About this file

This addendum is issued by Brevard County Purchasing Services for the Sykes Creek Phase II Muck Removal Project (B-8-26-36) and serves as a clarification to the original bid package. The addendum addresses a question regarding turbidity curtain requirements for seagrass protection during hydraulic dredging operations. The key modification announced in this addendum is the change to the bid opening date and time from the originally scheduled August 21, 2026 at 9:00 a.m. to Monday, August 31, 2026 at 9:00 a.m. All other terms and conditions of the bid package remain unchanged, and bidders are required to acknowledge receipt of Addendum 6 on the provided Price Sheet when submitting their bids.

Regarding turbidity curtain requirements, the addendum clarifies that separate turbidity curtains around seagrass areas are not mandated when properly installed and maintained turbidity curtains enclosing the active dredging area provide an effective barrier between dredging operations and seagrass. However, additional turbidity curtains must be installed where necessary to maintain compliance with applicable permit requirements and turbidity standards, or where active-work-area curtains do not provide effective separation. All required seagrass setbacks and prohibitions against anchoring, spudding, pipeline placement, or equipment operation within seagrass areas remain fully applicable regardless of turbidity curtain configuration.

View the file

Other files

File Type Posted
Bid_Tabulation.pdf PDF
Bid_Tabulation__Names_Only.pdf PDF
FDOT_Liquid_Damages.pdf PDF
Addendum_5.pdf PDF
Addendum_4.pdf PDF
Addendum_3.pdf PDF
Addendum_2.pdf PDF
Acousti_FenceProduct_Data_Sheet.pdf PDF
Revised_Attachment_F__Price_Sheet.xlsx XLSX spreadsheet
USACE_Permit_Modification.pdf PDF
Revised_Attachment_B__Construction_Drawings.pdf PDF
00_41_00_Bid_Form_Jul2026.pdf PDF
Geotechnical_Survey.pdf PDF
Prebid_Sign_In_Sheet.pdf PDF
Topographic_Survey.pdf PDF
Addendum_1.pdf PDF
Attachment_C8__FDEP_Permit_Mod_2_.pdf PDF
Attachment_D7_RFP_C.G._Reed_Proposal.pdf PDF
Attachment_C2_USACE_Permit.pdf PDF
Attachment_D2_Testing_Reports.pdf PDF
Attachment_D5__RFP_Draft_Contract.pdf PDF
Attachment_C10__FDEP_Mod_4.pdf PDF
Attachment_D6__RFP_Rock_Solid_Proposal.pdf PDF
Attachment_C3__USACE_Permit_Mod_1.pdf PDF
Attachment_F__Price_Sheet.xlsx XLSX spreadsheet
B82636_Inv_Specs.pdf PDF
Attachment_C9_FDEP_Mod_3.pdf PDF
Attachment_E__Draft_Contract.pdf PDF
Attachment_A_Technical_Specifications.pdf PDF
Attachment_C4__USACE_Permit_Mod_2.pdf PDF
Attachment_C7__FDEP_Permit_Mod_1.pdf PDF
Attachment_BConstruction_Drawings_SealedSykes_Creek_Ph_II.pdf PDF
Attachment_D4__RFP82601_Property_Use_Muck_Placement.pdf PDF
Attachment_C6__FDEP_Permit.pdf PDF
Attachment_D8_Nandivada_Multiuse_Facility_Phase_1_Stormwater_Retrofit_Permit_Drawings.pdf PDF
Attachment_D3__Vibracore_Surveys.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Purchasing Services 2725 Judge Fran Jamieson Way

Building C, Room 303 Viera, Florida 32940

Sykes Creek Phase II Muck Removal Project B-8-26-36

August 24, 2026

ADDENDUM 6

TO ALL PROSPECTIVE BIDDERS

This is an Addendum to and shall be considered as part of the original bid package for the above-mentioned bid. Please acknowledge receipt of Addendum 6 in space provided on Price Sheet.

Bidders are requested to acknowledge receipt of this addendum with their bid.

CLARIFICATION TO A QUESTION RECEIVED

Question: As it relates to turbidity curtains. The details show how to protect seagrass with turbidity curtains. If active dredge areas have turbidity curtains around the work area, are turbidity curtains also required around the seagrass areas?

Answer: Separate turbidity curtains are not required around seagrass areas where properly installed and maintained turbidity curtains enclosing the active dredging area provide an effective barrier between the dredging operations and the seagrass. Additional turbidity curtains shall be installed where necessary to maintain compliance with applicable permit requirements and turbidity standards, or where the active-work-area curtains do not provide effective separation. All required seagrass setbacks and prohibitions against anchoring, spudding, pipeline placement, or equipment operation within seagrass areas remain applicable.

Please note that the bid opening date and time have changed to Monday, August 31, 2026 @ 9:00

AM.

All other terms and conditions remain unchanged.

Sincerely, Sherry Collett Procurement Supervisor

END OF ADDENDUM 6

File details come from the government source that posted it. Updated .