About this file

This document contains a pre-construction risk assessment and federal contract opportunity related to renovating Building 4 at the Coatesville VA Medical Center in Pennsylvania. The pre-construction risk assessment outlines a Type D, Group 4 construction project to demolish and rebuild the first and second floors as well as part of the basement over a 14-month period. It addresses noise, vibration, emergency procedures, hazardous materials including asbestos and hot work, utility failures, safety concerns regarding exits and traffic, and extensive air quality and infection control measures. The related federal contract opportunity is a 100% SDVOSB set-aside to renovate approximately 31,000 square feet into an outpatient mental health clinic over 588 calendar days. The solicitation will be available on June 23rd and includes general construction, electrical, and mechanical work. The magnitude is estimated between $10-20 million under NAICS 236220. Interested contractors must have bonding and bid guarantee capacity and comply with various registration requirements.

View the file

Other files

File Type Posted
Award Announcement 36C24420C0112.pdf PDF
General Decision Number PA20200083.pdf PDF
36C24420B0003 0003.pdf PDF
00 01 15 - List of Drawing Sheets - ADD-01.pdf PDF
07 Architecture.pdf PDF
36C24420B0003 Amendment 0002.pdf PDF
10 22 26.13 - Operable Partitions - ADD-01.pdf PDF
RFI LOG_542-18-106_08052020.r2.pdf PDF
Sign In Sheet no. 3 B4A B 07162020.pdf PDF
Sign In Sheet B4A B 07162020.pdf PDF
03 Structural 54218106_Drawings_ADD-01_080320.pdf PDF
A012 54218106_Drawings_FinalCD_013120.pdf PDF
08 Interiors 54218106_Drawings_ADD-01_080320.pdf PDF
07 13 52 - Modified Bituminous Sheet Waterproofing - ADD-01.pdf PDF
07 60 00 - Flashing and Sheet Metal - ADD-01.pdf PDF
01 33 23 - Shop Drawings Product Data Samples - ADD-01.pdf PDF
00 01 10 - TOC - ADD-01.pdf PDF
11 Plumbing 54218106_Drawings_ADD-01_080320.pdf PDF
ADD-01 Narrative.pdf PDF
10 21 13 - Toilet Compartments - ADD-01.pdf PDF
07 27 27 - Fluid-Applied Membrane Air Barrier Vapor Retardg - ADD-01.pdf PDF
00 General 54218106_Drawings_ADD-01_080320.pdf PDF
11 73 00 - Ceiling Mounted Patient Lift System - ADD-01.pdf PDF
36C24420B0003 Amendment 0001 - Attachment.pdf PDF
36C24420B0003 AMENDMENT 0001.pdf PDF
36C24420B0003 MAP for Site Visit.pdf PDF
04 Structural 54218106_Drawings_FinalCD_013120.pdf PDF
10 Mechanical 54218106_Drawings_FinalCD_013120.pdf PDF
06 Interiors 54218106_Drawings_FinalCD_013120.pdf PDF
09 Plumbing 54218106_Drawings_FinalCD_013120.pdf PDF
08 Fire Protection 54218106_Drawings_FinalCD_013120.pdf PDF
02 Hazardous 54218106_Drawings_FinalCD_013120.pdf PDF
07 Equipment 54218106_Drawings_FinalCD_013120.pdf PDF
01 General 54218106_Drawings_FinalCD_013120.pdf PDF
05 Architectural 54218106_Drawings_FinalCD_013120.pdf PDF
11 Electrical 54218106_Drawings_FinalCD_013120.pdf PDF
03 Civil Landscape 54218106_Drawings_FinalCD_013120.pdf PDF
54218106-Spec-Vol 3_FinalCD_013120.pdf PDF
36C24420B0003.docx DOCX document
54218106-Spec-Vol 2_FinalCD_013120.pdf PDF
54218106-Spec-Vol 1_FinalCD_013120.pdf PDF
COVID Guidelines.pdf PDF
54218106-Spec-Vol 4_FinalCD_013120.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pre-Construction Risk Assessment

Infection Control / Safety Construction Permit Location of Construction: Bldg. # Building 4 A&B and basement west Project Start Date: TBD Project Coordinator: Tim Apollo Estimated Duration: 14 months Contractor Performing Work: TBD Permit Expiration Date: TBD Supervisor: TBD Telephone: 3547 Description of project: : This project will demo and rebuild the 1st and second floor as well as the west end of the basement wing. This will also include the construction of a new elevator and shaft on the front exterior of the building

Construction Activities The following projects do not require completion of the Pre-Construction Risk Assessment form:

1. Paint and wallpaper in business offices and non-patient areas.

2. Paint in patient room if closed for painting and less than 3 sq. ft. of wall needs patched. Filter for room unit changed after painting.

3. Installation of soap dispenser/needle box/paper towel holder in patient room

4. Repair of window blind.

5. Ceiling tile replacement for areas less than 50% of the total square footage of the room, if not in business offices and non-patient areas.

6. Ceiling tile replacement for area less than Five 2 X 2 tiles in a patient area if patient is out of the immediate area and clean up can be accomplished before patient returns.

7. Minimum repair of nurse call system/TV/Bed/Telephone.

8. Check or replace electric outlet.

9. Replace l ight bulb.

10. Unstop sink/commode with no water on floor.

11. Unstop commode when water on floor requires maintenance to have Housekeeping clean area immediately.

12. Repair medical gas outlet. (Front Body)

13. Air balance readings.

Yes No X Will there be noise generated that will impact a department adjacent to, above, or below the construction area?

X a. If so, these departments must be notified.

X b. How are you going to reduce the noise to an acceptable level?

Yes No X Will there be vibration generated that will impact a department adjacent to, above, or below the construction area?

X a. If so, these departments must be notified each time this type of work will be performed.

b. How are you going to reduce the vibration to an acceptable level?

Yes No X Are Emergency Procedures in place and posted on each job for accidental events that could greatly impact Patient Care or

Life Safety to the facility? Included in these procedures are such things as:

• Emergency telephone numbers of key departments.

• A plan that describes where main valves, switches, and controls are for the area in case of an emergency.

• A plan for unexpected outages.

Environment Yes No Are any of the following environmental hazards present?

X Will hazardous chemicals be used on this project? How will fumes and odors be controlled? SDS Sheets are required.

IF YES SUBMITLIST OF CHEMICALS. FUMES WILL BE EXHAUSTED TO THE OUTSIDE.

X Is asbestos abatement required on this job? If so, notify Safety and FES at the activation.

X Will there be hot work done on this project? If there are, then a hot work permit must be posted on the job site. All hot work must have a fire watch assigned to each area while the hot work is being performed.

X Will there be a Confined Space Entry required on this project? If so, the Medical Center’s confined space entry program must be

Utility Failures Yes No Will any of the following systems be out of service at any time during the project?

X • Fire alarm (If out for more than 4 hours, Interim Life Safety Measures must be implemented.)

X • Sprinkler (If out for more than 4 hours, Interim Life Safety Measures must be implemented.)

X • E lec t r i ca l X • Domestic water X • O x y g e n X • S e w a g e X • H V A C

X Will there be any work that will require activation of the Interim Life Safety Measures during this project? Some things that trigger ILSM's to be implemented are but not limited to:

• Any construction that impacts an EXIT or stairs,

• Any construction that impacts major breaches in a fire or smoke wall,

• Taking the main fire protection system out of service (sprinkler),

• Taking the main fire alarm system out of service,

• Taking the "area" fire or fire alarm systems out of service for more than 4 hours within a 24-hour period.

X Implementation of the ILSM requires a fire watch and the ILSM forms to be completed (forms are to be obtained from the X Medical Center Fire Department)

Additional Safety Concerns

X Will construction affect exit routes from occupied areas adjacent to construction site?

X Will project affect traffic patterns in area?

The following must be completed prior to any construction activities.

X • Separation wall must be constructed prior to project beginning.

• Fire protection systems must remain intact.

• Provide extra fire extinguishers in work areas.

• Maintain exit lights in work area.

• Maintain negative air in construction area (24/7) through duration of project.

• There cannot be any return air from within the construction area to the rest of the building.

• Redirect exiting not to go through construction area.

• Put signs on doors into construction area "Construction Area – Do Not Enter".

• Maintain daily logs and keep a current Hot Work Permit.

• Place tacky mats at doors interior and exterior exiting construction area.

• All debris removal must be by covered cart.

• Maintain clean and orderly work area.

• How will this project affect the departments above, below and adjacent to this project?

Air Quality and Infection Control

The construction activity types are defined by the amount of dust that is generated, the duration of the activity, and the amount of shared HVAC systems. Contact CVAMC's Safety Office and Infection Preventionist if any activity is questionable under these guidelines.

Yes No

X Will dust be generated during this project?

If yes, explain location of and plan for interim dust barriers or attach floor plan with barriers clearly marked.

DUST BARRIERS, ICRA WALLS WILL BE IN PLACEAND MAINTAINED FOR THE DURATION OF THE PROJECT

X Will debris removal be necessary? If yes, explain plan for debris removal and control.

DEBRIS CARTS AND DUMPSTERS WILL BE USED AND COVERED

X Negative airflow ventilation and filtration in place and assessed for effectiveness.

X Exhaust fans in place and functioning.

X Is supply duct to area closed and HEPA filtration unit in place and functioning in adjacent patient care area?

X Will work be done in a sterile area? If so, how are you going to maintain sterile atmosphere in work area and access to and from work area?

Type A Inspections and Non-Invasive Activities or Small scale, Short duration Activities

Removal of ceiling tiles for visual inspection (e.g 1 tile per 50 square feet) Painting (but not sanding) Wall covering—Describe work to be done:

Electrical trim work. Describe:

Minor plumbing. Describe:

Type B Small scale, short duration activities that create minimal dust.

Yes No

Installation of telephone and computer cabling Access to chase spaces Cutting of walls or ceiling where dust migration can be controlled.

Type C Any work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies.

Yes No

Sanding of walls for painting or wall covering Removal of xfloor coverings ceiling tile casework (>50% of surface area) Describe:

% Describe:

New wall construction Minor ductwork or electrical work above ceilings Major cabling activities Activity cannot be completed within a single work shift

Type D Major demolition and construction projects.

X Will require heavy demolition or removal of a complete ceiling system X New construction X Activities which require consecutive work shifts

GROUP I

LOWEST

GROUP

MEDIUM

GROUP 3

HIGH

GROUP 4

HIGHEST

1) Office areas 1

) Bldg. #69 Therapy areas

1) Pharmacy Bldg 2

SPS, Bldg 4

2) Hallways 2

) Respiratory Therapy/EKG

2) Radiology/ CT Scanner Bldg 3

Respiratory Isolation Rooms – 1B

3) Utility areas

) Outpatient Clinics 3) Urgent Care Bldg. 3 Urgent Care Bldg. 3

) CBOC’s 4) Laboratories Bldg. 3

) Mental Health Units

6) CLCs(1B, 59B, 138A, 138B, 138E/H)

7) Dining areas (Canteen, 139)

Contact the Infection Preventionist or Safety Office for risk assessment of any area not listed above.

CONSTRUCTION ACTIVITY (from previous page) Check type of activity

INFECTION CONTROL RISK GROUP (see above) Check risk group

TYPE A: Inspection, non-invasive activity GROUP 1: Lowest Risk TYPE B: Small scale, short duration projects GROUP 2: Medium Risk TYPE C: Activity generates moderate to high levels of dust, requiring >1 work shift for completion GROUP 3: High Risk

X TYPE D: Major duration and construction activities Requiring consecutive work shifts

X GROUP 4: Highest Risk

CLASSIFICATION OF REQUIRED PREVENTIVE MEASURES

CONSTRUCTION ACTIVITY-

TYPE

"A"

TYPE

"B"

TYPE

"C"

TYPE

"D"

INFECTION CONTROL

RISK GROUP

Group I I II II III/IV Group 2 I II III IV Group 3 I II III/IV IV Group 4 III III/IV III/IV IV An Infection Control—Safety Construction Permit is required for Class III or higher projects. Refer to Construction

Activity/Risk Group Matrix (above).

CLASS I 1. Execute work by methods to minimize raising dust from construction operations.

2. Immediately replace any ceiling tile displaced for visual inspection.

CLASS II 1. Provide active means to prevent air-borne dust from dispersing into atmosphere

6. Contain construction waste before and during transport in tightly covered containers.

2. Water mist work surfaces to control dust while cutting. 7. Wet mop and/or vacuum with HEPA filtered vacuum before

3. Seal unused doors with duct tape. Leaving work area.

4. Block off and seal air vents. 8. Place dust mat at entrance and exit of work area as needed.

5. Wipe surfaces with disinfectant. 9. Remove or isolate HVAC system in areas where work is being performed.

CLASS III

1. Obtain infection control permit before construction begins. 7. Place dust mat at entrance and exit of work area. Replace as

2. Isolate HVAC system in area where work is being done to needed.

Prevent contamination of the duct system. 8. Do not remove barriers from work area until completed project is

3. Complete all critical barriers before construction begins. inspected by Safety and thoroughly cleaned.

4. Maintain negative air pressure within work site utilizing

HEPA equipped air filtration units.

5. Contain construction waste before and during transport inAfter work is completed:

Tightly covered containers. 9. Remove barrier materials carefully to minimize spreading of dirt

6. Seal holes, pipes, conduits, etc. appropriately. and debris associated with construction.

10. Remove isolation of HVAC system.

Class IV

1. Obtain infection control permit before construction begins. 7. All personnel entering work site are required to wear shoe

2. Isolate HVAC system in area where work is being done to covers

Prevent contamination of duct system. 8. Contain construction waste before and during transport in tightly

3. Complete all critical barriers or implement control cube covered containers. Cover transport receptacles or carts. Tape method before construction begins. covering.

4. Maintain negative air pressure within work site utilizing 9. Do not remove barriers from work area until completed project is

HEPA equipped air filtration units. inspected by Safety and Epidemiology Depts. and thoroughly

5. Seal holes, pipes, conduits, and punctures appropriately. cleaned.

6. Construct anteroom and require all personnel to pass through this room so they can be vacuumed using a HEPA After work is completed:

vacuum cleaner before leaving work site or they can wear 10. Vacuum work area with HEPA filtered vacuums.

cloth or paper coveralls that are removed each time they 11. Wet mop with disinfectant.

leave the work site. 12. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

13. Remove isolation of HVAC system.

Additional concerns for all classes:

1. SIGNITURE OF RECORD ALL ONSITE CONSTRUCTION WORKERS FOR REVIEW OF FIRE AND LIFE SAFETY

PROCEDURES AT COATESVILLE VAMC.

2. REVIEW OF INFECTION PREVENTION TRAINING AND CONSTRUCTION SAFETY CHECK LIST.

3. Maintain manpower and equipment including dust mops, wet mops, brooms, buckets, and clean wiping rags for cleaning fine dust from floors within the work area (when appropriate) and adjacent occupied areas.

4. Contain work areas outside of construction barriers, including spaces above ceilings, with full height polyethylene sheet barrier that will be extended to the deck of the space and will be tightly taped.

5. Clean up dust tracked outside of construction area immediately.

6. Temporary construction barriers and closures above ceiling must be sealed as described in #4 above.

7. Removal of debris must be in covered containers.

8. Intermediate jobs that create a moderate amount of dust inside room and is made negative by use of HEPA-equipped unit with minimum 10 ACH, and all air discharged outside, HEPA unit must run 2 hours after completion of job and Housekeeping must clean room before unit is removed from room. All work and use of HEPA unit must be documented and Copy forward to Infection Prevention and Control and Safety. NOTE: all duct vents and Fan Coil Units to be sealed off during construction.

9. All water lines inactivated for greater than 72 hours must be thoroughly flushed. New piping will be flushed and disinfected prior to use.

Additional Requirements or Concerns:

• THIS PROJECT IS TYPE__D__, GROUP__4__, CLASS_4___

• SUBMITT EMERGENCY PROCEDURES TO BE POSTED

• POST PCRA AND APPROPRIATE CONSTRUCTION SIGNAGE FOR LIMITED ACCESS AND PROPER PPE IN WORK AREA

• CONTRACTOR TO NOTIFY COATESVILLE VAMC CO, COTR, POLICE AND SAFETY OFFICE IF A FEDERAL OR STATE

REGULATOR ARRIVE ONSITE TO INSPECT JOBSITE.

• TB risk assessment: for 2019 probability/severity is a 2, which requires continuing evaluation including the annual risk assessment for Coatesville VMAC (CY 2018) places the facility in what the CDC defines as low risk.. Based on the number of infectious TB patients hospitalized in the last year (<6) and TST/QuantiFeron conversion data among healthcare workers the risk is low for transmission. The risk of tuberculosis transmission within the facility will be assessed annually and as needed. Contract employees working in an area where there is known TB or those working on local exhaust ventilation (or within 25 feet of labeled biohazard exhaust vent) airborne isolation in Urgent Care or on 1B will be required to provide proof of TB testing in accordance with VHA Directive 2011-036.

• Dumpsters to have 6’ high chain link enclosures.

• No eating, drinking or smoking on the jobsite.

Permit Request By

Safety Approval

Infection Preventionist Approval

Date:3/11/2019 Date: Date:

2019-04-01T13:45:11-0400
Timothy E. Apollo 160788
2019-04-01T14:16:41-0400
Myers, Janice
2019-04-01T15:43:30-0400
BRIAN LONG 1678251

File details come from the government source that posted it. Updated .