2026-02-02_Flagler_Phase_2_Bid_Schedule_revised.pdf
PDF 72 KB Posted
- Solicitation number
- 25-ITB-078
- Issued by
- Glades County, Brownsville CDP, Florida
About this file
Bid Schedule for Flagler County Beach Nourishment Project - Reach II
This is a bid schedule document for the Flagler County Beach Nourishment Project - Reach II (Project No. 25-ITB-078), a coastal restoration initiative in Flagler County, Florida. The project involves placing approximately 1.8 million cubic yards of offshore beach-compatible sand across 5.5 miles of critically eroded coastline in the communities of Painter's Hill, Beverly Beach, and northern Flagler Beach. Key deliverables include 17 line items encompassing mobilization and demobilization, beach and dune fill placement (1,800,000 cubic yards), mechanical screening and spreading (1,800,000 cubic yards), structure inspection and vibration monitoring, beach tilling and decompaction, turbidity monitoring, endangered species observations, sea turtle trawling services (3 days), vegetation dune planting (364,200 units), sand fencing (12,900 linear feet), dune post and rope installation (600 linear feet), project signage, environmental monitoring, and construction bonding. The contract performance period extends 365 calendar days for final completion and acceptance, with work to commence within 240 calendar days of Notice to Proceed issuance. Bidders were required to submit questions by April 3, 2026, attend an optional pre-bid meeting on March 27, 2026, and submit sealed bids by April 16, 2026.
The bid schedule presents all line items with estimated unit costs and total prices left blank for bidder completion. Unit cost quantities for beach fill and mechanical screening are estimates only, with unit costs remaining valid for actual quantities up to 20 percent above or below estimated amounts. The contractor must identify fill and vegetation quantities placed within specific reaches (R-47.9 to R-65 and the City of Flagler Beach) for FEMA and FDOT reporting purposes. The project is funded through the Florida Department of Environmental Protection under Agreement No. 23FL2 (Amendment No. 2) with $44,544,369.25 in total state cost sharing and no local match requirement. The contractor must furnish performance and payment bonds equal to 100 percent of the contract amount, maintain comprehensive insurance coverage, and comply with all federal requirements including Clean Air Act, Federal Water Pollution Control Act, and domestic preference provisions. Liquidated damages will apply at rates ranging from $904 to $10,224 per calendar day, with five percent retainage held until satisfactory completion and payment made in accordance with Florida's Local Government Prompt Payment Act.
View the file
Other files
Show 40 more
Latest 50 of 90 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Item No. & Description Technical Specifications
Reference 2 Quantity Unit Unit Price
Total Item
Price
1. Mobilization / Demobilization Section 20 1 LS $ - $ -
2. Beach / Dune Fill 3,4 Sections 21, 37, & 42 1,800,000 CY $ - $ -
3. Mechanical Screening and Spreading 3,4 Sections 22 & 41 1,800,000 CY $ - $ -
4. MEC Support Sections 23 & 41 1 LS $ - $ -
5. Structure Inspection & Vibration Monitoring Sections 12 & 24 1 LS $ - $ -
6. Beach Tilling / Decompaction Sections 25 & 42 1 LS $ - $ -
7. Turbidity Monitoring Sections 26 & 47 1 LS $ - $ -
8. Endangered Species Observations Sections 35 & 49 1 LS $ - $ -
9. Sea Turtle Trawling: MOB/DEMOB Sections 27 & 49 1 LS $ - $ -
10. Sea Turtle Trawling: DAY RATE Sections 28 & 49 3 DAY $ - $ -
11. Vegetation – Dune Planting Units Sections 29 & 56 364,200 EA $ - $ -
12. Sand Fencing Sections 30 & 57 12,900 LF $ - $ -
13. Project Signs Sections 32 & 59 1 LS $ - $ -
14. Dune Post and Rope Sections 31 & 58 600 LF $ - $ -
15. Environmental Monitoring Sections 36 & 49 1 LS $ - $ -
16. Standby Time 1 Sections 33 24 HR $ - $ -
17. Construction Bond Sections 34 1 LS $ - $ -
On Contractor's Pay Applications, the Contractor shall specifically identify, for reporting purposes, the total quantities of Fill (Item 2) and Vegetation (Item 11) placed within R-47.9 to R-65 for reporting to FEMA (140,190 CY and 146,835 plants), and within the City of Flagler Beach (from the southern project limit to approximately R-65) for reporting to FDOT.
The unit cost quantities for Line Items 2 and 3 are only estimates. The unit costs provided in this bid shall remain valid for actual Fill and Mechanical Screening and Spreading placed up to
20% above or below these estimated quantities.
Technical Specification reference is provided for convenience. The Contractor shall be responsible for adherence to all contract requirements.
Beach and Dune Restoration Project - Reach 2
Flagler County, FL
Base Bid
Total Construction Cost
Project No.: 25-ITB-078
Standby Time is defined as time spent by the dredge, at the direction of the County or Engineer, for reasons outside of the requirements in the contract.