This document is a set of sealed construction drawings for the Sykes Creek Phase II Dredging Project in Brevard County, Florida. The project encompasses hydraulic dredging operations across multiple zones within Sykes Creek, with a total dredging volume of 352,400 cubic yards of muck removal. The base bid includes Zones 3A-North (68,300 cu. yds.) and 3B-South (157,300 cu. yds.), totaling 225,600 cubic yards, with four additional optional zones available for award: Option 1 Zone 3A-South (17,200 cu. yds.), Option 2 Zone 3B-North (34,700 cu. yds.), Option 3 Zone 1B.2 (38,100 cu. yds.), and Option 4 Zone 2 (38,800 cu. yds.). The contract requires furnishing all labor, materials, tools, equipment, and trucking to perform muck removal work. The drawings, sealed by Professional Engineer Kenneth R. Craig (PE#52605) of Taylor Engineering, Inc., dated June 2026, provide detailed existing conditions surveys, vibracore data indicating muck thickness and bottom elevations, dredging profiles, typical cross-sections, and project specifications across 22 sheets. The base bid zones must be completed prior to commencing work on any additional zones if awarded.

The project includes dredged material management at the Nandivada Property, with detailed site layout plans indicating 15-foot wetland offset buffers, fencing requirements, and pipeline access routes. Comprehensive erosion control measures are mandated, including Type III and IV silt fences, turbidity curtains with 5-foot seagrass buffers, manatee excluder grates on discharge pipes, and hay bale barriers. Environmental considerations are significant, with restrictions including a manatee dredging window restriction for multiple baseline locations, Outstanding Florida Waters designations, seagrass area protections, and mangrove buffer maintenance of 15 feet minimum. The project location is bounded by Township 24 South, Ranges 36 and 37 East, Sections 23, 24, 25, 26, 30, and 31. Aids to navigation including channel markers and danger shoal signage must be removed prior to dredging and reinstalled upon project completion, with removed signage to be preserved by the contractor for county reuse.

View the file

Other files

File Type Posted
Bid_Tabulation.pdf PDF
Bid_Tabulation__Names_Only.pdf PDF
Addendum_6.pdf PDF
FDOT_Liquid_Damages.pdf PDF
Addendum_5.pdf PDF
Addendum_4.pdf PDF
Addendum_3.pdf PDF
Addendum_2.pdf PDF
Acousti_FenceProduct_Data_Sheet.pdf PDF
Revised_Attachment_F__Price_Sheet.xlsx XLSX spreadsheet
USACE_Permit_Modification.pdf PDF
Revised_Attachment_B__Construction_Drawings.pdf PDF
00_41_00_Bid_Form_Jul2026.pdf PDF
Geotechnical_Survey.pdf PDF
Prebid_Sign_In_Sheet.pdf PDF
Topographic_Survey.pdf PDF
Addendum_1.pdf PDF
Attachment_C8__FDEP_Permit_Mod_2_.pdf PDF
Attachment_D7_RFP_C.G._Reed_Proposal.pdf PDF
Attachment_C2_USACE_Permit.pdf PDF
Attachment_D2_Testing_Reports.pdf PDF
Attachment_D5__RFP_Draft_Contract.pdf PDF
Attachment_C10__FDEP_Mod_4.pdf PDF
Attachment_D6__RFP_Rock_Solid_Proposal.pdf PDF
Attachment_C3__USACE_Permit_Mod_1.pdf PDF
Attachment_F__Price_Sheet.xlsx XLSX spreadsheet
B82636_Inv_Specs.pdf PDF
Attachment_C9_FDEP_Mod_3.pdf PDF
Attachment_E__Draft_Contract.pdf PDF
Attachment_A_Technical_Specifications.pdf PDF
Attachment_C4__USACE_Permit_Mod_2.pdf PDF
Attachment_C7__FDEP_Permit_Mod_1.pdf PDF
Attachment_D4__RFP82601_Property_Use_Muck_Placement.pdf PDF
Attachment_C6__FDEP_Permit.pdf PDF
Attachment_D8_Nandivada_Multiuse_Facility_Phase_1_Stormwater_Retrofit_Permit_Drawings.pdf PDF
Attachment_D3__Vibracore_Surveys.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ZONE 2

ZONE 1B.2

ZONE 3A - SOUTH

ZONE 3B - SOUTH

ZONE 3B - NORTH

ZONE 3A - NORTH

REFERENCES:

USGS 7.5' QUADRANGLE MAP

COURTENAY, FLORIDA 1976

USGS 7.5' QUADRANGLE MAP

COCOA, FLORIDA 1976

FLORIDA

NASSAU

ST. JOHNS

FLAGLER

VOLUSIA

BREVARD

INDIAN RIVER

ST. LUCIE

MARTIN

PALM BEACH

BROWARD

DADE

DUVAL

1"= 1,500' (22x34) 1"= 3,000' (11x17)

LOCATION MAP

N.T.S.

VICINITY MAP

PROJECT LOCATION

21 3 4 5 6 7 8

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

21 3 4 5 6 7 8

SYKES CREEK DREDGING PHASE II

CONSTRUCTION DRAWINGS

BREVARD COUNTY, FLORIDA

AD

AM

L U

C

EY

, 6 /2

4/

:5 8:

P

M , X

:\s ys

\P ro je ct s\ C

-0

S yk es C re ek

\C on st ru ct io n\ c2

4-

Ph as e

II\

C

-0

-C

-C ov er .d w g

DRAWING INDEX

DREDGING LOCATIONS

TOWNSHIP 24 SOUTH

RANGE 36 & 37 EAST

SECTIONS 23, 24, 25, 26, 30 & 31

Sheet List Table

C-1 COVER SHEET

C-2 PROJECT NOTES

C-3 PROJECT OVERVIEW

C-4 EXISTING CONDITIONS ZONE 3

C-5 EXISTING CONDITIONS ZONES 1 & 2

C-6 VIBRACORE LOCATIONS

C-7 THICKNESS OF MUCK ZONE 3

C-8 THICKNESS OF MUCK ZONES 2 & 3

C-9 THICKNESS OF MUCK ZONES 1 & 2

C-10 BOTTOM OF MUCK ELEVATIONS ZONE 3

C-11 BOTTOM OF MUCK ELEVATIONS ZONES 2 & 3

C-12 BOTTOM OF MUCK ELEVATIONS ZONES 1 & 2

C-13 BASELINE 1 PROFILE

C-14 BASELINE 1A, 9, 10 & 11 PROFILES

C-15 BASELINE 12 & 21 PROFILES

C-16 TYPICAL SECTIONS

C-17 TYPICAL SECTIONS

C-18 TYPICAL SECTIONS

C-19 TYPICAL SECTIONS

C-20 AIDS TO NAVIGATION CHANNEL MARKER PLAN & DETAILS

C-21 NANDIVADA SITE LAYOUT

C-22 EROSION CONTROL DETAILS

COUNTY IDENTIFIED

DMMA & STAGING

AREA

NANDIVADA PARCEL

SEAL

PROJECT TITLE

SHEET OFDATE

PROJECT NO

C-1C2024-098

JUN 2026

SYKES CREEK DREDGING

PHASE II

PROJECT ADDRESS

REGISTRY # 4815

10199 SOUTHSIDE BLVD

SUITE 310

JACKSONVILLE, FLORIDA 32256

(904)-731-7040

TAYLOR

ENGINEERING, INC.

KENNETH R. CRAIG P.E.# 52605

THIS ITEM HAS BEEN DIGITALLY SIGNED AND

SEALED BY KENNETH R. CRAIG II ON THE DATE

ADJACENT TO THE SEAL.

PRINTED COPIES OF THIS DOCUMENT ARE NOT

CONSIDERED SIGNED AND SEALED AND THE

SIGNATURE MUST BE VERIFIED ON ANY

ELECTRONIC COPIES.

SEAL

PROJECT TITLE

DESIGNED

DRAWN

CHECKED

REVIEWED

DATE

SCALE

PROJECT NO

DRAWING TITLE

SHEET OF

21 3 4 5 6 7 8

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

21 3 4 5 6 7 8

PROJECT NOTES

C-2

AD

AM

L U

C

EY

, 6 /2

4/

:5 8:

P

M , X

:\s ys

\P ro je ct s\ C

-0

S yk es C re ek

\C on st ru ct io n\ c2

4-

Ph as e

II\

C

-0

-C

-N ot es .d w g

C2024-098

AL

AF

AL

KRC

JUN 2026

SYKES CREEK DREDGING

PHASE II

BREVARD COUNTY, FLORIDA

N O

R

EV

IS

IO

N S

/ S U

BM

IS

SI

O

N S

D

AT

E

ZO

N E

AS SHOWN

KENNETH R. CRAIG P.E.# 52605

TAYLOR ENGINEERING INC.

10199 SOUTHSIDE BLVD.

BLDG ONE, SUITE 310

JACKSONVILLE, FLORIDA 32256

(904)-731-7040

REGISTRY # 4815

SY

KE

S

CR

EE

K

PK

W

Y

ULUMAY WILDLIFE SANCTUARY

HANNAH DR.

HOLLY AVE.

CONCORD AVE.

CUNNINGHAM AVE.

W

IL

EY

C

T.

BA

R

R

ET

T D

R

JA

N

IC

E

C T.

TH

EO

D O

R E

D R

FLORAL LN.

PLUM AVE.

PLUM AVE.

ISLAND DR.

JAC

AR

AN

D

A ST.

QUINCE AVE.

C

AP

TA

IN

'S R

O W

ANCHOR LN.

GLEN HAVEN DR.

PHYLLIS DR.

PHYLLIS DR.

GLEN HAVEN DR.

ANCHOR LN.

ISLAND DR.

N

BAN

AN

A R

IVER

D

R

H U

LA

C

IR

SA

R

O N

G C

IR

BI

KI

N I C

IR

BREVARD COUNTY PARKS &

RECREATION

SYKES CREEK PKWY

E RICHLAND AVE. SY

KE

S

CR

EE

K

PK

W

Y

AUDUBON R

D.

O

LD

A

UD

UB

O

N

RD

NEEDLE BLVD.

SABAL AVE.

PATRICK AVE.

BELAIR AVE. BELAIR AVE.

PAULA AVE.RIVERSIDE AVE.

H

AM

PT

O

N W

AY EL

EA

N O

R S

T.

M

AR

G

AR

ET

S

T.

NEEDLE

BLV

D.

ALABAMA AVE.

NEEDLE BLVD.

4T H

P L.

MAUNA LOA CT.

SAN CRISTOBAL CT.

CARRIOCA CT.

SUNDORO CT.

BACARDI DR.

N

EW

H

AM

PT

O

N W

AY

E R

IC

H

LA

N

D A

VE

MONTEGO BAY CT.

W

AI

KI

KI

D R

KO

LO

A D

R

CATALINA ISLE DR.

TIKI DR.

M O

N

TE

G O

B

AY

D R

. S

LA

R

KV

IE

W S

T.

2N D

S T.

1S T

ST

TIKI DR.

SURFSPRAY DR.

O U

TR

IG

G

ER

D R

TY

PH

O O

N D

R

M

AI

KA

I D

R

WAINAI DR.

MIKADO DR.

OAHU DR.

M

AL

AK

I D R

M O

N

TE

G O

B

AY

D R

. N

BECORA DR.

TRINIDAD DR.

C

AS

A

BL

AN

C

A D

R

POI CT.

CARACAS DR.

N

EW

H

AM

PT

O

N W

AY

D

IA

M O

N D

H

EA

D D

R

JACALA DR.

DAKAR DR.

SKYLARK AVE.

BALI DR.

E RICHLAND AVE.

SAMOA DR.

ULUMAY WILDLIFE SANCTUARY

SYKES CREEK

SHEET C-5, C-9 & C-12

SHEET C-8 & C-11

SHEET C-4, C-7 & C-10

SYKES CREEK

DREDGING

LIMITS

APPROXIMATE

SHORELINE

(TYPICAL)

SEAGRASS AREAS

(TYPICAL)

MANGROVE LOCATION (TYPICAL)

GENERALIZED PIPELINE LOCATION FOR

HYDRAULIC DREDGING (TYPICAL)

OUTSTANDING FLORIDA

WATER LOCATIONS

(TYPICAL)

ZONE 2

ZONE 3A - SOUTH

ZONE 3B - SOUTH

SHOAL

SHOAL

SHOAL

ZONE 1B.2

OUTSTANDING FLORIDA WATERS

NANDIVADA PROPERTY

DREDGED MATERIAL

MANAGEMENT AREA

SEAGRASS AREAS

(TYPICAL)

GENERALIZED PIPELINE

LOCATION FOR HYDRAULIC

DREDGING (TYPICAL)

EFFLUENT DISCHARGE

LOCATION

ZONE 3B - NORTH

ZONE 3A - NORTH

C R

AN

E

C R

EE

K

VOLUME SUMMARY

ZONE CUT (CU. YDS.)

BASE BID

3A - NORTH 68,300

223,600

3B - SOUTH 157,300

OPTION 1 3A - SOUTH 17,200 17,200

OPTION 2 3B - NORTH 34,700 34,700

OPTION 3 1B.2 38,100 38,100

OPTION 4 2 38,800 38,800

TOTAL CUT 352,400

DESIGNED

DRAWN

CHECKED

REVIEWED

DATE

SCALE

PROJECT NO

DRAWING TITLE

SHEET OF

21 3 4 5 6 7 8

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

21 3 4 5 6 7 8

PROJECT OVERVIEW

C-3

AD

AM

L U

C

EY

, 6 /2

4/

:5 9:

P

M , X

:\s ys

\P ro je ct s\ C

-0

S yk es C re ek

\C on st ru ct io n\ c2

4-

Ph as e

II\

C

-0

-C

-O ve rv ie w .d w g

C2024-098

AL

AF

AL

KRC

JUN 2026

SYKES CREEK DREDGING

PHASE II

BREVARD COUNTY, FLORIDA

N O

R

EV

IS

IO

N S

/ S U

BM

IS

SI

O

N S

D

AT

E

ZO

N E

N0

GRAPHIC SCALE

800' 1,600'400'

22X34: 1" = 400' 11X17: 1" = 800'

VERT. SCALE: 1" = 5' (22x34)VERT. SCALE: 1" = 10' (11X17)

DREDGE LIMITS

DREDGING VOLUME : 352,400 CU. YDS.

ALLOWABLE OVERDREDGE DEPTH FOR PAYMENT: 0.0 FT

SEAGRASS AREAS

OUTSTANDING FLORIDA WATERS

TAYLOR ENGINEERING INC.

10199 SOUTHSIDE BLVD.

BLDG ONE, SUITE 310

JACKSONVILLE, FLORIDA 32256

(904)-731-7040

REGISTRY # 4815

NOTE: BASE BID ZONES MUST BE COMPLETED

PRIOR TO COMMENCING WORK ON ADDITIONAL

ZONES (IF AWARDED).

APPROXIMATE SHORELINE

MANGROVE EDGE

KE

S

CREE

K

PK

W Y

O

LD

A

UD

UB

O

N

RD

MANGROVE BOUNDARY (TYP)

E RICHLAND AVE.

MAUNA LOA CT.

SAN CRISTOBAL CT.

CARRIOCA CT.

SUNDORO CT.

BACARDI DR.

N

EW

H

AM

PT

O N

W

AY

E R

IC

H

LA

N

D A

VE

MONTEGO BAY CT.

W

AI

KI

KI

D R

KO

LO

A D

R

.CATALINA ISLE DR.

TIKI DR.

M O

N

TE

G O

B

AY

D R

. S

LA

R

KV

IE

W S

T.

TIKI DR.

SURFSPRAY DR.

O U

TR

IG

G

ER

D R

TY

PH

O O

N D

R

M

AI

KA

I D

R

WAINAI DR.

MIKADO DR.

OAHU DR.

M

AL

AK

I D

R

M O

N

TE

G O

B

AY

D R

. N

BECORA DR.

TRINIDAD DR.

POI CT.

CARACAS DR.

N

EW

H

AM

PT

O

N W

AY

D

IA

M O

N D

H

EA

D D

R

JACALA DR.

DAKAR DR.

BALI DR.

SAMOA DR.

ULUMAY WILDLIFE

SANCTUARY

SYKES CREEK

M

AT

C H

LI

N

E C

-4 M

AT

C

H

LI

N E

C -5

ZONE 3

SHOAL

SHOAL

SHOAL

SHOAL

MATCHLINE C-4

MATCHLINE C-5

SEAGRASS

SEAGRASS LEGEND

MANGROVE / BRAZILIAN PEPPER

DREDGING LIMITS

DESIGNED

DRAWN

CHECKED

REVIEWED

DATE

SCALE

PROJECT NO

DRAWING TITLE

SHEET OF

21 3 4 5 6 7 8

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

21 3 4 5 6 7 8

EXISTING CONDITIONS

ZONE 3

C-4

AD

AM

L U

C

EY

, 6 /2

4/

:5 9:

P

M , X

:\s ys

\P ro je ct s\ C

-0

S yk es C re ek

\C on st ru ct io n\ c2

4-

Ph as e

II\

C

-0

-C

-E xt

C on d.

dw g

C2024-098

AL

AF

AL

KRC

JUN 2026

SYKES CREEK DREDGING

PHASE II

BREVARD COUNTY, FLORIDA

N

GRAPHIC SCALE

400' 800'200'

22X34: 1" = 200' 11X17: 1" = 400'

VERT. SCALE: 1" = 5' (22x34)VERT. SCALE: 1" = 10' (11X17)

REFERENCES:

1. EXISTING BATHYMETRY SHOWN ON THESE DRAWINGS, EXCLUDING ZONE 1B.2,

WAS PROVIDED TO TAYLOR ENGINEERING, INC. BY LAND & SEA SURVEYING

CONCEPTS, INC.. FINAL DRAWINGS DATED 2-14-15. ZONE 1B.2 SURVEYS WERE

PROVIDED AS PART OF PHASE I BY OCEANSIDE SOLUTIONS, LLC., ON 7-24-2023.

2. AERIALS REFERENCE: FLORIDA DEPARTMENT OF TRANSPORTATION, BREVARD

COUNTY, FLORIDA, 2012.

N O

R

EV

IS

IO

N S

/ S U

BM

IS

SI

O

N S

D

AT

E

ZO

N E

TAYLOR ENGINEERING INC.

10199 SOUTHSIDE BLVD.

BLDG ONE, SUITE 310

JACKSONVILLE, FLORIDA 32256

MANGROVE / BRAZILIAN PEPPER LOCATION (TYP)

KE

S

CR

EE

K

PK

W

Y

SY

KE

S

CR

EE

K

PK

W

Y

ULUMAY WILDLIFE

SANCTUARY

HANNAH DR.

HOLLY AVE.

CONCORD AVE.

CUNNINGHAM AVE.

W

IL

EY

C

T.

BA

R

R

ET

T D

R

JA

N

IC

E

C T.

TH

EO

D O

R E

D R

FLORAL LN.

PLUM AVE.

PLUM AVE.

ISLAND DR.

JAC

AR

AN

D

A ST.

QUINCE AVE.

C

AP

TA

IN

'S R

O W

ANCHOR LN.

GLEN HAVEN DR.

PHYLLIS DR.

PHYLLIS DR.

GLEN HAVEN DR.

ANCHOR LN.

ISLAND DR.

N

BAN

AN

A R

IVER

D

R

H U

LA

C

IR

SA

R

O N

G C

IR

BI

KI

N I C

IR

BREVARD COUNTY

PARKS & RECREATION

LIMITS OF

SURVEY

MANGROVE / BRAZILIAN PEPPER LOCATION (TYP)

TYPICAL 15' BUFFER

(MANGROVE / BRAZILIAN PEPPER)

LIMITS OF SURVEY

M

AT

C H

LI

N

E C

-4 M

AT

C

H

LI

N E

C -5

ZONE 2

SHOAL

SYKES CREEK

SYKES CREEK

ZONE 1B.2

MATCHLINE C-4

MATCHLINE C-5

NANDIVADA PROPERTY

DREDGED MATERIAL

MANAGEMENT AREA

SEAGRASS

SEAGRASS LEGEND

MANGROVE / BRAZILIAN PEPPER

DREDGING LIMITS

DESIGNED

DRAWN

CHECKED

REVIEWED

DATE

SCALE

PROJECT NO

DRAWING TITLE

SHEET OF

21 3 4 5 6 7 8

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

21 3 4 5 6 7 8

EXISTING CONDITIONS

ZONES 1 & 2

C-5

AD

AM

L U

C

EY

, 6 /2

4/

:5 9:

P

M , X

:\s ys

\P ro je ct s\ C

-0

S yk es C re ek

\C on st ru ct io n\ c2

4-

Ph as e

II\

C

-0

-C

-E xt

C on d.

dw g

C2024-098

AL

AF

AL

KRC

JUN 2026

SYKES CREEK DREDGING

PHASE II

BREVARD COUNTY, FLORIDA

GRAPHIC SCALE

400' 800'200'

22X34: 1" = 200' 11X17: 1" = 400'

VERT. SCALE: 1" = 5' (22x34)VERT. SCALE: 1" = 10' (11X17)

N O

R

EV

IS

IO

N S

/ S U

BM

IS

SI

O

N S

D

AT

E

ZO

N E

TAYLOR ENGINEERING INC.

10199 SOUTHSIDE BLVD.

BLDG ONE, SUITE 310

JACKSONVILLE, FLORIDA 32256

(904)-731-7040

REGISTRY # 4815

REFERENCES:

1. EXISTING BATHYMETRY SHOWN ON THESE DRAWINGS, EXCLUDING ZONE

1B.2, WAS PROVIDED TO TAYLOR ENGINEERING, INC. BY LAND & SEA

SURVEYING CONCEPTS, INC.. FINAL DRAWINGS DATED 2-14-15. ZONE 1B.2

SURVEYS WERE PROVIDED AS PART OF PHASE I BY OCEANSIDE

SOLUTIONS, LLC., ON 7-24-2023.

2. AERIALS REFERENCE: FLORIDA DEPARTMENT OF TRANSPORTATION,

BREVARD COUNTY, FLORIDA, 2012.

15' BUFFER (TYP)

MANGROVE LOCATIONS (TYP)

SEAGRASS AREA

APPROXIMATE SHORELINE

SEAGRASS

AREA

SEAGRASS

AREA

VIBRACORE N TOP OF MUCK

-12.70

VIBRACORE O TOP OF MUCK

-17.61

VIBRACORE P TOP OF MUCK

-5.98

VIBRACORE R TOP OF MUCK

-14.07

VIBRACORE S TOP OF MUCK

-10.86

VIBRACORE L TOP OF MUCK

-10.06

VIBRACORE L BOTTOM OF MUCK

-14.76

VIBRACORE M TOP OF MUCK

-12.70

VIBRACORE M BOTTOM OF MUCK

-18.80

VIBRACORE N BOTTOM OF MUCK

-18.80

VIBRACORE O BOTTOM OF MUCK

-20.46

VIBRACORE P BOTTOM OF MUCK

-8.28

VIBRACORE Q TOP OF MUCK

-7.18

VIBRACORE Q BOTTOM OF MUCK

-8.68

VIBRACORE R BOTTOM OF MUCK

-18.67

VIBRACORE S BOTTOM OF MUCK

-15.56

VIBRACORE I TOP OF MUCK

-11.58

VIBRACORE A BOTTOM OF MUCK

-18.98

VIBRACORE A TOP OF MUCK

-10.48

VIBRACORE AA BOTTOM OF MUCK

-20.35

VIBRACORE AA TOP OF MUCK

-15.35

VIBRACORE B BOTTOM OF MUCK

-15.14

VIBRACORE B TOP OF MUCK

-9.94

VIBRACORE BB BOTTOM OF MUCK

-17.00

VIBRACORE BB TOP OF MUCK

-14.40

VIBRACORE C BOTTOM OF MUCK

-16.49

VIBRACORE C TOP OF MUCK

-12.49

VIBRACORE CC BOTTOM OF MUCK

-15.76

VIBRACORE CC TOP OF MUCK

-13.41

VIBRACORE D BOTTOM OF MUCK

-14.67

VIBRACORE D TOP OF MUCK

-12.67

VIBRACORE DD BOTTOM OF MUCK

-17.74

VIBRACORE DD TOP OF MUCK

-14.54

VIBRACORE E BOTTOM OF MUCK

-17.92

VIBRACORE E TOP OF MUCK

-13.72

VIBRACORE F BOTTOM OF MUCK

-17.92

VIBRACORE F TOP OF MUCK

-12.62

VIBRACORE G BOTTOM OF MUCK

-14.67

VIBRACORE G TOP OF MUCK

-12.27

VIBRACORE H BOTTOM OF MUCK

-15.07

VIBRACORE H TOP OF MUCK

-13.47

VIBRACORE I BOTTOM OF MUCK

-16.58

VIBRACORE J BOTTOM OF MUCK

-14.24

VIBRACORE J TOP OF MUCK

-12.24

VIBRACORE K BOTTOM OF MUCK

-16.61

VIBRACORE K TOP OF MUCK

-14.21

VIBRACORE T BOTTOM OF MUCK

-19.17

VIBRACORE T TOP OF MUCK

-14.87

VIBRACORE U BOTTOM OF MUCK

-18.47

VIBRACORE U TOP OF MUCK

-14.97

VIBRACORE V BOTTOM OF MUCK

-18.77

VIBRACORE V TOP OF MUCK

-15.17

VIBRACORE W BOTTOM OF MUCK

-21.15

VIBRACORE W TOP OF MUCK

-14.30

VIBRACORE X BOTTOM OF MUCK

-18.78

VIBRACORE X TOP OF MUCK

-15.38

VIBRACORE Y BOTTOM OF MUCK

-15.80

VIBRACORE Y TOP OF MUCK

-13.80

VIBRACORE Z BOTTOM OF MUCK

-17.52

VIBRACORE Z TOP OF MUCK

-14.22

SEAGRASS AREA

SEAGRASS AREA

SEAGRASS AREA

SEAGRASS AREA

SEAGRASS AREA

ZONE 2

ZONE 3A - SOUTH

ZONE 3B - SOUTH

SHO

AL

SHOAL

SHOAL

SHOAL

SHOAL

15' BUFFER (TYP)

SYKES CREEK

SYKES CREEK

ZONE 1B.2

15' BUFFER (TYP)

ZONE 3A - NORTH

ZONE 3B - NORTH

SEAGRASS AREA

VIBRACORE LOCATIONS

VIBRACORE DESCRIPTION

VIBRACORE A BOTTOM OF MUCK

VIBRACORE A TOP OF MUCK

VIBRACORE AA BOTTOM OF MUCK

VIBRACORE AA TOP OF MUCK

VIBRACORE B BOTTOM OF MUCK

VIBRACORE B TOP OF MUCK

VIBRACORE BB BOTTOM OF MUCK

VIBRACORE BB TOP OF MUCK

VIBRACORE C BOTTOM OF MUCK

VIBRACORE C TOP OF MUCK

VIBRACORE CC BOTTOM OF MUCK

VIBRACORE CC TOP OF MUCK

VIBRACORE D BOTTOM OF MUCK

VIBRACORE D TOP OF MUCK

VIBRACORE DD BOTTOM OF MUCK

VIBRACORE DD TOP OF MUCK

VIBRACORE E BOTTOM OF MUCK

VIBRACORE E TOP OF MUCK

VIBRACORE F BOTTOM OF MUCK

VIBRACORE F TOP OF MUCK

EASTING

755943.0000

755942.8000

756526.6244

756526.3400

756526.5000

756526.1000

756302.6986

756302.3400

755806.0580

755802.3411

756383.0072

756382.0361

755692.5000

755692.0000

756346.8240

756346.4700

755955.2500

755955.7410

756138.0000

756138.1000

NORTHING

1465543.0000

1465542.6000

1467046.0910

1467046.5200

1465784.0000

1465783.5000

1467401.3590

1467401.6100

1466931.4230

1466930.0770

1468392.4000

1468393.3060

1467345.0000

1467345.5000

1467996.7420

1467997.0100

1467750.3000

1467750.8310

1468170.0000

1468169.5000

DEPTH

(NAVD88)

-18.98

-10.48

-20.35

-15.35

-15.14

-9.94

-17.00

-14.40

-16.49

-12.49

-15.76

-13.41

-14.67

-12.67

-17.74

-14.54

-17.92

-13.72

-17.92

-12.62

VIBRACORE LOCATIONS

VIBRACORE DESCRIPTION

VIBRACORE G BOTTOM OF MUCK

VIBRACORE G TOP OF MUCK

VIBRACORE H BOTTOM OF MUCK

VIBRACORE H TOP OF MUCK

VIBRACORE I BOTTOM OF MUCK

VIBRACORE I TOP OF MUCK

VIBRACORE J BOTTOM OF MUCK

VIBRACORE J TOP OF MUCK

VIBRACORE K BOTTOM OF MUCK

VIBRACORE K TOP OF MUCK

VIBRACORE L BOTTOM OF MUCK

VIBRACORE L TOP OF MUCK

VIBRACORE M BOTTOM OF MUCK

VIBRACORE M TOP OF MUCK

VIBRACORE N BOTTOM OF MUCK

VIBRACORE N TOP OF MUCK

VIBRACORE O BOTTOM OF MUCK

VIBRACORE O TOP OF MUCK

VIBRACORE P BOTTOM OF MUCK

VIBRACORE P TOP OF MUCK

EASTING

755768.5000

755768.0000

755927.0000

755927.5000

754333.8065

754334.8032

754201.9060

754201.8018

755102.5645

755102.5645

762354.9665

762354.9665

761021.7640

761021.7640

760635.3371

760635.3371

760847.0215

760847.0215

761977.9393

761977.9393

NORTHING

1468568.5000

1468568.0000

1469250.3000

1469250.8000

1469004.6850

1469004.7600

1469719.9730

1469720.0950

1470570.3830

1470571.0930

1466891.7627

1466891.7627

1466209.7207

1466209.7207

1465532.5193

1465532.5193

1464958.1911

1464958.1911

1464598.5240

1464598.5240

DEPTH

(NAVD88)

-14.67

-12.27

-15.07

-13.47

-16.58

-11.58

-14.24

-12.24

-16.61

-14.21

-14.76

-10.06

-18.80

-12.70

-18.80

-12.70

-20.46

-17.61

-8.28

-5.98

VIBRACORE LOCATIONS

VIBRACORE DESCRIPTION

VIBRACORE Q BOTTOM OF MUCK

VIBRACORE Q TOP OF MUCK

VIBRACORE R BOTTOM OF MUCK

VIBRACORE R TOP OF MUCK

VIBRACORE S BOTTOM OF MUCK

VIBRACORE S TOP OF MUCK

VIBRACORE T BOTTOM OF MUCK

VIBRACORE T TOP OF MUCK

VIBRACORE U BOTTOM OF MUCK

VIBRACORE U TOP OF MUCK

VIBRACORE V BOTTOM OF MUCK

VIBRACORE V TOP OF MUCK

VIBRACORE W BOTTOM OF MUCK

VIBRACORE W TOP OF MUCK

VIBRACORE X BOTTOM OF MUCK

VIBRACORE X TOP OF MUCK

VIBRACORE Y BOTTOM OF MUCK

VIBRACORE Y TOP OF MUCK

VIBRACORE Z BOTTOM OF MUCK

VIBRACORE Z TOP OF MUCK

EASTING

761755.0331

761755.0331

759715.0700

759715.0700

758634.0500

758634.0500

757651.6407

757651.0500

755814.5976

755813.9500

755829.8827

755829.1100

756300.0144

756299.7100

755938.4126

755937.2400

756119.5531

756118.3600

756325.1206

756325.0100

NORTHING

1464259.3896

1464259.3896

1464355.9100

1464355.9100

1466348.0000

1466348.0000

1467006.5200

1467007.0300

1470604.2240

1470605.5900

1470247.4190

1470248.1500

1469806.0770

1469806.1300

1469880.6440

1469880.9400

1469112.6500

1469113.0400

1468600.1640

1468600.3500

DEPTH

(NAVD88)

-8.68

-7.18

-18.67

-14.07

-15.56

-10.86

-19.17

-14.87

-18.47

-14.97

-18.77

-15.17

-21.15

-14.30

-18.78

-15.38

-15.80

-13.80

-17.52

-14.22

N0

GRAPHIC SCALE

400' 800'200'

22X34: 1" = 200' 11X17: 1" = 400'

VERT. SCALE: 1" = 5' (22x34)VERT. SCALE: 1" = 10' (11X17)

DESIGNED

DRAWN

CHECKED

REVIEWED

DATE

SCALE

PROJECT NO

DRAWING TITLE

SHEET OF

21 3 4 5 6 7 8

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

21 3 4 5 6 7 8

VIBRACORE LOCATIONS

C-6

AD

AM

L U

C

EY

, 6 /2

4/

:5 9:

P

M , X

:\s ys

\P ro je ct s\ C

-0

S yk es C re ek

\C on st ru ct io n\ c2

4-

Ph as e

II\

C

-0

-C

-V ib ra co re .d w g

C2024-098

AL

AF

AL

KRC

JUN 2026

SYKES CREEK DREDGING

PHASE II

BREVARD COUNTY, FLORIDA

O

R

EV

IS

IO

N S

/ S U

BM

IS

SI

O

N S

D

AT

E

ZO

N E

TAYLOR ENGINEERING INC.

10199 SOUTHSIDE BLVD.

BLDG ONE, SUITE 310

JACKSONVILLE, FLORIDA 32256

1-888-404-FWCC

CAUTION

MANATEES

SEAGRASS

AREA

E RICHLAND AVE.

SY

KE

S

CR

EE

K

PK

W

Y

O

LD

A

UD

UB

O

N

RD

PAULA AVE.RIVERSIDE AVE.

MAUNA LOA CT.

SAN CRISTOBAL CT.

CARRIOCA CT.

SUNDORO CT.

BACARDI DR.

N

EW

H

AM

PT

O

N W

AY

E R

IC

H

LA

N

D A

VE

MONTEGO BAY CT.

W

AI

KI

KI

D R

KO

LO

A D

R

CATALINA ISLE DR.

TIKI DR.

M O

N

TE

G O

B

AY

D R

. S

LA

R

KV

IE

W S

T.

TIKI DR.

SURFSPRAY DR.

O U

TR

IG

G

ER

D R

TY

PH

O O

N D

R

M

AI

KA

I D

R

WAINAI DR.

MIKADO DR.

OAHU DR.

M

AL

AK

I D

R

M O

N

TE

G O

B

AY

D R

. N

BECORA DR.

TRINIDAD DR.

POI CT.

CARACAS DR.

N

EW

H

AM

PT

O

N W

AY

D

IA

M O

N D

H

EA

D D

R

DAKAR DR.

BALI DR.

E RICHLAND AVE.

SAMOA DR.

ULUMAY WILDLIFE SANCTUARY

SYKES C

R

EEK

SEAGRASS AREA

SEAGRASS AREA

SEAGRASS AREA

SEAGRASS AREA

DREDGING LIMITS BUFFER (TYP)

APPROXIMATE SHORELINE

DREDGING LIMITS BUFFER (TYP)

DREDGING LIMITS

EXISTING STRUCTURE (TYP)

M

AT

C H

LI

N

E C

-8 M

AT

C

H

LI

N E

C -9

MATCHLINE C-7

MATCHLINE C-8

MATCHLINE C-7

MATCHLINE C-8

ZONE 3A - NORTH

ZONE 3B - SOUTH

ZONE 2

BL-7

MANATEE DREDGING

WINDOW RESTRICTION

SEE NOTES ON SHEET C-2

SHOAL

SHOAL

SHOAL

SHOAL

SYKES CREEK

15' BUFFER (TYP)

15' BUFFER (TYP)

ZONE 3A - SOUTH

ZONE 3B - NORTH

THICKNESS OF MUCK

RANGE

MAX.

(FT)

MIN.

(FT)

COLOR

DESIGNED

DRAWN

CHECKED

REVIEWED

DATE

SCALE

PROJECT NO

DRAWING TITLE

SHEET OF

21 3 4 5 6 7 8

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

21 3 4 5 6 7 8

THICKNESS OF MUCK

ZONE 3

C-7

AD

AM

L U

C

EY

, 6 /2

4/

:5 9:

P

M , X

:\s ys

\P ro je ct s\ C

-0

S yk es C re ek

\C on st ru ct io n\ c2

4-

Ph as e

II\

C

-0

-C

-M uc kD ep th .d w g

C2024-098

AL

AF

AL

KRC

JUN 2026

SYKES CREEK DREDGING

PHASE II

BREVARD COUNTY, FLORIDA

GRAPHIC SCALE

400' 800'200'

22X34: 1" = 200' 11X17: 1" = 400'

VERT. SCALE: 1" = 5' (22x34)VERT. SCALE: 1" = 10' (11X17)

N O

R

EV

IS

IO

N S

/ S U

BM

IS

SI

O

N S

D

AT

E

ZO

N E

TAYLOR ENGINEERING INC.

10199 SOUTHSIDE BLVD.

BLDG ONE, SUITE 310

JACKSONVILLE, FLORIDA 32256

MANATEES

1-888-404-FWCC

CAUTION

MANATEES

SEAGRASS

AREA

SY

KE

S

CR

EE

K

PK

W

Y

E RICHLAND AVE.

SY

KE

S

CREE

K

PK

W Y

AUDUBON R

D.

O

LD

A

UD

UB

O

N

RD

NEEDLE BLVD.

SABAL AVE.

PATRICK AVE.

BELAIR AVE. BELAIR AVE.

PAULA AVE.RIVERSIDE AVE.

H

AM

PT

O

N W

AY

EL

EA

N O

R S

T.

M

AR

G

AR

ET

S

T.

NEEDLE

BLV

D.

ALABAMA AVE.

NEEDLE BLVD.

4T H

P L.

MAUNA LOA CT.

SAN CRISTOBAL CT.

N

EW

H

AM

PT

O

N W

AY

E R

IC

H

LA

N

D A

VE

MONTEGO BAY CT.

M O

N

TE

G O

B

AY

D R

. S

LA

R

KV

IE

W S

T.

BALI DR.

E RICHLAND AVE.

SEAGRASS AREA

M

AT

C H

LI

N

E C

-8 M

AT

C

H

LI

N E

C -9

M

AT

C H

LI

N

E C

-8 M

AT

C

H

LI

N E

C -9

MATCHLINE C-7

MATCHLINE C-8

MATCHLINE C-7

MATCHLINE C-8

DREDGING LIMITS

DREDGING LIMITS BUFFER (TYP)

ZONE 2

ZONE 3B - SOUTH

BL-7

MANATEE DREDGING

WINDOW RESTRICTION

SEE NOTES ON SHEET C-2

BL-8

MANATEE DREDGING

WINDOW RESTRICTION

SEE NOTES ON SHEET C-2

SHOAL

SYKES CREEK

15' BUFFER (TYP)

SEAGRASS

AREA

ZONE 3B - NORTH

THICKNESS OF MUCK

RANGE

MAX.

(FT)

MIN.

(FT)

DESIGNED

DRAWN

CHECKED

REVIEWED

DATE

SCALE

PROJECT NO

DRAWING TITLE

SHEET OF

21 3 4 5 6 7 8

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

21 3 4 5 6 7 8

THICKNESS OF MUCK

ZONES 2 & 3

C-8

AD

AM

L U

C

EY

, 6 /2

4/

:5 9:

P

M , X

:\s ys

\P ro je ct s\ C

-0

S yk es C re ek

\C on st ru ct io n\ c2

4-

Ph as e

II\

C

-0

-C

-M uc kD ep th .d w g

C2024-098

AL

AF

AL

KRC

JUN 2026

SYKES CREEK DREDGING

PHASE II

BREVARD COUNTY, FLORIDA

GRAPHIC SCALE

400' 800'200'

22X34: 1" = 200' 11X17: 1" = 400'

VERT. SCALE: 1" = 5' (22x34)VERT. SCALE: 1" = 10' (11X17)

N O

R

EV

IS

IO

N S

/ S U

BM

IS

SI

O

N S

D

AT

E

ZO

N E

TAYLOR ENGINEERING INC.

10199 SOUTHSIDE BLVD.

BLDG ONE, SUITE 310

JACKSONVILLE, FLORIDA 32256

MANATEES

1-888-404-FWCC

CAUTION

MANATEES

1-888-404-FWCC

CAUTION

MANATEES

1-888-404-FWCC

CAUTION

MANATEES

1-888-404-FWCC

CAUTION

MANATEES

DREDGING

LIMITS

DREDGING LIMITS BUFFER (TYP)

MANGROVE LOCATION (TYP)

SEAGRASS

AREA

SEAGRASS AREA

ULUMAY WILDLIFE SANCTUARY

HANNAH DR.

HOLLY AVE.

CONCORD AVE.

CUNNINGHAM AVE.

W

IL

EY

C

T.

BA

R

R

ET

T D

R

JA

N

IC

E

C T.

TH

EO

D O

R E

D R

FLORAL LN.

PLUM AVE.

PLUM AVE.

ISLAND DR.

JAC

AR

AN

D

A ST.

QUINCE AVE.

C

AP

TA

IN

'S R

O W

ANCHOR LN.

GLEN HAVEN DR.

PHYLLIS DR.

PHYLLIS DR.

GLEN HAVEN DR.

ANCHOR LN.

ISLAND DR.

N

BAN

AN

A R

IVER

D

R

H U

LA

C

IR

SA

R

O N

G C

IR

BI

KI

N I C

IR

BREVARD COUNTY PARKS

& RECREATION AREA

SY

KE

S

CR

EE

K

PK

W

Y

MANGROVE

LOCATIONS

(TYP)

MANGROVES LOCATIONS (TYP)

M

AT

C H

LI

N

E C

-8 M

AT

C

H

LI

N E

C -9

M

AT

C H

LI

N

E C

-8 M

AT

C

H

LI

N E

C -9

MATCHLINE C-7

MATCHLINE C-8

ZONE 2

BL-14

MANATEE DREDGING

WINDOW RESTRICTION

SEE NOTES ON SHEET C-2

BL-16

MANATEE DREDGING

WINDOW RESTRICTION

SEE NOTES ON SHEET C-2

1-888-404-FWCC

CAUTION

MANATEES

BL-15

MANATEE DREDGING

WINDOW RESTRICTION

SEE NOTES ON SHEET C-2

15' BUFFER (TYP)

SHOAL

SYKES CREEK

ZONE 1B.2

SEAGRASS

AREA

DREDGING

LIMITS

SEAGRASS AREA

SEAGRASS

AREA

THICKNESS OF MUCK

RANGE

MAX.

(FT)

MIN.

(FT)

DESIGNED

DRAWN

CHECKED

REVIEWED

DATE

SCALE

PROJECT NO

DRAWING TITLE

SHEET OF

21 3 4 5 6 7 8

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

21 3 4 5 6 7 8

THICKNESS OF MUCK

ZONES 1 & 2

C-9

AD

AM

L U

C

EY

, 6 /2

4/

:5 9:

P

M , X

:\s ys

\P ro je ct s\ C

-0

S yk es C re ek

\C on st ru ct io n\ c2

4-

Ph as e

II\

C

-0

-C

-M uc kD ep th .d w g

C2024-098

AL

AF

AL

KRC

JUN 2026

SYKES CREEK DREDGING

PHASE II

BREVARD COUNTY, FLORIDA

400' 800'200'

22X34: 1" = 200' 11X17: 1" = 400'

VERT. SCALE: 1" = 5' (22x34)VERT. SCALE: 1" = 10' (11X17)

N O

R

EV

IS

IO

N S

/ S U

BM

IS

SI

O

N S

D

AT

E

ZO

N E

TAYLOR ENGINEERING INC.

10199 SOUTHSIDE BLVD.

BLDG ONE, SUITE 310

JACKSONVILLE, FLORIDA 32256

0+00

2+00

50+57

0+00

2+004+00 6+00

8+00

10+00

12+00

14+00

16+00

18+00

20+00

22+00

24+00

26+00

28+00

30+00

32+00

34+00

36+00

+0

+0

+0

+0

+0

+0

+0

7+00 0+00

2+004+006+00

SEAGRASS

AREA

E RICHLAND AVE.

SY

KE

S

CREE

K

PK

W Y

O

LD

A

UD

UB

O

N

RD

PAULA AVE.RIVERSIDE AVE.

MAUNA LOA CT.

SAN CRISTOBAL CT.

CARRIOCA CT.

SUNDORO CT.

BACARDI DR.

N

EW

H

AM

PT

O

N W

AY

E R

IC

H

LA

N

D A

VE

MONTEGO BAY CT.

W

AI

KI

KI

D R

KO

LO

A D

R

CATALINA ISLE DR.

TIKI DR.

M O

N

TE

G O

B

AY

D R

. S

LA

R

KV

IE

W S

T.

TIKI DR.

SURFSPRAY DR.

O U

TR

IG

G

ER

D R

TY

PH

O O

N D

R

M

AI

KA

I D

R

WAINAI DR.

MIKADO DR.

OAHU DR.

M

AL

AK

I D

R

M O

N

TE

G O

B

AY

D R

. N

BECORA DR.

TRINIDAD DR.

POI CT.

CARACAS DR.

N

EW

H

AM

PT

O

N W

AY

D

IA

M O

N D

H

EA

D D

R

DAKAR DR.

BALI DR.

E RICHLAND AVE.

SAMOA DR.

ULUMAY WILDLIFE SANCTUARY

SYKES CREEK

SEAGRASS AREA

SEAGRASS AREA

SEAGRASS AREA

SEAGRASS AREA

SEAGRASS AREA

DREDGING LIMITS BUFFER (TYP)

APPROXIMATE SHORELINE

DREDGING LIMITS BUFFER (TYP)

DREDGING LIMITS

EXISTING STRUCTURE (TYP)

M

AT

C H

LI

N

E C

-1

M

AT

C H

LI

N

E C

-1

MATCHLINE C-10

MATCHLINE C-11

MATCHLINE C-10

MATCHLINE C-11

BA

SE

LI

NE

BASELINE 1

BASELINE 1

BASELINE 9

BASELINE 1

BASELINE 1A

ZONE 3A - NORTH

ZONE 3B - SOUTH

ZONE 2

SHOAL

15' BUFFER (TYP)

SHOALING AREA

15' BUFFER SHOAL

SHOAL

SHOAL

SYKES CREEK

SYKES CREEK

ZONE 3A - SOUTH

ZONE 3B - NORTH

NOTES:

1. CONTRACTOR TO FIELD VERIFY AND MAINTAIN

DREDGING LIMIT BUFFERS FOR ALL

STRUCTURES/FEATURES WHETHER

STRUCTURE/FEATURES ARE SHOWN ON

DRAWING OR NOT. SEE TECHNICAL

SPECIFICATIONS FOR BUFFER DIMENSIONS.

BOTTOM OF MUCK ELEVATION (NAVD88)

RANGE

MAX

ELEV (FT)

-36

-26

-16

-6

MIN

ELEV (FT)

-26

-16

-6

DESIGNED

DRAWN

CHECKED

REVIEWED

DATE

SCALE

PROJECT NO

DRAWING TITLE

SHEET OF

21 3 4 5 6 7 8

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

21 3 4 5 6 7 8

BOTTOM OF MUCK

ELEVATIONS ZONE 3

C-10

AD

AM

L U

C

EY

, 6 /2

4/

:5 9:

P

M , X

:\s ys

\P ro je ct s\ C

-0

S yk es C re ek

\C on st ru ct io n\ c2

4-

Ph as e

II\

C

-0

-C

-O pe n- Ea st .d w g

C2024-098

AL

AF

AL

KRC

JUN 2026

SYKES CREEK DREDGING

PHASE II

BREVARD COUNTY, FLORIDA

GRAPHIC SCALE

400' 800'200'

22X34: 1" = 200' 11X17: 1" = 400'

VERT. SCALE: 1" = 5' (22x34)VERT. SCALE: 1" = 10' (11X17)

N O

R

EV

IS

IO

N S

/ S U

BM

IS

SI

O

N S

D

AT

E

ZO

N E

TAYLOR ENGINEERING INC.

10199 SOUTHSIDE BLVD.

BLDG ONE, SUITE 310

JACKSONVILLE, FLORIDA 32256

2+00

4+00

6+00

8+00

0+00

2+00

4+00

6+00

8+00

10+00

0+00

2+004+00 6+00

8+00

10+00

12+00

14+00

16+00

18+00

20+00

SEAGRASS

AREA

SY

KE

S

CREE

K

PK

W Y

E RICHLAND AVE.

SY

KE

S

CR

EE

K

PK

W

Y

AUDUBON R

D.

O

LD

A

UD

UB

O

N

RD

NEEDLE BLVD.

SABAL AVE.

PATRICK AVE.

BELAIR AVE. BELAIR AVE.

PAULA AVE.RIVERSIDE AVE.

H

AM

PT

O

N W

AY

EL

EA

N O

R S

T.

M

AR

G

AR

ET

S

T.

NEEDLE

BLV

D.

ALABAMA AVE.

NEEDLE BLVD.

4T H P

L.

MAUNA LOA CT.

SAN CRISTOBAL CT.

N

EW

H

AM

PT

O

N W

AY

MONTEGO BAY CT.

M O

N

TE

G O

B

AY

D R

. S

LA

R

KV

IE

W S

T.

BALI DR.

E RICHLAND AVE.

SEAGRASS AREA

SEAGRASS AREA

M

AT

C H

LI

N

E C

-1

M

AT

C H

LI

N

E C

-1

M

AT

C H

LI

N

E C

-1

M

AT

C H

LI

N

E C

-1

MATCHLINE C-10

MATCHLINE C-11

MATCHLINE C-10

MATCHLINE C-11

DREDGING

LIMITS (TYP)

DREDGING LIMITS

BUFFER (TYP)

BASELINE 1

BASELINE 9

BASELINE 1

BASELINE 21

ZONE 2

ZONE 3B - SOUTH

SHOAL

15' BUFFER (TYP) SYKES CREEK

SYKES CREEK

ZONE 3B - NORTH

SEAGRASS

AREA

NOTES:

1. CONTRACTOR TO FIELD VERIFY AND MAINTAIN

DREDGING LIMIT BUFFERS FOR ALL

STRUCTURES/FEATURES WHETHER

STRUCTURE/FEATURES ARE SHOWN ON

DRAWING OR NOT. SEE TECHNICAL

SPECIFICATIONS FOR BUFFER DIMENSIONS.

BOTTOM OF MUCK ELEVATION (NAVD88)

RANGE

MAX

ELEV (FT)

-36

-26

-16

-6

MIN

ELEV (FT)

-26

-16

-6

DESIGNED

DRAWN

CHECKED

REVIEWED

DATE

SCALE

PROJECT NO

DRAWING TITLE

SHEET OF

21 3 4 5 6 7 8

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

21 3 4 5 6 7 8

BOTTOM OF MUCK

ELEVATIONS ZONES 2

& 3

C-11

AD

AM

L U

C

EY

, 6 /2

4/

:0 0:

P

M , X

:\s ys

\P ro je ct s\ C

-0

S yk es C re ek

\C on st ru ct io n\ c2

4-

Ph as e

II\

C

-0

-C

-O pe n- Ea st .d w g

C2024-098

AL

AF

AL

KRC

JUN 2026

SYKES CREEK DREDGING

PHASE II

BREVARD COUNTY, FLORIDA

GRAPHIC SCALE

400' 800'200'

22X34: 1" = 200' 11X17: 1" = 400'

VERT. SCALE: 1" = 5' (22x34)VERT. SCALE: 1" = 10' (11X17)

N O

R

EV

IS

IO

N S

/ S U

BM

IS

SI

O

N S

D

AT

E

ZO

N E

TAYLOR ENGINEERING INC.

10199 SOUTHSIDE BLVD.

BLDG ONE, SUITE 310

JACKSONVILLE, FLORIDA 32256

15+24

2+00 4+00

6+

8+

+0

12+00

14+00

3+20

0+00

2+00

23+43

0+00

2+00

4+00

6+00

8+00

10+00

12+00

14+00

16+00

18+00

20+00

22+00

12+00

0+00

2+00

4+00

6+00

8+00

10+00

0+00

2+004+00 6+00

LIMITS OF

DREDGE

MANGROVE LOCATION

SEAGRASS

AREA

SEAGRASS AREA

SEAGRASS

AREA

SEAGRASS

AREA

SY

KE

S

CR

EE

K

PK

W

Y

ULUMAY WILDLIFE SANCTUARY

KIWANIS ISLAND

HANNAH DR.

HOLLY AVE.

CONCORD AVE.

CUNNINGHAM AVE.

W

IL

EY

C

T.

BA

R

R

ET

T D

R

JA

N

IC

E

C T.

TH

EO

D O

R E

D R

FLORAL LN.

PLUM AVE.

PLUM AVE.

ISLAND DR.

JAC

AR

AN

D

A ST.

QUINCE AVE.

C

AP

TA

IN

'S R

O W

ANCHOR LN.

GLEN HAVEN DR.

PHYLLIS DR.

PHYLLIS DR.

GLEN HAVEN DR.

ANCHOR LN.

ISLAND DR.

N

BAN

AN

A R

IVER

D

R

H U

LA

C

IR

SA

R

O N

G C

IR

BI

KI

N I C

IR

BREVARD COUNTY PARKS &

RECREATION AREA

SY

KE

S

CREE

K

PK

W Y

O

LD

A

UD

UB

O

N

RD

MANGROVE LOCATIONS (TYP)

MANGROVE LOCATIONS (TYP)

M

AT

C H

LI

N

E C

-1

M

AT

C H

LI

N

E C

-1

M

AT

C H

LI

N

E C

-1

M

AT

C H

LI

N

E C

-1

MATCHLINE C-10

MATCHLINE C-11

DREDGING

LIMITS (TYP)

DREDGING LIMITS

BUFFER (TYP)

BASELINE 9

BASELINE 1

BASELINE 11

BASELINE 21

ZONE 2

ZONE 1B.2

15' BUFFER (TYP)

SHOAL

SYKES CREEK

SYKES CREEK

SYKES CREEK

SYKES CREEK

BASELINE 12

+8

+0

+0

+0

22+00

24+00

26+00

28+00

30+00

32+00

34+00 36+00 38+00 39+86

BASELINE 10

SEAGRASS

AREA

BASELINE 9

NOTES:

1. CONTRACTOR TO FIELD VERIFY AND MAINTAIN

DREDGING LIMIT BUFFERS FOR ALL

STRUCTURES/FEATURES WHETHER

STRUCTURE/FEATURES ARE SHOWN ON

DRAWING OR NOT. SEE TECHNICAL

SPECIFICATIONS FOR BUFFER DIMENSIONS.

BOTTOM OF MUCK ELEVATION (NAVD88)

RANGE

MAX

ELEV (FT)

-36

-26

-16

-6

MIN

ELEV (FT)

-26

-16

-6

DESIGNED

DRAWN

CHECKED

REVIEWED

DATE

SCALE

PROJECT NO

DRAWING TITLE

SHEET OF

21 3 4 5 6 7 8

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

21 3 4 5 6 7 8

BOTTOM OF MUCK

ELEVATIONS ZONES 1

& 2

C-12

AD

AM

L U

C

EY

, 6 /2

4/

:0 0:

P

M , X

:\s ys

\P ro je ct s\ C

-0

S yk es C re ek

\C on st ru ct io n\ c2

4-

Ph as e

II\

C

-0

-C

-O pe n- Ea st .d w g

C2024-098

AL

AF

AL

KRC

JUN 2026

SYKES CREEK DREDGING

PHASE II

BREVARD COUNTY, FLORIDA

400' 800'200'

22X34: 1" = 200' 11X17: 1" = 400'

VERT. SCALE: 1" = 5' (22x34)VERT. SCALE: 1" = 10' (11X17)

N O

R

EV

IS

IO

N S

/ S U

BM

IS

SI

O

N S

D

AT

E

ZO

N E

TAYLOR ENGINEERING INC.

10199 SOUTHSIDE BLVD.

BLDG ONE, SUITE 310

JACKSONVILLE, FLORIDA 32256

EL

EV

AT

IO

N

IN

F

EE

T (N

AV

D

DISTANCE IN FEET FROM BASELINE

BASELINE 1 PROFILE

-28 -26 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2

8+00 8+50 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50 20+00 20+50 21+00

EL

EV

AT

IO

N

IN

F

EE

T (N

AV

D

DISTANCE IN FEET FROM BASELINE

BASELINE 1 PROFILE

-28 -26 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2

21+00 21+50 22+00 22+50 23+00 23+50 24+00 24+50 25+00 25+50 26+00 26+50 27+00 27+50 28+00 28+50 29+00 29+50 30+00 30+50 31+00 31+50 32+00 32+50 33+00 33+50 34+00

EL

EV

AT

IO

N

IN

F

EE

T (N

AV

D

DISTANCE IN FEET FROM BASELINE

BASELINE 1 PROFILE

-28 -26 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2

34+00 34+50 35+00 35+50 36+00 36+50 37+00 37+50 38+00 38+50 39+00 39+50 40+00 40+50 41+00 41+50 42+00 42+50 43+00 43+50 44+00 44+50 45+00 45+50 46+00 46+50 47+00

EL

EV

AT

IO

N

IN

F

EE

T (N

AV

D

DISTANCE IN FEET FROM BASELINE

BASELINE 1 PROFILE

-28 -26 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2

47+00 47+50 48+00 48+50 49+00 49+50 50+00 50+50 51+00

EXISTING TOP OF MUCK

EXISTING TOP OF MUCK

DREDGE TEMPLATE (BOTTOM OF MUCK)

PROFILE LEGEND

DREDGE TEMPLATE (BOTTOM OF MUCK)

MUCK TO BE REMOVED

EXISTING TOP OF MUCK

DREDGE TEMPLATE (BOTTOM OF MUCK)

MUCK TO BE REMOVED

EXISTING TOP OF MUCK

DREDGE TEMPLATE (BOTTOM OF MUCK)

MUCK TO BE REMOVED

EXISTING TOP OF MUCK

DREDGE TEMPLATE (BOTTOM OF MUCK)

MUCK TO BE REMOVED

MUCK TO BE REMOVED

SHOAL SHOAL

DESIGNED

DRAWN

CHECKED

REVIEWED

DATE

SCALE

PROJECT NO

DRAWING TITLE

SHEET OF

21 3 4 5 6 7 8

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

21 3 4 5 6 7 8

BASELINE 1 PROFILE

C-13

AD

AM

L U

C

EY

, 6 /2

4/

:0 0:

P

M , X

:\s ys

\P ro je ct s\ C

-0

S yk es C re ek

\C on st ru ct io n\ c2

4-

Ph as e

II\

C

-0

-C

-S ec tio ns

.d w g

C2024-098

AL

AF

AL

KRC

JUN 2026

SYKES CREEK DREDGING

PHASE II

BREVARD COUNTY, FLORIDA

X

XXX

BASELINE 1 PROFILE

MAIN BASELINE IN SYKES CREEK - ZONE 3

50' 100'22X34: 1" = 50' 11X17: 1" = 100' VERT. SCALE: 1" = 10' (22x34) VERT. SCALE: 1" = 20' (11x17)

TAYLOR ENGINEERING INC.

10199 SOUTHSIDE BLVD.

BLDG ONE, SUITE 310

JACKSONVILLE, FLORIDA 32256

(904)-731-7040

REGISTRY # 4815

N O

R

EV

IS

IO

N S

/ S U

BM

IS

SI

O

N S

D

AT

E

ZO

N E

AT

IO

N

IN

F

EE

T (N

AV

D

DISTANCE IN FEET FROM BASELINE

BASELINE 9 PROFILE

-26 -24 -22 -20 -18 -16 -14 -12 -10

-8 -6 -4 -2

3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00

EL

EV

AT

IO

N

IN

F

EE

T (N

AV

D

DISTANCE IN FEET FROM BASELINE

BASELINE 11 PROFILE

-32 -30 -28 -26 -24 -22 -20 -18 -16 -14 -12 -10

0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00

EL

EV

AT

IO

N

IN

F

EE

T (N

AV

D

DISTANCE IN FEET FROM BASELINE

BASELINE 1A PROFILE

-24 -22 -20 -18 -16 -14 -12 -10

-8 -6

0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00

EL

EV

AT

IO

N

IN

F

EE

T (N

AV

D

DISTANCE IN FEET FROM BASELINE

BASELINE 10 PROFILE

-32 -30 -28 -26 -24 -22 -20 -18 -16 -14 -12 -10

-8 -6 -4 -2

19+00 19+50 20+00 20+50 21+00 21+50 22+00 22+50 23+00 23+50 24+00 24+50 25+00 25+50 26+00 26+50 27+00 27+50

EL

EV

AT

IO

N

IN

F

EE

T (N

AV

D

DISTANCE IN FEET FROM BASELINE

BASELINE 11 PROFILE

-32 -30 -28 -26 -24 -22 -20 -18 -16 -14 -12 -10

13+00 13+50 14+00 14+50 15+00 15+50

EXISTING TOP OF MUCK

DREDGE TEMPLATE (BOTTOM OF MUCK)

MUCK TO BE REMOVED

EXISTING TOP OF MUCK

DREDGE TEMPLATE (BOTTOM OF MUCK)

MUCK TO BE REMOVED

EXISTING TOP OF MUCK

DREDGE TEMPLATE (BOTTOM OF MUCK)

MUCK TO BE REMOVED

EXISTING TOP OF MUCK

DREDGE TEMPLATE (BOTTOM OF MUCK)

MUCK TO BE REMOVED

EXISTING TOP OF MUCK

DREDGE TEMPLATE (BOTTOM OF MUCK)

MUCK TO BE REMOVED

EXISTING TOP OF MUCK

DREDGE TEMPLATE (BOTTOM OF MUCK)

PROFILE LEGEND

SHOAL

DESIGNED

DRAWN

CHECKED

REVIEWED

DATE

SCALE

PROJECT NO

DRAWING TITLE

SHEET OF

21 3 4 5 6 7 8

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

21 3 4 5 6 7 8

BASELINE 1A, 9, 10 & 11

PROFILES

C-14

AD

AM

L U

C

EY

, 6 /2

4/

:0 0:

P

M , X

:\s ys

\P ro je ct s\ C

-0

S yk es C re ek

\C on st ru ct io n\ c2

4-

Ph as e

II\

C

-0

-C

-S ec tio ns

.d w g

C2024-098

AL

AF

AL

KRC

JUN 2026

SYKES CREEK DREDGING

PHASE II

BREVARD COUNTY, FLORIDA

XXXX

CANAL PROFILES BASELINE 1A &

BASELINE 9 TO BASELINE 11 - ZONE 3

50' 100'22X34: 1" = 50' 11X17: 1" = 100' VERT. SCALE: 1" = 10' (22x34) VERT. SCALE: 1" = 20' (11x17)

N O

R

EV

IS

IO

N S

/ S U

BM

IS

SI

O

N S

D

AT

E

ZO

N E

TAYLOR ENGINEERING INC.

10199 SOUTHSIDE BLVD.

BLDG ONE, SUITE 310

JACKSONVILLE, FLORIDA 32256

AT

IO

N

IN

F

EE

T (N

AV

D

DISTANCE IN FEET FROM BASELINE

BASELINE 12 PROFILE

-28 -26 -24 -22 -20 -18 -16 -14 -12 -10

-8 -6 -4

0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50

EL

EV

AT

IO

N

IN

F

EE

T (N

AV

D

DISTANCE IN FEET FROM BASELINE

BASELINE 21 PROFILE

-22 -20 -18 -16 -14 -12 -10

-8 -6 -4 -2

0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00

EXISTING TOP OF MUCK

DREDGE TEMPLATE (BOTTOM OF MUCK)

MUCK TO BE REMOVED

EXISTING TOP OF MUCK

DREDGE TEMPLATE (BOTTOM OF MUCK)

PROFILE LEGEND

MUCK TO BE REMOVED

EXISTING TOP OF MUCK

DREDGE TEMPLATE (BOTTOM OF MUCK)

DESIGNED

DRAWN

CHECKED

REVIEWED

DATE

SCALE

PROJECT NO

DRAWING TITLE

SHEET OF

21 3 4 5 6 7 8

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

21 3 4 5 6 7 8

BASELINE 12 & 21 PROFILES

C-15

AD

AM

L U

C

EY

, 6 /2

4/

:0 0:

P

M , X

:\s ys

\P ro je ct s\ C

-0

S yk es C re ek

\C on st ru ct io n\ c2

4-

Ph as e

II\

C

-0

-C

-S ec tio ns

.d w g

C2024-098

AL

AF

AL

KRC

JUN 2026

SYKES CREEK DREDGING

PHASE II

BREVARD COUNTY, FLORIDA

CANAL PROFILES

BASELINE 12 & 21 - ZONE 3

50' 100'22X34: 1" = 50' 11X17: 1" = 100' VERT. SCALE: 1" = 10' (22x34) VERT. SCALE: 1" = 20' (11x17)

N O

R

EV

IS

IO

N S

/ S U

BM

IS

SI

O

N S

D

AT

E

ZO

N E

TAYLOR ENGINEERING INC.

10199 SOUTHSIDE BLVD.

BLDG ONE, SUITE 310

JACKSONVILLE, FLORIDA 32256

AT

IO

N

IN

F

EE

T (N

AV

D

DISTANCE IN FEET

BASELINE 1

9+00

-24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2

-24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2

0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 320 340 3600-20-40-60

EL

EV

AT

IO

N

IN

F

EE

T (N

AV

D

DISTANCE IN FEET

BASELINE 1

10+00

-26 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4

-26 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4

0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 320 340 360 3800-20-40-60-80-100

EL

EV

AT

IO

N

IN

F

EE

T (N

AV

D

DISTANCE IN FEET

BASELINE 1

12+00

-28 -26 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2

-28 -26 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2

0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 320 340 360 380 400 420 4400-20-40-60-80-100-120-140-160-180

EL

EV

AT

IO

N

IN

F

EE

T (N

AV

D

DISTANCE IN FEET

BASELINE 1

14+00

-28 -26 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2

-28 -26 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2

0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 320 340 360 380 400 420 440 460 4800-20-40-60-80-100-120-140-160-180-200-220-240-260-280-300-320-340-360-380-400-420-440-460-480-500-520-540-560-580-600-620

EL

EV

AT

IO

N

IN

F

EE

T (N

AV

D

DISTANCE IN FEET

BASELINE 1

18+00

-30 -28 -26 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2

-30 -28 -26 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2

0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 3200-20-40-60-80-100-120-140-160-180-200-220-240-260-280-300-320-340-360-380-400-420-440-460-480-500-520-540-560-580-600-620-640-660-680-700-720-740-760-780-800-820-840-860-880-900-920-940-960-980-1000

DESIGNED

DRAWN

CHECKED

REVIEWED

DATE

SCALE

PROJECT NO

DRAWING TITLE

SHEET OF

21 3 4 5 6 7 8

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

21 3 4 5 6 7 8

TYPICAL SECTIONS

C-16

AD

AM

L U

C

EY

, 6 /2

4/

:0 0:

P

M , X

:\s ys

\P ro je ct s\ C

-0

S yk es C re ek

\C on st ru ct io n\ c2

4-

Ph as e

II\

C

-0

-C

-X -S ec tio ns .d w g

C2024-098

AL

AF

AL

KRC

JUN 2026

SYKES CREEK DREDGING

PHASE II

BREVARD COUNTY, FLORIDA

TYPICAL SECTIONS

50' 100'22X34: 1" = 50' (U.N.O.)

11X17: 1" = 100' VERT. SCALE: 1" = 10' (22x34) VERT. SCALE: 1" = 20' (11x17)

EXISTING TOP OF MUCK

DREDGE TEMPLATE (BOTTOM OF MUCK)

SECTION LEGEND

EXISTING BOTTOM OF MUCK

MUCK TO BE REMOVED

N O

R

EV

IS

IO

N S

/ S U

BM

IS

SI

O

N S

D

AT

E

ZO

N E

TAYLOR ENGINEERING INC.

10199 SOUTHSIDE BLVD.

BLDG ONE, SUITE 310

JACKSONVILLE, FLORIDA 32256

AT

IO

N

IN

F

EE

T (N

AV

D

DISTANCE IN FEET

BASELINE 1

22+00

-16 -14 -12 -10 -8 -6 -4 -2

-16 -14 -12 -10 -8 -6 -4 -2

0 20 40 60 80 100 120 1400-20-40-60-80-100-120-140-160-180-200-220-240-260-280-300-320-340-360-380-400-420-440-460-480-500-520-540-560-580-600-620-640-660-680

EL

EV

AT

IO

N

IN

F

EE

T (N

AV

D

DISTANCE IN FEET

BASELINE 1

26+00

-22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2

-22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2

0 20 40 60 80 100 120 140 160 180 200 220 240 2600-20-40-60-80-100-120-140-160-180-200-220-240-260-280-300-320-340-360-380-400-420-440-460-480-500-520-540

EL

EV

AT

IO

N

IN

F

EE

T (N

AV

D

DISTANCE IN FEET

BASELINE 1

32+00

-22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2

-22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2

0 20 40 60 80 100 120 140 160 180 200 220 240 2600-20-40-60-80-100-120-140-160-180-200-220

EL

EV

AT

IO

N

IN

F

EE

T (N

AV

D

DISTANCE IN FEET

BASELINE 1

36+00

-22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2

-22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2

0 20 40 60 80 100 120 140 160 180 200 220 240 2600-20-40-60-80-100-120-140-160-180-200-220-240

EL

EV

AT

IO

N

IN

F

EE

T (N

AV

D

DISTANCE IN FEET

BASELINE 1

40+00

-26 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2

-26 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2

0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 320 3400-20-40-60-80-100-120-140-160-180-200-220-240-260-280-300-320

EL

EV

AT

IO

N

IN

F

EE

T (N

AV

D

DISTANCE IN FEET

BASELINE 1

46+00

-26 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2

-26 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2

0 20 40 60 80 100 120 140 160 180 200 220 2400-20-40-60-80-100-120-140-160-180-200-220-240-260-280-300-320-340-360-380-400-420-440-460-480-500-520-540-560-580

DESIGNED

DRAWN

CHECKED

REVIEWED

DATE

SCALE

PROJECT NO

DRAWING TITLE

SHEET OF

21 3 4 5 6 7 8

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

21 3 4 5 6 7 8

TYPICAL SECTIONS

C-17

AD

AM

L U

C

EY

, 6 /2

4/

:0 0:

P

M , X

:\s ys

\P ro je ct s\ C

-0

S yk es C re ek

\C on st ru ct io n\ c2

4-

Ph as e

II\

C

-0

-C

-X -S ec tio ns .d w g

C2024-098

AL

AF

AL

KRC

JUN 2026

SYKES CREEK DREDGING

PHASE II

BREVARD COUNTY, FLORIDA

TYPICAL SECTIONS

50' 100'22X34: 1" = 50' (U.N.O.)

11X17: 1" = 100' VERT. SCALE: 1" = 10' (22x34) VERT. SCALE: 1" = 20' (11x17)

EXISTING TOP OF MUCK

DREDGE TEMPLATE (BOTTOM OF MUCK)

SECTION LEGEND

EXISTING BOTTOM OF MUCK

MUCK TO BE REMOVED

N O

R

EV

IS

IO

N S

/ S U

BM

IS

SI

O

N S

D

AT

E

ZO

N E

TAYLOR ENGINEERING INC.

10199 SOUTHSIDE BLVD.

BLDG ONE, SUITE 310

JACKSONVILLE, FLORIDA 32256

AT

IO

N

IN

F

EE

T (N

AV

D

DISTANCE IN FEET

BASELINE 1A

4+00

-32 -30 -28 -26 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2

-32 -30 -28 -26 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2

0 20 40 60 80 1000-20-40-60-80-100

EL

EV

AT

IO

N

IN

F

EE

T (N

AV

D

DISTANCE IN FEET

BASELINE 9

4+00

-22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2

-22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2

0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 320 3400-20-40-60-80-100-120-140-160-180-200-220-240-260-280-300-320-340-360-380

EL

EV

AT

IO

N

IN

F

EE

T (N

AV

D

DISTANCE IN FEET

BASELINE 9

6+00

-22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2

-22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2

0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 320 340 360 380 400 4200-20-40-60-80-100-120-140-160-180

EL

EV

AT

IO

N

IN

F

EE

T (N

AV

D

DISTANCE IN FEET

BASELINE 9

7+00

-22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2

-22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2

0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 320 340 360 380 400 420 440 460 480 500 5200-20-40-60-80-100-120-140-160-180-200 EL

EV

AT

IO

N

IN

F

EE

T (N

AV

D

DISTANCE IN FEET

BASELINE 10

20+00

-18 -16 -14 -12 -10 -8 -6 -4 -2

-18 -16 -14 -12 -10 -8 -6 -4 -2

0 20 40 60 80 100 120 140 160 180 2000-20-40-60-80-100

EL

EV

AT

IO

N

IN

F

EE

T (N

AV

D

DISTANCE IN FEET

BASELINE 10

22+00

-28 -26 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2

-28 -26 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2

0 20 40 60 80 100 120 140 160 180 2000-20-40-60-80-100-120-140-160-180

EL

EV

AT

IO

N

IN

F

EE

T (N

AV

D

DISTANCE IN FEET

BASELINE 10

24+00

-32 -30 -28 -26 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2

-32 -30 -28 -26 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2

0 20 40 60 80 100 120 140 160 180 200 220 240 2600-20-40-60-80-100-120-140-160-180-200-220-240-260

EL

EV

AT

IO

N

IN

F

EE

T (N

AV

D

DISTANCE IN FEET

BASELINE 10

26+00

-26 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2

-26 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2

0 20 40 60 80 100 120 140 160 180 200 220 2400-20-40-60-80-100-120-140-160-180-200-220

DESIGNED

DRAWN

CHECKED

REVIEWED

DATE

SCALE

PROJECT NO

DRAWING TITLE

SHEET OF

21 3 4 5 6 7 8

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

21 3 4 5 6 7 8

TYPICAL SECTIONS

C-18

AD

AM

L U

C

EY

, 6 /2

4/

:0 0:

P

M , X

:\s ys

\P ro je ct s\ C

-0

S yk es C re ek

\C on st ru ct io n\ c2

4-

Ph as e

II\

C

-0

-C

-X -S ec tio ns .d w g

C2024-098

AL

AF

AL

KRC

JUN 2026

SYKES CREEK DREDGING

PHASE II

BREVARD COUNTY, FLORIDA

TYPICAL SECTIONS

50' 100'22X34: 1" = 50' (U.N.O.)

11X17: 1" = 100' VERT. SCALE: 1" = 10' (22x34) VERT. SCALE: 1" = 20' (11x17)

EXISTING TOP OF MUCK

DREDGE TEMPLATE (BOTTOM OF MUCK)

SECTION LEGEND

EXISTING BOTTOM OF MUCK

MUCK TO BE REMOVED

N O

R

EV

IS

IO

N S

/ S U

BM

IS

SI

O

N S

D

AT

E

ZO

N E

TAYLOR ENGINEERING INC.

10199 SOUTHSIDE BLVD.

BLDG ONE, SUITE 310

JACKSONVILLE, FLORIDA 32256

AT

IO

N

IN

F

EE

T (N

AV

D

DISTANCE IN FEET

BASELINE 11

2+00

-20 -18 -16 -14 -12 -10 -8 -6 -4 -2

-20 -18 -16 -14 -12 -10 -8 -6 -4 -2

0 20 40 60 80 1000-20-40-60-80-100-120 EL

EV

AT

IO

N

IN

F

EE

T (N

AV

D

DISTANCE IN FEET

BASELINE 11

6+00

-22 -20 -18 -16 -14 -12 -10

-8 -6 -4 -2

-22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2

0 20 40 600-20-40-60-80-100-120-140-160-180-200-220-240-260-280-300-320-340-360-380-400-420-440

EL

EV

AT

IO

N

IN

F

EE

T (N

AV

D

DISTANCE IN FEET

BASELINE 11

10+00

-22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2

-22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2

0 20 40 60 80 100 120 140 160 180 200 2200-20-40-60-80-100-120-140-160-180-200

EL

EV

AT

IO

N

IN

F

EE

T (N

AV

D

DISTANCE IN FEET

BASELINE 11

13+00

-32 -30 -28 -26 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2

-32 -30 -28 -26 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2

0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 3000-20-40-60-80-100-120-140-160-180-200-220-240-260-280-300

EL

EV

AT

IO

N

IN

F

EE

T (N

AV

D

DISTANCE IN FEET

BASELINE 12

2+00

-30 -28 -26 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2

-30 -28 -26 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2

0 20 40 60 80 100 120 140 160 180 2000-20-40-60-80-100-120-140-160-180-200-220-240-260-280-300-320-340-360-380-400-420-440-460-480-500-520-540-560-580-600-620-640

DESIGNED

DRAWN

CHECKED

REVIEWED

DATE

SCALE

PROJECT NO

DRAWING TITLE

SHEET OF

21 3 4 5 6 7 8

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

21 3 4 5 6 7 8

TYPICAL SECTIONS

C-19

AD

AM

L U

C

EY

, 6 /2

4/

:0 0:

P

M , X

:\s ys

\P ro je ct s\ C

-0

S yk es C re ek

\C on st ru ct io n\ c2

4-

Ph as e

II\

C

-0

-C

-X -S ec tio ns .d w g

C2024-098

AL

AF

AL

KRC

JUN 2026

SYKES CREEK DREDGING

PHASE II

BREVARD COUNTY, FLORIDA

TYPICAL SECTIONS

50' 100'22X34: 1" = 50' (U.N.O.)

11X17: 1" = 100' VERT. SCALE: 1" = 10' (22x34) VERT. SCALE: 1" = 20' (11x17)

EXISTING TOP OF MUCK

DREDGE TEMPLATE (BOTTOM OF MUCK)

SECTION LEGEND

EXISTING BOTTOM OF MUCK

MUCK TO BE REMOVED

N O

R

EV

IS

IO

N S

/ S U

BM

IS

SI

O

N S

D

AT

E

ZO

N E

TAYLOR ENGINEERING INC.

10199 SOUTHSIDE BLVD.

BLDG ONE, SUITE 310

JACKSONVILLE, FLORIDA 32256

R28G27

G29

R30

R32G31

R34

G33

DANGER

SHOAL

DANGER SHOAL SIGN

R30

G29 R28

R26

DANGER

SHOAL

DANGER SHOAL SIGN

G23 R24

R22

G21

SLOW SPEED

MANATEE

ZONE

MANATEE ZONE SIGN

SLOW SPEED

MANATEE

ZONE

MANATEE ZONE SIGN

SLOW SPEED

MANATEE

ZONE

MANATEE ZONE SIGN

SLOW SPEED

MANATEE

ZONE

MANATEE ZONE SIGN

SLOW SPEED

MANATEE

ZONE

MANATEE ZONE SIGN

SLOW SPEED

MANATEE

ZONE

MANATEE ZONE SIGN

SLOW SPEED

MANATEE

ZONE

MANATEE ZONE SIGN

SLOW SPEED

MANATEE

ZONE

MANATEE ZONE SIGN

SLOW SPEED

MANATEE

ZONE

MANATEE ZONE SIGN ZONE 2

ZONE 1B.2

ZONE 3

SHOAL

SHOAL

SHOAL

SYKES C

R

EEK

SYKES C

R

EEK

SYKES CREEK

21 3 4 5 6 7 8

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

21 3 4 5 6 7 8

AD

AM

L U

C

EY

, 6 /2

4/

:0 1:

P

M , X

:\s ys

\P ro je ct s\ C

-0

S yk es C re ek

\C on st ru ct io n\ c2

4-

Ph as e

II\

c2

4-

8- C

-A to

N -M ar ke rs .d w g

6'

VA

R

IA

BL

E

BA

SE

D O

N L

O C

AT

IO

N 8'

M

IN

IM

U

M E

M

BE

D M

EN

T

TREATED TIMBER PILE

6"

6'

VA

R

IA

BL

E

BA

SE

D O

N L

O C

AT

IO

N 8'

M

IN

IM

U

M E

M

BE

D M

EN

T

DAYBOARD

MEAN HIGH

WATER LINE

TREATED TIMBER PILE

6" WHITE REFLECTIVE TAPE

SECURED WITH (4) 38" LONG

STAINLESS STEEL STAPLES

WITH A MIN. 1" OVERLAP

APPLIED USING

ADHESIVE BACKING.

TYPE 304 58" STAINLESS STEEL

THROUGH BOLT OR

THREADED RODS, NUTS, FLAT

WASHERS, LOCK WASHERS,

AND NYLON SHOULDER WASHERS.

8" X 1.5" STAINLESS

STEEL LAG

BOLTS AND LOCK

WASHERS

6"

MUDLINE

PORT SIDE

N.T.S

STARBOARD SIDE

GRAPHIC SCALE

1,000' 2,000'500'

22X34: 1" = 500' 11X17: 1" = 1,000'

VERT. SCALE: 1" = 5' (22x34)VERT. SCALE: 1" = 10' (11X17)

N

NOTES:

1. CONTRACTOR SHALL REMOVE ALL AIDS TO NAVIGATION PRIOR TO START OF DREDGING WITH THE VICINITY OF

EXISTING SIGNAGE. THE CONTRACT NOTIFY THE U.S. COAST GUARD PRIOR TO REMOVAL.

2. UPON REMOVAL OF AIDS TO NAVIGATION, THE CONTRACTOR WILL TAKE CARE TO REMOVE SIGNAGE IN ORDER TO REUSE. CONTRACT SHALL PROVIDE ALL REMOVED SIGNAGE TO COUNTY TO STORE AND REUSE UPON PROJECT

COMPLETION.

3. CONTRACTOR MAY DISCARD OF EXISTING REMOVED PILES AND NEW PILES MUST BE INSTALLED UPON PROJECT

COMPLETION WITHIN THE WORK ZONE.

3/8" X 1.5" STAINLESS

STEEL LAG BOLTS

AND LOCK WASHERS.

TYPE 304 5/8" STAINLESS STEEL

THROUGH BOLTS OR THREADED

RODS, NUTS, FLAT WASHERS,

LOCK WASHERS, AND

NYLON SHOULDER WASHERS

DESIGNED

DRAWN

CHECKED

REVIEWED

DATE

SCALE

PROJECT NO

DRAWING TITLE

SHEET OF

AIDS TO NAVIGATION

CHANNEL MARKER PLAN &

DETAILS

C-20

C2024-098

AL

AF

AL

KRC

JUN 2026

SYKES CREEK DREDGING

PHASE II

BREVARD COUNTY, FLORIDA

O

R

EV

IS

IO

N S

/ S U

BM

IS

SI

O

N S

D

AT

E

ZO

N E

TAYLOR ENGINEERING INC.

10199 SOUTHSIDE BLVD.

BLDG ONE, SUITE 310

JACKSONVILLE, FLORIDA 32256

(904)-731-7040

REGISTRY # 4815

AutoCAD SHX Text

MARKER AND PILING DETAIL

AutoCAD SHX Text NATURAL RESOURCES MANAGEMENT DEPARTMENT BOATING & WATERWAYS PROGRAM BREVARD COUNTY BOARD OF COUNTY COMMISSIONERS 2725 JUDGE FRAN JAMIESON WAY, RM. 219, BLDG. A, VIERA, FL 32940 Ph. (321) 633-2016, Fx. (321) 633-2029

W1 W2

W3 W4

W5 W6

W7 W8

W9

W11

W12

W13

W10

15' WETLAND OFFSET LINE

SET 36" WOODEN STAKE

MARKED "WL 15' OFFSET"

15' VEGETATED

CONSTRUCTION

OFFSET BUFFER

NORTHERN PROPERTY BOUNDARY

SHOWN FOR INFORMATIONAL

PURPOSES ONLY

SOUTHERN PROPERTY BOUNDARY

SHOWN FOR INFORMATIONAL

PURPOSES ONLY

EASTERN PROPERTY BOUNDARY

SHOWN FOR INFORMATIONAL

PURPOSES ONLY

NORTH LINE OF

SECTION 31

SET 5/8" IRON ROD AND CAP

(LB8411) AT EACH OF THE

WETLAND FLAG LOCATIONS

TAX PARCEL ID: 24-37-31-00-4

NANDIVADA PROPERTY

NANDIVADA PROPERTY

INGRESS/EGRESS

APPROXIMATE LOCATION OF

TEMPORARY CONSTRUCTION

FENCING TO BE INSTALLED

BY CONTRACTOR

APPROXIMATE LOCATION OF

TEMPORARY FENCE TO BE

INSTALLED BY CONTRACTOR

(NO CONSTRUCTION BUFFER

NEEDED)

NANDIVADA PARCEL INGRESS/ EGRESS.

GATE AND FENCING TO BE DETERMINED

AND CONSTRUCTED BY CONTRACTOR

APPROXIMATE LOCATION

OF PERMANENT FENCE TO BE

INSTALLED BY CONTRACTOR

PIPELINE ACCESS TO

NANDIVADA PROPERTY

CONTRACTOR SHALL MAINTAIN

15' CONSTRUCTION BUFFER

AREA MAY BE CLEARED BY

CONTRACTOR AS NEEDED

AND WITHIN PROPERTY LIMITS

APPROXIMATE LOCATION OF

ACOUSTICAL BARRIER SYSTEM

APPROXIMATE LOCATION OF

ACOUSTICAL BARRIER SYSTEM

WETLAND POINTS TABLE

POINT NAME

W1

W2

W3

W4

W5

W6

W7

W8

W9

W10

W11

W12

W13

NORTHING

1464232.02

1464228.40

1464206.71

1464194.47

1464201.94

1464172.66

1464164.49

1464155.04

1464108.10

1464091.25

1464064.88

1464035.18

1464013.04

EASTING

762032.76

762040.62

762069.41

762088.62

762113.24

762130.06

762141.58

762162.73

762192.03

762198.24

762218.75

762208.53

762218.78

DESIGNED

DRAWN

CHECKED

REVIEWED

DATE

SCALE

PROJECT NO

DRAWING TITLE

SHEET OF

21 3 4 5 6 7 8

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

21 3 4 5 6 7 8

NANDIVADA SITE LAYOUT

C-21

AD

AM

L U

C

EY

, 6 /2

4/

:3 3:

P

M , X

:\s ys

\P ro je ct s\ C

-0

S yk es C re ek

\C on st ru ct io n\ c2

4-

Ph as e

II\

c2

4-

8- C

-D M

M A

Si te

.d w g

C2024-098

AL

AF

AL

KRC

JUN 2026

SYKES CREEK DREDGING

PHASE II

BREVARD COUNTY, FLORIDA

AS SHOWN

N

FOR INFORMATION

ONLY- NOT FOR

CONSTRUCTION

XXXX

NANDIVADA SITE OVERVIEW

FOR INFORMATION ONLY- NOT FOR CONSTRUCTION

FOR INFORMATION ONLY- NOT FOR CONSTRUCTION

N O

R

EV

IS

IO

N S

/ S U

BM

IS

SI

O

N S

D

AT

E

ZO

N E

TAYLOR ENGINEERING INC.

10199 SOUTHSIDE BLVD.

BLDG ONE, SUITE 310

JACKSONVILLE, FLORIDA 32256

(904)-731-7040

REGISTRY # 4815

GRAPHIC SCALE

120' 240'60'

22X34: 1" = 60' 11X17: 1" = 120'

VERT. SCALE: 1" = 5' (22x34)VERT. SCALE: 1" = 10' (11X17)

LEGEND

= WETLAND FLAGW#

= WETLAND LIMITS SET 5/8 IRON ROD AND CAP - "LB8411"

= 15' OFFSET LIMIT

= PROPERTY BOUNDARY (FOR INFORMATIONAL PURPOSES ONLY)

= NANDIVADA BOUNDARY (FOR INFORMATIONAL PURPOSES ONLY)

= SECTION LINE

= CHAIN-LINK FENCE

= ACOUSTIC BARRIER SYSTEM

TYPE IV SILT FENCE

8"

1' MIN.

15"-18"3' OR

GREATER

POST (OPTIONS: 2" X 4"

OR 21

2 MIN. DIA. WOOD;

STEEL 1.33 LBS/FT. MIN.)

6' MAX

FILTER FABRIC (IN

CONFORMANCE WITH

SEC. 985 F.D.O.T. SPEC.)

SILT FLOW

FILTER FABRIC

20°

PRINCIPLE POST

POSITION (CANTED

20° TOWARD FLOW)

VE

R

TI

C

AL

OPTIONAL POST POSITIONS

ELEVATION SECTION

POST (OPTIONS: 4" X 4" OR 3"

MIN. DIA. WOOD; STEEL 1.33

LBS/FT. MIN.)

PRINCIPLE POST POSITION

(CANTED 20° TOWARD FLOW)

POULTRY MESH OR

TYPE A FENCE FABRIC

SILT FLOW

OPTIONAL POST POSITIONS

VE

R

TI

C

AL

POULTRY MESH (20. GA. MIN.) OR

TYPE A FENCE FABRIC

(INDEX NO. 452 & SEC. 985

F.D.O.T. SPEC.)

FILTER FABRIC (IN

CONFORMANCE WITH

SEC. 985 F.D.O.T. SPEC.) FILTER FABRIC

10' MAX

8"18" MIN.

3' OR

GREATER

3'

ELEVATION SECTION

20°

SILT FLOWSILT FLOW

DITCH INSTALLATION AND SPACING FOR TYPE III & TYPE IV FENCE TO BE IN

ACCORDANCE WITH SHEET 1 OF 3, F.D.O.T. INDEX NO. 102.

TYPE IV SILT FENCE TYPE III SILT FENCE

TYPE III OR TYPE IV SILT FENCE PROTECTION

AROUND DITCH BOTTOM INLETS.

TYPE III OR TYPE IV SILT FENCE

DO NOT DEPLOY IN A MANNER THAT SILT FENCES WILL ACT AS A DAM ACROSS PERMANENT FLOWING WATERCOURSES. SILT FENCES ARE TO BE USED AT UPLAND LOCATIONS AND TURBIDITY BARRIERS USED AT

PERMANENT BODIES OF WATER.

SILT FLOW

TYPE III SILT FENCE

WOVEN FILTER FABRIC IN ABSENCE OF ESTABLISHED GRASS

(APPROX. 12' X 12'). SECURE EDGES BY ENTRENCHING AND

EXTEND UNDER BAGS AND BALES. FABRIC SHALL MEET THE

REQUIREMENTS OF SECTION F.D.O.T. 985 OF THE STANDARD

SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION.

LOOSE SOIL PLACED BY SHOVEL AND LIGHTLY COMPACTED

ALONG THE UPSTREAM EDGE OF BALES.

ANCHOR LOWER BALES WITH 2 - 2" X 2" X 4' STAKES PER BALE.

ANCHOR TOP BALES TO LOWER BALES WITH 2 - 2" X 2" X 4' STAKES PER BALE. ANCHOR BALES WITH 2 - 2" X 2" X 4' STAKES PER BALE

TYPE II TYPE I

ELEVATIONELEVATION

PLAN

FL

O

W

PLAN

APPLICATION AND SPACING OF TYPES I & II HAY BALE BARRIERS SHELL BE IN ACCORDANCE WITH SHEET 1 OF 3, F.D.O.T. INDEX NO. 102

SAND BAGS

5' MIN.

LOOSE SOIL PLACED BY SHOVEL AND LIGHTLY COMPACTED

ALONG THE UPSTREAM EDGE OF BALES.FL

O W

POST

RAIL

5'

(TYP.)

1' MINIMUM

RECOMMENDED

5'

(TYP.)

1' MINIMUM

RECOMMENDED

1' MIN. RECOMMENDED

FL

O

W

SOD

SOD

RAIL POST

PLAN

ELEVATION

ANCHOR BALES WITH

2 - 2" X 2" X 4'

STAKES PER BALE.

LOOSE SOIL PLACED BY SHOVEL

AND LIGHTLY COMPACTED

ALONG UPSTREAM EDGE OF

BALES.

SPACING: BALE BARRIERS FOR PAVED DITCHES SHOULD BE SPACED IN ACCORDANCE WITH CHART I, SHEET 1 OF 3, INDEX NO. 102 OF F.D.O.T. ROADWAY AND TRAFFIC DESIGN STANDARDS.

CROSS-SECTION OF A PROPERLY

INSTALLED STRAW BALE

BINDING WIRE

OR TWINE

FILTERED RUNOFF

STAKED AND ENTRENCHED

STRAW BALE

COMPACTED SOIL

TO PREVENT

PIPING

SEDIMENT

LADEN

RUNOFF

1. SET POSTS AND EXCAVATE A

8"x4" TRENCH UPSLOPE ALONG

THE LINE OF POSTS

2. STAPLE WIRE

FENCING TO THE

POSTS.

3. ATTACH THE FILTER

FABRIC TO THE WIRE FENCE

AND EXTEND IT INTO THE

TRENCH.

4. BACKFILL AND

COMPACT THE

EXCAVATED SOIL.

EXTENSION OF FABRIC

AND WIRE INTO THE

TRENCH.

8"

4"

FILTER FABRIC

1'

TURBIDITY CURTAIN DETAIL

CROWN BUOY

MOORING BUOY BOOM

WATER LEVEL

ROPE

ANCHOR

CHAIN

CURTAIN WEIGHT

ROPE

SILT CURTAIN

BOTTOM SEDIMENT

XX

XX

XX XX XX XX

XX

XX

XX

XX

XXXXXXXX

XX

TURBIDITY CURTAIN PLAN DETAIL

TURBIDITY CURTAIN

5' BUFFER FROM SEAGRASS BOUNDARY

5' BUFFER

SEAGRASS

SEAGRASS BOUNDARY

18 (OR 22) OZ. VINYL

COVERED NYLON

TURBIDITY CURTAIN - TYPE II

5/16 IN. CHAIN

BALLAST & LOAD LINE

STRESS PLATESTRESS BAND

PVC

SLOT-CONNECTOR FLOATATION

100 FT. STANDARD LENGTH

DEPTH ACCORDING

TO NEED

FOLDS EVERY 6 FEET

TOP LOAD LINE

5/16 VINYL COATED

CABLE

WATER

SEAL

GALVANIZED #24

SAFETY HOOK

STRESS PLATE

(TO REMOVE

PRESSURE

FROM FLOATS)

EXISTING

EBB

FLOW

PROPOSED TOE

OF SLOPE

*THIS DISTANCE IS VARIABLE

SHORELINE

ANCHOR PT. SHORELINE

ANCHOR PT.

ANCHOR &

ANCHOR BUOY

BARRIER MOVEMENT

DUE TO TIDAL CHANGE

FILL AREA

DISCHARGE PIPE

45° ELBOW

BACK-UP RING

DISCHARGE

DISCHARGE

FLOW FROM

DEWATERING

FACILITY

MANATEE EXCLUDER GRATE

BOLTED

CONNECTION

(TYP)

MANATEE EXCLUDER GRATE SIDE VIEW

MANATEE EXCLUDER GRATE

8" MAX. BAR

SPACING

BOLT PATTERN AND

SIZE TO MATCH

BACK-UP RING

OPENING SIZE

TO MATCH

BACK-UP RING

SEAL

PROJECT TITLE

DESIGNED

DRAWN

CHECKED

REVIEWED

DATE

SCALE

PROJECT NO

DRAWING TITLE

SHEET OF

21 3 4 5 6 7 8

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

21 3 4 5 6 7 8

EROSION CONTROL

DETAILS

C-22

AD

AM

L U

C

EY

, 6 /2

4/

:0 1:

P

M , X

:\s ys

\P ro je ct s\ C

-0

S yk es C re ek

\C on st ru ct io n\ c2

4-

Ph as e

II\

c2

4-

8- C

-E ro s- C on t.d w g

C2024-098

AL

AF

AL

KRC

JUN 2026

SYKES CREEK DREDGING

PHASE II

BREVARD COUNTY, FLORIDA

AS SHOWN

KENNETH R. CRAIG P.E.# 52605

SILT FENCE TYPE III & IV

SCALE: N.T.S.

BARRIER FOR PAVED DITCH

SCALE: N.T.S.

CONSTRUCTION DETAILS FOR SILT FENCES

SCALE: N.T.S.

STAKED HAY BALE

SCALE: N.T.S.

HAY BARRIERS TYPE I & II

SCALE: N.T.S.

EROSION CONTROL AND GRASSING/SODDING NOTES:

1. THE CONTRACTOR SHALL IMPLEMENT AND MAINTAIN EROSION CONTROL MEASURES AS NECESSARY TO COMPLY WITH ALL FEDERAL, STATE, AND LOCAL REGULATIONS AND COMPLY WITH STATE WATER QUALITY CRITERIA FOR STORMWATER DISCHARGE. EROSION CONTROL MEASURES INCLUDE BUT ARE NOT LIMITED TO TURBIDITY SCREENS, MULCHING, HAY BALES, AND SILT FENCE. IF A WATER QUALITY VIOLATION OCCURS, THE CONTRACTOR SHALL BE WHOLLY RESPONSIBLE FOR ALL DAMAGE AND ALL COSTS WHICH MAY RESULT INCLUDING LEGAL FEES, CONSTRUCTION COSTS, AND FINES.

2. DISTURBED AREAS NOT INCLUDING ROADWAYS AND WETLANDS SHALL BE SEEDED/GRASSED, FERTILIZED, MULCHED, AND MAINTAINED IN ACCORDANCE WITH CITY, COUNTY, STATE, AND FEDERAL REQUIREMENTS UNTIL A PERMANENT VEGETATIVE COVER IS ESTABLISHED.

3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ESTABLISHING A PERMANENT STAND OF SOD AND/OR GRASS AT ALL DISTURBED AREAS PER CITY STANDARDS AND

SPECIFICATIONS AND MEETING THE NPDES FINAL STABILIZATION REQUIREMENTS.

4. EROSION CONTROL MEASURES SHALL BE MAINTAINED FOR THE ENTIRE DURATION OF THE PROJECT OR UNTIL SODDING AND/OR GRASS IS ESTABLISHED.

5. EROSION CONTROL MEASURES SHALL BE PLACED TO CONTAIN ALL POINTS OF DISCHARGE TO SURFACE WATERS OR WETLANDS INCLUDING CURB INLETS, DITCH BOTTOM INLETS, DITCHES, AND DOWNSTREAM PORTIONS OF STREAMS AND TIDAL WATERS ADJACENT TO CONSTRUCTION.

6. 48 HOURS PRIOR TO COMMENCEMENT OF CONSTRUCTION, THE CONTRACTOR WILL SUBMIT A NPDES PERMIT TO FDEP.

7. THE CONTRACTOR SHALL WRAP STORM GRATES IN FILTER FABRIC TO PREVENT…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .