Revised_Attachment_F__Price_Sheet.xlsx
XLSX spreadsheet 130 KB Posted
- Attached to
- Sykes Creek Phase II Muck Removal
- Solicitation number
- B-8-26-36
- Issued by
- Brevard County, Florida
About this file
This is a revised price sheet bid form for the Sykes Creek Phase II Muck Removal Project (B-8-26-36) issued by Brevard County, Florida. The project requires sealed bids for hydraulic dredging and muck disposal services, with bids due August 21, 2026 at 9:00 a.m. and a mandatory pre-bid meeting scheduled for July 16, 2026 at 10:00 a.m. at Kiwanis Island Park in Merritt Island. The base bid encompasses muck removal of approximately 225,600 cubic yards from Zones 3A-North and 3B-South, with four optional dredging zones ranging from 17,200 to 38,800 cubic yards each. The contractor must furnish all labor, materials, equipment, permits, and fees to complete the project, including engineering design and permitting, temporary utilities construction, dredged material management area (DMMA) construction and restoration, environmental protection and monitoring, dewatering and treatment, and permanent disposal of excavated material. Work is phased with approximately 1,400 calendar days to substantial completion and 1,460 days to final completion, with operations restricted to Monday-Friday 7:00 a.m.-6:00 p.m. and Saturday 8:00 a.m.-5:00 p.m.
All bid items are lump-sum (LS) or unit price arrangements with estimated quantities provided. The contractor must include full compensation in unit prices for mobilization, demobilization, surveys, quality control testing, turbidity and water quality testing, environmental species monitoring, and as-built documentation. Pricing shall account for bulking factors with no post-excavation payment adjustments. The contractor is responsible for independently securing permanent upland disposal sites, as County-identified sites are not guaranteed. A public construction bond at 100 percent of contract price and bid security at 5 percent of the proposed amount are required within five days of award. General liability insurance of $1 million per occurrence, workers' compensation, auto liability of $1 million combined single limit, and pollution liability of $1 million are mandatory. Award will be made to the lowest responsive and responsible bidder based on total bid including all optional zones, with potential contract terms and fuel escalation subject to negotiation post-award.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Form
SYKES CREEK PHASE II MUCK REMOVAL PROJECT
B-8-26-36
REVISED - PRICE SHEET
All bid items shall include full compensation for furnishing all labor, materials, equipment, supplies, permits, fees, supervision, testing, mobilization, overhead, profit, and incidentals necessary to complete the Work in accordance with the Contract Documents, including all Work shown on the Construction Drawings and specified in the Contract Specifications.
ITEM ITEM DESCRIPTION ESTIMATED QUANTITY UNITS UNIT COST TOTAL COST
GENERAL ITEMS
1 Base Bid Bonds and Insurance 1 LS $ - 0
DREDGED MATERIAL MANAGEMENT AREA (DMMA), DEWATERING AND TREATMENT SITE CONSTRUCTION, DISPOSAL AND RESTORATION
| 2 | Engineering Design and Permitting | 1 | LS | $ - 0 |
| 3 | Temporary Utilities Construction and Permitting | 1 | LS | $ - 0 |
| 4 | DMMA Surveys (Pre-Construction and Staking) | 1 | LS | $ - 0 |
| 5 | DMMA Mobilization | 1 | LS | $ - 0 |
| 6 | DMMA Clearing and Grubbing | 1 | LS | $ - 0 |
| 7 | Construction Quality Control Testing | 1 | LS | $ - 0 |
| 8 | DMMA Facility Construction | 1 | LS | $ - 0 |
| 9 | DMMA Facility Fencing and Gates | 1 | LS | $ - 0 |
| 10 | Erosion and Sediment Control | 1 | LS | $ - 0 |
| 11 | DMMA Demobilization | 1 | LS | $ - 0 |
| 12 | DMMA Stabilization, Restoration and Cleanup | 1 | LS | $ - 0 |
| 13 | DMMA As-Built Survey | 1 | LS | $ - 0 |
| 14 | Permanent Upland Disposal Fixed Costs | 1 | LS | $ - 0 |
SUB-TOTAL (ITEMS 2 TO 14) $ - 0
DREDGING BASE BID (ZONE 3A-NORTH AND ZONE 3B-SOUTH)
| 15 | Pre-Construction Utility Surveys | 1 | LS | $ - 0 |
| 16 | Mobilization | 1 | LS | $ - 0 |
| 17 | Pre-Dredge Surveys (Including Photo Documentation) | 1 | LS | $ - 0 |
| 18 | Muck Removal Dredging | 225,600 | CY | $ - 0 |
| 19 | Dredged Material Handling and Dewatering | 225,600 | CY | $ - 0 |
| 20 | Dewatered Muck Transport and Permanent Disposal | 225,600 | CY | $ - 0 |
| 21 | Turbidity and Water Quality Testing | 1 | LS | $ - 0 |
| 22 | Post-Dredge and Progress Surveys | 1 | LS | $ - 0 |
| 23 | Post-Dredge Photo Documentaiton | 1 | LS | $ - 0 |
| 24 | Environmental Protection | 1 | LS | $ - 0 |
| 25 | Environmental Species Monitoring | 1 | LS | $ - 0 |
| 26 | Dredged Material Management | 1 | LS | $ - 0 |
| 27 | Demobilization | 1 | LS | $ - 0 |
| 28 | As-Built Hydrographic Maps | 1 | LS | $ - 0 |
SUB-TOTAL (DREDGING BASE) $ - 0
DREDGING OPTION 1 (ZONE 3A-SOUTH)
| 1.Opt1 | Options Bonds and Insurance (Option 1) | 1 | LS | $ - 0 |
| 15.1 | Pre-Construction Utility Surveys | 1 | LS | $ - 0 |
| 16.1 | Mobilization | 1 | LS | $ - 0 |
| 17.1 | Pre-Dredge Surveys (Including Photo Documentation) | 1 | LS | $ - 0 |
| 18.1 | Muck Removal Dredging | 17,200 | CY | $ - 0 |
| 19.1 | Dredged Material Handling and Dewatering | 17,200 | CY | $ - 0 |
| 20.1 | Dewatered Muck Transport and Permanent Disposal | 17,200 | CY | $ - 0 |
| 21.1 | Turbidity and Water Quality Testing | 1 | LS | $ - 0 |
| 22.1 | Post-Dredge and Progress Surveys | 1 | LS | $ - 0 |
| 23.1 | Post-Dredge Photo Documentaiton | 1 | LS | $ - 0 |
| 24.1 | Environmental Protection | 1 | LS | $ - 0 |
| 25.1 | Environmental Species Monitoring | 1 | LS | $ - 0 |
| 26.1 | Dredged Material Management | 1 | LS | $ - 0 |
| 27.1 | Demobilization | 1 | LS | $ - 0 |
| 28.1 | As-Built Hydrographic Maps | 1 | LS | $ - 0 |
| SUB-TOTAL (DREDGING OPTION 1) | $ - 0 |
| TIME REQUIRED TO COMPLETE (DREDGING OPTION 1) | days |
DREDGING OPTION 2 (ZONE 3B-NORTH)
| 1.Opt2 | Options Bonds and Insurance (Option 2) | 1 | LS | $ - 0 |
| 15.2 | Pre-Construction Utility Surveys | 1 | LS | $ - 0 |
| 16.2 | Mobilization | 1 | LS | $ - 0 |
| 17.2 | Pre-Dredge Surveys (Including Photo Documentation) | 1 | LS | $ - 0 |
| 18.2 | Muck Removal Dredging | 34,700 | CY | $ - 0 |
| 19.2 | Dredged Material Handling and Dewatering | 34,700 | CY | $ - 0 |
| 20.2 | Dewatered Muck Transport and Permanent Disposal | 34,700 | CY | $ - 0 |
| 21.2 | Turbidity and Water Quality Testing | 1 | LS | $ - 0 |
| 22.2 | Post-Dredge and Progress Surveys | 1 | LS | $ - 0 |
| 23.2 | Post-Dredge Photo Documentaiton | 1 | LS | $ - 0 |
| 24.2 | Environmental Protection | 1 | LS | $ - 0 |
| 25.2 | Environmental Species Monitoring | 1 | LS | $ - 0 |
| 26.2 | Dredged Material Management | 1 | LS | $ - 0 |
| 27.2 | Demobilization | 1 | LS | $ - 0 |
| 28.2 | As-Built Hydrographic Maps | 1 | LS | $ - 0 |
| SUB-TOTAL (DREDGING OPTION 2) | $ - 0 |
| TIME REQUIRED TO COMPLETE (DREDGING OPTION 2) | days |
DREDGING OPTION 3 (ZONE 1B.2)
| 1.Opt3 | Options Bonds and Insurance (Option 3) | 1 | LS | $ - 0 |
| 15.3 | Pre-Construction Utility Surveys | 1 | LS | $ - 0 |
| 16.3 | Mobilization | 1 | LS | $ - 0 |
| 17.3 | Pre-Dredge Surveys (Including Photo Documentation) | 1 | LS | $ - 0 |
| 18.3 | Muck Removal Dredging | 38,100 | CY | $ - 0 |
| 19.3 | Dredged Material Handling and Dewatering | 38,100 | CY | $ - 0 |
| 20.3 | Dewatered Muck Transport and Permanent Disposal | 38,100 | CY | $ - 0 |
| 21.3 | Turbidity and Water Quality Testing | 1 | LS | $ - 0 |
| 22.3 | Post-Dredge and Progress Surveys | 1 | LS | $ - 0 |
| 23.3 | Post-Dredge Photo Documentaiton | 1 | LS | $ - 0 |
| 24.3 | Environmental Protection | 1 | LS | $ - 0 |
| 25.3 | Environmental Species Monitoring | 1 | LS | $ - 0 |
| 26.3 | Dredged Material Management | 1 | LS | $ - 0 |
| 27.3 | Demobilization | 1 | LS | $ - 0 |
| 28.3 | As-Built Hydrographic Maps | 1 | LS | $ - 0 |
| SUB-TOTAL (DREDGING OPTION 3) | $ - 0 |
| TIME REQUIRED TO COMPLETE (DREDGING OPTION 3) | days |
DREDGING OPTION 4 (ZONE 2)
| 1.Opt4 | Options Bonds and Insurance (Option 4) | 1 | LS | $ - 0 |
| 15.4 | Pre-Construction Utility Surveys | 1 | LS | $ - 0 |
| 16.4 | Mobilization | 1 | LS | $ - 0 |
| 17.4 | Pre-Dredge Surveys (Including Photo Documentation) | 1 | LS | $ - 0 |
| 18.4 | Muck Removal Dredging | 38,800 | CY | $ - 0 |
| 19.4 | Dredged Material Handling and Dewatering | 38,800 | CY | $ - 0 |
| 20.4 | Dewatered Muck Transport and Permanent Disposal | 38,800 | CY | $ - 0 |
| 21.4 | Turbidity and Water Quality Testing | 1 | LS | $ - 0 |
| 22.4 | Post-Dredge and Progress Surveys | 1 | LS | $ - 0 |
| 23.4 | Post-Dredge Photo Documentaiton | 1 | LS | $ - 0 |
| 24.4 | Environmental Protection | 1 | LS | $ - 0 |
| 25.4 | Environmental Species Monitoring | 1 | LS | $ - 0 |
| 26.4 | Dredged Material Management | 1 | LS | $ - 0 |
| 27.4 | Demobilization | 1 | LS | $ - 0 |
| 28.4 | As-Built Hydrographic Maps | 1 | LS | $ - 0 |
| SUB-TOTAL (DREDGING OPTION 4) | $ - 0 |
| TIME REQUIRED TO COMPLETE (DREDGING OPTION 4) | days |
TOTAL BID (LINE ITEMS 01 TO 28.4) $ - 0
Company Name Name of Authorized Representative (Print)
Street Address Name of Authorized Representative (Signature)
City, State, Zip Code E-Mail Address
Telephone image1.png
File details come from the government source that posted it. Updated .