Attach 26 Coburn Gore Division 01 - Table of Contents 2025 07 02.docx
DOCX document 30 KB Posted
- Solicitation number
- 47PB0025R0044
About this file
This is a Table of Contents for Division 01 (General Requirements) of the specifications for the Coburn Gore Land Port of Entry (LPOE) construction project in Maine, scheduled for January 20, 2026. The document outlines the organizational structure of general contract requirements and specifications applicable to the Construction Manager as Constructor (CMc) procurement.
The specifications are organized into 41 major sections covering critical project management and execution areas. Key requirement areas include: project summary and work restrictions; allowances, alternates, options, and substitution procedures; contract modifications and payment procedures; project management via Critical Path Method (CPM) scheduling; construction documentation and photographic requirements; submittal procedures; quality assurance and control testing (including air barrier systems and structural testing); temporary facilities and security; safety and health requirements; product and execution requirements; selective demolition and fire prevention; construction indoor air quality management; closeout procedures including operation and maintenance documentation; Building Information Modeling (BIM) with regional standards; sustainable design compliance; commissioning requirements for general systems and building enclosure; and demonstration and training. This table of contents serves as the organizational framework for the detailed specifications that contractors must follow for this estimated $125,000,000 to $135,000,000 federal construction project.
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| Coburn Gore LPOE | January 20, 2026 |
| Coburn Gore, Maine | CMc Procurement Set |
| Division |
| Section Title |
SPECIFICATIONS GROUP
General Requirements Subgroup
DIVISION 01 - GENERAL REQUIREMENTS
| 00 01 00 |
| TABLE OF CONTENTS |
| 01 10 00 |
| SUMMARY |
| 01 14 00 |
| WORK RESTRICTIONS |
| 01 21 00 |
| ALLOWANCES |
| 01 23 00 |
| ALTERNATES |
| 01 24 00 |
| OPTIONS |
| 01 25 00 |
| SUBSTITUTION PROCEDURES |
| 01 26 00 |
| CONTRACT MODIFICATION PROCEDURES |
| 01 27 00 |
| UNIT PRICES |
| 01 29 00 |
| PAYMENT PROCEDURES |
| 01 30 00 |
| PROJECT MANAGEMENT INFORMATION SYSTEM |
| 01 31 00 |
| PROJECT MANAGEMENT AND COORDINATION |
| 01 31 10 |
| CRITICAL PATH METHOD (CPM) SCHEDULING for PROSPECTUS PROJECTS |
| 01 32 00 |
| CONSTRUCTION PROGRESS DOCUMENTATION |
| 01 32 20 |
| PHOTOGRAPHIC DOCUMENTATION |
| 01 33 00 |
| SUBMITTAL PROCEDURES |
| 01 35 10 |
| HISTORIC TREATMENT PROCEDURES (not applicable) |
| 01 36 00 |
| COBie |
| 01 40 00 |
| QUALITY ASSURANCE & QUALITY CONTROL REQUIREMENTS |
| 01 40 25 |
| QUALITY CONTROL TESTING FOR AIR BARRIER SYSTEM |
| 01 40 50 |
| SYSTEM QUALITY CONTROL |
| 01 41 00 |
| STRUCTURAL TESTING LABORATORY SYSTEMS |
| 01 42 00 |
| GENERAL REFERENCES |
| 01 50 00 |
| TEMPORARY FACILITES AND CONTROLS |
01 51 00 01 56 39
ARTWORK PROTECTION
TREE and PLANT PROTECTION
| 01 59 30 |
| SECURITY REGULATIONS |
| 01 59 50 |
| SAFETY AND HEALTH |
| 01 60 00 |
| PRODUCT REQUIREMENTS |
| 01 70 00 |
| EXECUTION REQUIREMENTS |
| 01 73 10 |
| CUTTING AND PATCHING |
| 01 73 20 |
| SELECTIVE DEMOLITION |
| 01 73 50 |
| FIRE PREVENTATION PRECAUTIONS FOR HOT WORK |
| 01 74 10 |
| CONSTRUCTION INDOOR AIR QUALITY MANAGEMENT |
| 01 74 19 |
| CONSTRUCTION NONHAZARDOUS WASTE AND REMOVAL |
| 01 77 00 |
| CLOSEOUT PROCEDURES |
01 78 10 01 78 22 07 78 25
PROJECT RECORD DOCUMENTS
OPERATION AND MAINTENANCE DOCUMENTATION
BUILDING INFORMATION MODELING (BIM) WITH CDX & REGIONAL STANDARD
| 01 81 11 |
| SUSTAINABLE DESIGN LAWS |
| 01 82 00 |
| DEMONSTRATION AND TRAINING |
| 01 91 13 |
| GENERAL COMMISSIONING (CX) REQUIREMENTS |
| 01 91 19 |
| BUILDING ENCLOSURE COMISSIONING |
Table of Contents TOC - 1