofthemaincanopy.Thereareseparatelanesforcommercial andnon-commercialtraffic,butnocommercialboothsorcanopies.Commercialvehicledriversmustparktheirvehicleandenter theLPOEtopresenttheirpermitstobeprocessed.If deniedentry, thecommercialvehicletravelspasttheLPOEandmakesa u-turnatanabutter’spropertydirectlyeastofthe1.38acresitesouthofRoute27-arparcel02-5.Apursuitvehicleispositioned attheeasternsideofthetrafficinspectionareaattheconvergenceofthelanes.Small pavedareasatbothsidesoftheLPOE providelimitedparkingforCBPandthepublic,whilepaveddrivewaysateachresidenceanddirectlyeastofresidence1provide additional parking for CBP.
CBP has provided recent traffic records, which stands at 19,084 commercial trucks, 30,224 POVs, and6pedestriansforFY 2022.Arecentrecordofvehiclesandpedestrianspassingtheportisprovidedwiththeappendix.CBPanticipatescommercial traffictoincreasesignificantlyatthecompletionofthecommercialportexpansion.Nocongestionproblemswerereportedfrom the 2018 feasibility study, expansion of the facility is expected to significantly increase the vehicle throughput at the LPOE.
1.2. Prior Studies and Program Discussions
● A2018FeasibilityStudy(FS)conductedbytheGSAanddevelopedbyPARSONSexaminedthecurrentcapabilitiesof the LPOE and reviewed its deficiencies in technology and operations and plans for future expansion. With the collaboration of U.S. Customs and Border Protection (CBP), three solutions were produced, with a Preferred Alternative (PA) chosen and documentation provided to describe the masterplan of the new LPOE, roadway modifications, and treatment of the historical port and residences. A subsequent budget was also developed to correspondtotheexpansionworkscopeofthePA.DetailsofthisstudyandthePAareprovidedwithintheappendixof this SOW.
● CBP provided GSA a FS and Program of Requirements (POR) review in the spring of 2022, with details of staff increaseandprogramchangesthatneedtobeintegratedintothe2018PA.CBPalsoproposedanewlocationofthe residences superseding the 2018 master plan. This document is provided within the appendix of this SOW.
● AseriesofBuildingPreservationPlanspreparedbyBuildingConservationAssociates,Inc. wascompletedonJune 28,2020andisattachedtothisscopeofwork.Thedocumentprovidesadditionalpreservationguidelinesanddetailed history of renovations to all buildings at the port.
● GSA is completing a Pre-Planning Design contract with DattnerArchitects, whichupdatesthe2018studywiththe currentProgramofRequirements(POR)betweenGSAandCBP,alongwithintegratingcurrentstandardsandintegrated to a new PA masterplan of the portexpansionwithanupdatedCostEstimateWorkbook(CEW). Theresultsofthe work will be provided as soon as it is approved by GSA and CBP under the appendices to this document.
● National Environmental Policy Act (NEPA)- GSAisincontracttoconductaNEPAstudyforthesiteandimmediate vicinityoftheLPOEconductingtheEnvironmentalAssessment(EA)withJohnson,Mirmiran&Thompson,Inc.(JMT).
JMT is also conducting wetlands delineation forthesiteofthepotential portexpansion.NEPAsubmissionswill be provided to the design A/E when available.
● ThreePhasePowerandGeothermalstudies- ColbyCo.Engineering(CCE)hascompletedathreephasepowerstudy and is performing a geothermal energy study at the LPOE. The purpose of the geothermal study is to explorethe
Project No. NVT: TBD Design & Construction Division (1PTC) Contract No. TBD February 7, 2024 possibilityofutilizinggroundsourceheatpumpsasarenewablesourceofenergyfortheproject. Threephasepower will needtobeprovidedbyHydroQuebecasthenearestsourceofthreephasepowerfromtheUnitedStatesistoofar tobeeconomicallyfeasible.Theresultsofthethreephasestudyisprovidedasanappendixtothisdocument,while geothermal study will be provided when available.
● CBPHousingprogramdiscussions-UnderahousingtransfercharterexecutedbetweenCBPandGSAinJuneof2023, TheCBPofficers’ housingatCoburnGoreareaportionoftheremainingunitsatLPOEsthatwill betransferredfrom GSAownershiptoCBPownership.TheAgencieswillbeenteringintoaMemorandumofAgreements(MOU)forCoburn Gorethatclearlydefinesrolesandresponsibilities.TheCharterindicatesthatthetransferofhousingatCoburnGoreis tobecompletedbytheThird-QuarterofFY29,oruponcompletionoftheCoburnGoremodernizationproject,whichever comesfirst. CBPhasprovidedaProgramofRequirements(POR)fortheexpansionoftheofficers’housingprogramat theLPOE(seeappendix). Additionally, GSARegionOneLPOEmanagementofficehasprovidedalistofAssumptions andQualifications(A&Qs)tobeusedasreferencefordesign.Additionalguidanceandreferencedocumentssuchas theNewCBPHousingDesignGuideandon-goingCBPHousingfeasibilitystudieswill beprovidedwhenavailablefor release. TheA/ErespondingtothisSOWwill provideaseparate2-monthphaseofstudyandinvestigationtoclearly define the A&Qs, along with life safety, accessibility, environmental, climate and energy goals for the housing expansion with both agencies. This phase of service is to be concurrent with the development of the new LPOE.
Additionalbackgroundstudiessuchas:AsbestosSurveyReportcompletedin2012,BoundarySurvey,Climateresiliencestudy will be provided under the appendices of this document
1.3. Estimated Cost of Construction at Award (ECCA)
The Estimated Cost of Construction at Award for the project is $93,840,000. This will serveastheDesign-to-Limitforthe project.
2. LPOE EXISTING CONDITIONS
The Coburn Gore Border Station is locatedtwomileseastofWoburn,Canada and25milesnorthwestofEustis, Maine.Thefacilityoperates24/7.TheBorder Stationcurrentlyconsistsofof5relatedbuildings,consistingofthemainport building and four (4) housing units
The Coburn Gore LPOE is a surviving facility erectedbetween1931and1937 alongtheMaine-Quebecborder. ThisGeorgianRevivalbuilding,designedbythe Office of the Supervising Architect of the Treasury, sharescommontechnical, stylisticandprogrammaticfeatureswithotherstationsconstructedatthattime.
As a group, these border stations are closely associated with three major themes in twentieth century American history: Prohibition (1919-1933), the popularization of the automobile, and the Depressionofthe1930's.Facilityis listed on the National Register.
2.1. Building Backgrounds
ME0551BE - LPOE, Coburn Gore is a two story 5,038 gsf building with basement, which was constructedin1932.Thereisaprimaryinspectioncanopyextendingofftotheeastsideofthe station, covering two vehicle inspection lanes. The first floor of the station houses employee restrooms, primary pedestrian inspection, public waiting, document processing, munitions storage, kitchenette and CBP office areas. The second floor contains bedrooms.
ME0552BE - (Residence #1 - on the left image) CBP Residence is a one story 954 gsf with basement, whichwasconstructedin1932.Themainfloorincludesalivingroom,twobedrooms, Project No. NVT: TBD Design & Construction Division (1PTC) Contract No. TBD February 7, 2024 a kitchen, two front parlors, and a bathroom. The basement contains mechanical and electrical equipment.Thepropertyis currently offline due to unsatisfactory conditions. CBP requirement for this residence is still valid.
ME0553BE - (Residence #2 - on the right) CBP Residence- Aone story2,174gsfwithbasement, whichwasconstructedin1932.The mainfloorincludesalivingroom,twobedrooms,akitchen,twofront parlors, and a bathroom. The basement contains mechanical and electrical equipment.
ME0554BE - (Residence #3- ontheleftimage)CBPResidence- A onestory2,188gsfwithbasement, whichwasconstructedin1967.
The first floor includes a living room, two bedrooms, a kitchen, a diningroom,andabathroom.Thebasementhasanopenfloorplan and contains mechanical and electrical equipment.
ME0555BE - (Residence #4 - on the right) CBPResidence- Aone story2,188gsfwithbasement, whichwasconstructedin1967.The firstfloorincludesalivingroom,twobedrooms,akitchen,adiningroom,andabathroom.Thebasementhasanopenfloorplan and contains mechanical and electrical equipment.
ThehistoricalLPOEhasreceivedseveralrecentrenovations-themostrecentbeingthesprinklersysteminthe garageofthe LPOE, and the LAN Room renovations completed in 2021. The four residences have received roofing and windows replacements, and residences 2,3, and 4 have received updates to the kitchens. A record of documents for completed renovations are provided with the appendices. The AE must review and understand completed scope toinformthedesign services.
The CBP residences are to continue to provide housing for CBP officers serving at the LPOE. As discussed, the new CBP Housing program is tobedevelopedfromCBPHousingGuidance.It isexpectedthattheoperationsandmaintenance(O&M) activities of the historical residences will be transferred from GSA to CBP.
2.2. Proposed Action and Site Acquisition
TheoperationscarriedoutattheUnitedStatesLPOEfacilitiestraditionallyfocusontheinspectionandcontrolofvehicles,and commercial and non-commercial goods.
AsdiscussedinthePriorstudiesandprogramsection,theproposedactioninitially developedinafeasibilitystudycompleted byParsonsin2018willbeupdatedbyDattnerArchitects’finalsubmissionwiththePreDesignPlanningContract.NEPAanalysis will inform the development of the concept for the new port. The program for the agencies (CBP and GSA) encompasses approximately43,616GSFofenclosedbuildingarea,7,181GSFofenclosedareafornewhousing.andapproximatelyanother 7,500 GSF of Parking area. The new program is discussed in further detail later in the SOW.
Theproposedactionwill requiresiteacquisition.GSAwill formalizethesiteboundarywithinputfromtheA/Eteamduringthe development of the concept and the NEPA process.
2.3. Tenant Agencies
U.S.Customs&BorderProtection(https://www.cbp.gov/) U.S.Customs&BorderProtection(CBP) isthemaintenantattheport, occupyingthemajorityofthefacility. CBP’soperationsareconductedintheMain Port Building and Primary Inspection / Garage Building. The CBP Housing PMO will providetheguidelinesand technical information for the developmentanddesignfornewhousingforCBPofficers.UndertheCBPHousing transfer charter, CBP will assume ownership and maintenance of the existing and the new CBP officers’ housing https://www.cbp.gov/
Project No. NVT: TBD Design & Construction Division (1PTC) Contract No. TBD February 7, 2024
GSA (https://www.gsa.gov/)TheU.S.GeneralServicesAdministration(GSA)operatesthebuildingsystemsand maintains the port for its tenant agencies. While it has a small presence at the port, its role is important as it provideswell-designed,functional, andenergyefficientofficespacetothetenantattheport.GSAisresponsiblefor operation and maintenance of the buildings, mechanical systems, and other property managementtaskssuchas custodialservices,trashremoval, landscapemaintenance,andsnowremoval. ThesetasksarecontractedouttoanOperations & Maintenance (O&M) contractor.
2.4. Additional Stakeholders
The design and construction of the modernization and expansion of the Coburn Gore LPOE will require collaboration and coordination with the following stakeholders.
Maine Department of Transportation (MaineDOT)(https://www.maine.gov/mdot/) MaineDOTplans,develops,implements,andmanagesastatewidetransportationnetwork–includingroads, bridges, railroads, airports, park-and-rides, bicycle and pedestrian facilities, and publictransportationfacilitiesandservices.
Outreach hasnotbeencompletedtodetermineinterestandcollaborationwiththeCoburnGoreLPOEproject.Thesitearrival points and the facility’s connections and access to them will need to be coordinated with MDOT.
Canada Border Services Agency(https://www.cbsa-asfc.gc.ca/menu-eng.html Woburn, Quebec Port of Entry. Outreach has not been completed to determine interest and collaboration with counterpart Canadian Agencies.
Coburn Gore - Franklin County (https://www.franklincountymaine.gov/county-operations/unorganized-territories/) Coburn Gore is a small unorganized township /unorganizedterritorywithapproximately41residents(per2000census).On October26,2023,GSAandJMTconductedapublicscopingmeetingtoinformtheresidentsoftheproposedgovernmentaction fortheportexpansion.Additionalpublicoutreacheventswill beconductedbyJMTundertheNEPAcontract.FranklinCounty’s economic development council is on the outreach list for GSA
Town of Eustis / Village of Stratton, ME(https://eustismaine.org/departments/fire-department/) Eustis,isthenearestorganizedtownshiptotheCoburnGoreLPOE,withtheFireDepartmentthatwouldbethefirst responders for the LPOE. GSA is including key town officials in addition to the Eustis Fire Chief on the list for outreach and coordination.
Western Mountains Corporation (WMC) The WMC has reached out to CBP requesting information on the proposed contract action at the LPOE. The organization has been planning a recreational trail from Coburn Gore to Kingsfield, ME. The plan for the LPOE expansion will need to accommodate this proposed trail. A copy ofthepresentationmadebyWMCtotheMaine Bureau of Parks and Lands dated 2013 is provided in the appendix.
State of Maine Land Use Planning Commission (LUPC) (https://www.maine.gov/dacf/lupc/about/index.shtml) TheMaineLandUsePlanningCommission(theLUPCorCommission)servesastheplanningandzoningauthority for the unorganized and de-organized areas of theState,includingtownshipsandplantations.Theseareaseither have no local government or have chosen nottoadministerlandusecontrolsatthelocallevel.TheLUPCwillbe engaged by GSA for the LPOE expansion.
http://www.gsa.gov/) https://www.gsa.gov/ https://www.maine.gov/mdot/ https://www.cbsa-asfc.gc.ca/menu-eng.html https://www.franklincountymaine.gov/county-operations/unorganized-territories/ https://eustismaine.org/departments/fire-department/ https://www.maine.gov/dacf/lupc/about/index.shtml
Project No. NVT: TBD Design & Construction Division (1PTC) Contract No. TBD February 7, 2024
Saint-Augustin-de-Woburn (Woburn), Quebec Woburn is a parishmunicipalityinLerGranitRegionalCountyMunicipalityintheEstrieregionofQuebec,Canada, andtheclosestsettlementtotheLPOE.ResidentsandtimberbusinessesofWoburnareinvitedtoparticipateinthe NEPA process
DarkSky International -Mont-Mégantic InternationalDark Sky Reserve Thesiteisthefirstcertifiedreservebytheadvocacygroup,whichseekstopreservedarkskiesforconservationand wildlife. The reserve is approximately 20 miles from the LPOE in Canada. The lighting design for the LPOE will consider the recommendations of DarkSky, in conjunction with Leadership in Energy and Environmental Design (LEED) to limit light trespass to the night sky.
2.5. Continuous Operations & Phasing
TheLPOEwillremainoperationalduringtheconstructionoftheproject.GSAissolicitingConstructionManageras Advisor(CMa)servicestomanagethephasingandlogisticsofconstructiontoensurecontinuousoperationsofthe current LPOE. Refer to the Attachments for additional information on the existing LPOE
3. PROJECT GOALS AND OBJECTIVES
3.1. General
All goalsandobjectivesareapplicabletoallstagesoftheproject.TheA/Eshalldocumentandtrackanyevolutionofthese goals and objectives through the course of the project.
● ProvideafullyoperationalLPOEthatcoordinateswiththetrafficflowandoperationsoftheCanadianportofentryat
Saint-Augustin-de-Woburn Quebec, Port of Entry.
● Providebuildingsandinfrastructurethatincorporatedurableconstructionmaterials,sustainabledesignelements,and are climate resilient.
● Provide a new port that is functional, accessible and equitable foreachcustomeragencyandtheiroperationsand interactions with the public.
● Perform design and construction operations efficiently and effectively using current technology tools for design, reviews, inspections, and project management processes.
● Adopt an integrated design approach that engages all team members and extends through all phases of the project.
● Meet specific sustainability goals, including:
○ A Net Zero Ready facility
○ Use all-electric HVAC and plumbing equipment
○ The use of GSA’s green proving ground technology and the use of key sustainable products
○ Achievement of LEED Gold and SITES Silver certification
○ Adherence to Guiding Principles for Sustainable Federal Buildings (see Attachments)
○ Whole-building embodied carbon reduction
○ Low embodied carbon concrete
○ Environmentally preferable asphalt
● Provide best value to GSA’s customer agencies, the community, and the American taxpayer.
3.2. CBP Goals and Objectives
ThenewfacilityshallfulfillrequirementsofCBP’sPORandshalladdressproblemsandissueswiththeexistingfacility(see 2018 Feasibility Study). Goals include:
● Provide a new LPOE that meets CBP’s mission. especially with the constraints & opportunities within the community https://en.cieletoilemontmegantic.org/
Project No. NVT: TBD Design & Construction Division (1PTC) Contract No. TBD February 7, 2024
● ProvidecontrolledentrytoandfromtheUnitedStateswithefficientprocessfortravelersandimprovedsafetyof officers and the travel public
● Accommodating increasing volume of traffic with smoother flow while mitigating congestion
● Accommodating additional and evolving border security measures and technologies
● Creating a facility that is highly functional, accessible and useable, with visibility within and beyond facilities
● Provide adequate parking for CBP personnel and visitors.
● Provide better sight lines for officers at Primary Inspection.
● Provide for snow plowing, storage, and removal.
● Reduce energy consumption/demand
● Increase sustainability where appropriate by utilize photovoltaics, solar hot water, and snow melt systems
● Provide good site drainage.
● Allow for future security technology upgrades at Primary Inspection for POVs
● Provide charging stations for electric vehicles (EVs).
● Provide current technology and allow for future upgrades within the LPOE buildings.
● Provide required emergency generators.
● Provide an accessible facility for officers and visitors
● Provide additional housing for CBP officers meeting CBP POR and specifications
3.3. GSA Goals and Objectives
The new facility shall fulfill the requirements of CBP’s & GSA’s PORandaddressproblemsandissueswiththeexisting facility (refer to PARSON’s 2018 Report, and Dattner’s Pre-Final report). Goals include:
● Provide best value to GSA’s customer agencies, the community, and the American Taxpayer.
● Provide a fully operational LPOE that meets CBP’s mission.
● Provide a port that is durable, reliable, maintainable & cleanable in this remote location.
● Provide long- lasting & durable assets, which are sustainable, climate resilient, superior buildings with low maintenanceandoperatingcosts; andwhicharefunctional,technologicallyefficientandflexiblewhileprovidinga welcoming gateway into and out of the United States of America.
● Completethedesignandconstructionoperationsinanefficientandeffectivemanner-keepingtheprojectontime, on budget, within scope, with quality and compliant with the project requirements.
● Maintain an integrated design approach engaging all team members throughout all phases of the project.
● ProvideadequateparkingforGSAanditsO&Mcontractorsandsubcontractorsincludinginfrastructureforfuture charging stations for electric vehicles (EVs).
● Continuousavailabilityofutilities(power,phone/data,water,sewer,andstormwater)andemergencypowerduring phased construction
● Utility design to accommodate operational and emergency requirements of all port components.
● Snow plowing, snow storage, snow removal, and snow melt control across the LPOE site
● Incorporationofdrainageandstormwatermanagementsystemstomanageonsiteandoffsiterainfall/snowmelt runoff across the LPOE site.
● Compliance with EISA 438 and local stormwater management requirements.
● Incorporation of flood resistance/mitigation measures in accordance with P100 and ASCE 24.
● Achievement of LEED 4.1 Gold, SITES Silver, and NetZero Energy Ready
● Utilize renewable energy when feasible (e.g., photovoltaics, solar hot water heating)
● Incorporate snow melt systems (at entrances to buildings and approaching sidewalks)
● Incorporate additional sustainability technologies such as rainwater/snow melt capture.
● Heightened accessibility and implementation of Universal Design Concepts as well as support the GSA/DEIA
Strategic Plan.
● Ensure compliance with the Historic Preservation Act.
Project No. NVT: TBD Design & Construction Division (1PTC) Contract No. TBD February 7, 2024
4. PROJECT TYPE AND DELIVERY METHOD
4.1. Project Type
ForthepurposeofapplyingthesubmissionrequirementsinAppendixAofGSA’sP100,“FacilitiesStandardsforthePublic Buildings Service,” and the cost estimating and schedule requirements of GSA’s P120, “PBS Cost and Schedule Management Policy,” this project is defined as a New Construction project and the Tier Level is Baseline.
4.2. Design Bid Build Delivery Method
This project will utilize the Design Bid Build (DBB) delivery method. Using this approach, the A/E will reference the pre-designworkcompletedbyDattnerArchitects.OnceNEPAhasbeenfinalized,theconceptdesignwill bepresentedto the GSA PBS Commissioner for approval. Commissioners ApprovalisrequiredbeforeenteringintoDesignDevelopment and Construction Documents.
GSAhascontractedwithaConstructionManagerasAdvisor(CMa)andCommissioningServicesProvider(CxP)whowill workwiththeselectedarchitecturaldesignandteamtoassessconstructabilityofthedesignaswellasprovideinputand costing analysis throughout the concept design, design development, construction document phases. Cost estimates preparedbytheAEwill needtobereconciledwiththeCMageneratedcostestimates.Theconstructiondocumentswillbe put out to bid for a General Contractor (GC) to bid and complete the construction.
4.3. Contract Parties and Contract Work
ThepartiestothiscontractaretheArchitect/EngineerContractor(A/E)andtheUnitedStatesGovernment.Forpurposesof thiscontract, theofficerepresentingtheGovernmentistheGeneralServicesAdministration(GSA),PublicBuildingService (PBS), Design&ConstructionDivision,ThomasP.O’Neill, Jr., FederalBuilding,10CausewayStreet,11thFloor,Boston,MA 02222, hereinafter referred to as GSA.
TheindividualauthorizedtoactonthebehalfofGSAintheadministrationofthiscontractistheGSAContractingOfficer (CO). The GSA Contracting Officer may delegate certain of his or her authorities to others(e.g., aContractingOfficer’s Representative(COR)), andif so,willnotifytheA/Einwritingofthespecificauthoritiesdelegatedtoandlimitationsplaced upontheauthorizedindividuals.TheA/Eshall nottakeanydirectionoractuponanyinformationfromanyoneotherthan those having the requisite authority as confirmed by the GSA Contracting Officer’s written notification.
4.4. Professional Ethics and Standards of Practice
Intheconductofall activitiesrequiredfororrelatedtotheperformanceofthecontractwork,theA/Eshallconformtoand uphold all established ethical principles and professional standards ofpracticegoverningtheA/E’ssegmentoftheA/E profession, including the International Union of Architects (UIA) Accord on Recommended International Standards of Professionalism in Architectural Practice and the American Council of Engineering Companies (ACEC) Ethical Guidelines.
4.5. Project Team Roles and Responsibilities
Intheperformanceoftherequirementsofthiscontract,theA/Eshallcooperatewithandworkinconcertwithotherparties on the Project DeliveryTeam.TheProjectDeliveryTeamwill includeothercontractors, GSApersonnel, customeragency representatives,andotherstakeholders.GSAwill develop,periodicallyupdate, andmaintainthroughoutthecourseofthe projectalistingoftheProjectDeliveryTeammembershipandrespectiverolesandresponsibilities.OtherGSA-contracted major parties in the Project Delivery Team and their overall roles and responsibilities are further identified in this section.
Project No. NVT: TBD Design & Construction Division (1PTC) Contract No. TBD February 7, 2024
5. A/E TEAM (ARCHITECT of RECORD)
The A/E shall provide at a minimum, experts in disciplines listed in GSA’s P100, “Facilities Standards for the Public BuildingsService,”andasotherwiserequiredinthissection(withcredentialsasindicated)astheyapplytotheDesignand ConstructionStagesofthisproject.TheA/Eshall utilizethepersonnelnamedinitsoffertoperformtheservicesrequired under this contract. In the event that any of the personnel named in the acceptedA/Eproposal(incorporatedintothis contract by reference) become unavailable, the A/E shall promptly submit a detailed explanation of thecircumstances necessitating the proposed substitution, a complete written resume for the proposed substitution, and any other informationnecessaryforGSAtoapproveordisapprovethesubstitution.SeealsoFAR52.244-4regardingsubcontractors and outside associates and consultants.
1. Project Executive
2. Lead Architectural Designer
3. A/E Project Manager
4. Interior Architect | Interior Designer
5. Preservation Architect
6. Engineering Designers - All Disciplines
7. Hydrology and Hydraulics consultant / engineer
8. Traffic modeling Consultant/Engineer
9. Registered Fire Protection Engineer: Defined inP-100v2021§ 7.1.3.1
10. Physical Security and Access Control Consultant/Coordinator
11. Building Envelope Consultant
12. LEED | SITES Coordinator
13. Physical Accessibility Specialist
14. Energy Modeler of Record (Responsible for developing the energy model that archives the energy requirements)
15. AV Designer/Integrator
16. Lighting Design Consultant
17. Landscape Architect
18. Acoustic Consultant
19. Lead Environmental Coordinator
20. Cost Engineer
21. Information Technology (IT) Consultant/Coordinator
22. Building Information Modeling (BIM) Manager
23. Document Manager (DM)
5.1. A/E Team Substitution
During the performance of the services required under this contract, theA/Eshall obtainGSAwrittenconsentfromthe Contracting Officer before making any substitution for A/E subcontractors and outside associates or consultants specifically identified and agreed to in the request for qualifications, proposal, contract, and any contract modifications.
5.2. A/E’S Document Manager (DM)
The DM shall provide a single point of contact to manage documents and coordinate submissions. The A/E shall coordinate with GSA’s BIM POC within 60 calendar days after the NTP to confirm the BIM Management Plan (BMP), including naming conventions, format, structure, and training requirements. The DM shall:
1. Control of all project documentation, including Kahua/Dr Checks requirements
2. Control of drawings and project files
3. Coordination with PBS CAD Standards, Building Information Modeling (BIM) and (COBie) and other Electronic Data https://www.gsa.gov/cdnstatic/P100%202021%20v1.pdf
Project No. NVT: TBD Design & Construction Division (1PTC) Contract No. TBD February 7, 2024
6. PROJECT DURATION and SCHEDULE MILESTONES
Below are tentative duration and milestone schedule dates for the project. The durations and dates listed below are estimated and will be finalized in the Contract/Task Order when issued.
Activity Duration Start Date End Date Award A/E Contract / Task Order
1 Site Acquisition Stage
1.1 Site Acquisition Phase 21 months 10/31/2024 08/04/2026
NEPA process- determination and project execution 19 months 10/3/2023 12/01/2024
2 Design Stage
2.1 Pre-Planning / Design (under separate
contract, donot includeeffort for this phase in this proposal)
12 months 06/07/2023 05/31/2024
2.2 Concept Design, Design development, Construction Documents
28 months 04/03/2014 08/17/2026
3 Bidding / Construction Award 6 months 05/15/2026 11/15/2026
4 Construction Stage
4.1 Construction (General) 36.5 months 09/15/2026 09/30/2029
5 Art-in-Architecture 18 months 12/08/2026 05/30/2028
6 Substantial Completion 6.5 months 08/01/2028 02/16/2029 7 Project Closeout 5 months 03/30/2029 08/30/2029
7. PROJECT DELIVERY TEAM ROLES and RESPONSIBILITIES
In the performanceofthecontractrequirements,theA/Eshall workinconcertwithotherpartiesontheProjectDelivery Team.TheProjectDeliveryTeamshall includeothercontractors, NEPA,GC,CMa&CxP,GSApersonnel, occupantagency representativesandotherstakeholders.GSAshall develop,periodicallyupdate,andmaintainthroughoutthecourseofthe project, a listing of the Project Delivery Team membership and respective roles and responsibilities. The other GSA-contractedmajorpartiesinvolvedortobeinvolvedintheProjectDeliveryTeam,andtheirrespectiveoverallrolesand responsibilities, are as follows:
7.1. Owner’s Quality Assurance Design (SME) Reviewers
GSA’s responsibility to meet complex requirements of the Legislative and Executive Branch of the federal government necessitatemaintainingastaffofprofessionals(subjectmatterexperts(SME)experiencedinqualityassurancereviewsof A/Esubmissions.SMEsparticipateinbothformalandinformaldesignreviewstoverifythatstandardsandobjectivesare met.DesignreviewsprovideGSAwiththeopportunitytoconsideranddocumenthowdesigndecisionswillaffectbuilding functionality and assurethattheoccupantagenciesarepresentedwithdesignsolutionsthatsatisfytheOwner’sProject Requirements(OPR).CommentsfromeverydesignreviewmustbeaddressedtothesatisfactionoftheSMEprovidingthe comment before advancing to the subsequent design phase. The SME review does not mitigate or relieve the A/E’s contractualresponsibilitytoprovideacodecompliantfacility.Seesections21.1,21.2,andsubsection21.2.1fordetailson the document review process.
7.2. Owner’s Operations and Maintenance Staff (OMS)
The Owner’sOMSwill activelyparticipateintheOPRdevelopment, designreviews,systemselection,andthepreliminary
Project No. NVT: TBD Design & Construction Division (1PTC) Contract No. TBD February 7, 2024 commissioningprocess.TheadherencetoOperationalExcellence(OE)standardsarearequirementfortheproject.GSA’s OE leadswill beintegraltothereviewofsystemdesignforoperationsandmaintenancerequirements. SeeSection19- Operational Excellence, section 21.42 and appendix document- Design Guide for Operational Excellence for additional information.
7.3. Construction Manager as Advisor (CMa) Role and Responsibilities The GSA hires a professional construction manager to be its advisor. During design the CMa assists with design management. The CMa performsconstructabilityreviewsofdesigndevelopmentandconstructiondocuments.TheCMa provides quality assurance services to monitor the A/E’s quality control. The CMa may serve as the CxP directly or indirectlybysubcontractingCxPservices.Toreduceconfusionduringprojectcoordinationandcollaborationactivitieson the project, the A/E must read the CMa - CxP Statement of Work. Key CMa responsibilities are to:
1. Assists GSA to ensure the A/E meets the contract requirements.
2. Serveasfacilitatorandcoordinatorofall parties’ collaborationrequiredproject activitiestoassistGSAwithensuring this project’s execution proceeds per plan.
3. After A/E NTP, perform and coordinate Concept Design, Design Development, andConstructionDocumentsreviews and comments’ resolution.
4. Participateinthecommissioningprocess,coordinatingwithGSAandtheCxPtodeveloptheproject’scommissioning goals, andsupportinginspectionsandtestingpracticesthatensuretheprojectwillmeettheproject’sCommissioning Plan’s objectives.
5. Produce3rdpartycostestimates,reviewchangeorderrequests,andprovideotherconstructionmanagementservices to assist GSA fulfill its fiduciary responsibilities.
6. ConductMarketstudyonLowEmbodiedCarbon(LEC)materialswithintheMaineregionandvicinity,insupportofthe GSA Bipartisan Infrastructure Law (BIL) and Inflation Reduction Act (IRA) programs
7. Coordinate the communications plan with the A/E
7.4. Commissioning Provider (CxP) - Subconsultant to the CMa
1. The CxP is responsible for developing the commissioning requirements for incorporation into the performance specification.
2. CxP services shall consist of work as necessary to verify and document compliance with the GSA performance objectives throughout the design, construction, start-up, and the initial period of operation.
3. The CxP advises GSA on issues involving the commissioningprocess,emphasizingthelong-termperformanceand maintainability of the systems included in the commissioning scope of work.
4. TheCxPshall adviseGSAofdeficienciesinvolvingthedesign,construction,testing,adjusting,andbalancing,orother deficiencies that would compromise the ability of the facility to meet the needs of GSA.
5. The CxP is authorized to recommend toGSAtheacceptance,modification,orrejectionofall materials, procedures, schedules, tests, reports, or other required commissioning submittals.
7.5. General Contractor (GC) Role and Responsibilities
GSA will contract with a general contractor to oversee the construction process. The GC will coordinatewithCMaand execute the project per the final bid documents prepared by the A/E.
The GC is responsible for the hiring and managing subcontractors to complete the day-to-day building tasks from mobilizationtoprojectacceptanceandfinaloccupancy.TheGCworkstostayonbudgetandontimewiththeprojectand must report deviations to either criterion to GSA. Key GC responsibilities are to:
1. Utilizing the final bid documents released by the A/E team, Prepare overall bid in listing values of sub-trades and selection process to arrive at the best value for the construction project.
2. Prepare and maintain an overall construction schedule inclusive of all milestones and durations.
3. Indicate variables within the schedule along with the project critical path.
Project No. NVT: TBD Design & Construction Division (1PTC) Contract No. TBD February 7, 2024
4. FollowthesecurityHSPD-12protocolforallpersonnelenteringthesiteasoutlinedinSection7-GeneralRequirements / 7.5 and 7.12.
5. Conduct weeklyprojectstatusupdatemeetingswithGSAandCBP- provideprogressupdatessuchasprocurement, mobilization, manpower.
6. Clarifydesignintentand/oralternatecompliancebypreparingRequestforInformation(RFI)fordistributiontotheA/E, GSA, and CBP.
7. Prepare formal submittals for distribution and approval prior to procurement.
8. CoordinatewiththeCXP,LEED/SITEScoordinatorandsubcontractorstoensurethecommissioningandsustainability goals of the project are met.
9. Prepare monthly Schedule of Values (SOV) for formal review with GSA for invoicing and payment.
10. PerformcloseoutproceduresbypreparingandmanagingthepunchlistwithGSA/CBP/CMaandsubcontractorsfor final occupancy.
7.6. Environmental Consultant (NEPA/EA)
GSAisincontractwithJohnson,Mirmiran&Thompson,Inc.(JMT)forservicesforaconsultanttoleadtheGSAthrough the NEPAprocess.TheA/Eteamwill needtoprovidegraphicsandinformationabouttheconceptdesignsasthedesign progresses.DuringNEPAthepublicwillprovidecommentsandquestionsabouttheproject.TheA/Ewillberesponsiblefor makingsurethatthefinaldesignconceptisreflectiveoftheNEPAprocess.Afinalconceptdesigncannotbecompleted withoutbeinginformedthroughtheNEPAprocess.NEPAmustberesolvedbeforetheCommissioner'spresentationwhich isagatetogettoDesignDevelopment.ProgressreportsproducedbyJMTwill beprovidedundertheappendicesofthis
SOW
7.7. Art In Architecture (AiA) Program Artist
GSAwill contractwithanartistthroughGSA’sArtinArchitecture(AiA)Program.TheA/E’sleadarchitectshallparticipate ontheArtinArchitecturepaneltorecommendartist(s)forconsiderationtoGSA.Theleadarchitectshallalsoparticipatein orientation and coordination meetings with the contracted artist and GSA as needed. See Section XVI for additional details.
7.8. GSA Regional Fine Arts Officer (RFAO)
The RFAO overseestheArtinArchitectureProgramfortheregionaloffice,monitoringeachartprojectfrominauguration through the installation of the completed artwork, and implementing the required maintenance plan.
7.9. Regional Historic Preservation Officer (RHPO)
The RHPO oversees National Historic Preservation Act (NHPA) Section 106 compliance, design review,integrationwith otherdisciplinesandexecution.TheRFPOisanintegralpartofthedesignreviewprocessandistheliaisonwiththeMaine Historic Preservation Commission. Key design decisions are to be reviewed by the RHPO.
7.10. GSA Regional Fire Protection and Life Safety Engineer - Responsible in Charge (RIC)
The GSA regional fire protection engineer will participate in each phase of the project from concept through design, construction,finalacceptance,andoccupancytoensurethatfireprotectionandlifesafetyrequirementsareincorporated intotheproject.TheGSAregionalfireprotectionengineerwillreviewdesignplans,specifications,andrelatedinformation;
review GC submittals for compliance with contract documents; witness acceptance testing and commissioning of fire protectionandlifesafetysystems;anduponsuccessfulcompletionofcommissioningandacceptanceoftestedsystems, will issue certificates of occupancy (or temporary certificates of occupancy) before occupancy.
The GSA regional fire protection engineer is the authority having jurisdiction (AHJ) for technical requirements in this chapter, includingall fireprotectionandlifesafetycodeinterpretationsandcodeenforcementrequirements.AstheAHJ, https://jmt.com/
Project No. NVT: TBD Design & Construction Division (1PTC) Contract No. TBD February 7, 2024 the GSA regional fire protectionengineerhastherighttorevisethespecificrequirementsasdefinedintheP-100v2021 based on a technical evaluation and analysis and the project’s specific needs.
7.11. GSA Regional Environmental Coordinator
The GSA regional environmental coordinator coordinates the review of design submittals for compliance with the mitigationmeasuresidentifiedintheNEPAreportpreparedbyothers,aswellascompliancewithenvironmentalregulations and standards related to:
1. Stormwater Management (EISA 438)
2. Fuel Storage Tanks (Fuel Oil/Diesel)
3. Hazardous Materials
4. General environmental compliance
5. Indoor air quality during construction
6. Compliance with NEPA mitigation measures related to:
a. Clean Air Act and Clean Water Act Permitting (floodplains and wetlands)
b. Threatened and Endangered and Sensitive Species (plants and wildlife)
7.12. GSA National Accessibility Officer
The GSA national accessibility officer oversees accessibility compliance with respect to local adopted codes and GSA adoptednationalaccesscode-ArchitecturalBarriersActAccessibilityStandard(ABAAS).Thenationalaccessibilityofficer will beassistedbytheRegionalAccessibilityOfficer(RAO),thismemberwillreviewtheaccessibilitystrategiesandensure theGSADEIAstrategicPlanandallrelevantP-100andABAAScodesarebeingaddressed.TheRAOwillreviewandprocess anyrequestedABAASexceptionsandaccessibilitywaivers.TheRAOwill reviewtherequirementsoftheSubmittalMatrix with respect to documents submission type.
7.13. GSA’S Building Technology Services Division
GSAbusinessunitresponsibleforfacilitytechnologyrequirementsincludingCyber,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .