Attach 28 Coburn Gore Parcel Acquisition 2026 01 13.pdf

PDF 7 MB Posted

Attached to
Construction Manager as Constructor (CMc) Requirement for a New Land Port of Entry (LPOE), Coburn Gore, Maine
Solicitation number
47PB0025R0044
Issued by

About this file

This is a boundary and existing conditions plan for a New Land Port of Entry (LPOE) at the Coburn Gore Border Crossing in Coburn Gore, Maine. The plan depicts the property survey, site layout, and acquisition parcels for GSA Project No. 6092, located at 6092 Arnold Trail–Route 27, Coburn Gore, ME 04936. The project is being developed by the General Services Administration (GSA) Public Building Service Region 1, with architectural services provided by Dattner Architects and engineering support from multiple firms including Vanasse Hangen Brustlin, Inc. (civil), Jaros Baum & Bolles (MEP), Tylin (structural), Elizabeth Kennedy Landscape Architect, Trinity Consultants (AV/IT), and Toscano Clements Taylor, LLC (cost estimator).

The plan identifies multiple parcels designated for full and partial acquisition. Full acquisition parcels total 209,559 square feet and include Parcel 3 (48,474 SF), Parcel 4 (14,590 SF), Parcel 5 (30,177 SF), Parcel 6 (50,741 SF), Parcel 7 (29,067 SF), Parcel 15 (9,126 SF), and Parcel 16 (27,384 SF). Partial acquisition areas total approximately 455,480 square feet, comprising 101,060 SF and 354,421 SF across designated zones. The plan includes detailed survey work completed August 8, 2025, with coordinate references (NAD 83 Maine West Zone 1802), contour mapping, utility locations, wetland boundaries, and identified monumentation and survey markers. The document is marked as controlled unclassified information and is the final concept submission.

View the file

Other files

File Type Posted
RFP Document 2 V2 - Contract Price Form 47PB0025R0044 2026 02 26.pdf PDF
Coburn Gore 47PB0025R0044 QA V4 2026 03 02.pdf PDF
47PB0025R0044 Amendment 0005 SF30 2026 03 02.pdf PDF
Attach 29v1 Coburn Gore LPOE FFE Proposal Worksheet 2026 02 26 .xlsx XLSX spreadsheet
RFP Document 4 V1- Agreement CMc REVISED 2026 02 26.pdf PDF
47PB0025R0044 Amendment 0004 SF30 .pdf PDF
47PB0025R0044_0003 Amendment SF30 .pdf PDF
Attach 25 Divison 1 Template Sections 2025 07 02.docx DOCX document
Attach 26 Coburn Gore Division 01 - Table of Contents 2025 07 02.docx DOCX document
RFP Document 2 - Contract Price Form 47PB0025R0044 2026 01 22.pdf PDF
Coburn Gore 47PB0025R0044 QA V3 2026 01 22.pdf PDF
47PB0025R0044 1442 dated 2026 01 22.pdf PDF
Attach 11 Wage Determination ME20260007 2026 01 02.pdf PDF
Attch 11 - Wage Determination ME20250007 2025 12 05.pdf PDF
Attch 24ii- Coburn Gore -Funding Responsibility Tool 2025 12 10.xlsx XLSX spreadsheet
Attch 24 Coburn Gore 47PB0025R0044 QA V2 2025 12 10.pdf PDF
Attch 24i. DS Quick Reference Guide- 2023 LPOE DS Overview 2023 12 06.pdf PDF
Attch 24iii. Coburn Gore Final Geothermal Study 2025 09 06.pdf PDF
Amendment 0002 to 47PB0025R0044 Final 2025 12 10 .pdf PDF
Amendment 0001 to 47PB0025R0044 Final 102725.pdf PDF
47PB0025R0044 QA Document 102725.pdf PDF
Coburn Gore Attendance Sheet 102225.pdf PDF
Pre-Proposal Meeting Final.pdf PDF
RFP Document 12 - CBP Non-Disclosure Agreement Form.pdf PDF
15. Coburn Gore LPOE_Final Concept Submission_Combined_REV 08-11-25.pdf PDF
RFP Document 5 - Reps and Certs CMc MAY 2025.pdf PDF
RFP Document 14 - Proprietary Information Agreement - Sample Template.docx DOCX document
11. GSA Commissioning Guide September 2020.pdf PDF
1. Coburn Gore LPOE CMc SOW Final 2025 03 27.pdf PDF
6. P-120 Public Buildings Service Cost and Schedule Management Policy Requirements, October 2022.pdf PDF
RFP Document 2 - Contract Price Form 47PB0025R0044.pdf PDF
2. Coburn Gore Three phase SOW Final 2025 04 04 (1).pdf PDF
RFP Document 10 - Bid Bond SF24.pdf PDF
RFP Document 6 - Past Performance Questionnaire.docx DOCX document
3. Coburn Gore AE SOW_FINAL 2024 08 06.pdf PDF
7. Coburn Gore LPOE 15Aug25- LPOE POR at final concept.pdf PDF
RFP Document 4 - Agreement CMc MAY 2025.pdf PDF
16. Coburn Gore LPOE_Spec TOC_Final Concept_Combined 08-11-25.pdf PDF
RFP Document 1 - SF1442-22.pdf PDF
5. Colby Coburn Gore Three-Phase Final Report 2022 12 22.pdf PDF
RFP Document 3 - Solicitation CMc MAY 2025.pdf PDF
RFP Document 11 - Wage Determination ME20250007.pdf PDF
17. Coburn Gore Housing_Preliminary Concepts 13June25.pdf PDF
RFP Document 8 - CASB DS-1.pdf PDF
RFP Document 9 - UNIFORMAT II - Level 3 Detail Reference Guide.xlsx XLSX spreadsheet
RFP Document 7 - SB Sub Plan - Individual Model - May 2025 - 508 Compliant.docx DOCX document
14. Coburn Gore LPOE - Design Narrative_Final Concept REV 08-11-25.pdf PDF
4. Coburn Gore LPOE - CMa w CxP SOW 2023 10 12.pdf PDF
10. PBS Core Building Standards Memorandum 2025 02 24.pdf PDF
RFP Document 13 - CBP Short Term Contractors- Visitor Form_BLANK - Short Term Contractors Template.pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNITED STATES OF AMERICA

CANADA

MAINE ROUTE 27

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

EXISTING BUILDING

EXISTING BUILDING

EXISTING

BUILDING

EXISTINGBUILDING

EXISTING

BUILDING

EXISTING

BUILDING

EXISTINGBUILDING

EXISTING

BUILDING

EXISTING BUILDING

EXISTING

BUILDING

EXISTING

BUILDING

EXISTING BUILDING

EXISTING

BUILDING

EXISTING

BUILDING

EXISTING

BUILDINGEXISTING BUILDING

EXISTING BUILDINGEXISTING BUILDINGEXISTING

BUILDING

EXISTING BUILDING

EXISTING BUILDING

EXISTING

BUILDING

EXISTING

BUILDING

EXISTING

BUILDING

EXISTING

BUILDING

EXISTING BUILDING

EXISTING

BUILDING

EXISTING BUILDING

EXISTING BUILDING

EXISTING

BUILDING

EXISTING BUILDING

EXISTING BUILDING

EXISTING BUILDING

EXISTING

BUILDING

EXISTING BUILDING

EXISTING

BUILDING

GRAVEL GRAVEL

GRAVEL

GRAVEL

GRAVEL

GRAVEL

GRAVEL

GRAVEL

GRAVEL

GRAVEL

GRAVEL

GRAVEL

GRAVEL

GRAVEL

GRAVEL

GRAVEL

GRAVEL

GRAVEL

GRAVEL

GRAVEL

GRAVEL

GRAVEL

GRAVEL

GRAVEL

GRAVEL

GRA

VEL

GRAVEL

GRAVEL

GRAVEL

GR

AV

EL

GR

AV

EL

GR

AV

EL

TREE

TREE

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASSGRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASSGRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

BR

US

H

BR

US

H

BR

US

HWETLAND

WETLAND

WETLAND

WETLAND

WETLAND

WETLAND

WETLAND

WETLAND

WATER

WATER

WATER

SW

L

SW

L

SW

L

SW

L

SW

L

SW

L

SW

L

SW

L

SW

L

SW

L

SW

L

DY

L

DY

L

DY

L

DY

L

DY

L

DY

L

DY

L

DYL

DYL

DYL

DYL

DYL

DYL

DYL

DYL

DYL

DYL

DYLSYL

SYL

SYLSYL

DYL

DYL SYL

SYL SYL

SYL

SYL

SYL

SWL SWL

SWLSWLSWL

ASPHALT

ASPHALT

ASPHALT

ASPHALT

ASPHALT

ASPHALT

ASPHALT

ASPHALT

ASPHALTASPHALT

ASPHALT

ASPHALT

ASPHALT

ASPHALT

ASPHALT

ASPHALT

ASPHALT

ASPHALT

ASPHALT ASPHALT

ASPHALT

ASPHALT

ASPHALT

ASPHALT

ASPHALT

ASPHALT

ASPHALT

ASPHALT

AS

PH

AL

T

ASPHALT

AS

PH

AL

T

ASPHALT

AS

PH

AL

T

FO

C

BO

C

FO

CBO

C

FO

CBO

C

FO

CBO

C

FO

CBO

C

FO

CBO

C

FO

CBO

C

FO

CBO

C

FO

CBO

C

FO

CBO

C

FO

CBO

C

FOCBO

C

FOCBOC

FOC

BOC

FOCBOC

FOC

FOC

FOCBOC

ASPHALT

GRASS

FOC

BOC

FOCBOC

FOCBOC

FOC

BOC

FOC

BOC

FOC

BOC

FOC

BOC

FOC

BOC

FOC

BOC

FOC

BOC

FOC

BOC

FOC

BOC

FOC

BOC

FOC

BOC

FOC

BOC

FOCBOC

WALL WALL

ASPHALT

ASPHALT ASPHALT

AS

PH

AL

T

AS

PH

AL

T

AS

PH

AL

TSTEPSSTEPS

STEPSSTEPS

STEPS

STEPS

DECK

POOL

TRAMPOLINE

STEPS

STEPS

STEPS

CONCRETE

CONCRETE

CONCRETE

CONCRETE

GRASS

GRASS

GRASS GRASS

GRASS

CONCRETE

CONCRETE

CONCRETECONCRETECONCRETECONCRETE

CONCRETE

CONCRETE

BRUSH

BRUSH

BRUSH

BRUSH

BRUSH

BRUSH

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

STEPS

LSA

LSA

LSA

LSA

GAS

GASGAS TRANSFORMER

TOWER

CONCRETE PAD

ROCK

FIRE PIT

BRUSH

BRUSH

BRUSH

BRUSH

BRUSH

BRUSH

BRUSH

BRUSH

BRUSH

BRUSH

BRUSH

BRUSH

BRUSH

BRUSH

GRASS

GRASS

GRASS

GRASS

GRASS

BRUSH

BRUSH

BRUSH

TREE

TREE

WETLAND

BOC

FOC

DEBRIS

DECK

STEPS

DEBRIS

STEPS

BOC

FOC BOC

FOC

GRASSGRASS

TRAILERS

DEBRIS

DEBRIS

DEBRIS

EXISTING

BUILDING

02-7

02-10

02-11

02-35

02-13

NOW OR FORMERLY

ADAM R. BILODEAU

BOOK 4236 PAGE 47

FR016 PLAN 02-16

NOW OR FORMERLY

JEAN-DENIS LAPOINTE

BOOK 3064 PAGE 160

FR016 PLAN 02-17

NOW OR FORMERLY

JEAN-DENIS LAPOINTE

FR016 PLAN 02-18

NOW OR FORMERLY

JOSEPH P. DUMAIS &

KIMBERLY A. DUMAIS

BOOK 4349 PAGE 348

FR016 PLAN 02-14

NOW OR FORMERLY

RAYMOND LAPOINTE

FR016 PLAN 02-31

SEE GENERAL NOTE #9

NOW OR FORMERLY

GEORGE R. BRIGGS &

HOLLY L. ROGERS

BOOK 3932 PAGE 291

FR016 PLAN 02-19

THE ARNOLD TRAIL

NOW OR FORMERLY

VAN VLECK TIMBERLANDS, LLC

6,968 ACRES

FR016 PLAN 01-2.1, 3

02-12.3 02-12.1

02-12.4

CONSERVATION EASEMENT

GRANTED BY COBURN GORE, LLC

TO

FOREST SOCIETY OF MAINE

ON LAND IN

COBURN GORE, MAINE

BOOK 4475 PAGE 268

NOW OR FORMERLY

COBURN GORE, LLC

BOOK 2456 PAGE 264

FR016 PLAN 01-1

NOW OR FORMERLY

COBURN GORE, LLC

BOOK 2456 PAGE 264

FR016 PLAN 01-1

SUBJECT PARCEL 2

AREA = 60,186± SQ. FT.

(1.382± ACRES)

N 89°05'53" E 370.00'

S 89°05'53" W 241.11'

N 31°25'37" W 195.80'

NOW OR FORMERLY

UNITED STATE OF AMERICA

BOOK 247 PAGE 376

FR016 PLAN 02-2

SUBJECT PARCEL 1

AREA = 96,106± SQ. FT.

(2.206± ACRES)

SUBJECT PARCEL 16

AREA = 27,384± SQ. FT.

(0.629± ACRES)

N 89°05'53" E 430.00'

N 0°

'07

" W

0.5 4'

N 0°

'07

" W

.46

S 78°42'39" W567.70'

S 44°07'06" E

187.50'

C17C18

N 0°

'07

" W

0.5 4'

N 86°47'43" E 135.26'

NOW OR FORMERLY

UNITED STATE OF AMERICA

BOOK 247 PAGE 376

FR016 PLAN 02-1

SUBJECT PARCEL 14

AREA = 112,168± SQ. FT.

(2.575± ACRES)

N 1°3

3'3 3"

W

0.4 3'

N 5°

'29

" W

0.0 0'

N 73°57'31" E

367.00'

S 2 °4

8'4 1"

E

1.0 1'

S 2 °5

6'0 7"

E

.43

C15

SUBJECT PARCEL 15

AREA = 9,126± SQ. FT.

(0.210± ACRES)

C16

N 1°1

0'5 2"

W

2.1 2'

N 73°57'31" E

45.00'

NOW OR FORMERLY

ALEX PEPIN &

CHRISTINE CARRIER

BOOK 4298 PAGE 42

FR016 PLAN 02-4

NOW OR FORMERLY

PEPIN'S GENERAL STORE INC

BOOK 4272 PAGE 278

FR016 PLAN 02-7, 10, 11, 35

NOW OR FORMERLY

MAURICE J. PEPIN &

JULIE R. PEPIN

BOOK 1955 PAGE 87

FR016 PLAN 02-6

SUBJECT PARCEL 13

AREA = 22,280± SQ. FT.

(0.511± ACRES)

SUBJECT PARCEL 12

AREA = 40,228± SQ. FT.

(0.924± ACRES)

SUBJECT PARCEL 11

AREA = 13,058± SQ. FT.

(0.300± ACRES)

SUBJECT PARCEL 10

AREA = 11,989± SQ. FT.

(0.275± ACRES)

SUBJECT PARCEL 9

AREA = 19,744± SQ. FT.

(0.453± ACRES)

SUBJECT PARCEL 8

AREA = 158,390± SQ. FT.

(3.636± ACRES)

SUBJECT PARCEL 7

AREA = 29,067± SQ. FT.

(0.667± ACRES)

SUBJECT PARCEL 6

AREA = 50,741± SQ. FT.

(1.165± ACRES)

SUBJECT PARCEL 5

AREA = 30,177± SQ. FT.

(0.693± ACRES)

SUBJECT PARCEL 3

AREA = 48,474± SQ. FT.

(1.113± ACRES)

N 71°03'53" E

100.00'

C13

S 65°30'51" W 9.12'

C14

N 40 °52

'16" E

.70

C11

S 54°51'38" W 22.26'

C12

N 6°

'07

" W

.70

C10

N 49°54'40" W

200.91'

N 41 °33

'49 " E

65.

00'

S 49°54'40" E 200.33'

S 58°56'46" E 200.00'

S 3 2°3

9'4 0"

W

.00

N 58°55'12" W

200.65'

C9

S 3 7°5

5'4 9"

W

99.

'N 59°08'47" W

200.21'

C8

S 89°48'47" E 209.94'

S 88°48'40" E 231.33'

S 7 °3

8'3 2"

W

4.1 3'

S 88°51'40" W 417.95'

N 8°

'43

" E

5.1 3'

N 7°

'49

" W

.39

S 87°30'48" E 92.85'

S 8 °2

5'4 4"

W

.82

S 1 5°

'11

" W

2.8

8'

N 73°15'37" W

123.06'

N 19°

'58

" E

0.9 7'

S 6 °0

0'3 1"

E

6.1 1'

N 9°

'13

" W

2.1 3'

C6 N 65°30'51" E 9.12'

C7

S 76°09'14" W50.00'

S 76°13'31" W102.00'

N 9°

'58

" W

8.7 6'

C4 R=1260.42' L=50.00' Δ=2°16'23"

C2

S 8 °2

6'3 7"

E

3.8 0'

S 86°43'22" W 256.67'

S 0 °5

4'0 7"

E

0.0 0'

N 44°07'06" W 43.00'

NOW OR FORMERLY

COLLETTE LABONTE BOULANGER &

REAL J. BOULANGER

BOOK 1876 PAGE 80

FR016 PLAN 02-5

SUBJECT PARCEL 4

AREA = 14,590± SQ. FT.

(0.335± ACRES)

S 76°13'31" W75.47'

N 8°

'37

" W

3.8 0'

C3

C5

C1

NOW OR FORMERLY

COLLETTE LABONTE

BOULANGER &

REAL J. BOULANGER

BOOK 1867 PAGE 286

FR016 PLAN 02-9, 12.2

NOW OR FORMERLY

MEGANTIC FISH & GAME

BOOK 2539 PAGE 99

FR016 PLAN 01-1.1

NOW OR FORMERLY

INHABITANTS OF THE COUNTY FRANKLIN

BOOK 1257 PAGE 23

FR016 PLAN 02-37

PLAN #2644

NOW OR FORMERLY

MAURICE J. PEPIN &

JULIE R. PEPIN

BOOK 2472 PAGE 81

FR016 PLAN 02-33

NOW OR FORMERLY

CEDRIC PEPIN

BOOK 3538 PAGE 109

UNRECORDED ACME PLAN

FR016 PLAN 02-38

NOW OR FORMERLY

KATIE WAUGH

BOOK 4489 PAGE 1

BOOK 4492 PAGE 152

FR016 PLAN 02-13

NOW OR FORMERLY

JEAN R. DUPUIS

BOOK 3634 PAGE 24

FR016 PLAN 02-15

NOW OR FORMERLY

COLLETTE LABONTE

BOULANGER &

REAL J. BOULANGER

BOOK 1876 PAGE 80

FR016 PLAN 02-8

IRON PIPE FOUND

N 74°52'08" W 2.94' FROM

PROPERTY CORNER

REBAR FOUND

N 35°08'29" E

8.29' FROM

PROPERTY CORNER

REBAR FOUND

N 12°40'39" W

17.39' FROM

PROPERTY CORNER

REBAR FOUND

4.2' FROM

PROPERTY LINE

REBAR FOUND

N:928465.32' E:2788033.33'

REBAR FOUND 0.15'

FROM PROPERTY LINE

REBAR FOUND 0.36'

FROM PROPERTY LINE

CONCRETE

MONUMENT

FOUND

CONCRETE

MONUMENT

FOUND

REBAR

FOUND

IRON PIPE

FOUND

N 89°05'53" E

3.06' FROM

PROPERTY

CORNER

REBAR

FOUND

REBAR

FOUND

REBAR

FOUND

REBAR FOUND

N:928416.81' E:2789096.59'

REBAR

FOUND

REBAR

FOUND

IRON PIPE

FOUND

IRON PIPE

FOUND

IRON PIPE

FOUND

IRON PIPE

FOUND

IRON PIPE FOUND

N:928640.25'

E:2789139.62'PK NAIL FOUND

ON LINE 2.87'

FROM PROPERTY

CORNER

REBAR FOUND

N:928772.35' E:2789441.45'

REBAR

FOUND

REBAR

FOUND

ON LINE

0.66' FROM

CORNER

REBAR FOUND

ON LINE

0.87' FROM

PROPERTY

CORNER

REBAR

FOUND

REBAR

FOUND

REBAR FOUND

ON LINE 1.0' FROM

PROPERTY CORNER

REBAR FOUND

N:929013.47' E:2789035.64'

REBAR

FOUND

REBAR FOUND

N:928776.05' E:2788502.19'

REBAR FOUND

ON LINE

0.23' FROM

PROPERTY

CORNER

REBAR

FOUND

ON LINE

2.1' FROM

CORNER

CONCRETE

MONUMENT

FOUND S 63°02'31" E

3.64' FROM

PROPERTY CORNER

IRON PIPE FOUND

N 30°18'26" E 20.05'

FROM PROPERTY

CORNER

REBAR FOUND

S 48°24'16" E 12.88'

FROM PROPERTY

CORNER

S 45°22'27" E 195.86'

(FOR REFERENCE ONLY)S 65°09'01" E96.32'

(FOR REFERENCE ONLY)

Parcel Curve Data

NUMBER

C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11 C12 C13 C14 C15 C16 C17 C18

RADIUS

3133.61' 1260.42' 1260.42' 1260.42' 1260.42' 1260.42' 651.24' 1056.97' 1056.97' 990.97' 990.97' 585.24' 585.24' 1194.42' 1194.42' 1194.42' 1194.42' 3040.94'

LENGTH

121.94' 108.26' 70.01' 102.46' 50.00' 131.08' 118.91' 100.01' 59.94' 65.00' 206.22' 55.17' 53.65' 56.40' 321.00' 45.00' 15.24' 120.97'

DELTA ANGLE

`=2°14' `=4°55' `=3°11' `=4°39' `=2°16' `=5°58' `=10°28' `=5°25' `=3°15' `=3°45' `=11°55' `=5°24' `=5°15' `=2°42' `=15°24' `=2°10' `=0°44' `=2°17'

CHORD BEARING

N 87°37'19" E N 84°02'48" E N 79°59'41" E N 76°04'29" E N 72°36'34" E N 68°29'37" E N 60°17'00" E N 37°37'22" E N 33°17'15" E S 41°03'31" W S 48°53'56" W S 57°33'40" W S 62°53'16" W S 66°52'01" W S 75°55'07" W S 84°41'49" W S 86°08'30" W S 87°38'32" W

CHORD

121.93' 108.23' 70.00' 102.43' 50.00' 131.02' 118.75' 99.97' 59.93' 64.98' 205.85' 55.15' 53.63' 56.39' 320.03' 45.00' 15.24' 120.96'

NOW OR FORMERLY

PEPINS GENERAL STORE INC.

BOOK 4318 PAGE 244

FR016 PLAN 02-12.1, 12.3, 12.4

PLAN #6664

S 71°26'08" W235.54'

18" HDPE INV.=1400.0'

INV.=1400.2'

18" HDPE

INV.=1406.8'

INV.=1406.2'18" CMP

INVERT

NOT

FOUND

INV.=1406.4'

CB

TF=1411.40'

CB

TF=1412.13'

CB

TF=1419.52'

CB

TF=1422.41'

LANDFILL

N 44°07'06" W 90.56'

CORNER-TO-CORNER

TIE LINE

NOW OR FORMERLY

SOMERSET TELEPHONE CO.

BOOK 1217 PAGE 308

FR016 PLAN 02-36

WETLAND

WETLAND

WETLAND

WETLAND

WETLAND

WETLAND

WETLAND

WETLAND

WETLAND

WETLAND

WETLAND

WETLAND

25 1415

14151420

14251430

14151415

14101410

REBAR

FOUND

3.7' FROM

PROPERTY

LINE

WETLAND

WETLAND

SEE PLAN REFERENCE #2

CONCRETE

MONUMENT

FOUND S 26°09'10" E

4.16' FROM

PROPERTY CORNER

(SEE PLAN REFERENCES 12 & 13)

Boundary & Existing Conditions Plan

COBURN GORE LPOE

Mark Date Description

CHECKED BY

DRAWN BY

FLOOR NUMBER

DRAWING TITLE

SHEET

NUMBER

SUBMISSION DATE

SUBMISSION STAGE

GSA PM

GSA PROJECT NO.

PROJECT

DESCRIPTION

PROJECT TITLE

BUILDING NUMBER

CITY/ST./ZIP

ADDRESS

BUILDING NAME

PRIME CONTR. NO.

PRIME ORDER NO.

CONST. CONTR.

A/E

SUB A/E

CONST. CONTR. NO.

SHEET SIZE:

DATE DRAWN:

30 X 42

FINAL CONCEPT

08/08/2025

08/08/2025LEH

DAS

TBD

LI-HANG WANG

SH

EE

T

ID

EN

TI

FI

CA

TI

ON

DISCIPLINE

PR

OJ

EC

T

ID

EN

TI

FI

CA

TI

ON

BU

ILD

IN

G

BIM FILE NAME

CO

NT

RA

CT

OR

S

RE

VI

SI

ON

B

LO

CK

GR

AP

HI

C

SC

AL

E

KE

Y

PL

AN

ST

AM

P

OR

S

EA

L

DE

SI

GN

ER

ID

EN

TI

FI

CA

TI

ON

OW

NE

R

ID

EN

TI

FI

CA

TI

ON

CIVIL

SHEET OF SHEETSXXX 20

NEW LAND PORT OF ENTRY (LPOE) AT THE COBURN

GORE BORDER CROSSING

PROPERTY OF THE UNITED STATES GOVERNMENT This is controlled unclassified information. Do not remove the CUI marking. Properly destroy or return documents when no longer needed.

Controlled By: GSA (Records@gsa.gov)

VANASSE HANGEN BRUSTLIN, INC.

1805 ATLANTIC AVE

MANASQUAN, NJ 08736

Mechanical/Electrical/Plumbing Engineers

JAROS BAUM & BOLLES CONSULTING

ENGINEERS LLP

80 PINE STREET

NEW YORK, NY 10005

TYLIN

32 OLD SLIP, 10TH FL

NEW YORK, NY 10005

Structural Engineers

ELIZABETH KENNEDY LANDSCAPE

ARCHITECT, PLLC

63 FLUSHING AVENUE BUILDING 275-202

BROOKLYN, NY 11205

Landscape Architects

TRINITY CONSULTANTS

1001 AVENUE OF THE AMERICAS, 4TH FL

NEW YORK, NY 10018

AV / IT

TOSCANO CLEMENTS TAYLOR, LLC

150 W 30TH STREET, SUITE 701

NEW YORK, NY 10001

Cost Estimator

Civil Engineers

General Services Administration Public Building Service

Region 1

O'NEILL FEDERAL BUILDING 11TH

FLOOR

10 CAUSEWAY STREET, BOSTON,

MA 02222

WWW.GSA.GOV

47PC0321D006

6092 ARNOLD TRAIL - ROUTE 27

COBURN GORE, ME 04936-999

479B0024F0389

DATTNER ARCHITECTS

TBD

VHB, JB&B, TYLIN, EKLA, TCT, TRINITY

TBD

ARCH_2324.0A_Coburn Gore LPOE_Building Model

ME0551-0555BE

COBURN GORE LPOE

General Notes

1) THE PROPERTY LINES SHOWN ON THIS PLAN ARE BASED UPON AN ACTUAL FIELD SURVEY

CONDUCTED BY VHB, INC. BETWEEN NOVEMBER, 2024 AND AUGUST, 2025, AND FROM DEEDS AND

PLANS OF RECORD.

2) THE EXISTING CONDITIONS SHOWN ON THIS PLAN ARE BASED UPON AERIAL LIDAR SURVEY

METHODS PERFORMED BY VHB IN DECEMBER, 2024.

3) THE LOCATIONS OF UTILITIES SHOWN ON THIS PLAN WERE DETERMINED BY VISIBLE EVIDENCE OBSERVED IN THE FIELD AND FROM LIDAR DATA. PLEASE NOTE THAT WHILE BEST PRACTICES WERE

FOLLOWED, NOT ALL UTILITIES MAY BE SHOWN AND THE ACCURACY OF UTILITY LOCATIONS

CANNOT BE GUARANTEED.

4) THE NORTH ORIENTATION DEPICTED HEREON IS REFERENCED TO THE NORTH AMERICAN DATUM

OF 1983 (NAD 83), NSRS 2011. UNIT OF MEASURE: U.S. SURVEY FOOT.

5) THE ELEVATION DATA DEPICTED HEREON IS REFERENCED TO THE NORTH AMERICAN VERTICAL

DATUM OF 1988 (NAVD 88).

6) THE LOT LIES ENTIRELY WITHIN AN AREA NOT YET STUDIED BY FEMA TO DETERMINE FLOOD

HAZARD. NO FLOOD MAPS WERE AVAILABLE AT THE TIME OF SURVEY.

7) THE WETLANDS SHOWN ON THIS PLAN NORTH OF ROUTE 27 WERE FLAGGED AND LOCATED BY

JMT. THE WETLANDS SOUTH OF ROUTE 27 WERE FLAGGED AND LOCATED BY VHB'S

ENVIRONMENTAL DEPARTMENT IN JUNE, 2025.

8) THE TREE SYMBOL OUTLINE SHOWN ON THIS PLAN DOES NOT REPRESENT THE ACTUAL TREE

CANOPY.

9) THIS SURVEY WAS PREPARED WITHOUT THE BENEFIT OF A CURRENT TITLE REPORT AND MAY BE

SUBJECT TO ADDITIONAL INFORMATION DISCLOSED IN SUCH.

10)AT THE TIME OF SURVEY, NO DEED COULD BE FOUND FOR FR016 PLAN 02-31. ASSESSOR'S

INFORMATION LISTS RAYMOND LAPOINTE AS THE OWNER OF RECORD.

Plan References

1) BOUNDARY & UTILITY SURVEY, COBURN GORE, MAINE, FRANKLIN COUNTY, LAND PORT OF ENTRY, US-VISITDATE: 06/30/2005, BY TITCOMB ASSOCIATES. THIS PLAN IS UNRECORDED.

2) SURVEY PLAN DEPICTING BOUNDARIES OF CONSERVATION EASEMENT AREAS FOR PROPOSED

CONSERVATION EASEMENTS TO BE CONVEYED BY VAN VLECK TIMBERLANDS, LLC & COBURN GORE, LLC TO THE FOREST SOCIETY OF MAINE, BEING PORTIONS OF THE LANDS DESCRIBED IN FRANKLIN COUNTY REGISTRY OF DEEDS BOOK 2456, PAGE 250; BOOK 2456, PAGE 264; BOOK 2539, PAGE 108;

COBURN GORE TOWNSHIP, FRANKLIN COUNTY, MAINE, SHEETS 1 AND 2 OF 2, BY PLISGA & DAY LAND SURVEYORS, RECORDED IN THE FRANKLIN COUNTY REGISTRY OF DEEDS AS PLANS 6901 AND 6902.

3) SURVEY PLAN OF LAND OF VAN VLECK TIMBERLANDS, LLC, OWNER OF RECORD - BK. 2456 PG. 250, TO BE CONVEYED TO MAURICE PEPIN, ROUTE 27, COBURN GORE, FRANKLIN COUNTY, MAINE, 1

INCH = 40 FEET, BY ACME LAND SURVEYING, LLC. THIS PLAN IS UNRECORDED.

4) PLAN OF FRANKLIN COUNTY, RECORDED IN THE FRANKLIN COUNTY REGISTRY OF DEEDS AS PLAN 120-4-2.

5) PLAN OF PROPERTY LINE BETWEEN MEGANTIC FISH & GAME CORPORATION AND WILFRED

GREGOIRE, COBURN GORE, MAINE, SCALE: 1"=200', DATED: OCT. 1960, BY BROWN CO. WOODS DEPT., RECORDED IN THE FRANKLIN COUNTY REGISTRY OF DEEDS IN PLAN BOOK 130-1/2, PAGE 34.

6) PLAT OF VILLAGE OF COBURN GORE, MAINE, BY WAGNER WOODLANDS & COMPANY, DATED:

7-19-1968, RECORDED IN THE FRANKLIN COUNTY REGISTRY OF DEEDS IN PLAN BOOK 132-1/2, PAGE

22 AND RE-RECORDED AS PLAN 2653.

7) STANDARD BOUNDARY SURVEY FOR FRANKLIN COUNTY, MAIN ST., FARMINGTON, MAINE 04938 IN COBURN GORE, MAINE, FRANKLIN COUNTY, BY MOUNTAINSIDE ENGINEERING, INC., RECORDED IN

THE FRANKLIN COUNTY REGISTRY OF DEEDS AS PLAN 2644.

10)SURVEY PLAN FOR MARIO A. PEPIN, OWNER OF RECORD: MARIO A. PEPIN BY DEED RECORDED IN THE FRANKLIN COUNTY REGISTRY OF DEEDS IN BOOK 2012, PAGE 198, ROUTE 27 - ARNOLD TRAIL, TOWN OF COBURN GORE - COUNTY OF FRANKLIN - STATE OF MAINE, PROJECT NO. 7186, SCALE:

1"=40', BY ACME LAND SURVEYING, LLC, DATED: NOVEMBER 5, 2020, RECORDED IN THE FRANKLIN

COUNTY REGISTRY OF DEEDS AS PLAN 6664.

11) STATE OF MAINE DEPARTMENT OF TRANSPORTATION RIGHT OF WAY MAP, STATE HIGHWAY "41" (ROUTE 27), COBURN GORE, FRANKLIN COUNTY, FEDERAL AID PROJECT NO. STP-1021(500)X, SECT. V, DATE: FEBRUARY 2003, SCALE: 1=250, D.O.T. FILE NO. 4-222, SHEETS 9 TO 15 OF 15, RECORDED IN

THE FRANKLIN COUNTY REGISTRY OF DEEDS AS PLAN NUMBERS 4634 TO 4640.

12)STATE OF MAINE DEPARTMENT OF TRANSPORTATION, CHAIN OF PONDS TWP / COBURN GORE, FRANKLIN COUNTY, RTE. 27, PROJECTS STP-1021(500)X & STP-9691(00)X, DATED: MARCH, 2003, SHEETS 1 TO 220 OF 220, ON FILE WITH MAINE D.O.T.

13)SURVEY PLAN FOR MARIO A. PEPIN, OWNER OF RECORD: MARIO A. PEPIN BY DEED RECORDED IN THE FRANKLIN COUNTY REGISTRY OF DEEDS IN BOOK 2012, PAGE 198, ROUTE 27 - ARNOLD TRAIL, TOWN OF COBURN GORE - COUNTY OF FRANKLIN - STATE OF MAINE, PROJECT NO. 7186, SCALE:

1"=40', BY ACME LAND SURVEYING, LLC, DATED: NOVEMBER 5, 2020, RECORDED IN THE FRANKLIN

COUNTY REGISTRY OF DEEDS AS PLAN 6664.

SCALE IN FEET

050 50 100

N

GR

ID

N

OR

TH

ND

AD

(2

1)

M

AI

NE

W

ES

T Z

ON

E 1

IRON PIPE FOUND

CATCH BASIN

STREET SIGN

UTILITY POLE

Legend

CURB

OVERHEAD WIRES

EDGE OF PAVEMENT

EDGE OF GRAVEL

JERSEY BARRIERS

SUBJECT PARCEL LINE

INTERIOR PARCEL LINE

STORMWATER DRAINAGE

ASSESSOR'S PARCEL LINE

DOUBLE YELLOW LINE

DASHED WHITE LINE

DYL

DWL

BACK OF CURB

FACE OF CURB

BOC

FOC

SINGLE YELLOW LINESYL

TREE

EDGE OF VEGETATION

INTERNATIONAL BORDER

WETLAND BOUNDARY

MAJOR CONTOUR

MINOR CONTOUR

REBAR FOUND

PK NAIL FOUND

CONCRETE MONUMENT FOUND

CONSERVATION EASEMENT

Progress Print

11/24/2025

FOR REVIEW ONLY

dsenus Snapshot dsenus Area Measurement 101,058.1 sf dsenus Area Measurement 354,421.2 sf dsenus Area Measurement 36,447.13 sf dsenus Area Measurement 143,992.9 sf dsenus Area Measurement 29,021.32 sf dsenus Text Box Partial Acquisition Areas (approx):

101,060 SF (+/-)

+ 354,420 SF (+/-)

455,480 SF (+/-) - Approximate

Full Acquisition Parcels:

48,474 SF (Parcel 3) 14,590 SF (Parcel 4) 30,177 SF (Parcel 5) 50,741 SF (Parcel 6) 29,067 SF (Parcel 7) 9,126 SF (Parcel 15) + 27,384 SF (Parcel 16) 209,559 SF (Total)

File details come from the government source that posted it. Updated .