2026-02-02_Flagler_Phase_2_Bid_Schedule_revised.pdf

PDF 72 KB Posted

Attached to
Flagler County Beach Nourishment Project - Reach II FPN 429573-1-38-01
Solicitation number
25-ITB-078
Issued by
Glades County, Brownsville CDP, Florida

About this file

This is a bid schedule document for the Flagler County Beach Nourishment Project - Reach II (Project No. 25-ITB-078, FPN 429573-1-38-01), a coastal restoration initiative in Flagler County, Florida. The project requires placement of approximately 1.8 million cubic yards of beach-compatible sand across 5.5 miles of critically eroded coastline in Painter's Hill, Beverly Beach, and northern Flagler Beach. Key deliverables include mobilization and demobilization, beach and dune fill placement with mechanical screening and spreading, structure inspection and vibration monitoring, beach tilling and decompaction, turbidity monitoring, endangered species observations, sea turtle trawling services, vegetation dune planting of approximately 364,200 units, sand fencing installation (12,900 linear feet), dune post and rope installation (600 linear feet), project signage, environmental monitoring, and construction bonding. The optional pre-bid meeting is scheduled for March 27, 2026 at 10:00 a.m., with bidder questions due by April 3, 2026 at 2:00 p.m., and sealed bids due by April 16, 2026 at 2:00 p.m. through the OpenGov Procurement portal. Work shall commence upon issuance of a Notice to Proceed and be completed within 240 calendar days, with a total contract performance period of 365 calendar days for final completion and acceptance. The contract will be awarded to the lowest responsible bidder meeting all contract requirements.

The project is funded through the Florida Department of Environmental Protection under Agreement No. 23FL2 (Amendment No. 2) with total state cost sharing of $44,544,369.25 and no local match requirement. The project is eligible for Federal Emergency Management Agency funding as a hurricane recovery project, subjecting all work to federal requirements including compliance with the Contract Work Hours and Safety Standards Act, Clean Air Act, Federal Water Pollution Control Act, non-debarment verification, Byrd Anti-Lobbying Amendment certification, and domestic preference for United States-produced goods. The successful contractor must furnish performance and payment bonds equal to 100 percent of the contract amount, comprehensive insurance coverage including worker's compensation, commercial general liability, automobile liability, and builder's risk insurance, and maintain a one-year warranty bond following project acceptance. Liquidated damages will apply at rates ranging from $904 to $10,224 per calendar day depending on contract value. Payment will be made in accordance with Florida's Local Government Prompt Payment Act with five percent retainage held until satisfactory completion. Unit cost quantities for beach fill (Item 2) and mechanical screening and spreading (Item 3) are estimated at 1.8 million cubic yards each, with unit costs remaining valid for actual placement quantities up to 20 percent above or below these estimates.

View the file

Other files

File Type Posted
Flagler_County_Beach_Nourishment_Project_-_Reach_II_FPN_429573-1-38-01_(Addendum_#7_Revision).pdf PDF
Example_Photography_of_Concrete_Debris.pdf PDF
Contract_Form.pdf PDF
Contract_Form.pdf PDF
Federal_Requirements.pdf PDF
Federal_Requirements.pdf PDF
Flagler_County_Construction_Beach_Fill_Plans_2026-03-04_RevSHT26.pdf PDF
Flagler_County_Construction_Beach_Fill_Plans_2026-03-04_RevSHT26.pdf PDF
23FL2_A2_Flagler_County_Hurricane_Recovery_Project.pdf PDF
23FL2_A2_Flagler_County_Hurricane_Recovery_Project.pdf PDF
FLAGLER_INTERIM_TECH_REPORT_[OA]_25_NOV_2019.pdf PDF
FLAGLER_INTERIM_TECH_REPORT_[OA]_25_NOV_2019.pdf PDF
USACE_2015_Feasability_Study_-_AppendixD_Geotechnical.pdf PDF
USACE_2015_Feasability_Study_-_AppendixD_Geotechnical.pdf PDF
[Q]_20251014-SP_Proffered_Permit_Form.pdf PDF
[Q]_20251014-SP_Proffered_Permit_Form.pdf PDF
Example_Warranty_Bond_Form.pdf PDF
Example_Warranty_Bond_Form.pdf PDF
Example_Payment_and_Performance_Bond_Form_337_18_Version_May_6_2014_doc.pdf PDF
Example_Payment_and_Performance_Bond_Form_337_18_Version_May_6_2014_doc.pdf PDF
2025-03_BeachProfiles_NAVD88.CSV CSV file
2025-03_BeachProfiles_NAVD88.CSV CSV file
Attachment_23_Flagler_County_Physical_Monitoring_Plan_2025-01-13.pdf PDF
Attachment_23_Flagler_County_Physical_Monitoring_Plan_2025-01-13.pdf PDF
2019-05_BorrowArea_NAVD88.txt TXT text file
2019-05_BorrowArea_NAVD88.txt TXT text file
Flagler_County_Construction_Beach_Fill_Plans_2026-03-04_RevSHT25.pdf PDF
Flagler_County_Construction_Beach_Fill_Plans_2026-03-04_RevSHT25.pdf PDF
README.txt TXT text file
README.txt TXT text file
Project_Contract_Forms.pdf PDF
Project_Contract_Forms.pdf PDF
2026-02-02_Flagler_Phase_2_Bid_Schedule_revised.pdf PDF
Flagler_2020_Geotechnical_Investigation.pdf PDF
Flagler_2020_Geotechnical_Investigation.pdf PDF
[T]_20251016_PA_4673-01484_PN_714658_and_PA_4680-00153_PN_714659_DOCUMENT_SOU.pdf PDF
[T]_20251016_PA_4673-01484_PN_714658_and_PA_4680-00153_PN_714659_DOCUMENT_SOU.pdf PDF
Flagler_County_Permit_Mod_Attachment_16f_Sediment_QAQC_Plan.pdf PDF
Flagler_County_Permit_Mod_Attachment_16f_Sediment_QAQC_Plan.pdf PDF
[S]_Vessel_Strike_Avoidance_Measures.pdf PDF
[S]_Vessel_Strike_Avoidance_Measures.pdf PDF
[R]_OCS_A_0572_BOEM_Lease_Flagler_Phase_II_Executed_8-21-2025.pdf PDF
[R]_OCS_A_0572_BOEM_Lease_Flagler_Phase_II_Executed_8-21-2025.pdf PDF
FO_Flagler_County_Beach_and_Dune_Restoration_Project_-_0379716-003-JM.pdf PDF
FO_Flagler_County_Beach_and_Dune_Restoration_Project_-_0379716-003-JM.pdf PDF
2024-03_Flagler_Geotechnical_Investigation.pdf PDF
2024-03_Flagler_Geotechnical_Investigation.pdf PDF
Flagler_Reach_2_Tech_Specs_Formatted.pdf PDF
24-PC-01778_Flagler_Final_Report_[July_2024].pdf PDF
24-PC-01778_Flagler_Final_Report_[July_2024].pdf PDF
Show 40 more

Latest 50 of 90 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Item No. & Description Technical Specifications

Reference 2 Quantity Unit Unit Price

Total Item

Price

1. Mobilization / Demobilization Section 20 1 LS $ - $ -

2. Beach / Dune Fill 3,4 Sections 21, 37, & 42 1,800,000 CY $ - $ -

3. Mechanical Screening and Spreading 3,4 Sections 22 & 41 1,800,000 CY $ - $ -

4. MEC Support Sections 23 & 41 1 LS $ - $ -

5. Structure Inspection & Vibration Monitoring Sections 12 & 24 1 LS $ - $ -

6. Beach Tilling / Decompaction Sections 25 & 42 1 LS $ - $ -

7. Turbidity Monitoring Sections 26 & 47 1 LS $ - $ -

8. Endangered Species Observations Sections 35 & 49 1 LS $ - $ -

9. Sea Turtle Trawling: MOB/DEMOB Sections 27 & 49 1 LS $ - $ -

10. Sea Turtle Trawling: DAY RATE Sections 28 & 49 3 DAY $ - $ -

11. Vegetation – Dune Planting Units Sections 29 & 56 364,200 EA $ - $ -

12. Sand Fencing Sections 30 & 57 12,900 LF $ - $ -

13. Project Signs Sections 32 & 59 1 LS $ - $ -

14. Dune Post and Rope Sections 31 & 58 600 LF $ - $ -

15. Environmental Monitoring Sections 36 & 49 1 LS $ - $ -

16. Standby Time 1 Sections 33 24 HR $ - $ -

17. Construction Bond Sections 34 1 LS $ - $ -

On Contractor's Pay Applications, the Contractor shall specifically identify, for reporting purposes, the total quantities of Fill (Item 2) and Vegetation (Item 11) placed within R-47.9 to R-65 for reporting to FEMA (140,190 CY and 146,835 plants), and within the City of Flagler Beach (from the southern project limit to approximately R-65) for reporting to FDOT.

The unit cost quantities for Line Items 2 and 3 are only estimates. The unit costs provided in this bid shall remain valid for actual Fill and Mechanical Screening and Spreading placed up to

20% above or below these estimated quantities.

Technical Specification reference is provided for convenience. The Contractor shall be responsible for adherence to all contract requirements.

Beach and Dune Restoration Project - Reach 2

Flagler County, FL

Base Bid

Total Construction Cost

Project No.: 25-ITB-078

Standby Time is defined as time spent by the dredge, at the direction of the County or Engineer, for reasons outside of the requirements in the contract.