Addendum_4.pdf

PDF 161 KB Posted

Attached to
Sykes Creek Phase II Muck Removal
Solicitation number
B-8-26-36
Issued by
Brevard County, Florida

About this file

This is an Addendum 4 issued by Brevard County Purchasing Services in Florida to the Sykes Creek Phase II Muck Removal Project (B-8-26-36) bid package. The addendum clarifies four key questions submitted by prospective bidders regarding project specifications and requirements. The document addresses the treatment of temporary acoustical barriers, fencing height requirements, structural design responsibilities, and the disposition of project components upon completion. Critical timeline changes are announced: the questions deadline has been extended to Wednesday, August 19, 2026 at 5:00 PM, and the bid opening date has been moved to Friday, August 28, 2026 at 9:00 AM. The addendum must be acknowledged by bidders on the Price Sheet submitted with their proposals.

The clarifications establish that the temporary 10-foot acoustical barrier system along the northern and eastern portions of the Dredged Material Management Area (DMMA) shall be removed upon project completion unless the County provides written direction otherwise. The permanent entrance fence and gate at North Banana River Drive require contractor design but are not subject to the 10-foot height requirement and shall remain. The acoustical barrier system and its supporting structure are contractor-designed and the contractor bears full responsibility for structural adequacy, including wind load calculations, bracing, foundations, anchorage, and embedment in accordance with applicable codes and the signed-and-sealed DMMA design. Temporary facilities, equipment, fencing, and materials must be removed upon project completion, while permanent improvements including the ingress/egress fencing, 18-inch utility pipe, and driveway apron shall remain unless the Owner directs otherwise in writing. The addendum reiterates that all other contract terms and conditions remain unchanged from the original bid package.

View the file

Other files

File Type Posted
Bid_Tabulation.pdf PDF
Bid_Tabulation__Names_Only.pdf PDF
Addendum_6.pdf PDF
FDOT_Liquid_Damages.pdf PDF
Addendum_5.pdf PDF
Addendum_3.pdf PDF
Addendum_2.pdf PDF
Acousti_FenceProduct_Data_Sheet.pdf PDF
Revised_Attachment_F__Price_Sheet.xlsx XLSX spreadsheet
USACE_Permit_Modification.pdf PDF
Revised_Attachment_B__Construction_Drawings.pdf PDF
00_41_00_Bid_Form_Jul2026.pdf PDF
Geotechnical_Survey.pdf PDF
Prebid_Sign_In_Sheet.pdf PDF
Topographic_Survey.pdf PDF
Addendum_1.pdf PDF
Attachment_C8__FDEP_Permit_Mod_2_.pdf PDF
Attachment_D7_RFP_C.G._Reed_Proposal.pdf PDF
Attachment_C2_USACE_Permit.pdf PDF
Attachment_D2_Testing_Reports.pdf PDF
Attachment_D5__RFP_Draft_Contract.pdf PDF
Attachment_C10__FDEP_Mod_4.pdf PDF
Attachment_D6__RFP_Rock_Solid_Proposal.pdf PDF
Attachment_C3__USACE_Permit_Mod_1.pdf PDF
Attachment_F__Price_Sheet.xlsx XLSX spreadsheet
B82636_Inv_Specs.pdf PDF
Attachment_C9_FDEP_Mod_3.pdf PDF
Attachment_E__Draft_Contract.pdf PDF
Attachment_A_Technical_Specifications.pdf PDF
Attachment_C4__USACE_Permit_Mod_2.pdf PDF
Attachment_C7__FDEP_Permit_Mod_1.pdf PDF
Attachment_BConstruction_Drawings_SealedSykes_Creek_Ph_II.pdf PDF
Attachment_D4__RFP82601_Property_Use_Muck_Placement.pdf PDF
Attachment_C6__FDEP_Permit.pdf PDF
Attachment_D8_Nandivada_Multiuse_Facility_Phase_1_Stormwater_Retrofit_Permit_Drawings.pdf PDF
Attachment_D3__Vibracore_Surveys.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Purchasing Services 2725 Judge Fran Jamieson Way

Building C, Room 303 Viera, Florida 32940

Sykes Creek Phase II Muck Removal Project

B-8-26-36 August 12, 2026

ADDENDUM 4

TO ALL PROSPECTIVE BIDDERS

This is an Addendum to and shall be considered as part of the original bid package for the above-mentioned bid. Please acknowledge receipt of Addendum 4 in space provided on Price Sheet.

Bidders are requested to acknowledge receipt of this addendum with their bid.

CLARIFICATION TO QUESTIONS RECEIVED

Question 1: It is our understanding that the 10’ fence is permanent and will remain after the project is completed. Does the AcoustiFence remain on the fence at the completion of this project, or will the panels be removed?

Answer: The Contract Documents distinguish between the temporary construction fencing, permanent fencing at the site ingress/egress, and the temporary 10-foot acoustical barrier system along the northern and eastern portions of the DMMA. The acoustical barrier shall remain through completion of DMMA stabilization, restoration, and final cleanup and shall then be removed as a temporary DMMA feature. Bidders shall base their pricing on removal. If the County later determines that the barrier should remain for future use, that should be addressed by written Owner direction before demobilization.

Question 2: Does the fence with associated gate at the entrance to the site from N. Banana River Drive also need to be 10’ tall?

Answer: No. The 10-foot height requirement applies to the acoustical barrier system, not the permanent fence and gate at the North Banana River Drive entrance. The entrance fence and gate shall be Contractor-designed and coordinated with the approximate acoustical-barrier limits shown on Sheet C-21 of the Construction Drawings. The acoustical barrier system may serve as construction security fencing along its installed alignment, provided it functions as a construction security barrier and limits unauthorized access in accordance with Section 35 20 23.33 – Dredged Material Management.

Question 3: For permanent fencing is there any design requirements for wind load on the fence? 10’ fence with solid fabric panels is going to have to be designed for a certain wind load and embedment depth with very large posts or is will this all by contractor design?

Answer: The acoustical barrier and its supporting system are Contractor-designed. The Contractor is responsible for the system’s structural adequacy, including applicable wind loads, bracing, foundations, anchorage, footings, and embedment, in accordance with applicable codes. The design shall be incorporated into the Contractor’s signed-and-sealed DMMA design in accordance with

Section 35 20 23.33 – Dredged Material Management and Note 3 on Sheet C-21 of the Construction Drawings.

Question 4: Are there any components of the DMMA, other than what is currently being constructed and the fence that are to remain or will all contractor improvements be removed upon completion?

Answer: Temporary DMMA facilities, equipment, temporary fencing, acoustical barrier systems, unused materials, and other temporary features shall be removed upon completion unless otherwise directed by the Owner in writing. The permanent ingress/egress fencing and gate and the existing improvements identified in Addendum No. 1, Question 14 and Attachment D-8, including the installed 18-inch utility pipe and driveway apron, shall remain. Upon completion of dewatering, the Contractor shall leave the 18-inch utility pipe free and clear of sediment and other materials and install blanks or caps in accordance with Section 35 20 23.33 – Dredged Material Management. Other permanent components, such as weirs, outfall pipes, or drainage pipes, may remain only when directed by the Owner in writing and identified in the DMMA Site Stabilization and Restoration Plan.

The questions deadline has been extended to Wednesday, August 19, 2026 @ 5:00 PM.

Please note that the bid opening date and time have changed to Friday, August 28, 2026 @ 9:00

AM.

All other terms and conditions remain unchanged.

Sincerely, Mary Bowers Purchasing Manager

END OF ADDENDUM 4