About this file

This is a geotechnical information sheet for the Flagler County Beach Nourishment Project - Reach II (ITB #25-ITB-078, FPN 429573-1-38-01), prepared by Flagler County, Florida. The document presents borrow area geotechnical data and vibracore information to support the competitive sealed bid procurement for the beach nourishment initiative. The project involves restoring approximately 5.5 miles of critically eroded coastline across Painter's Hill, Beverly Beach, and northern Flagler Beach through placement of approximately 1.8 million cubic yards of offshore beach-compatible sand. The sheet, dated March 4, 2026, includes vibracore data from 2011 and 2023, seabed elevation information, and dredge zone boundaries at a design excavation depth of -64.5 feet (NAVD88). Bidders must submit questions by April 3, 2026 at 2:00 p.m., attend an optional pre-bid meeting on March 27, 2026 at 10:00 a.m., and submit sealed bids through the OpenGov Procurement portal by April 16, 2026 at 2:00 p.m. The project is scheduled to commence upon issuance of Notice to Proceed with work completion required within 240 calendar days, with a total contract performance period of 365 calendar days for final completion and acceptance.

The contract will be awarded to the lowest responsible bidder meeting all requirements, with the successful contractor required to furnish performance and payment bonds equal to 100 percent of the contract amount and maintain comprehensive insurance coverage including worker's compensation, commercial general liability, automobile liability, and builder's risk insurance. The project is eligible for federal funding through the Federal Emergency Management Agency as a hurricane recovery project, subjecting all work to federal compliance requirements including the Contract Work Hours and Safety Standards Act, Clean Air Act, Federal Water Pollution Control Act standards, non-debarment verification, Byrd Anti-Lobbying Amendment certification, and domestic preference for United States-produced goods. Funding is provided through the Florida Department of Environmental Protection under Agreement No. 23FL2 (Amendment No. 2) with $44,544,369.25 in total state cost sharing and no local match requirement. Liquidated damages will apply at rates ranging from $904 to $10,224 per calendar day depending on contract value, with payment made in accordance with Florida's Local Government Prompt Payment Act and five percent retainage held until satisfactory completion.

View the file

Other files

File Type Posted
Flagler_County_Beach_Nourishment_Project_-_Reach_II_FPN_429573-1-38-01_(Addendum_#7_Revision).pdf PDF
Example_Photography_of_Concrete_Debris.pdf PDF
Contract_Form.pdf PDF
Contract_Form.pdf PDF
Federal_Requirements.pdf PDF
Federal_Requirements.pdf PDF
Flagler_County_Construction_Beach_Fill_Plans_2026-03-04_RevSHT26.pdf PDF
23FL2_A2_Flagler_County_Hurricane_Recovery_Project.pdf PDF
23FL2_A2_Flagler_County_Hurricane_Recovery_Project.pdf PDF
FLAGLER_INTERIM_TECH_REPORT_[OA]_25_NOV_2019.pdf PDF
FLAGLER_INTERIM_TECH_REPORT_[OA]_25_NOV_2019.pdf PDF
USACE_2015_Feasability_Study_-_AppendixD_Geotechnical.pdf PDF
USACE_2015_Feasability_Study_-_AppendixD_Geotechnical.pdf PDF
[Q]_20251014-SP_Proffered_Permit_Form.pdf PDF
[Q]_20251014-SP_Proffered_Permit_Form.pdf PDF
Example_Warranty_Bond_Form.pdf PDF
Example_Warranty_Bond_Form.pdf PDF
Example_Payment_and_Performance_Bond_Form_337_18_Version_May_6_2014_doc.pdf PDF
Example_Payment_and_Performance_Bond_Form_337_18_Version_May_6_2014_doc.pdf PDF
2025-03_BeachProfiles_NAVD88.CSV CSV file
2025-03_BeachProfiles_NAVD88.CSV CSV file
Attachment_23_Flagler_County_Physical_Monitoring_Plan_2025-01-13.pdf PDF
Attachment_23_Flagler_County_Physical_Monitoring_Plan_2025-01-13.pdf PDF
2019-05_BorrowArea_NAVD88.txt TXT text file
2019-05_BorrowArea_NAVD88.txt TXT text file
Flagler_County_Construction_Beach_Fill_Plans_2026-03-04_RevSHT25.pdf PDF
Flagler_County_Construction_Beach_Fill_Plans_2026-03-04_RevSHT25.pdf PDF
README.txt TXT text file
README.txt TXT text file
Project_Contract_Forms.pdf PDF
Project_Contract_Forms.pdf PDF
2026-02-02_Flagler_Phase_2_Bid_Schedule_revised.pdf PDF
2026-02-02_Flagler_Phase_2_Bid_Schedule_revised.pdf PDF
Flagler_2020_Geotechnical_Investigation.pdf PDF
Flagler_2020_Geotechnical_Investigation.pdf PDF
[T]_20251016_PA_4673-01484_PN_714658_and_PA_4680-00153_PN_714659_DOCUMENT_SOU.pdf PDF
[T]_20251016_PA_4673-01484_PN_714658_and_PA_4680-00153_PN_714659_DOCUMENT_SOU.pdf PDF
Flagler_County_Permit_Mod_Attachment_16f_Sediment_QAQC_Plan.pdf PDF
Flagler_County_Permit_Mod_Attachment_16f_Sediment_QAQC_Plan.pdf PDF
[S]_Vessel_Strike_Avoidance_Measures.pdf PDF
[S]_Vessel_Strike_Avoidance_Measures.pdf PDF
[R]_OCS_A_0572_BOEM_Lease_Flagler_Phase_II_Executed_8-21-2025.pdf PDF
[R]_OCS_A_0572_BOEM_Lease_Flagler_Phase_II_Executed_8-21-2025.pdf PDF
FO_Flagler_County_Beach_and_Dune_Restoration_Project_-_0379716-003-JM.pdf PDF
FO_Flagler_County_Beach_and_Dune_Restoration_Project_-_0379716-003-JM.pdf PDF
2024-03_Flagler_Geotechnical_Investigation.pdf PDF
2024-03_Flagler_Geotechnical_Investigation.pdf PDF
Flagler_Reach_2_Tech_Specs_Formatted.pdf PDF
24-PC-01778_Flagler_Final_Report_[July_2024].pdf PDF
24-PC-01778_Flagler_Final_Report_[July_2024].pdf PDF
Show 40 more

Latest 50 of 90 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

18-33

18-34

18-35

18-36

18-37

18-38

18-39

18-40

18-41

18-42

18-43

18-44

18-45

18-46

18-47

18-48

11-5

23-01 23-06 23-07

23-12

23-13

23-14

23-15

23-16

23-17

23-18

23-19

23-20

23-21

23-22

A

B C

D

E F

G

H

GRAPHIC SCALE

0 700 FT350

VIBRACORE

(TYP)

VIBRACORE

SEABED ELEV.

(TYP)

DREDGE ZONE

BOUNDARY (TYP) PROJECT NO:

CHECKED

DESIGNED

DRAWN

SURVEYED

BY DATE

DATE OF PREPARATION

N O

BY

D

AT

E D

ES

C

R

IP

TI

O

N

R

EV

IS

IO

N S

SHEET NUMBER

SHEET TITLE:

ISSUANCE:

1 2 3 4 5

PE STAMP (COA 32549)

BID SET

BORROW AREA

GEOTECHNICAL

INFORMATION

ML 3/4/2026

SG/ZB 3/4/2026

FL

A

G

LE

R C

O U

N

TY

, F L

VIBRACORE

FOR BID

PURPOSES

ONLY

A

A'

B

EA

C H

A N

D D

U N

E R

ES

TO

R A

TI

O

N P

R O

JE

C

T R

EA

C

H

NOTES:

1) HOR. - NAD83 SPC FL EAST, VERT. - NAVD88, FEET.

2) SURVEY DATE: MARCH 2025.

PROJECT BORROW AREA

DESIGN EXCAVATION DEPTH

-64.5 FT (NAVD88), TYP.

25-ITB-078

ZONE 1

ZONE 2

Sheets and Views
Sheet 26 - Sand Thickness & Vibra

File details come from the government source that posted it. Updated .