Construction Manager as Constructor (CMc) Requirement for a New Land Port of Entry (LPOE), Coburn Gore, Maine
Solicitation number
47PB0025R0044
Issued by

About this file

This document is a Request for Proposal (RFP) Amendment for CMc Services at the Coburn Gore Land Port of Entry (LPOE) in Maine. The amendment extends the offer receipt deadline from November 17, 2025, to December 17, 2025, to allow the Government time to prepare and provide additional technical documents. Key changes include: designating two attachments as Controlled Unclassified Information, adding three new documents to the Master Attachment List (including a Building Information Modeling guide), replacing the Contracting Officer from Jim Adamo to Molly Lewis, and extending the deadline for requests for clarification to November 28, 2025. The amendment also introduces a new Bid Guarantee requirement, mandating a bid guarantee of 20% of the bid price or $3,000,000, whichever is less, with specific conditions for bid submission and potential default.

View the file

Other files

File Type Posted
RFP Document 2 V2 - Contract Price Form 47PB0025R0044 2026 02 26.pdf PDF
Coburn Gore 47PB0025R0044 QA V4 2026 03 02.pdf PDF
47PB0025R0044 Amendment 0005 SF30 2026 03 02.pdf PDF
Attach 29v1 Coburn Gore LPOE FFE Proposal Worksheet 2026 02 26 .xlsx XLSX spreadsheet
RFP Document 4 V1- Agreement CMc REVISED 2026 02 26.pdf PDF
47PB0025R0044 Amendment 0004 SF30 .pdf PDF
47PB0025R0044_0003 Amendment SF30 .pdf PDF
Attach 28 Coburn Gore Parcel Acquisition 2026 01 13.pdf PDF
Attach 25 Divison 1 Template Sections 2025 07 02.docx DOCX document
Attach 26 Coburn Gore Division 01 - Table of Contents 2025 07 02.docx DOCX document
RFP Document 2 - Contract Price Form 47PB0025R0044 2026 01 22.pdf PDF
Coburn Gore 47PB0025R0044 QA V3 2026 01 22.pdf PDF
47PB0025R0044 1442 dated 2026 01 22.pdf PDF
Attach 11 Wage Determination ME20260007 2026 01 02.pdf PDF
Attch 11 - Wage Determination ME20250007 2025 12 05.pdf PDF
Attch 24ii- Coburn Gore -Funding Responsibility Tool 2025 12 10.xlsx XLSX spreadsheet
Attch 24 Coburn Gore 47PB0025R0044 QA V2 2025 12 10.pdf PDF
Attch 24i. DS Quick Reference Guide- 2023 LPOE DS Overview 2023 12 06.pdf PDF
Attch 24iii. Coburn Gore Final Geothermal Study 2025 09 06.pdf PDF
Amendment 0002 to 47PB0025R0044 Final 2025 12 10 .pdf PDF
47PB0025R0044 QA Document 102725.pdf PDF
Coburn Gore Attendance Sheet 102225.pdf PDF
Pre-Proposal Meeting Final.pdf PDF
RFP Document 12 - CBP Non-Disclosure Agreement Form.pdf PDF
15. Coburn Gore LPOE_Final Concept Submission_Combined_REV 08-11-25.pdf PDF
RFP Document 5 - Reps and Certs CMc MAY 2025.pdf PDF
RFP Document 14 - Proprietary Information Agreement - Sample Template.docx DOCX document
11. GSA Commissioning Guide September 2020.pdf PDF
1. Coburn Gore LPOE CMc SOW Final 2025 03 27.pdf PDF
6. P-120 Public Buildings Service Cost and Schedule Management Policy Requirements, October 2022.pdf PDF
RFP Document 2 - Contract Price Form 47PB0025R0044.pdf PDF
2. Coburn Gore Three phase SOW Final 2025 04 04 (1).pdf PDF
RFP Document 10 - Bid Bond SF24.pdf PDF
RFP Document 6 - Past Performance Questionnaire.docx DOCX document
3. Coburn Gore AE SOW_FINAL 2024 08 06.pdf PDF
7. Coburn Gore LPOE 15Aug25- LPOE POR at final concept.pdf PDF
RFP Document 4 - Agreement CMc MAY 2025.pdf PDF
16. Coburn Gore LPOE_Spec TOC_Final Concept_Combined 08-11-25.pdf PDF
RFP Document 1 - SF1442-22.pdf PDF
5. Colby Coburn Gore Three-Phase Final Report 2022 12 22.pdf PDF
RFP Document 3 - Solicitation CMc MAY 2025.pdf PDF
RFP Document 11 - Wage Determination ME20250007.pdf PDF
17. Coburn Gore Housing_Preliminary Concepts 13June25.pdf PDF
RFP Document 8 - CASB DS-1.pdf PDF
RFP Document 9 - UNIFORMAT II - Level 3 Detail Reference Guide.xlsx XLSX spreadsheet
RFP Document 7 - SB Sub Plan - Individual Model - May 2025 - 508 Compliant.docx DOCX document
14. Coburn Gore LPOE - Design Narrative_Final Concept REV 08-11-25.pdf PDF
4. Coburn Gore LPOE - CMa w CxP SOW 2023 10 12.pdf PDF
10. PBS Core Building Standards Memorandum 2025 02 24.pdf PDF
RFP Document 13 - CBP Short Term Contractors- Visitor Form_BLANK - Short Term Contractors Template.pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

Solicitation 47PB0025R0044, Amendment 0001, CMc Services, Coburn Gore LPOE, ME, October 27, 2025

1.) RFP, Solicitation Section I.G., Receipt of Offers. The due date for receipt of offers is extended from 2:00 pm local time, November 17, 2025, to 2:00 pm local time, December 17, 2025. This extension is to allow the Government time to prepare and provide additional technical documents to aid potential offerors in completing their proposals. Once these documents are ready, the Government will issue a further amendment to add them to the solicitation and re-establish a new date for receipt of offers.

2.) RFP, Solicitation Section I.B., List of Solicitation Documents. The Master Attachment List at Solicitation Document (15) is modified to designate Attachments 14 (Coburn Gore LPOE – Design Narrative Final Concept REV 08-11-25) and 15 (Coburn Gore LPOE Final Concept Submission Combined REV 08-11-25) as Controlled Unclassified Information (CUI).

3.) RFP, Solicitation Section I.B., List of Solicitation Documents. The following documents are added to the Master Attachment List:

a. 18. 2025 Interim Core Building Standards Submittal Matrix.

b. 19. GSA Building Information Modeling (BIM) Guide 07

c. 20. 3D-4D Building Information Modeling Public Link - https://www.gsa.gov/real-estate/design-and-construction/3d4d-building-information-modeling

4.) RFP, Solicitation Section I.C., Authorized Representatives. Jim Adamo is replaced as the Contracting Officer with Molly Lewis. She can be reached at molly.lewis@gsa.gov and (617) 449-8319.

5.) RFP, Solicitation Section III.B., Requests for Clarification or Interpretation. The due date for requests is extended from October 31, 2025, to November 28, 2025.

6.) RFP, Solicitation Section III.G., Bond Requirements. Section III.G. is amended to include FAR Clause 52.228-1, Bid Guarantee.

Bid Guarantee (FAR 52.228-1) (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier’s check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds-

(1) To unsuccessful bidders as soon as practicable after the opening of bids; and https://www.gsa.gov/real-estate/design-and-construction/3d4d-building-information-modeling https://www.gsa.gov/real-estate/design-and-construction/3d4d-building-information-modeling mailto:molly.lewis@gsa.gov

Solicitation 47PB0025R0044, Amendment 0001, CMc Services, Coburn Gore LPOE, ME, October 27, 2025

(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be 20% percent of the bid price or $3,000,000.00, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

Solicitation Amendment 47PB0025R0044_0001 DRAFT.pdf
Amendment 0001 DRAFT.pdf
topmostSubform[0]:
Page1[0]:
AmendmentNo[0]: 0001
Code[0]: 1PQ
Code[1]:
AccountingData[0]:
A13[0]:
C13[0]:
D13[0]:
NameandTitleSigner[0]:
NameandTitleOfficer[0]: Molly Lewis, Contracting Officer
Description[0]: See continuation pages for Amendment content.
FacilityCode[0]:
Code[2]: 1PQ
IssuedBy[0]: Acquisition Management Division (1PQ) GSA/PBS

10 CAUSEWAY ST., RM 1100

BOSTON, MA 02222-1077 USA

NameandAddress[0]: ALL POTENTIAL OFFERORS
AdministeredBy[0]: Acquisition Management Division (1PQ) GSA/PBS

10 CAUSEWAY ST., RM 1100

BOSTON, MA 02222-1077 USA

ContractIDCode[0]:
ReqNumber[0]: EQ1PC-25-0033
AmendmentNo[1]: 47PB0025R0044
ModificationNo[0]:
ProjectNo[0]:
Page[0]: 1
Pages[0]: 3
EffectiveDate[0]: 10/27/2025
Dated9B[0]: 9/15/2025
Dated10B[0]:
CheckBox9[0]: 1
CheckBox10[0]: Off
CheckBox11[0]: 1
CheckBox13A[0]: Off
CheckBox13B[0]: Off
CheckBox13C[0]: Off
CheckBox13D[0]: Off
IsNot[0]: Off
Is[0]: Off
Extended[0]: 1
NotExtended[0]: Off
DateSigned[0]:
DateSigned[1]:
Copies[0]: 1