00_41_00_Bid_Form_Jul2026.pdf

PDF 123 KB Posted

Attached to
Sykes Creek Phase II Muck Removal
Solicitation number
B-8-26-36
Issued by
Brevard County, Florida

About this file

This is a bid form for the Sykes Creek Phase II Muck Removal Project being solicited by Brevard County, Florida. The project involves hydraulic dredging and muck disposal services with a base bid encompassing approximately 225,600 cubic yards of muck removal from Zones 3A-North and 3B-South, plus four optional dredging zones containing 17,200, 34,700, 38,100, and 38,800 cubic yards respectively. Major work components include engineering design and permitting, temporary utilities, surveys and staking, construction quality control testing, facility construction and fencing, erosion and sediment control, dredged material handling and dewatering, permanent upland disposal, turbidity and water quality testing, environmental protection and species monitoring, and post-dredge documentation. Bids are due August 21, 2026, with a mandatory pre-bid meeting scheduled for July 16, 2026. A signed and sealed preliminary Dredge Material Management Area (DMMA) design prepared by a Florida-licensed professional engineer must be submitted with the bid. The contractor must complete work in three phases: permit modification and site preparation (30 days), DMMA preparation and mobilization (30 days), and dredging construction (1,400 calendar days to substantial completion). Operations are restricted to Monday-Friday 7:00 a.m. to 6:00 p.m. and Saturday 8:00 a.m. to 5:00 p.m.

All bid items include full compensation for labor, materials, equipment, supplies, permits, fees, supervision, testing, mobilization, overhead, and profit. Bidders must submit prices on all items in the form to be considered for award, with the project being awarded to the lowest responsive and responsible bidder based on total bid amount including all optional dredging zones. The County reserves the right to award and execute any combination of the optional dredging zones based on budget availability and project priorities. A public construction bond at 100 percent of contract price is required within five days of award, and bid security at 5 percent of the proposed amount must be provided. Required insurance includes general liability of $1 million per occurrence, workers' compensation, auto liability of $1 million combined single limit, and pollution liability of $1 million. Contractors must comply with E-Verify, Build America Buy America Act requirements, foreign influence disclosures for contracts exceeding $100,000, scrutinized company certifications, and anti-human trafficking affidavits. Environmental compliance is mandatory, including adherence to USACE Nationwide Permit 27, FDEP Environmental Resource Permits, manatee protection requirements with two to three dedicated observers, sea turtle and smalltooth sawfish protection protocols, turbidity monitoring, and minimum 15-foot seagrass buffer setbacks. Contractors must independently secure permanent disposal sites and develop the final dredge pipeline route, with all costs included in bid prices. Addendum 1 clarified that contractors must estimate bulking factors in unit prices with no post-excavation payment adjustments and conduct pre-construction surveys extending 100 feet beyond disturbance limits.

View the file

Other files

File Type Posted
Bid_Tabulation.pdf PDF
Bid_Tabulation__Names_Only.pdf PDF
Addendum_6.pdf PDF
FDOT_Liquid_Damages.pdf PDF
Addendum_5.pdf PDF
Addendum_4.pdf PDF
Addendum_3.pdf PDF
Addendum_2.pdf PDF
Acousti_FenceProduct_Data_Sheet.pdf PDF
Revised_Attachment_F__Price_Sheet.xlsx XLSX spreadsheet
USACE_Permit_Modification.pdf PDF
Revised_Attachment_B__Construction_Drawings.pdf PDF
Geotechnical_Survey.pdf PDF
Prebid_Sign_In_Sheet.pdf PDF
Topographic_Survey.pdf PDF
Addendum_1.pdf PDF
Attachment_C8__FDEP_Permit_Mod_2_.pdf PDF
Attachment_D7_RFP_C.G._Reed_Proposal.pdf PDF
Attachment_C2_USACE_Permit.pdf PDF
Attachment_D2_Testing_Reports.pdf PDF
Attachment_D5__RFP_Draft_Contract.pdf PDF
Attachment_C10__FDEP_Mod_4.pdf PDF
Attachment_D6__RFP_Rock_Solid_Proposal.pdf PDF
Attachment_C3__USACE_Permit_Mod_1.pdf PDF
Attachment_F__Price_Sheet.xlsx XLSX spreadsheet
B82636_Inv_Specs.pdf PDF
Attachment_C9_FDEP_Mod_3.pdf PDF
Attachment_E__Draft_Contract.pdf PDF
Attachment_A_Technical_Specifications.pdf PDF
Attachment_C4__USACE_Permit_Mod_2.pdf PDF
Attachment_C7__FDEP_Permit_Mod_1.pdf PDF
Attachment_BConstruction_Drawings_SealedSykes_Creek_Ph_II.pdf PDF
Attachment_D4__RFP82601_Property_Use_Muck_Placement.pdf PDF
Attachment_C6__FDEP_Permit.pdf PDF
Attachment_D8_Nandivada_Multiuse_Facility_Phase_1_Stormwater_Retrofit_Permit_Drawings.pdf PDF
Attachment_D3__Vibracore_Surveys.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITEM ITEM DESCRIPTION ESTIMATED

QUANTITY UNITS UNIT COST TOTAL COST

1 Base Bid Bonds and Insurance 1 LS $ $

2 Engineering Design and Permitting 1 LS $ $ 3 Temporary Utilities Construction and Permitting 1 LS $ $ 4 DMMA Surveys (Pre-Construction and Staking) 1 LS $ $ 5 DMMA Mobilization 1 LS $ $ 6 DMMA Clearing and Grubbing 1 LS $ $ 7 Construction Quality Control Testing 1 LS $ $ 8 DMMA Facility Construction 1 LS $ $ 9 DMMA Facility Fencing and Gates 1 LS $ $

10 Erosion and Sediment Control 1 LS $ $ 11 DMMA Demobilization 1 LS $ $ 12 DMMA Stabilization, Restoration and Cleanup 1 LS $ $ 13 DMMA As-Built Survey 1 LS $ $ 14 Permanent Upland Disposal Fixed Costs 1 LS $ $

15 Pre-Construction Utility Surveys 1 LS $ $ 16 Mobilization 1 LS $ $ 17 Pre-Dredge Surveys (Including Photo Documentation) 1 LS $ $ 18 Muck Removal Dredging 225,600 CY $ $ 19 Dredged Material Handling and Dewatering 225,600 CY $ $ 20 Dewatered Muck Transport and Permanent Disposal 225,600 CY $ $ 21 Turbidity and Water Quality Testing 1 LS $ $ 22 Post-Dredge and Progress Surveys 1 LS $ $ 23 Post-Dredge Photo Documentaiton 1 LS $ $ 24 Environmental Protection 1 LS $ $ 25 Environmental Species Monitoring 1 LS $ $ 26 Dredged Material Management 1 LS $ $ 27 Demobilization 1 LS $ $ 28 As-Built Hydrographic Maps 1 LS $ $

SYKES CREEK PHASE II MUCK REMOVAL PROJECT

BREVARD COUNTY, FLORIDA

All bid items shall include full compensation for furnishing all labor, materials, equipment, supplies, permits, fees, supervision, testing, mobilization, overhead, profit, and incidentals necessary to complete the Work in accordance with the Contract Documents, including all Work shown on the Construction Drawings and specified in the Contract Specifications.

SECTION 00 41 00 BID FORMS

SUB-TOTAL (ITEMS 2 TO 15)

DREDGED MATERIAL MANAGEMENT AREA (DMMA), DEWATERING AND TREATMENT SITE CONSTRUCTION, DISPOSAL AND

RESTORATION

GENERAL ITEMS

DREDGING BASE BID (ZONE 3A-NORTH AND ZONE 3B-SOUTH)

SUB-TOTAL (DREDGING BASE)

1.Opt1 Options Bonds and Insurance (Option 1) 1 LS $ $

15.1 Pre-Construction Utility Surveys 1 LS $ $

16.1 Mobilization 1 LS $ $

17.1 Pre-Dredge Surveys (Including Photo Documentation) 1 LS $ $

18.1 Muck Removal Dredging 17,200 CY $ $

19.1 Dredged Material Handling and Dewatering 17,200 CY $ $

20.1 Dewatered Muck Transport and Permanent Disposal 17,200 CY $ $

21.1 Turbidity and Water Quality Testing 1 LS $ $

22.1 Post-Dredge and Progress Surveys 1 LS $ $

23.1 Post-Dredge Photo Documentaiton 1 LS $ $

24.1 Environmental Protection 1 LS $ $

25.1 Environmental Species Monitoring 1 LS $ $

26.1 Dredged Material Management 1 LS $ $

27.1 Demobilization 1 LS $ $

28.1 As-Built Hydrographic Maps 1 LS $ $

days

1.Opt2 Options Bonds and Insurance (Option 2) 1 LS $ $

15.2 Pre-Construction Utility Surveys 1 LS $ $

16.2 Mobilization 1 LS $ $

17.2 Pre-Dredge Surveys (Including Photo Documentation) 1 LS $ $

18.2 Muck Removal Dredging 34,700 CY $ $

19.2 Dredged Material Handling and Dewatering 34,700 CY $ $

20.2 Dewatered Muck Transport and Permanent Disposal 34,700 CY $ $

21.2 Turbidity and Water Quality Testing 1 LS $ $

22.2 Post-Dredge and Progress Surveys 1 LS $ $

23.2 Post-Dredge Photo Documentaiton 1 LS $ $

24.2 Environmental Protection 1 LS $ $

25.2 Environmental Species Monitoring 1 LS $ $

26.2 Dredged Material Management 1 LS $ $

27.2 Demobilization 1 LS $ $

28.2 As-Built Hydrographic Maps 1 LS $ $

days

TIME REQUIRED TO COMPLETE (DREDGING OPTION 1)

TIME REQUIRED TO COMPLETE (DREDGING OPTION 2)

DREDGING OPTION 1 (ZONE 3A-SOUTH)

SUB-TOTAL (DREDGING OPTION 1)

SUB-TOTAL (DREDGING OPTION 2)

DREDGING OPTION 2 (ZONE 3B-NORTH)

1.Opt3 Options Bonds and Insurance (Option 3) 1 LS $ $

15.3 Pre-Construction Utility Surveys 1 LS $ $

16.3 Mobilization 1 LS $ $

17.3 Pre-Dredge Surveys (Including Photo Documentation) 1 LS $ $

18.3 Muck Removal Dredging 38,100 CY $ $

19.3 Dredged Material Handling and Dewatering 38,100 CY $ $

20.3 Dewatered Muck Transport and Permanent Disposal 38,100 CY $ $

21.3 Turbidity and Water Quality Testing 1 LS $ $

22.3 Post-Dredge and Progress Surveys 1 LS $ $

23.3 Post-Dredge Photo Documentaiton 1 LS $ $

24.3 Environmental Protection 1 LS $ $

25.3 Environmental Species Monitoring 1 LS $ $

26.3 Dredged Material Management 1 LS $ $

27.3 Demobilization 1 LS $ $

28.3 As-Built Hydrographic Maps 1 LS $ $

days

1.Opt4 Options Bonds and Insurance (Option 4) 1 LS $ $

15.4 Pre-Construction Utility Surveys 1 LS $ $

16.4 Mobilization 1 LS $ $

17.4 Pre-Dredge Surveys (Including Photo Documentation) 1 LS $ $

18.4 Muck Removal Dredging 38,800 CY $ $

19.4 Dredged Material Handling and Dewatering 38,800 CY $ $

20.4 Dewatered Muck Transport and Permanent Disposal 38,800 CY $ $

21.4 Turbidity and Water Quality Testing 1 LS $ $

22.4 Post-Dredge and Progress Surveys 1 LS $ $

23.4 Post-Dredge Photo Documentaiton 1 LS $ $

24.4 Environmental Protection 1 LS $ $

25.4 Environmental Species Monitoring 1 LS $ $

26.4 Dredged Material Management 1 LS $ $

27.4 Demobilization 1 LS $ $

28.4 As-Built Hydrographic Maps 1 LS $ $

days

TIME REQUIRED TO COMPLETE (DREDGING OPTION 3)

TIME REQUIRED TO COMPLETE (DREDGING OPTION 4)

DREDGING OPTION 3 (ZONE 1B.2)

DREDGING OPTION 4 (ZONE 2)

SUB-TOTAL (DREDGING OPTION 3)

SUB-TOTAL (DREDGING OPTION 4)

Company Name

Street Address

City, State, Zip Code

Name of Authorized Representative (Print)

Name of Authorized Representative (Signature)

E-Mail Address

Telephone

TOTAL BID (LINE ITEMS 01 TO 28.4)

NOTICE TO ALL BIDDERS:

1. All quantities are estimated. Actual quantities may vary.

2. The Owner reserves the right to waive any informality in any bid, to reject any and all bids, and to delete any portion of any of the above items.

3. Changes in the Contract Price and Contract Time require prior authorization, in writing from the Owner, in the form of a Change Order. The Contractor is responsible for verification of all bid quantities and to report to the Engineer any discrepancies found prior to ordering materials and/or equipment for construction.

4. Bid prices for the various work items are intended to establish a total price for completing the project in its entirety. The Contractor shall include in the Bid, any item for which a separate pay item has not been established in the Bid Form (under any related pay item), to reflect the total price for completing the project in its entirety.

5. The Contractor shall meet requirements of all applicable authorizations, permits, and codes (in their current edition).

6. Bids must be received no later than the date and time stated in the Advertisement. Bids received after that date and time will not be considered.

7. This form must be returned with the Bid. Bids on any other form will not be accepted.

8. The Bidder must Bid on all items in the this form to be considered for award. This project will be awarded to the lowest responsive and responsible bidder based on the total bid amount, including all optional dredging zones.

9. The Owner intends to award the optional dredge zones in the order indicated on the Bid Form but reserves the right to award and/or execute any combination of the optional dredge zones at its sole discretion based on budget availability and project priorities.

10. This project includes four (4) bid options to dredge additional volumes from adjacent dredge zones as indicated on the construction drawings.

The Contractor shall provide additional time required for each optional dredge zone on this Bid Form.

Bid Form