Attch 24i. DS Quick Reference Guide- 2023 LPOE DS Overview 2023 12 06.pdf

PDF 732 KB Posted

Attached to
Construction Manager as Constructor (CMc) Requirement for a New Land Port of Entry (LPOE), Coburn Gore, Maine
Solicitation number
47PB0025R0044
Issued by

About this file

This document is the 2023 Land Port of Entry Design Standard (LPOEDS) Quick Reference Guide from U.S. Customs and Border Protection (CBP). The guide provides comprehensive standards for planning, renovating, and equipping CBP spaces at land port of entry facilities, replacing the 2018 version after 18 months of development. Key changes include updated design considerations focusing on energy efficiency, sustainability, and operational flexibility, revised room data specifications with clarified security requirements, and incorporation of new operational policy changes such as new technologies and backup emergency power requirements.

The document serves as a national policy and facility development standard for CBP land port of entry facilities, establishing design protocols, identifying project stakeholders, and providing technical criteria for building materials and systems. It aims to foster best practices and incorporate lessons learned from existing facilities. The guide is organized into various sections covering facility planning, space requirements, vehicle inspection spaces, commercial inspection areas, and detailed room data sheets. For technical assistance or questions, CBP recommends contacting the Technical Service PMO at OFAMTECHNICALSERVICESPMO@cbp.dhs.gov.

View the file

Other files

File Type Posted
RFP Document 2 V2 - Contract Price Form 47PB0025R0044 2026 02 26.pdf PDF
Coburn Gore 47PB0025R0044 QA V4 2026 03 02.pdf PDF
47PB0025R0044 Amendment 0005 SF30 2026 03 02.pdf PDF
Attach 29v1 Coburn Gore LPOE FFE Proposal Worksheet 2026 02 26 .xlsx XLSX spreadsheet
RFP Document 4 V1- Agreement CMc REVISED 2026 02 26.pdf PDF
47PB0025R0044 Amendment 0004 SF30 .pdf PDF
47PB0025R0044_0003 Amendment SF30 .pdf PDF
Attach 28 Coburn Gore Parcel Acquisition 2026 01 13.pdf PDF
Attach 25 Divison 1 Template Sections 2025 07 02.docx DOCX document
Attach 26 Coburn Gore Division 01 - Table of Contents 2025 07 02.docx DOCX document
RFP Document 2 - Contract Price Form 47PB0025R0044 2026 01 22.pdf PDF
Coburn Gore 47PB0025R0044 QA V3 2026 01 22.pdf PDF
47PB0025R0044 1442 dated 2026 01 22.pdf PDF
Attach 11 Wage Determination ME20260007 2026 01 02.pdf PDF
Attch 11 - Wage Determination ME20250007 2025 12 05.pdf PDF
Attch 24ii- Coburn Gore -Funding Responsibility Tool 2025 12 10.xlsx XLSX spreadsheet
Attch 24 Coburn Gore 47PB0025R0044 QA V2 2025 12 10.pdf PDF
Attch 24iii. Coburn Gore Final Geothermal Study 2025 09 06.pdf PDF
Amendment 0002 to 47PB0025R0044 Final 2025 12 10 .pdf PDF
Amendment 0001 to 47PB0025R0044 Final 102725.pdf PDF
47PB0025R0044 QA Document 102725.pdf PDF
Coburn Gore Attendance Sheet 102225.pdf PDF
Pre-Proposal Meeting Final.pdf PDF
RFP Document 12 - CBP Non-Disclosure Agreement Form.pdf PDF
15. Coburn Gore LPOE_Final Concept Submission_Combined_REV 08-11-25.pdf PDF
RFP Document 5 - Reps and Certs CMc MAY 2025.pdf PDF
RFP Document 14 - Proprietary Information Agreement - Sample Template.docx DOCX document
11. GSA Commissioning Guide September 2020.pdf PDF
1. Coburn Gore LPOE CMc SOW Final 2025 03 27.pdf PDF
6. P-120 Public Buildings Service Cost and Schedule Management Policy Requirements, October 2022.pdf PDF
RFP Document 2 - Contract Price Form 47PB0025R0044.pdf PDF
2. Coburn Gore Three phase SOW Final 2025 04 04 (1).pdf PDF
RFP Document 10 - Bid Bond SF24.pdf PDF
RFP Document 6 - Past Performance Questionnaire.docx DOCX document
3. Coburn Gore AE SOW_FINAL 2024 08 06.pdf PDF
7. Coburn Gore LPOE 15Aug25- LPOE POR at final concept.pdf PDF
RFP Document 4 - Agreement CMc MAY 2025.pdf PDF
16. Coburn Gore LPOE_Spec TOC_Final Concept_Combined 08-11-25.pdf PDF
RFP Document 1 - SF1442-22.pdf PDF
5. Colby Coburn Gore Three-Phase Final Report 2022 12 22.pdf PDF
RFP Document 3 - Solicitation CMc MAY 2025.pdf PDF
RFP Document 11 - Wage Determination ME20250007.pdf PDF
17. Coburn Gore Housing_Preliminary Concepts 13June25.pdf PDF
RFP Document 8 - CASB DS-1.pdf PDF
RFP Document 9 - UNIFORMAT II - Level 3 Detail Reference Guide.xlsx XLSX spreadsheet
RFP Document 7 - SB Sub Plan - Individual Model - May 2025 - 508 Compliant.docx DOCX document
14. Coburn Gore LPOE - Design Narrative_Final Concept REV 08-11-25.pdf PDF
4. Coburn Gore LPOE - CMa w CxP SOW 2023 10 12.pdf PDF
10. PBS Core Building Standards Memorandum 2025 02 24.pdf PDF
RFP Document 13 - CBP Short Term Contractors- Visitor Form_BLANK - Short Term Contractors Template.pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

L a n d

P o r t o f

E n tr y D e s ig n S ta n d a r d

About the Land Port of Entry Design Standard

U.S. Customs and Border Protection (CBP) developed the Land Port of Entry Design Standard (LPOEDS) to provide consistent requirements for planning, ren-ovating, and equipping CBP space at land port of entry facilities. This Standard pro-vides guidance and protocols, establishes facility design requirements and standard-ized procedures for land port of entry fa-cilities. This Standard identifies project stakeholders and applicable codes and regulations, defines operations, describes design concepts, categorizes spaces, and provides technical criteria for building materials and systems. The LPOEDS is used to develop planning and program-ming criteria for inclusion in programs of requirements, direct execution of design and engineering documentation, and in-form construction and construction admin-istration. The LPOEDS also establishes project closeout and post occupancy roles and responsibilities. The 2023 LPOEDS is the culmination of 18 months of effort to modernize the 2018 requirements.

Land Port of Entry Design Standard Quick Reference

Guide 2023

Changes from the 2018 Standard

The modifications from the 2018 LPOEDS fall primarily into the following cate-gories:

⇒ Document Development

⇒ CBP-Specific Design Considerations

⇒ New Content in Several Facility and Engineering Discipline Chapters

⇒ New and Improved Graphics

⇒ OFO Operational Policy Changes

The following is a list of major changes found in the 2023 LPOEDS:

Document Development—This document continues the utilize the organization structure from the previous Standard to make the LPOEDS simple to navigate and consult relevant sections to ensure compliance with CBP requirements and consistency across CBP facility design standards.

Design Considerations— The updated design considerations aim to create energy efficiency, sustainability, design flexibility, and streamline operations and inspec-tion processes.

Room Data Specifications—Revisions to the room data sheets include identifica-tion of construction materials, and clarifications of physical security require-ments, changes in square footages to reflect operational needs.

Revised Content—Appendices were developed and added or older ones removed, such as Submittal Requirements, Firing Range, Vault Build Guide, and Enclosed Secondary, CAVSS Design Guide.

New and Improved Graphics—The incorporation of new diagrams/graphics, and the revision of some existing diagrams/graphics, aims to increase clarity and en-sure layout/design consistency across land port of entry facilities.

OFO Operational Policy Changes—New operational policy changes have been captured in this new edition of the LPOEDS, to include, but are not limited to new technologies, new back up emergency power requirements, and clarification on forced entry ratings on the booths.

Design Standards— The LPOEDS and all other design standards can be found

HERE.

LPOEDS Mandate

The 2023 LPOEDS amends and replaces the land port of entry facilities requirements in the 2018 LPOEDS and all previous revisions. The LPOEDS serves as a reflection of national policy, procedures and facility development standards for the design and construction of CBP land port of entry facilities within the United States. This revised document builds on lessons learned from the construction and use of existing CBP land port of entry facilities and aims to foster inclusion of the most current best practices, revised requirements, and new gov-ernment regulations and directives.

For questions, comments, lessons learned, and technical assistance regard-ing the LPOEDS and other design stand-ards, please contact Technical

Service PMO at

OFAMTECHNICALSERVICESPMO

@cbp.dhs.gov https://cbpgov.sharepoint.com/sites/OFAM/IS/TS/SitePages/OFODesignStandards.aspx mailto:DesignStandardsFOF@cbp.dhs.gov

File details come from the government source that posted it. Updated .