This document contains a federal solicitation for construction services and products to renovate an outpatient mental health clinic. The solicitation is available only to verified Service-Disabled Veteran-Owned Small Businesses and involves general construction including demolition and renovation of approximately 28,000 square feet of existing space at the Coatesville VA Medical Center in Coatesville, Pennsylvania. The scope of work includes renovating the west basement wing and first and second floors of Building 4 along with associated basement and attic work. Additional work comprises construction of a new elevator and shaft at the front exterior of the building plus exterior improvements. Disciplines for the project consist of site, civil, structural, hazardous materials, architectural, fire protection, mechanical, plumbing, and electrical. The solicitation documents and drawings will be available for download from the Contracting Opportunities website on or about June 23, 2020. The bid due date and opening will be included in the solicitation. Award of a firm fixed price contract is subject to FY20 funds availability. The maximum completion time is 588 calendar days from notice to proceed.

View the file

Other files

File Type Posted
Award Announcement 36C24420C0112.pdf PDF
General Decision Number PA20200083.pdf PDF
36C24420B0003 0003.pdf PDF
00 01 15 - List of Drawing Sheets - ADD-01.pdf PDF
07 Architecture.pdf PDF
36C24420B0003 Amendment 0002.pdf PDF
10 22 26.13 - Operable Partitions - ADD-01.pdf PDF
RFI LOG_542-18-106_08052020.r2.pdf PDF
Sign In Sheet no. 3 B4A B 07162020.pdf PDF
Sign In Sheet B4A B 07162020.pdf PDF
03 Structural 54218106_Drawings_ADD-01_080320.pdf PDF
A012 54218106_Drawings_FinalCD_013120.pdf PDF
08 Interiors 54218106_Drawings_ADD-01_080320.pdf PDF
07 13 52 - Modified Bituminous Sheet Waterproofing - ADD-01.pdf PDF
07 60 00 - Flashing and Sheet Metal - ADD-01.pdf PDF
01 33 23 - Shop Drawings Product Data Samples - ADD-01.pdf PDF
00 01 10 - TOC - ADD-01.pdf PDF
11 Plumbing 54218106_Drawings_ADD-01_080320.pdf PDF
ADD-01 Narrative.pdf PDF
07 27 27 - Fluid-Applied Membrane Air Barrier Vapor Retardg - ADD-01.pdf PDF
00 General 54218106_Drawings_ADD-01_080320.pdf PDF
11 73 00 - Ceiling Mounted Patient Lift System - ADD-01.pdf PDF
36C24420B0003 Amendment 0001 - Attachment.pdf PDF
36C24420B0003 AMENDMENT 0001.pdf PDF
36C24420B0003 MAP for Site Visit.pdf PDF
04 Structural 54218106_Drawings_FinalCD_013120.pdf PDF
10 Mechanical 54218106_Drawings_FinalCD_013120.pdf PDF
06 Interiors 54218106_Drawings_FinalCD_013120.pdf PDF
09 Plumbing 54218106_Drawings_FinalCD_013120.pdf PDF
08 Fire Protection 54218106_Drawings_FinalCD_013120.pdf PDF
02 Hazardous 54218106_Drawings_FinalCD_013120.pdf PDF
07 Equipment 54218106_Drawings_FinalCD_013120.pdf PDF
01 General 54218106_Drawings_FinalCD_013120.pdf PDF
05 Architectural 54218106_Drawings_FinalCD_013120.pdf PDF
11 Electrical 54218106_Drawings_FinalCD_013120.pdf PDF
03 Civil Landscape 54218106_Drawings_FinalCD_013120.pdf PDF
54218106-Spec-Vol 3_FinalCD_013120.pdf PDF
36C24420B0003.docx DOCX document
PCRA 3-2019 building 4.pdf PDF
54218106-Spec-Vol 2_FinalCD_013120.pdf PDF
54218106-Spec-Vol 1_FinalCD_013120.pdf PDF
COVID Guidelines.pdf PDF
54218106-Spec-Vol 4_FinalCD_013120.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Coatesville VA Medical Center

Coatesville, Pennsylvania 19320

Renovate Building 4 A & B Floors Outpatient Mental Health Clinic

Bancroft Architects + Engineers

12-01-15

Contract No. 36C24418C0144

Station Project No. 542-18-106

Bancroft-AE Project No. 18-102 10 21 13-1 08-03-2020

SECTION 10 21 13

TOILET COMPARTMENTS

PART 1 - GENERAL

1.1 DESCRIPTION

This Section specifies metal toilet partitions and urinal screens.

1.2 RELATED WORK

A. Not used.

B. Not used.

C. Grab bars and toilet tissue holders: Section 10 28 00, TOILET, BATH, AND LAUNDRY ACCESSORIES.

1.3 SUBMITTALS

A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT

DATA, AND SAMPLES.

B. Samples: Prime coat of paint on 150 mm (six inch) square of metal panel with baked enamel finish coat over half of panel.

C. Manufacturer's Literature and Data: Specified items indicating all hardware and fittings, material, finish, and latching.

D. Shop Drawings: Construction details at 1/2 scale, showing installation details, anchoring and leveling devices.

E. Manufacturer's certificate, attesting that zinc-coatings conform to specified requirements.

1.4 APPLICABLE PUBLICATIONS

A. Publications listed below form a part of this specification to the extent referenced. Publications are referenced in the text by the basic designation only.

B. Federal Specifications (Fed. Spec.):

FF-B-575C...............Bolt, Hexagon and Square

C. Code of Federal Regulations (CFR):

40 CFR 247..............Comprehensive Procurement Guidelines for

Products Containing Recovered Materials

D. Commercial Item Descriptions (CID):

A-A-1925 Shield, Expansion (Nail Anchors)A-A-60003 Partitions, Toilet, Complete

Renovate Building 4 A & B Floors Outpatient Mental Health Clinic

Bancroft-AE Project No. 18-102 10 21 13-2 08-03-2020

PART 2 - PRODUCTS

2.1 TOILET PARTITIONS

A. Metal; graffiti resistant; non-absorbent; Class C flame spread rating.

B. Conform to Fed. Spec. CID A-A-60003, except as modified herein.

C. Fabricate to dimensions shown or specified.

D. Toilet Enclosures:

1. Type 1, Style A (Floor supported).

2. Not used.

3. Reinforce panels shown to receive toilet tissue holders or grab bars.

4. Upper pivots and lower hinges adjustable to hold doors open 30 degrees.

5. Latching devices and hinges for handicap compartments shall comply with ADA requirements.

6. Keeper:

a. U-slot to engage bar of throw latch.

b. Combined with rubber bumper stop.

7. Wheelchair Toilets:

a. Upper pivots and lower hinges to hold out swinging doors in closed position.

b. Provide U-type doors pulls, approximately 100 mm (four inches) long on pull side.

8. Finish:

a. Stainless Steel.

E. Urinal Screens:

1. Type III, Style E (wall hung), stainless steel.

a. With integral flanges and continuous, full height wall anchor plate.

b. Option: Full height U-Type bracket.

c. Wall anchor plate drilled for 4 anchors on both sides of screen.

2. Screen 600 mm (24 inches) wide and 1060 mm (42 inches high).

3. Not used.

F. Room Entrance Screens: NOT USED.

Renovate Building 4 A & B Floors Outpatient Mental Health Clinic

Bancroft-AE Project No. 18-102 10 21 13-3 08-03-2020

G. Toilet Partition products shall comply with following standards for biobased materials:

Material Type Percent by Weight

Phenolic Partition 55 percent biobased material

The minimum-content standards are based on the weight (not the volume) of the material in the insulating core only.

2.2 FASTENERS

A. Partition Fasteners: CID A-A-60003.

B. Use expansion bolts, CID A-A-60003, for anchoring to solid masonry or concrete.

C. Use toggle bolts, CID A-A-60003, for anchoring to hollow masonry or stud framed walls.

D. Use steel bolts FS-B-575, for anchoring pilasters to overhead steel supports.

E. Fasteners used shall be tamper resistant.

PART 3 - EXECUTION

3.1 INSTALLATION

A. General:

1. Install in rigid manner, straight, plumb and with all horizontal lines level.

2. Conceal evidence of drilling, cutting and fitting in finish work.

3. Use hex-bolts for through-bolting.

4. Adjust hardware and leave in freely working order.

5. Clean finished surfaces and leave free of imperfections.

B. Panels and Pilasters:

1. Support panels, except urinal screens, and pilaster abutting building walls near top and bottom by stirrup supports secured to partitions with through-bolts.

2. Secure stirrups to walls with two suitable anchoring devices for each stirrup.

3. Secure panels to faces of pilaster near top and bottom with stirrup supports, through-bolted to panels and machine screwed to each pilaster.

Renovate Building 4 A & B Floors Outpatient Mental Health Clinic

Bancroft-AE Project No. 18-102 10 21 13-4 08-03-2020

4. Secure edges of panels to edges of pilasters near top and bottom with "U" shaped brackets.

//5. Where overhead braced, secure pilasters to building walls by headrails clamped on or set into top of each pilaster.

a. Secure clamps to pilasters with two through-bolts to each clamp.

b. When headrails are set into pilasters, through-bolt them to the pilasters.

c. Support headrails on wall flange fittings secured to building walls with minimum of two anchor bolts to each flange fitting. //

C. Urinal Screens:

1. Anchor urinal screen flange to walls with minimum of four bolts both side of panel.