Sykes Creek Phase II Muck Removal
Solicitation number
B-8-26-36
Issued by
Brevard County, Florida

About this file

This is a revised price sheet bid form for the Sykes Creek Phase II Muck Removal Project (B-8-26-36) issued by Brevard County, Florida. The project requires sealed bids for hydraulic dredging and muck disposal services, with bids due August 21, 2026 at 9:00 a.m. and a mandatory pre-bid meeting scheduled for July 16, 2026 at 10:00 a.m. at Kiwanis Island Park in Merritt Island. The base bid encompasses muck removal of approximately 225,600 cubic yards from Zones 3A-North and 3B-South, with four optional dredging zones ranging from 17,200 to 38,800 cubic yards each. The contractor must furnish all labor, materials, equipment, permits, and fees to complete the project, including engineering design and permitting, temporary utilities construction, dredged material management area (DMMA) construction and restoration, environmental protection and monitoring, dewatering and treatment, and permanent disposal of excavated material. Work is phased with approximately 1,400 calendar days to substantial completion and 1,460 days to final completion, with operations restricted to Monday-Friday 7:00 a.m.-6:00 p.m. and Saturday 8:00 a.m.-5:00 p.m.

All bid items are lump-sum (LS) or unit price arrangements with estimated quantities provided. The contractor must include full compensation in unit prices for mobilization, demobilization, surveys, quality control testing, turbidity and water quality testing, environmental species monitoring, and as-built documentation. Pricing shall account for bulking factors with no post-excavation payment adjustments. The contractor is responsible for independently securing permanent upland disposal sites, as County-identified sites are not guaranteed. A public construction bond at 100 percent of contract price and bid security at 5 percent of the proposed amount are required within five days of award. General liability insurance of $1 million per occurrence, workers' compensation, auto liability of $1 million combined single limit, and pollution liability of $1 million are mandatory. Award will be made to the lowest responsive and responsible bidder based on total bid including all optional zones, with potential contract terms and fuel escalation subject to negotiation post-award.

View the file

Other files

File Type Posted
Bid_Tabulation.pdf PDF
Bid_Tabulation__Names_Only.pdf PDF
Addendum_6.pdf PDF
FDOT_Liquid_Damages.pdf PDF
Addendum_5.pdf PDF
Addendum_4.pdf PDF
Addendum_3.pdf PDF
Addendum_2.pdf PDF
Acousti_FenceProduct_Data_Sheet.pdf PDF
USACE_Permit_Modification.pdf PDF
Revised_Attachment_B__Construction_Drawings.pdf PDF
00_41_00_Bid_Form_Jul2026.pdf PDF
Geotechnical_Survey.pdf PDF
Prebid_Sign_In_Sheet.pdf PDF
Topographic_Survey.pdf PDF
Addendum_1.pdf PDF
Attachment_C8__FDEP_Permit_Mod_2_.pdf PDF
Attachment_D7_RFP_C.G._Reed_Proposal.pdf PDF
Attachment_C2_USACE_Permit.pdf PDF
Attachment_D2_Testing_Reports.pdf PDF
Attachment_D5__RFP_Draft_Contract.pdf PDF
Attachment_C10__FDEP_Mod_4.pdf PDF
Attachment_D6__RFP_Rock_Solid_Proposal.pdf PDF
Attachment_C3__USACE_Permit_Mod_1.pdf PDF
Attachment_F__Price_Sheet.xlsx XLSX spreadsheet
B82636_Inv_Specs.pdf PDF
Attachment_C9_FDEP_Mod_3.pdf PDF
Attachment_E__Draft_Contract.pdf PDF
Attachment_A_Technical_Specifications.pdf PDF
Attachment_C4__USACE_Permit_Mod_2.pdf PDF
Attachment_C7__FDEP_Permit_Mod_1.pdf PDF
Attachment_BConstruction_Drawings_SealedSykes_Creek_Ph_II.pdf PDF
Attachment_D4__RFP82601_Property_Use_Muck_Placement.pdf PDF
Attachment_C6__FDEP_Permit.pdf PDF
Attachment_D8_Nandivada_Multiuse_Facility_Phase_1_Stormwater_Retrofit_Permit_Drawings.pdf PDF
Attachment_D3__Vibracore_Surveys.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Form

SYKES CREEK PHASE II MUCK REMOVAL PROJECT

B-8-26-36

REVISED - PRICE SHEET

All bid items shall include full compensation for furnishing all labor, materials, equipment, supplies, permits, fees, supervision, testing, mobilization, overhead, profit, and incidentals necessary to complete the Work in accordance with the Contract Documents, including all Work shown on the Construction Drawings and specified in the Contract Specifications.

ITEM ITEM DESCRIPTION ESTIMATED QUANTITY UNITS UNIT COST TOTAL COST

GENERAL ITEMS

1 Base Bid Bonds and Insurance 1 LS $ - 0

DREDGED MATERIAL MANAGEMENT AREA (DMMA), DEWATERING AND TREATMENT SITE CONSTRUCTION, DISPOSAL AND RESTORATION

2Engineering Design and Permitting1LS$ - 0
3Temporary Utilities Construction and Permitting1LS$ - 0
4DMMA Surveys (Pre-Construction and Staking)1LS$ - 0
5DMMA Mobilization1LS$ - 0
6DMMA Clearing and Grubbing1LS$ - 0
7Construction Quality Control Testing1LS$ - 0
8DMMA Facility Construction1LS$ - 0
9DMMA Facility Fencing and Gates1LS$ - 0
10Erosion and Sediment Control1LS$ - 0
11DMMA Demobilization1LS$ - 0
12DMMA Stabilization, Restoration and Cleanup1LS$ - 0
13DMMA As-Built Survey1LS$ - 0
14Permanent Upland Disposal Fixed Costs1LS$ - 0

SUB-TOTAL (ITEMS 2 TO 14) $ - 0

DREDGING BASE BID (ZONE 3A-NORTH AND ZONE 3B-SOUTH)

15Pre-Construction Utility Surveys1LS$ - 0
16Mobilization1LS$ - 0
17Pre-Dredge Surveys (Including Photo Documentation)1LS$ - 0
18Muck Removal Dredging225,600CY$ - 0
19Dredged Material Handling and Dewatering225,600CY$ - 0
20Dewatered Muck Transport and Permanent Disposal225,600CY$ - 0
21Turbidity and Water Quality Testing1LS$ - 0
22Post-Dredge and Progress Surveys1LS$ - 0
23Post-Dredge Photo Documentaiton1LS$ - 0
24Environmental Protection1LS$ - 0
25Environmental Species Monitoring1LS$ - 0
26Dredged Material Management1LS$ - 0
27Demobilization1LS$ - 0
28As-Built Hydrographic Maps1LS$ - 0

SUB-TOTAL (DREDGING BASE) $ - 0

DREDGING OPTION 1 (ZONE 3A-SOUTH)

1.Opt1Options Bonds and Insurance (Option 1)1LS$ - 0
15.1Pre-Construction Utility Surveys1LS$ - 0
16.1Mobilization1LS$ - 0
17.1Pre-Dredge Surveys (Including Photo Documentation)1LS$ - 0
18.1Muck Removal Dredging17,200CY$ - 0
19.1Dredged Material Handling and Dewatering17,200CY$ - 0
20.1Dewatered Muck Transport and Permanent Disposal17,200CY$ - 0
21.1Turbidity and Water Quality Testing1LS$ - 0
22.1Post-Dredge and Progress Surveys1LS$ - 0
23.1Post-Dredge Photo Documentaiton1LS$ - 0
24.1Environmental Protection1LS$ - 0
25.1Environmental Species Monitoring1LS$ - 0
26.1Dredged Material Management1LS$ - 0
27.1Demobilization1LS$ - 0
28.1As-Built Hydrographic Maps1LS$ - 0
SUB-TOTAL (DREDGING OPTION 1)$ - 0
TIME REQUIRED TO COMPLETE (DREDGING OPTION 1)days

DREDGING OPTION 2 (ZONE 3B-NORTH)

1.Opt2Options Bonds and Insurance (Option 2)1LS$ - 0
15.2Pre-Construction Utility Surveys1LS$ - 0
16.2Mobilization1LS$ - 0
17.2Pre-Dredge Surveys (Including Photo Documentation)1LS$ - 0
18.2Muck Removal Dredging34,700CY$ - 0
19.2Dredged Material Handling and Dewatering34,700CY$ - 0
20.2Dewatered Muck Transport and Permanent Disposal34,700CY$ - 0
21.2Turbidity and Water Quality Testing1LS$ - 0
22.2Post-Dredge and Progress Surveys1LS$ - 0
23.2Post-Dredge Photo Documentaiton1LS$ - 0
24.2Environmental Protection1LS$ - 0
25.2Environmental Species Monitoring1LS$ - 0
26.2Dredged Material Management1LS$ - 0
27.2Demobilization1LS$ - 0
28.2As-Built Hydrographic Maps1LS$ - 0
SUB-TOTAL (DREDGING OPTION 2)$ - 0
TIME REQUIRED TO COMPLETE (DREDGING OPTION 2)days

DREDGING OPTION 3 (ZONE 1B.2)

1.Opt3Options Bonds and Insurance (Option 3)1LS$ - 0
15.3Pre-Construction Utility Surveys1LS$ - 0
16.3Mobilization1LS$ - 0
17.3Pre-Dredge Surveys (Including Photo Documentation)1LS$ - 0
18.3Muck Removal Dredging38,100CY$ - 0
19.3Dredged Material Handling and Dewatering38,100CY$ - 0
20.3Dewatered Muck Transport and Permanent Disposal38,100CY$ - 0
21.3Turbidity and Water Quality Testing1LS$ - 0
22.3Post-Dredge and Progress Surveys1LS$ - 0
23.3Post-Dredge Photo Documentaiton1LS$ - 0
24.3Environmental Protection1LS$ - 0
25.3Environmental Species Monitoring1LS$ - 0
26.3Dredged Material Management1LS$ - 0
27.3Demobilization1LS$ - 0
28.3As-Built Hydrographic Maps1LS$ - 0
SUB-TOTAL (DREDGING OPTION 3)$ - 0
TIME REQUIRED TO COMPLETE (DREDGING OPTION 3)days

DREDGING OPTION 4 (ZONE 2)

1.Opt4Options Bonds and Insurance (Option 4)1LS$ - 0
15.4Pre-Construction Utility Surveys1LS$ - 0
16.4Mobilization1LS$ - 0
17.4Pre-Dredge Surveys (Including Photo Documentation)1LS$ - 0
18.4Muck Removal Dredging38,800CY$ - 0
19.4Dredged Material Handling and Dewatering38,800CY$ - 0
20.4Dewatered Muck Transport and Permanent Disposal38,800CY$ - 0
21.4Turbidity and Water Quality Testing1LS$ - 0
22.4Post-Dredge and Progress Surveys1LS$ - 0
23.4Post-Dredge Photo Documentaiton1LS$ - 0
24.4Environmental Protection1LS$ - 0
25.4Environmental Species Monitoring1LS$ - 0
26.4Dredged Material Management1LS$ - 0
27.4Demobilization1LS$ - 0
28.4As-Built Hydrographic Maps1LS$ - 0
SUB-TOTAL (DREDGING OPTION 4)$ - 0
TIME REQUIRED TO COMPLETE (DREDGING OPTION 4)days

TOTAL BID (LINE ITEMS 01 TO 28.4) $ - 0

Company Name Name of Authorized Representative (Print)

Street Address Name of Authorized Representative (Signature)

City, State, Zip Code E-Mail Address

Telephone image1.png

File details come from the government source that posted it. Updated .