RFP Document 2 V2 - Contract Price Form 47PB0025R0044 2026 02 26.pdf
PDF 157 KB Posted
- Solicitation number
- 47PB0025R0044
About this file
This is a Contract Price Form (Version Dated 2026 FEB 26) for a federal construction project involving design services, demolition, and construction of a Customs and Border Protection (CBP) Land Port of Entry and housing facilities. The Basic Requirement consists of four primary pricing components: Design Phase Services (CLIN 0001) on a firm fixed price basis that includes all housing options; Target Estimated Cost of Work (CLIN 0002) covering demolition of existing facilities and housing; a 3% Contingency Allowance (CLINs 0003-0004); and a Fee component (CLINs 0005-0006) with a contractor-proposed fee percentage. The form also requires pricing for FF&E (Furniture, Fixtures, and Equipment) (CLIN 0007) and establishes a Guaranteed Maximum Price (GMP) for Construction Services (CLIN 0008), with the Total Evaluated Price for the Basic Requirement calculated as CLIN 0001 + CLIN 0007 + CLIN 0008.
Option 1 provides for the build-out of eighteen (18) CBP housing units with full parking, amenities, and utility spaces, structured similarly with Target Estimated Cost of Work, 3% Contingency Allowance, and Fee components, resulting in a GMP Option 3 price. The form requires contractors to submit detailed unit pricing for hazardous material removal and abatement activities, including asbestos and lead abatement for both the existing Land Port of Entry and existing housing facilities, priced in linear feet (LF), square feet (SF), or each (EA). Additional unit pricing covers septic remediation and removal, and soil remediation, all with associated costs included. The form also requires submission of two proposal rates applicable to all base and optional items: a Contractor's Overhead Rate for Adjustments and a Contractor's Daily Rate for Compensable Project Delay per workday. All proposed rates and unit prices will be evaluated for reasonableness by comparison to other solicitation responses and the independent government cost estimate.
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT PRICE FORM
Version Dated 2026 FEB 26
Total Evaluated Price
The Government will evaluate offers for award purposes by adding the Total Evaluated Price for the Basic Requirement to the Guaranteed Maximum Prices (GMP) for all options. Evaluation of options will not obligate the Government to exercise the option(s).
BASIC REQUIREMENT
CLIN ITEM PRICE
CLIN 0001 Design Phase Services (Firm Fixed Price) –
Includes all Housing Options
CLIN 0002 Target Estimated Cost of Work (ECW) – Includes demolition of existing Land Port of Entry and
Housing
CLIN 0003 CMc Contingency Allowance (CCA) Percentage 3%
CLIN 0004 CCA (CLIN 0002 x CLIN 0003) $__________
CLIN 0005 Fee Percentage _____%
CLIN 0006 Fee (CLIN 0002 x CLIN 0005) $__________
CLIN 0007
FF&E Proposal Cost
CLIN 0008 Guaranteed Maximum Price (GMP) Option for
Construction Services (Total CLIN 0002 + CLIN
0004 + CLIN 0006)
CLIN 0009 Total Evaluated Price – Basic Requirement
(CLIN 0001 + CLIN 0007 + CLIN 0008)
OPTION 1 – HOUSING UNITS (18)
Build out of eighteen (18) units of CBP housing with full parking, amenities, and utility spaces.
CLIN ITEM PRICE
CLIN 0001 Target Estimated Cost of Work (ECW) $__________
CLIN 0002 CMc Contingency Allowance (CCA) Percentage 3%
CLIN 0003 CCA (CLIN 0001 x CLIN 0002) $__________
CLIN 0004 Fee Percentage _____%
CLIN 0005 Fee (CLIN 0001 x CLIN 0004) $__________
CLIN 0006
Guaranteed Maximum Price (GMP) Option 3
(Total CLIN 0001 + CLIN 0003 + CLIN 0005) $__________
Proposed Rates and Unit Prices will be evaluated for price reasonableness by comparing the rates proposed to those received in response to the solicitation and to the independent government cost estimate.
PROPOSAL RATES (APPLICABLE TO ALL BASE AND OPTIONAL ITEMS)
RATE 0001 Contractor’s Overhead Rate for Adjustments _____%
RATE 0002 Contractor’s Daily Rate for Compensable Project
Delay (per Workday)
UNIT PRICES (APPLICABLE TO BASE PROPOSAL)
UNIT PRICE
Hazardous Material Removal, Asbestos
Abatement, Existing Land Port of Entry (including all associated costs)
LF
UNIT PRICE
Hazardous Material Removal, Asbestos
Abatement, Existing Land Port of Entry (including all associated costs)
SF
UNIT PRICE
Hazardous Material Removal, Asbestos
Abatement, Existing Land Port of Entry (including all associated costs)
EA
UNIT PRICE
Hazardous Material Removal, Asbestos
Abatement, Existing Housing (including all associated costs)
LF
UNIT PRICE
Hazardous Material Removal, Asbestos
Abatement, Existing Housing (including all associated costs)
SF
UNIT PRICE
Hazardous Material Removal, Asbestos
Abatement, Existing Housing (including all associated costs)
EA
UNIT PRICE
Hazardous Material Removal, Lead Abatement, Existing Land Port of Entry (including all associated costs)
SF
UNIT PRICE
Hazardous Material Removal, Lead Abatement, Existing Housing (including all associated costs)
SF
UNIT PRICE
Septic Remediation and Removal, Existing Land
Port of Entry (including all associated costs)
SY
UNIT PRICE
Septic Remediation and Removal, Existing Land
Port of Entry (including all associated costs)
EA
UNIT PRICE
Soil Remediation, Existing Land Port of Entry
(including all associated costs)
CY
UNIT PRICE
Soil Remediation, Existing Housing (including all associated costs)
CY
File details come from the government source that posted it. Updated .