This is a bid schedule document for the Flagler County Beach Nourishment Project - Reach II (Project No. 25-ITB-078, FPN 429573-1-38-01), a coastal restoration initiative in Flagler County, Florida. The project requires placement of approximately 1.8 million cubic yards of beach-compatible sand across 5.5 miles of critically eroded coastline in Painter's Hill, Beverly Beach, and northern Flagler Beach. Key deliverables include mobilization and demobilization, beach and dune fill placement with mechanical screening and spreading, structure inspection and vibration monitoring, beach tilling and decompaction, turbidity monitoring, endangered species observations, sea turtle trawling services, vegetation dune planting of approximately 364,200 units, sand fencing installation (12,900 linear feet), dune post and rope installation (600 linear feet), project signage, environmental monitoring, and construction bonding. The optional pre-bid meeting is scheduled for March 27, 2026 at 10:00 a.m., with bidder questions due by April 3, 2026 at 2:00 p.m., and sealed bids due by April 16, 2026 at 2:00 p.m. through the OpenGov Procurement portal. Work shall commence upon issuance of a Notice to Proceed and be completed within 240 calendar days, with a total contract performance period of 365 calendar days for final completion and acceptance. The contract will be awarded to the lowest responsible bidder meeting all contract requirements.
The project is funded through the Florida Department of Environmental Protection under Agreement No. 23FL2 (Amendment No. 2) with total state cost sharing of $44,544,369.25 and no local match requirement. The project is eligible for Federal Emergency Management Agency funding as a hurricane recovery project, subjecting all work to federal requirements including compliance with the Contract Work Hours and Safety Standards Act, Clean Air Act, Federal Water Pollution Control Act, non-debarment verification, Byrd Anti-Lobbying Amendment certification, and domestic preference for United States-produced goods. The successful contractor must furnish performance and payment bonds equal to 100 percent of the contract amount, comprehensive insurance coverage including worker's compensation, commercial general liability, automobile liability, and builder's risk insurance, and maintain a one-year warranty bond following project acceptance. Liquidated damages will apply at rates ranging from $904 to $10,224 per calendar day depending on contract value. Payment will be made in accordance with Florida's Local Government Prompt Payment Act with five percent retainage held until satisfactory completion. Unit cost quantities for beach fill (Item 2) and mechanical screening and spreading (Item 3) are estimated at 1.8 million cubic yards each, with unit costs remaining valid for actual placement quantities up to 20 percent above or below these estimates.
View the file
Other files
Show 40 more
Latest 50 of 90 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Item No. & Description Technical Specifications
Reference 2 Quantity Unit Unit Price
Total Item
Price
1. Mobilization / Demobilization Section 20 1 LS $ - $ -
2. Beach / Dune Fill 3,4 Sections 21, 37, & 42 1,800,000 CY $ - $ -
3. Mechanical Screening and Spreading 3,4 Sections 22 & 41 1,800,000 CY $ - $ -
4. MEC Support Sections 23 & 41 1 LS $ - $ -
5. Structure Inspection & Vibration Monitoring Sections 12 & 24 1 LS $ - $ -
6. Beach Tilling / Decompaction Sections 25 & 42 1 LS $ - $ -
7. Turbidity Monitoring Sections 26 & 47 1 LS $ - $ -
8. Endangered Species Observations Sections 35 & 49 1 LS $ - $ -
9. Sea Turtle Trawling: MOB/DEMOB Sections 27 & 49 1 LS $ - $ -
10. Sea Turtle Trawling: DAY RATE Sections 28 & 49 3 DAY $ - $ -
11. Vegetation – Dune Planting Units Sections 29 & 56 364,200 EA $ - $ -
12. Sand Fencing Sections 30 & 57 12,900 LF $ - $ -
13. Project Signs Sections 32 & 59 1 LS $ - $ -
14. Dune Post and Rope Sections 31 & 58 600 LF $ - $ -
15. Environmental Monitoring Sections 36 & 49 1 LS $ - $ -
16. Standby Time 1 Sections 33 24 HR $ - $ -
17. Construction Bond Sections 34 1 LS $ - $ -
On Contractor's Pay Applications, the Contractor shall specifically identify, for reporting purposes, the total quantities of Fill (Item 2) and Vegetation (Item 11) placed within R-47.9 to R-65 for reporting to FEMA (140,190 CY and 146,835 plants), and within the City of Flagler Beach (from the southern project limit to approximately R-65) for reporting to FDOT.
The unit cost quantities for Line Items 2 and 3 are only estimates. The unit costs provided in this bid shall remain valid for actual Fill and Mechanical Screening and Spreading placed up to
20% above or below these estimated quantities.
Technical Specification reference is provided for convenience. The Contractor shall be responsible for adherence to all contract requirements.
Beach and Dune Restoration Project - Reach 2
Flagler County, FL
Base Bid
Total Construction Cost
Project No.: 25-ITB-078
Standby Time is defined as time spent by the dredge, at the direction of the County or Engineer, for reasons outside of the requirements in the contract.