This file contains a Department of the Army Permit (SAJ-2019-02065) issued by the U.S. Army Corps of Engineers, Jacksonville District, in conjunction with a Consolidated Joint Coastal Permit and Sovereign Submerged Lands Authorization (Permit No. 0379716-003-JM) issued by the Florida Department of Environmental Protection. The permits authorize Flagler County Board of County Commissioners to conduct a beach and dune restoration project along approximately 7.3 miles of shoreline in Flagler County, Florida. The project involves dredging approximately 2.1 million cubic yards of sand from Borrow Area 3A, located approximately 10 nautical miles offshore in federal waters, and placing approximately 1.4 million cubic yards of dredged material into 113 acres of Atlantic Ocean waters for shoreline stabilization between R-46 and R-64.5. The project extends across two reaches: the North Reach (R-64.5 to R-80) and South Reach (R-94 to R-101), with staging and access areas at Varn Park and R-65 in Beverly Beach. The permit authorizes maintenance dredging of approximately 1.1 million cubic yards from the borrow area and placement of approximately 700,000 cubic yards for up to two maintenance events. The permits are effective through October 14, 2040, and March 10, 2040, respectively, allowing multiple construction events over the 15-year authorization period.
The permits establish comprehensive environmental and operational requirements including compliance with the South Atlantic Regional Biological Opinion (SARBO) for marine species protection, adherence to Statewide Programmatic Biological Opinion conditions for sea turtle protection, and implementation of shorebird protection measures during breeding seasons. Turbidity monitoring is required with a compliance standard of 29 NTUs above background at specified mixing zones up to 150 meters offshore and 1,000 meters alongshore. Post-construction sediment testing must be submitted within 90 days, and biennial physical monitoring surveys are required beginning one year after construction completion. The permitted sediment must comply with specifications including maximum 5% silt content and maximum shell content as detailed in the approved Sediment Quality Control/Quality Assurance Plan. Approved upland sand sources include materials from Vulcan-Goldhead, Vulcan-Keuka, Vulcan-Grandin, Cemex-Davenport, and E.R. Jahna-Independent North mines. The project must comply with conditions regarding hopper dredge deflector devices, marine turtle handling protocols, manatee protection measures, Eastern Indigo Snake protection measures, and specific provisions for preventing impacts to nesting shorebirds and migratory birds. Cultural resource protection, including immediate cessation of work upon discovery of archaeological materials and notification of the Florida State Historic Preservation Officer, is mandatory.
View the file
Other files
Show 40 more
Latest 50 of 90 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE ARMY PERMIT
Permittee: Flagler County Board of County Commissioners
Attention: Hamid Tabassian Flagler County Board of County Commissioners 1769 East Moody Boulevard, Building 2 Bunnell, Florida 32110
Permit No: SAJ-2019-02065 (SP-TMM)
Issuing Office: U.S. Army Engineer District, Jacksonville
NOTE: The term "you" and its derivatives, as used in this permit, means the permittee or any future transferee. The term "this office" refers to the appropriate district or division office of the U.S. Army Corps of Engineers (Corps) having jurisdiction over the permitted activity or the appropriate official of that office acting under the authority of the commanding officer.
You are authorized to perform work in accordance with the terms and conditions specified below.
Project Description: Authorization for the following:
1. DREDGE: To dredge 2.1 million-cubic-yards of sand from a 320-acre existing OCS offshore borrow area known as Borrow Area 3A located approximately 10 nautical miles offshore of the city of Flagler Beach, Florida. The hydraulic dredging would be conducted via a hopper dredge to -64.5-foot-depth NAVD 88 with a 2-foot of allowable over depth.
Because the borrow area is in Federal waters (more than 3 Nautical Miles offshore) on the OCS, BOEM holds the authority to authorize use of OCS sand and the applicant worked with BOEM to utilize the material.
2. FILL: To place approximately 1.4 million-cubic-yards of dredged material into approximately 113-acres of waters of the United States (1,120,000-cubic-yards of sand into 96 acres of open, tidal water of the Atlantic Ocean waterward of the mean high water line and 120,000-cubic-yards of sand into 17 acres of tidal waters between the high tide line and the mean high water line) from R-46 to R-64.5 of the Atlantic Ocean shoreline for shoreline stabilization. The above amounts include incorporation of the entire 2.1 million-cubic-yards of dredged material to account for loss of sand during transit as well as to account for sand that may be required as identified upon resurveying prior or during construction.
As part of the 1.4 million-cubic-yards of material placed, 160,000-cubic-yards of those cubic yards, from the Outer Continental Shelf Borrow Area 3A, would be placed into 23-acres of uplands landward of the high tide line. The proposed work would also include use
PERMIT NUMBER: SAJ-2019-02065
PERMITTEE: Flagler County of staging areas at Varn Park and R-monument 65 in Beverly Beach that could cause closure to public parking. These upland areas are not under the Corps jurisdiction, but would be within the National Environmental Policy Act, Endangered Species Act, and Section 106 scope of analysis that the Corps would review.
3. MAINTENANCE: In the event of any storm events, the proposed work would include dredging of approximately 1.1-million-cubic-yards of sediment from borrow area 3A and place approximately 700,000-cubic-yards of material into 113 acres of waters of the United States between R-46 – R-64.5 in up to two maintenance events for a total of 2.2-million-cubic-yards of dredge and 1.4-million-cubic-yards of fill. The maintenance events would depend upon potential storm events that could cause erosion and the surveyed beach and dune conditions immediately prior to such renourishment events. Specific maintenance project designs have not been developed at this time, therefore estimated volumes of dredge and fill are approximations. The applicant would work with BOEM in the future for a lease agreement for any maintenance events. The work described above is to be completed in accordance with the 24 pages of drawings (Attachment 1) and 15 attachments affixed at the end of this permit instrument.
Project Location: The project would affect waters of the United States associated with the Atlantic Ocean. The project site is located along the uplands, 404 waters of the shoreline between the high tide line and mean high water line, and in Section 10/404 waterward of the mean high water line of the Atlantic Ocean between the Florida Department of Environmental Protection (FDEP) Range (R) monuments R-46 and R- 64.5, Sections 46, 15, 14, 23, 26, Township 11 South, Range 31 East, in Flagler County, Florida. The borrow area associated with this project is Borrow Area 3A, which is located approximately 10 nautical miles east of the shoreline in Federal waters on the Outer Continental Shelf (OCS).
Directions to site: From Jacksonville, take Interstate 95 south to Exit 284 (State Road 100 East / East Moody Boulevard). Traveling east, proceed on State Road 100 for 10 miles to the intersection of Florida Highway A1A. Travel north approximately 2.6 miles.
The project lies along the shoreline of the Atlantic Ocean.
Approximate Central Coordinates:
Site Locations Latitude Longitude Notes Shoreline 29.557491° -81.164972° R-46 to 64.5 Borrow Area 3A, Flagler County Borrow Area
29.564235° -80.949371° 10 Nautical Miles Due East in the Atlantic Ocean, Center Area (reference Attachment 1)
Staging Area 1: Varn Park 29.550789° -81.162066° Staging Area 2: Beverly Beach 29.513525° -81.143306°
Permit Conditions
General Conditions:
1. The time limit for completing the work authorized ends on to October 14, 2040. If you find that you need more time to complete the authorized activity, submit your request for a time extension to this office for consideration at least one month before the above date is reached.
2. You must maintain the activity authorized by this permit in good condition and in conformance with the terms and conditions of this permit. You are not relieved of this requirement if you abandon the permitted activity, although you may make a good faith transfer to a third party in compliance with General Condition 4 below. Should you wish to cease to maintain the authorized activity or should you desire to abandon it without a good faith transfer, you must obtain a modification of this permit from this office, which may require restoration of the area.
3. If you discover any previously unknown historic or archeological remains while accomplishing the activity authorized by this permit, you must immediately notify this office of what you have found. We will initiate the Federal and State coordination required to determine if the remains warrant a recovery effort or if the site is eligible for listing in the National Register of Historic Places.
4. If you sell the property associated with this permit, you must obtain the signature and the mailing address of the new owner in the space provided and forward a copy of the permit to this office to validate the transfer of this authorization.
5. If a conditioned water quality certification has been issued for your project, you must comply with the conditions specified in the certification as special conditions to this permit. For your convenience, a copy of the certification is attached if it contains such conditions (Attachment 2).
6. You must allow representatives from this office to inspect the authorized activity at any time deemed necessary to ensure that it is being or has been accomplished in accordance with the terms and conditions of your permit.
Special Conditions:
1. Reporting Address: The Permittee shall submit all reports, notifications, documentation, and correspondence required by the general and special conditions of this permit to either (not both) of the following addresses:
a. For electronic mail (preferred): SAJ-RD-Enforcement@usace.army.mil (not to exceed 15 MB).
b. For standard mail: U.S. Army Corps of Engineers, Regulatory Division, Enforcement Section, P.O. Box 4970, Jacksonville, FL 32232-0019.
The Permittee shall reference this permit number, SAJ-2019-02065 (SP –TMM), on all submittals.
EASOF Rationale: This special condition is included in all Department of the Army permits and is required to ensure Corps oversight of the project (33 CFR 325, App. A, and 325.4 Conditioning of Permits).
2. Commencement Notification: Within 10 days from the date of initiating the work authorized by this permit, the Permittee shall submit a completed “Commencement Notification” form (Attachment 3).
3. Posting of Permit: The Permittee shall have available and maintain for review a copy of this permit and approved plans at the construction site.
4. Cultural Resources/Historic Properties:
a. No structure or work shall adversely affect, impact, or disturb properties listed in the National Register of Historic Places (NRHP), or those eligible for inclusion in the
NRHP.
b. If, during the ground disturbing activities and construction work within the permit area, there are archaeological/cultural materials encountered which were not the subject of a previous cultural resources assessment survey (and which shall include, but not be limited to: pottery, modified shell, human remains, ceramics, stone tools or metal implements, dugout canoes, evidence of structures or any other physical remains that could be associated with native cultures or early colonial settlement), the Permittee shall immediately stop all work and ground-disturbing activities within a 100-meter diameter of the discovery and notify the Corps at the addresses listed in the Reporting Address Special Condition within the same business day (8 hours). The Corps shall coordinate with the Florida State Historic Preservation Officer (SHPO) to assess the significance of the discovery and devise appropriate actions.
c. If, during permitted activities, items that may have historic or archaeological origin are observed the Permittee shall immediately cease all activities adjacent to the discovery that may result in the destruction of these resources and shall prevent his/her employees from further removing, or otherwise damaging, such resources.
The applicant shall notify both the Florida Department of State, Division of Historical Resources, Compliance Review Section at (850)-245-6333 and the Corps, of the observations within the same business day (8 hours). Examples of submerged historical, archaeological or cultural resources include shipwrecks, shipwreck debris fields (such as steam engine parts, or wood planks and beams), anchors, ballast rock, concreted iron objects, concentrations of coal, prehistoric watercraft (such as log "dugouts"), and other evidence of human activity. The materials may be deeply buried in sediment, resting in shallow sediments or above them, or protruding into water. The Corps shall coordinate with the Florida State Historic Preservation Officer (SHPO) to assess the significance of the discovery and devise appropriate actions. Project activities shall not resume without verbal and/or written authorization from the Corps.
d. Additional cultural resources assessments may be required of the permit area in the case of unanticipated discoveries as referenced in accordance with the above Special Condition and, if deemed necessary by the SHPO or Corps, in accordance with 36 CFR 800 or 33 CFR 325, Appendix C (5). Based on the circumstances of the discovery, equity to all parties, and considerations of the public interest, the Corps may modify, suspend, or revoke the permit in accordance with 33 CFR Part
325.7. Such activity shall not resume on non-federal lands without written authorization from the SHPO for finds under his or her jurisdiction, and from the Corps.
e. In the unlikely event that unmarked human remains are identified on non-federal lands, they will be treated in accordance with Section 872.05 Florida Statutes. All work and ground disturbing activities within a 100-meter diameter of the unmarked human remains shall immediately cease and the Permittee shall immediately notify the medical examiner, Corps, and State Archaeologist within the same business day (8-hours). The Corps shall then notify the appropriate SHPO. Based on the circumstances of the discovery, equity to all parties, and considerations of the public interest, the Corps may modify, suspend, or revoke the permit in accordance with 33 CFR Part 325.7. Such activity shall not resume without written authorization from the SHPO and from the Corps.
f. If prehistoric or historic artifacts such as pottery or ceramics, projectile points, dugout canoes, metal implements, historic building materials, or any other physical remains that could be associated with Native American, early European, or American settlement are encountered at any time within the project site area, the permitted project shall cease all activities involving subsurface disturbance in the vicinity of the discovery.
The applicant shall contact the Florida Department of State, Division of Historical Resources, Compliance Review Section at (850)-245-6333. Project activities shall not resume without verbal and/or written authorization. In the event that unmarked human remains are encountered during permitted activities, all work shall stop immediately and the proper authorities notified in accordance with Section 872.05, Florida Statutes.
g. The contractor must avoid any impacts within the 200-foot buffers depicted in Attachment 16 of this permit. No subsurface digging, spudding, anchoring or dredging will be allowed within these buffers nor will any depositing of heavy materials such as dredge piping. The coordinates for these four buffered locations must be provided to the contractor as a component of the submitted plans for sand conveyance work.
5. Local Notice to Mariners: The contractor is required to contact the United States Coast Guard office a minimum of 2 weeks prior to commencement and provide locations affected, equipment, hours of operation, and duration of the project so that the information can be published in the Local Notice to Mariners.
6. Bureau of Ocean and Energy Management Lease: The applicant shall comply with BOEM Lease OCS-A 0572, issued 21 August 2025 (Attachment 4).
7. Encountering of Munitions and Explosives of Concern (MEC) – The borrow site has a probability for having munitions and explosives (MEC). Therefore, the applicant shall comply with the following conditions:
1. Thirty days prior to commencement, Permittee shall contact the Corps at SAJ-RD- Enforcement@usace.army.mil and (904) 232-1177 (note Flagler County and MEC in the subject line and message) and SARBO@usace.army.mil with the commencement date, the contact information for any unexploded ordinance (UXO) technician, and the MEC Protocol Plan that is required in the BOEM lease (Attachment 4), Title IV D(10).
2. The Permittee or its contractor must screen to a minimum of 3/4 inch mesh screen size or to the state required screen size, whichever is smaller, at the beach pipeline output. The Permittee or the contractor must ensure the screen is monitored. It is recommended that a qualified UXO technician (DDESB TP-18 Revision 1) monitor the screening.
a. If MEC is recovered, the Permittee must follow the BOEM lease, Title IV D(10), the approved MEC Protocol Plan, and also contact the Corps at SAJ-RD- Enforcement@usace.army.mil and (904) 232-1177 (note Flagler County and MEC in the subject line and message), and SARBO@usace.army.mil.
b. The Permittee or its contractor must immediately notify USACE of any potential ESA-listed species takes identified in the beach outflow screening box.
c. If MEC are unexpectedly discovered in the project’s onshore areas after completion of the Project, the County is solely responsible for any remediation.
3. If the Permittee or the Corps determine that screening for MEC at the drag head becomes necessary, before adding any such screen, the Permittee must confer with the Corps and the National Marine Fisheries Service, who will engage in the alternative review/supersede process outlined in Section 2.9.5 of the 2020 South Atlantic Regional Biological Opinion [or any update to or replacement for that Biological Opinion]. If screening at the drag head is approved through that process, the Permittee must engage a Protected Species Observer to inspect the drag head MEC screens after every load to verify that no ESA-listed species are impinged on the screening.
8. Assurance of Navigation and Maintenance: The Permittee understands and agrees that, if future operations by the United States require the removal, relocation, or other alteration, of the structures or work herein authorized, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the Permittee will be required, upon due notice from the U.S. Army Corps of Engineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made against the United States on account of any such removal or alteration.
SARBO CONDITIONS
9. Reporting Addresses: The Permittee shall ensure all reports, notifications, documentation, and correspondence required by the general or special conditions of this permit are submitted to the Corps at the following email address: saj-rd-enforcement@usace.army.mil and RD.SARBO.GRBO@usace.army.mil. The Permittee shall reference this permit number, SAJ-2019-02065 (SP–TMM), choose one, and include the topic in the subject line of the email and on all submittals.
EASOF Rationale: Required to ensure Corps oversight of the project (33 CFR 325, App.
A, and 325.4 Conditioning of Permits).
10. Reporting requirements:
a. Commencement Notification: At least 45 days prior to the date of initiating the work authorized by this permit, the Permittee shall submit a completed “Commencement Notification” form (Attachment 5) to the Reporting Addresses Special
Condition. Upon receipt of the notification email, the Corps will provide a list of the Corps primary points of contact for reporting species take/incidents. If the permit authorizes multiple work events, the Permittee must submit the SARBO Pre- Construction Notification 45 days prior to each event.
b. North Atlantic right whale: All observations of North Atlantic right whales observed while completing the authorized work be reported immediately. The process to report a North Atlantic right whale observation is outlined in the North Atlantic Right Whale Plan (SARBO Appendix F) and applies to all work covered under SARBO.
c. Take Reporting: All lethal and nonlethal take associated with a project covered under SARBO will be reported to the Corps’ Incidental Take Reporter by phone immediately upon discovery. The contact information for the Incidental Take Reporter shall be provided by the Corps upon receipt of the pre-construction notification.
i. Take occurring during hopper dredging will be reported using the ODESS digital application system at the time of the take. ODESS digital submission also includes submission of a copy of a paper record using the reporting form available on the ODESS website as well as photos of the take as defined under the 2020 SARBO Appendix H.
ii. Take occurring during relocation trawling will be reported using an Excel spreadsheet with columns matching the template provided.
iii. Project details related to take will be reported by completing “SARBO Take Reporting” form (Attachment 6) and sent to the following emails:
RD.SARBO.GRBO@usace.army.mil.
d. Relocation Trawling: At least 48 hours prior to the start of relocation trawling, notify the Corps by email to the Reporting Addresses Special Condition if the project will be using relocation trawling. The email should contain when trawling will begin, expected project length, and when it is complete.
e. Post-Construction Reporting: Within 30 days of completing the work authorized by this permit, the Permittee shall submit a completed “SARBO Post-Construction Notification” form (Attachment 7) to the Reporting Addresses Special Condition.
11. South Atlantic Regional Biological Opinion: This permit does not authorize the Permittee to take an endangered species, in particular sea turtles, sturgeon, or any other endangered or threatened species under the purview of National Marine Fisheries Service (NMFS). In order to legally take a listed species, the Permittee must have separate authorization under the Endangered Species Act (ESA) (e.g., an ESA Section 10 permit, or a BO under ESA Section 7, with “incidental take” provisions with which you must comply). The NMFS South Atlantic Regional Biological Opinion (SARBO) contains mandatory terms and conditions to implement the reasonable and prudent measures that are associated with the incidental take statement set forth in the BO. The mandatory terms and conditions include adherence to the Project Design Criteria (PDC) applicable to the authorized project. Authorization under this permit is conditioned upon compliance with all of the mandatory terms and conditions and reasonable and prudent measures associated with the incidental take statement set forth in the enclosed BO, which are incorporated by reference in this permit. Failure to comply with the terms and conditions and reasonable and prudent measures associated with the incidental take statement set forth in the BO, would constitute noncompliance with this permit. In addition, failure to comply with the terms and conditions and reasonable and prudent measures associated with the incidental take statement set forth in the BO, where a take of a listed species occurs, would constitute an unauthorized take. The NMFS is the appropriate authority to determine compliance with the terms and conditions of its BO, and with the ESA.
The Permittee understands and agrees that, even where it is in full compliance with the terms and conditions of the SARBO ITS and this permit, incidental take by the Permittee or other hopper dredging operations within the area covered by the SARBO may result in suspension or modification of this permit by the Corps. The amount of incidental take that will trigger suspension, and the need for any such suspension, is a discretionary decision that shall be determined by the Corps. The Permittee understands and agrees on behalf of itself, its agents, contractors, and other representatives, no claim, legal action in equity or for damages, adjustment, or other entitlement against the Corps shall arise as a result of such suspension or related action. SARBO may be subject to revision at any time. The most recent version of these SARBO must be utilized during the design and construction of the permitted work. The Permittee is required to adhere to the most recent SARBO which can be viewed on the following website:
https://www.fisheries.noaa.gov/content/endangered-species-act-section-7-biological-opinions-southeast
12. Project Timing: For each work event, the Corps will determine project timing and necessary minimization measures to reduce the risk of take of ESA-listed species through the Risk Based Adaptive Management process outlined in Section 2.9.2.2 and Appendix J of the 2020 SARBO. Additional timing requirements apply within the range of certain species, as outlined in the North Atlantic Right Whale Conservation Plan (Appendix F of 2020 SARBO) and sturgeon PDCs (Appendix E of 2020 SARBO). The Permittee shall submit a Pre-Construction Risk Assessment to the Reporting Addresses Special Condition using the format located in 2020 SARBO Appendix J. The Assessment must be submitted by September 1st of each year work is anticipated to commence (e.g. for work planned in February 2022, the Pre-Construction Risk Assessment must be submitted by September 1, 2021). The Corps will provide a written response within 30 days of receipt. Work cannot occur until the Corps review and approves the proposed construction window in writing.
13. Pre-Construction Meeting: The Permittee will schedule a pre-construction meeting with a Corps representative no later than 30 days prior to the start of work to review the special conditions of the permit. The Permittee shall not start work prior to the pre-construction meeting.
HOPPER DREDGING CONDITIONS
14. Hopper Deflector Device Submittal: The Permittee shall ensure drawings of the proposed sea turtle deflector device and the completed “Hopper Dredge Deflector Device Checklist” form (Attachment 8) is submitted to the Corps at least 30 days prior to initiating the authorized work to the addresses listed in the Reporting Addresses Special Condition. No dredging shall be performed by a hopper dredge without the inclusion of an approved, rigid, sea turtle deflector device. The Permittee shall not commence hopper dredging until approval of the sea turtle deflector device has been granted by the Corps. A copy of the approved drawings, calculations, and signed “Hopper Dredge Deflector Device Checklist” form shall be available on the vessel during dredging operations.
15. Hopper Dredging Pre-Dredging Inspection Submittal: The Permittee shall submit the completed “Hopper Dredge Pre-Dredge Inspection Checklist” form (Attachment 9) to the Corps, at least 10 days prior to initiating the authorized work. This checklist can be accessed at:
https://dqm.usace.army.mil/odess/
Note – Please use a different browser if experiencing trouble opening the above link.
16. Dredging Quality Management (DQM): Dredging and dredged sediment discharge/placement and monitoring of the dredging projects using the Dredge Quality Management (DQM) system shall be implemented for this permit when the project is constructed with a hopper dredge or with scows/barges. When the dredging project utilizes a pipeline dredge, DQM shall be implemented when the dredge is equipped with DQM monitoring from previous work. The permittee’s DQM equipment must have been certified by the National DQM Support Center within one calendar year prior to the initiation of the dredging/discharge/placement of sediments. Questions regarding certification should be addressed to the National DQM Support Center at (877) 840- 8024. Additional information about the DQM program can be found at:
https://dqm.usace.army.mil/. The permittee is responsible for ensuring the DQM system is operational throughout the dredging and discharge/placement of sediments and the project data is submitted to the DQM Center in accordance with the specifications provided at the aforementioned website.
17. Hopper Dredge Startup Inspection: Within 3 days from the date of initiating the authorized work, the Permittee shall provide to the Corps, the completed Hopper Dredge Startup Inspection Checklist form Attachment 10 with a written notification of the date of commencement of work authorized by this permit. An inspection of the hopper dredge will be scheduled and performed by the Corps after receipt of the notification of commencement.
BEACH NOURISHMENT CONDITIONS
18. Statewide Programmatic Biological Opinion (SPBO): This permit does not authorize the Permittee to take an endangered species, in particular sea turtles. In order to legally take a listed species, the Permittee must have separate authorization under the Endangered Species Act (ESA) (e.g., an ESA Section 10 permit, or a BO under ESA Section 7, with “incidental take” provisions with which you must comply). The U.S.
Fish and Wildlife Service (USFWS) SPBO contains mandatory terms and conditions to implement the reasonable and prudent measures that are associated with the incidental take statement set forth in the BO. Authorization under this permit is conditioned upon compliance with all of the mandatory terms and conditions and reasonable and prudent measures associated with the incidental take statement set forth in the enclosed BO, which are incorporated by reference in this permit. Failure to comply with the terms and conditions and reasonable and prudent measures associated with the incidental take statement set forth in the BO, would constitute noncompliance with this permit. In addition, failure to comply with the terms and conditions and reasonable and prudent measures associated with the incidental take statement set forth in the BO, where a take of a listed species occurs, would constitute an unauthorized take. The USFWS is the appropriate authority to determine compliance with the terms and conditions of its BO, and with the ESA.
19. Manatee:
a. The Permittee shall comply with the “Standard Manatee Conditions for In-Water Work – 2011” (Attachment 11).
b. Barges shall install mooring bumpers that provide a minimum 4-foot standoff distance under maximum compression between other moored barges and large vessels, when in the vicinity of inlets, river mouths, and large estuaries where manatees are known to congregate.
c. Pipelines shall be positioned such that they do not restrict manatee movement to the maximum extent possible. Plastic pipelines shall be weighted or floated. Pipelines transporting dredged material within the vicinity of inlets, river mouths, and large estuaries where manatees are known to congregate shall be weighted or secured to the bottom substrate as necessary to prevent movement of the pipeline and to prevent manatee entrapment or crushing.
d. In the event that such positioning has the potential to impact submerged aquatic vegetation (SAV) or nearshore hardbottom, the pipeline may be elevated or secured to the bottom substrate to minimize impacts to SAV.
20. Migratory Birds: Florida Fish and Wildlife Conservation Commission (FWC) standard guidelines to protect against impacts to nesting shorebirds (Attachment 12) during implementation of this project during the periods from February 15 to August 31.
21. Mean Grain Size and Silt content: The sand utilized for the placement on the beach will meet the following sediment compliance specifications, as found in the Consolidated Joint Coastal Permit and Sovereign Submerged Lands Authorization Modification, Permit Number 0379716-003-JM, Sediment Quality Control/Quality Assurance Plan for Beach Restoration or Nourishment Using and Offshore Borrow Area: Flagler County Beach and Dune Restoration Project (Attachment 2):
The Permittee shall utilize the offshore borrow site as shown in Attachment 1, 1 of 24.
22. Piping Plover Programmatic Biological Opinion (P3BO): This permit does not authorize the Permittee to take an endangered species, in particular piping plover. In order to legally take a listed species, the Permittee must have separate authorization under the Endangered Species Act (ESA) (e.g., an ESA Section 10 permit, or a BO under ESA Section 7, with “incidental take” provisions with which you must comply).
The U.S. Fish and Wildlife Service (USFWS) P3BO contains mandatory terms and conditions to implement the reasonable and prudent measures that are associated with the incidental take statement set forth in the BO. Authorization under this permit is conditioned upon compliance with all of the mandatory terms and conditions and reasonable and prudent measures associated with the incidental take statement set forth in the enclosed BO, which are incorporated by reference in this permit. Failure to comply with the terms and conditions and reasonable and prudent measures associated with the incidental take statement set forth in the BO, would constitute noncompliance with this permit. In addition, failure to comply with the terms and conditions and reasonable and prudent measures associated with the incidental take statement set forth in the BO, where a take of a listed species occurs, would constitute an unauthorized take. The USFWS is the appropriate authority to determine compliance with the terms and conditions of its BO, and with the ESA.
23. Eastern Indigo Snake Protection Measures and Inspection: Permittee shall comply with U.S. Fish and Wildlife Service's “Standard Protection Measures for the Eastern Indigo Snake” dated May 2024, as provided in Attachment 13 of this permit. All gopher tortoise burrows, active or inactive, shall be evacuated prior to site manipulation in the vicinity of the burrow. If excavating potentially occupied burrows, active or inactive, individuals must first obtain state authorization via a Florida Fish and Wildlife Conservation Commission (FWC) Authorized Gopher Tortoise Agent permit. The excavation method selected shall minimize the potential for injury of an indigo snake.
The Permittee shall follow the excavation guidance provided in the most current FWC Gopher Tortoise Permitting Guidelines found at http://myfwc.com/gophertortoise. If an indigo snake is encountered, the snake must be allowed to vacate the area prior to additional site manipulation in the vicinity. Holes, cavities, and snake refugia other than gopher tortoise burrows shall be inspected each morning before planned site manipulation of a particular area, and if occupied by an indigo snake, no work shall commence until the snake has vacated the vicinity of the proposed work.
24. Proposed Species/Critical Habitat: At this time, this project does not fall within the range for any known candidate or proposed species to be federally listed and/or proposed critical habitat to be designated under the Endangered Species Act. If any species or critical habitat should become federally listed within the range of the permitted action, the Permittee is required to stop work and ask the Corps to re-evaluate effects on the species or designated critical habitat, and if needed, complete Section 7 consultation with the United States Fish and Wildlife Service or National Marine Fisheries Service to address potential impacts to the species and/or designated critical habitat.
25. Fill Material: The Permittee shall use only clean fill material for this project. The fill material shall be free from items such as trash, debris, automotive parts, asphalt, construction materials, concrete block with exposed reinforcement bars, and soils contaminated with any toxic substance in toxic amounts, in accordance with Section 307 of the Clean Water Act.
26. As-Built Certification: Within 60 days of completion of the work authorized by this permit, the Permittee shall submit as-built drawings of the authorized work and a completed “As-Built Certification by Professional Engineer or Surveyor” form (Attachment 14) to the Corps. The as-built drawings shall be signed and sealed by a registered professional engineer or surveyor and include the following:
a. A plan view drawing of the location of the authorized work footprint, as shown on the permit drawings, with an overlay of the work as constructed. The plan view drawing should show all existing water management structures and the completed structures, dredge/fill activities, and wetland impacts.
b. A list of any deviations between the work authorized by this permit and the work as constructed. In the event that the completed work deviates, in any manner, from the authorized work, describe on the attached “As-Built Certification by Professional Engineer” form the deviations between the work authorized by this permit and the work as constructed. Clearly indicate on the as-built drawings any deviations that have been listed. Please note that the depiction and/or description of any deviations on the drawings and/or “As-Built Certification by Professional Engineer” form does not constitute approval of any deviations by the Corps.
c. The Department of the Army permit number on all sheets submitted.
27. Notice of Permit: The Permittee shall complete and record the “Notice of Department of the Army Permit” form Attachment 15 with the Clerk of the County Court, Registrar of Deeds or other appropriate official charged with the responsibility of maintaining records of title to or interest in real property within the county of the authorized activity. No later than 90 days after the effective date of this permit, the Permittee shall provide a copy of the recorded Notice of Permit form to the Corps, clearly showing a stamp from the appropriate official indicating the book and page at which the Notice of Permit is recorded in the official records and the date of recording.
Further Information:
1. Congressional Authorities: You have been authorized to undertake the activity described above pursuant to:
(X) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403)
(X) Section 404 of the Clean Water Act (33 U.S.C. 1344)
( ) Section 103 of the Marine Protection, Research and Sanctuaries Act of 1972 (33 U.S.C. 1413)
( ) Section 14 of the Rivers and Harbors Act of 1899 (33 U.S.C. 408)
2. Limits of this authorization.
a. This permit does not obviate the need to obtain other Federal, State, or local authorizations required by law.
b. This permit does not grant any property rights or exclusive privileges.
c. This permit does not authorize any injury to the property or rights of others.
d. This permit does not authorize interference with any existing or proposed Federal projects.
3. Limits of Federal Liability. In issuing this permit, the Federal Government does not assume any liability for the following:
a. Damages to the permitted project or uses thereof as a result of other permitted or unpermitted activities or from natural causes.
b. Damages to the permitted project or uses thereof as a result of current or future activities undertaken by or on behalf of the United States in the public interest.
c. Damages to persons, property, or to other permitted or unpermitted activities or structures caused by the activity authorized by this permit.
d. Design or construction deficiencies associated with the permitted work.
e. Damage claims associated with any future modification, suspension, or revocation of this permit.
4. Reliance on Applicant's Data: The determination of this office that issuance of this permit is not contrary to the public interest was made in reliance on the information you provided.
5. Reevaluation of Permit Decision: This office may reevaluate its decision on this permit at any time the circumstances warrant. Circumstances that could require a reevaluation include, but are not limited to, the following:
a. You fail to comply with the terms and conditions of this permit.
b. The information provided by you in support of your permit application proves to have been false, incomplete, or inaccurate (see 4 above).
c. Significant new information surfaces which this office did not consider in reaching the original public interest decision.
Such a reevaluation may result in a determination that it is appropriate to use the suspension, modification, and revocation procedures contained in 33 CFR 325.7 or enforcement procedures such as those contained in 33 CFR 326.4 and 326.5. The referenced enforcement procedures provide for the issuance of an administrative order requiring you comply with the terms and conditions of your permit and for the initiation of legal action where appropriate. You will be required to pay for any corrective measures ordered by this office, and if you fail to comply with such directive, this office may in certain situations (such as those specified in 33 CFR 209.170) accomplish the corrective measures by contract or otherwise and bill you for the cost.
6. Extensions: General Condition 1 establishes a time limit for the completion of the activity authorized by this permit. Unless there are circumstances requiring either a prompt completion of the authorized activity or a reevaluation of the public interest decision, the Corps will normally give favorable consideration to a request for an extension of this time limit.
Your signature below, as permittee, indicates that you accept and agree to comply with the terms and conditions of this permit.
(PERMITTEE) (DATE)
(PERMITTEE NAME-PRINTED)
This permit becomes effective when the Federal official, designated to act for the Secretary of the Army, has signed below.
________________________ Date:
for: Brandon L. Bowman Colonel, U.S. Army District Commander
Hamid Tabassian, Flagler County Engineer
10/10/2025Hamid Tabassian, PE, DBIA Digitally signed by Hamid Tabassian, PE, DBIA Date: 2025.10.10 17:24:02 -04'00'
Muriel M.
Blaisdell
Digitally signed by Muriel M. Blaisdell Date: 2025.10.14 15:49:37 -04'00'
When the structures or work authorized by this permit are still in existence at the time the property is transferred, the terms and conditions of this permit will continue to be binding on the new owner(s) of the property. To validate the transfer of this permit and the associated liabilities associated with compliance with its terms and conditions, have the transferee sign and date below.
(TRANSFEREE-SIGNATURE) (DATE)
(NAME-PRINTED)
(ADDRESS)
(CITY, STATE, AND ZIP CODE)
Attachments to Department of the Army Permit Number SAJ-2019-02065
1. PERMIT DRAWINGS: 24 pages, dated June 28, 2024
2. WATER QUALITY CERTIFICATION: Specific Conditions of the water quality permit/certification in accordance with General Condition number 5 on page 2 of this DA permit. 35 pages.
a. Flagler County Permit Mod Sediment QAQC Plan
b. Flagler County Permit Mod Physical Monitoring Plan
3. COMMENCEMENT NOTIFICATION: 1 page
4. BOEM LEASE: 24 pages
5. SARBO REPORTING COMMENCEMENT NOTIFICATION: 1 PAGE
6. TAKE REPORTING EXCEL FILE: 1 page
7. SARBO POST CONSTRUCTION REPORTING FORM: 1 page
8. HOPPER DREDGE DEFLECTOR DEVICE CHECKLIST FORM: 1 page
9. HOPPER DREDGE PRE-DREDGE INSPECTION CHECKLIST FORM: 1 page
10. HOPPER DREDGE STARTUP INSPECTIN CHECKLIST FORM: 1 page
11. STANDARD MANATEE CONDITIONS FOR IN WATER WORK: 2 pages
12. FLORIDA FISH AND WILDLIFE CONSERVATION COMMISSION (FWC)
STANDARD GUIDELINES TO PROTECT AGAINST IMPACTS TO NESTING
SHOREBIRDS: 4 pages
13. STANDARD PROTECTION MEASURES FOR THE EASTERN INDIGO SNAKE: 5
pages
14. AS-BUILT CERTIFICATION FORM: 2 pages
15. RECORD PERMIT FORM: 2 pages
16. SECTION 106 NEARSHORE AVOIDANCE AREAS MAP: 1 page
E
E
1860000N
1940000N
6326632006 6326321126631631996 63263222636316318836
6316316 77763
63763 0 6376373 163663699963 637637226372 6363688
63367
642642004206 642642111641644199 6426422222 6416 8
6464704 64711
64664699
6476472264 6464688
65200 652652652265211 65519
652652525 2
656557777770000005
66657165665699 657657657222
6626 0 6621
66166199
662662222
66676 0 6676 1 66766722667
-50
-50
-50
-50
-50
00000
000000
000000
-10 -100
010100000 -11-1-11-110
-10 -10 -10 -10101010
-20 -20 -20 -220
-20 -2-20 -2020
-20 -20 -2020 -20
-30 -303030
-30 -30 -30300
-30 -3030 -30 -3000
-30300
-40
-40
-40
-40
-40
-60
-60
-60
-60
-60
-60 -60
-60
-6
-70 -700
-7070
-70 -70
-70 -7000
-70-70
-70-70
-60
-6
-60
-60
-6
-7
-7
FL
GAAL
SC
Gulf of Mexico
Atlantic Ocean
SITE
Flagler Co, FL
ML
DATE:
DRAWN BY:
SHEET
FOR PURPOSES OF PERMIT ONLY
NOT FOR CONSTRUCTION
LOCATION
FLAGLER COUNTY, FL
BEACH & DUNE
RESTORATION PROJECT: PHASE 2
FDEP 0379716-001-JC/SAJ-2019-02065(SP-TMM)
olsen associates, inc.
2618 Herschel St.
Jacksonville, FL 32204
(904) 387-6114
(FAX) 384-7368
COA 00003491
FLAGLER COUNTY, FL FOR PURPOSES OF PERMIT ONLY
NOT FOR CONSTRUCTION
NOTES:
1) Hor. - NAD83 SPC FL EAST
Latitude: 29° 26.9' N Longitude: 81° 7.0' W Township: 11, 12 S Range: 31, 32 E Section: 1, 7, 12, 13, 18, 19, 29, 30, 35, 36
08/27/2019
APPRLTR DATE
REVISIONS
DESCRIPTION
of 24
GRAPHIC SCALE
0 2.5 mi1.25
VOLUSIA
COUNTY
FLAGLER
COUNTY
ST. JOHNS
COUNTY
FEDERAL
STATE
FEDERAL
STATE
R-64.5
R-80
R-94
R-101
BORROW
AREA 3A
(USACE, 2015)
ATLANTIC
OCEAN
R-1
R-10
R-20
R-30
R-40
R-50
R-60
R-70
R-90
R-100
R-80
FLAGLER
COUNTY
BORROW
AREA
(PHASE 2)
10 Nautical miles
N au tic al mile s
R-5
R-15
R-25
R-35
R-45
R-55
R-65
R-75
R-85
R-95
R-46
Phase 4
(FUTURE)
Phase 3
(FUTURE)
Phase 2
Phase 1
Phase 2
11 Nautical miles
FEDERAL
BORROW
AREA
R-14
R-1
PROPOSED
PROJECT
EXTENSION
(R-46 TO R-64.5)
FEDERAL PROJECT
FDEP PERMIT #
0378136-001-JC
SEE SHEETS 14-24
SEE SHEETS 3-10
A
ADDED BEACH FILL EXTENSION/ 2024-06-28 CGCA
A
REVISED BORROW AREA CONFIGURATION
BOEM
LEASE
BLOCK,
TYP.
R-60
R-65
R-70
R-75
R-80
R-85
R-90
R-95
R-100 R-101
R-50
R-40R-40
R-50
-50 -50
000000 -11-1110000000
-22-2-2-200000 3-33000
-3300 -30
-40 -40
-60
ML
DATE:
DRAWN BY:
08/27/2019
SHEET
FOR PURPOSES OF PERMIT ONLY
NOT FOR CONSTRUCTION
LOCATION
olsen associates, inc.
2618 Herschel St.
Jacksonville, FL 32204
(904) 387-6114
(FAX) 384-7368
COA 00003491
FLAGLER COUNTY, FL FOR PURPOSES OF PERMIT ONLY
NOT FOR CONSTRUCTION
NOTES:
1) Hor. - NAD83 SPC FL EAST, Vert. - NAVD88, feet.
* STAGING AND ACCESS AREA
Latitude: 29° 26.9' N Longitude: 81° 7.0' W Township: 11, 12 S Range: 31, 32 E Section: 1, 7, 12, 13, 18, 19, 29, 30, 35, 36APPRLTR DATE
REVISIONS
DESCRIPTION
of 24
GRAPHIC SCALE
0 1.5 mi0.75VOLUSIA COUNTY, FL
PHASE 2
PHASE 2
PHASE 1
(Federal Project)
R-101
FLAGLER
COUNTY, FL
BORROW AREA
10nm OFFSHORE
FED
ER
AL
STATE
ATLANTIC
OCEAN
GAMBLE ROGERS STATE
RECREATION AREA
PROPOSED
PIPELINE
CORRIDOR,
TYP.
PIER
CITY OF
FLAGLER BEACH
TOWN OF
BEVERLY BEACH
PAINTERS HILL
R-94
HAMMOCK
DUNES
R-48
R-80
R-46
VARN PARK
A
ADDED BEACH FILL EXTENSION 2024-06-28 CGCA
FLAGLER COUNTY, FL
BEACH & DUNE
RESTORATION PROJECT: PHASE 2
FDEP 0379716-001-JC/SAJ-2019-02065(SP-TMM)
1V:15H
1V:50H
R-64
R-65
R-66
R-67
OSPREY DR
S O
C
EA
N S
H O
R E
BL
VD
OCEAN MARINA DR
TIE FILL TO EXTENSION
(SEE SHEET 17)
C C
C L
C C
C L
23rd ST N
C O
N
ST
R U
C
TI
O N
AC
C
ES
S
1884000N
E
.8
8.
-4 .7
-9 .3
-1 1.
-9 .6
-9 .3
-1 0.
-1 2.
.6
6.
-3 .6
-1 1.
-1 1.
-1 0.
-9 .6
-1 0.
-1 2.
.7
5.
-3 .5
-1 0.
-1 1.
-1 0.
-9 .1
-1 0.
-1 2.
5.
-3 .9
-9 .4
-1 1.
-1 1.
-9 .7
-1 0.
-1 2.
BE
VE
R
LY
B
EA
C H
1V:15H
1V:50H
R-68
R-69
R-70
C C
C L
C C
C L
S O
C
EA
N S
H O
R E
BL
VD
21st ST N
22nd ST N
20th ST N
18th ST N
1879000N
E
7.
-2 .8
-4 .6
-7 .3
-1 0.
-1 2.
-1 1.
-1 1.
-1 0.
-8 .7
-8 .6
-9 .4
-1 0.
-1 1.
-1 2.
-1 3.
-1
.5
6.
-3 .2
-9 .8
-1 1.
-9 .9
-9 .1
-1 0.
-1 2.
-1
.3
-3 .5
-6 .5
-1 1.
-1 1.
-9 .3
-9 .1
-1 1.
-1 3.
ML
DATE:
DRAWN BY:
08/27/2019
SHEET
FOR PURPOSES OF PERMIT ONLY
NOT FOR CONSTRUCTION
PLAN
olsen associates, inc.
2618 Herschel St.
Jacksonville, FL 32204
(904) 387-6114
(FAX) 384-7368
COA 00003491
FLAGLER COUNTY, FL
GRAPHIC SCALE
0 400 FT200
FOR PURPOSES OF PERMIT ONLY
NOT FOR CONSTRUCTION
NOTES:
1) Hor. - NAD83 SPC FL WEST, Vert. - NAVD88, feet
2) SURVEY: APRIL 2019; AERIALS: MAY 2019
MHWL
(07/19)
ETOF (TYP)
TOE OF
FILL (TYP)
EDGE OF BERM
(+8', TYP)
DUNE (TYP)
Latitude: 29° 26.9' N Longitude: 81° 7.0' W Township: 11, 12 S Range: 31, 32 E Section: 1, 7, 12, 13, 18, 19, 29, 30, 35, 36
MHWL
(07/19)
LANDWARD LIMIT
OF FILL (TYP)
APPRLTR DATE
REVISIONS
DESCRIPTION
A ADDED TIE-IN NOTE FOR 2024-06-28 CGC
of 24
R-64.5 to R-80, R-94 to R-101
A
NORTHERN FILL EXTENSION
FLAGLER COUNTY, FL
BEACH & DUNE
RESTORATION PROJECT: PHASE 2
FDEP 0379716-001-JC/SAJ-2019-02065(SP-TMM)
IMMEDIATE
POST-CONST.
MHWL (TYP)
R-71
R-72
R-73
S O
C
EA
N S
H O
R E
BL
VD
17th ST N
14th ST N
C C
C L
C C
C L
16th ST N
15th ST N
1877000N
E
.5
-3 .5
-6 .5
-1 2.
-1 1.
-9 .9
-9 .2
-1 1.
-1 3.
.5
3.
-5 .2 -1 0.
-1 2.
-1 0.
-8 .9
-1 0.
-1 2.
.8
4.
-4 .5
-8 .6
-1 2.
-1 0.
-9 .0
-9 .9
-1 2.
1V:15H
1V:50H
R-74
R-75
R-76
S O
C
EA
N S
H O
R E
BL
VD
14th ST N
10th ST N
9th ST N
8th ST N
7th ST N
11th ST N
12th ST N
13th ST N
C C
C L
C C
C L
1875000N
E
.5
-4 .6
-7 .0
-1 2.
-1 1.
-9 .3
-9 .3
-1 1.
.0
4.
-4 .5
-8 .8
-1 2.
-1 1.
-9 .2
-1 0.
-1 2.
.4
7.
-3 .2
-7 .6
-1 2.
-1 2.
-1 0.
-9 .6
-1 1.
ML
DATE:
DRAWN BY:
08/27/2019
SHEET
FOR PURPOSES OF PERMIT ONLY
NOT FOR CONSTRUCTION
olsen associates, inc.
2618 Herschel St.
Jacksonville, FL 32204
(904) 387-6114
(FAX) 384-7368
COA 00003491
FLAGLER COUNTY, FL
GRAPHIC SCALE
0 400 FT200
FOR PURPOSES OF PERMIT ONLY
NOT FOR CONSTRUCTION
NOTES:
1) Hor. - NAD83 SPC FL WEST, Vert. - NAVD88, feet
2) SURVEY: APRIL 2019; AERIALS: MAY 2019
MHWL
(07/19)
ETOF
(TYP)
TOE OF
FILL (TYP)
EDGE OF BERM
(+8', TYP)
DUNE (TYP)
Latitude: 29° 26.9' N Longitude: 81° 7.0' W Township: 11, 12 S Range: 31, 32 E Section: 1, 7, 12, 13, 18, 19, 29, 30, 35, 36
LANDWARD LIMIT
OF FILL (TYP)
PLAN
APPRLTR DATE
REVISIONS
DESCRIPTION
of 24
R-64.5 to R-80, R-94 to R-101
FLAGLER COUNTY, FL
BEACH & DUNE
RESTORATION PROJECT: PHASE 2
FDEP 0379716-001-JC/SAJ-2019-02065(SP-TMM)
IMMEDIATE
T-77
R-78
R-79
R-80
HWY 100
7th ST S
S O
C
EA
N S
H O
R E
BL
VD
6th ST S
7th ST N
6th ST N
5th ST N
4th ST N
3rd ST N
2nd ST N
5th ST S
4th ST S
3rd ST S
2nd ST S
SOUTHERN LIMIT-NORTH REACH
FEDERAL
[FDEP PERMIT # 0378136-001-JC]
C C
C L
C C
C L
1872000N
E
.8
.3
-4 .3
-8 .8
-1 2.
-1 0.
-9 .8
-9 .8
-1 1.
3.
.5
-4 .4
-1
-1 1.
-9 .7
-9 .5-1 1.
-1 1.
-5 .8
.3
-2 .7
-6 .0
-1 0.
-1 4.
-1 0.
-1 0.
-1 1.
6.
.1
-1 1.
-1 0.
-1 0.
-1 1.
-1 0.
-8 .4-4 .218
.0
-3 .5
-4 .2
-8 .4
-1 0.
-1 1.
-1 0.
-1 0.
-1 1.
1V:15H
1V:50H
R-93
R-94
R-95
R-96
28th ST S
S O
C
EA
N S
H O
R E
BL
VD
27th ST S
NORTHERN LIMIT-SOUTH REACH
C C
C L
C C
C L
FEDERAL
[FDEP PERMIT # 0378136-001-JC]
1859000N
E
.3
-0 .8
-4 .2
-8 .4
-1 2.
-1 1.
-1 0.
-9 .9
.4
2.
-3 .4
-6 .9
-1 0.
-1 3.
-1 1.
-9 .8
-1 1.
9.
-3 .3
-6 .3
-9 .5
-1 2.
-9 .8
-9 .7
-1 1.
.6
-2 .6
-4 .7
-8 .5
-1 3.
-1 1.
-1 0.
-1 0.
-1 2.
ML
DATE:
DRAWN BY:
08/27/2019
SHEET
FOR PURPOSES OF PERMIT ONLY
NOT FOR CONSTRUCTION
olsen associates, inc.
2618 Herschel St.
Jacksonville, FL 32204
(904) 387-6114
(FAX) 384-7368
COA 00003491
FLAGLER COUNTY, FL
GRAPHIC SCALE
0 400 FT200
FOR PURPOSES OF PERMIT ONLY
NOT FOR CONSTRUCTION
NOTES:
1) Hor. - NAD83 SPC FL WEST, Vert. - NAVD88, feet
2) SURVEY: APRIL 2019; AERIALS: MAY 2019
MHWL
(07/19)
ETOF
(TYP)
TOE OF
FILL (TYP)
EDGE OF BERM
(+8', TYP)
DUNE (TYP)
FISHING
PIER
Latitude: 29° 26.9' N Longitude: 81° 7.0' W Township: 11, 12 S Range: 31, 32 E Section: 1, 7, 12, 13, 18, 19, 29, 30, 35, 36
616,404 E 1,869,886 N
621,241 E 1,857,835 N
SEAWARD EDGE
OF ESTABLISHED
VEGETATION/
LANDWARD LIMIT
OF FILL (TYP)
PLAN
APPRLTR DATE
REVISIONS
DESCRIPTION
CGCA 08/25/2023ADDED UPLAND ACCESS FOR
EQUIPMENT AND CREWS
STAGING/
ACCESS AREA
STAGING/
ACCESS AREA
STAGING/
ACCESS AREA
HIGH
TIDE
LINE
(2023)
HIGH
TIDE
LINE
(2023) of 24
R-64.5 to R-80, R-94 to R-101
FLAGLER COUNTY, FL
BEACH & DUNE
RESTORATION PROJECT: PHASE 2
FDEP 0379716-001-JC/SAJ-2019-02065(SP-TMM)
IMMEDIATE
R-96
R-97
R-98
R-99
S O
C
EA
N S
H O
R E
BL
VD
C C
C L
C C
C L
C O
N
ST
R U
C
TI
O N
AC
C
ES
S
1854000N
E
.6
-2 .6
-4 .7
-8 .5
-1 3.
-1 1.
-1 0.
-1 0.
-1
.8
0.
-3 .3
-6 .7
-1 0.
-1 3.
-1 1.
-9 .8
-1 1.
.1
3.
-3 .9
-7 .2
-1 0.
-1 2.
-1 0.
-1 0.
-1 1.
-1 4.
.3
-4 .0
-5 .1
-9 .1
-1 3.
-9 .8
-9 .7
-1 0.
-1 2.
1V:15H
1V:50H
R-99
R-100
R-101 SOUTHERN LIMIT-SOUTH REACH
C C
C C
C L
C C
C L
1851000N
E
.3
-4 .0
-5 .1
-9 .1
-1 3.
-9 .8
-9 .7
-1 0.
-1 2.
.7
9.
-3 .5 -6 .8
-1 0.
-1 2.
-1 0.
-9 .7
-1 1.
-1 3.
ML
DATE:
DRAWN BY:
08/27/2019
SHEET
FOR PURPOSES OF PERMIT ONLY
NOT FOR CONSTRUCTION
olsen associates, inc.
2618 Herschel St.
Jacksonville, FL 32204
(904) 387-6114
(FAX) 384-7368
COA 00003491
FLAGLER COUNTY, FL
GRAPHIC SCALE
0 400 FT200
FOR PURPOSES OF PERMIT ONLY
NOT FOR CONSTRUCTION
NOTES:
1) Hor. - NAD83 SPC FL WEST, Vert. - NAVD88, feet
2) SURVEY: APRIL 2019; AERIALS: MAY 2019
MHWL
(07/19)
ETOF
(TYP)
TOE OF
FILL (TYP)
EDGE OF BERM
(+8', TYP)
DUNE (TYP)
Latitude: 29° 26.9' N Longitude: 81° 7.0' W Township: 11, 12 S Range: 31, 32 E Section: 1, 7, 12, 13, 18, 19, 29, 30, 35, 36
623,507 E 1,851,644 N
LANDWARD LIMIT
OF FILL (TYP)
PLAN
APPRLTR DATE
REVISIONS
DESCRIPTION
of 24
R-64.5 to R-80, R-94 to R-101
FLAGLER COUNTY, FL
BEACH & DUNE
RESTORATION PROJECT: PHASE 2
FDEP 0379716-001-JC/SAJ-2019-02065(SP-TMM)
IMMEDIATE
FD…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .