05 Architectural 54218106_Drawings_FinalCD_013120.pdf
PDF 25 MB Posted
- Attached to
- Z2DA--Renovate Building 4 A + B Floors Outpatient Mental Health Clinic, Project No. 542-18-106
- Solicitation number
- 36C24420B0003
About this file
This solicitation is for construction services to renovate approximately 28,000 square feet of existing space and 3,000 square feet of basement space at a Department of Veterans Affairs medical facility in Coatesville, Pennsylvania into an outpatient mental health clinic. The scope of work includes total demolition and renovation of the first and second floors, as well as renovations to the basement, and construction of a new elevator and exterior improvements. Disciplines involved are site work, structural, mechanical, plumbing, electrical and more.
The solicitation will be available on June 23, 2020 via the System for Award Management website. The procurement is valued between $10-20 million based on the North American Industry Classification System code for general building construction. Interested service-disabled veteran-owned small businesses must register in the System for Award Management, meet certification requirements through the Veterans Affairs Center for Verification and Evaluation, and comply with Occupational Safety and Health Administration and Environmental Protection Agency regulations to be considered for award. The contract type will be firm-fixed price with a performance period of 588 calendar days from notice to proceed.
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EARTH
GRAVEL
CONCRETE
CONCRETE MASONRY UNIT,
CLAY TILE, OR MIXTURE
BRICK MASONRY
STEEL/STAINLESS STEEL
ALUMINUM
WOOD BLOCKING / FRAMING SHIM OR NAILER
PLYWOOD
HARDWOOD
RIGID INSULATION
BATT INSULATION
MORTAR/SAND/STUCCO/GYPSUM
BOARD SURFACE
ACOUSTIC CEILING
CERAMIC TILE
SECTION NUMBER
SHEET WHERE DRAWN
DETAIL NUMBER
SHEET WHERE DRAWN
NAME OF LEVEL
HEIGHT ABOVE PROJECT
DATUM
XXX
X
XXXX
BUILDING &
WALL SECTION
EXTERIOR ELEVATION
DETAIL BUBBLE
SECTION DETAIL
INTERIOR ELEVATION
(MULTIPLE)
INTERIOR ELEVATION (SINGLE)
PARTITION TYPE
WINDOW NUMBER
DOOR NUMBER
ROOM TAG
ELEVATION TAG
DRAWING TITLE AND SCALE
EQUIPMENT NUMBER
NOTE:
SEE CORRESPONDING NUMBERED LIST ON SHEET
WHERE TAG OCCURS UNLESS NOTED OTHERWISE.
Room name
XXX
ELEVATION
0'-0"
View Name 1/8" = 1'-0"
NORTH ARROW
REVISION NUMBER
X
XXXX
X
XXXX
X
XXXX
X
X
X
X
ELEVATION NUMBER AND SHEET
WHERE DRAWN
XXXX
X
XX
XX
XXX REVISION NUMBER
ROOM NAME
ROOM
NUMBER
ELEVATION NUMBER
SHEET WHERE DRAWN
ELEVATION NUMBER
AND DIRECTION OF
VIEW
SHEET WHERE DRAWN
DETAIL NUMBER
SHEET WHERE DRAWN
/XXXXX
Ref View Name
0 4' 8' 16'
KEYNOTE TAG DEMOLITIONXX
XX KEYNOTE TAG NEW CONSTRUCTION
4'
M A
X F
O R
C O
N T
R O
LS
F O
R C
O N
T R
O
LS
3'
M
IN
G R
A B
B A
R
2'
T Y
P
2'
(RECESSED)
2'
TOILET TISSUE DISPENSERS
(CENTERED IN
PARTITION)
(SURFACE)
1'
TOP
OF
UNIT
1'
M
IN
3'
T Y
P
DISPENSER
2'
SEAT - COVER
DISPENSER
SANITARY
NAPKIN
DISPOSAL
(RECESSED - SHOWN)
N O
N
A C
C E
S S
IB
LE
5'
3'
2'
COMBINATION TOILET COMPARTMENT ACCESSORIES
PARTITION MOUNTED OR RECESSED SANITARY NAPKIN
DISPOSAL / TOILET
TISSUE DISPENSER
4'
M A
X F
O R
C O
N T
R O
LS
F O
R C
O N
T R
O
LS
3'
M
IN
3'
DISPENSER
R E
C O
M E
N D
E D
T O
5"
3'
M A
X
2'
M
IN
R E
C O
M E
N D
E D
5'
PAPER TOWEL DISPENSERS WASTE RECEPTACLES
(RECESSED) (SURFACE MTD)
PAPER TOWEL DISPENSER / WASTE RECEPTACLES
(RECESSED
& FULLY
RECESSED)
(RECESSED) (RECESSED)
3'
DISPENSER
3'
COIN
SLOT
R E
C O
M E
N D
E D
3'
PUSH
BUTTON
R E
C O
M E
N D
E D
3'
M A
X A
B O
V E
L A
V A
T O
R Y
3'
M
AX
O
TH
ER
L
O
CA
TI
O
NS
(T
O B
O
TT
O M
O F
RE
FL
EC
TI
VE
SU
RF
AC
E)
SANITARY
NAPKIN / TAMPON
VENDORS
(RECESSED
&SURFACE)
SOAP
DISPENSERS
HAND
DRYER
(SURFACE)
ALL FRAMED
MIRRORS
(SURFACE)
2'
9"
CLOCK OR
CLOCK OUTLET
MANUAL FIRE ALARM
PULL
STATION
LIGHT SWITCH &
DIMMER
DUPLEX
OUTLET
DUPLEX
OUTLET
DESK
INTERCOM
OUTLET
INTERCOM STATION TELECOMM
OUTLET
THERMOSTAT SPECIAL
PURPOSE
OUTLETS
SPECIAL
PURPOSE
OUTLETS
JUNCTION BOX WALL-MTD
TELEPHONE
OUTLET
MEDICAL
GAS ALARM
PANEL
FEC OR
FHV
CABINET
ELECTRICAL
PANELBOARD
(FLUSH MTD)
ELECTRICAL
PANELBOARD
(SURFACE MTD)
COAT
HOOKS
(WALL-MTD)
COAT
HOOK
(DOOR-MTD)
CHALKBOARD,
TACKBOARD, OR DRY
MARKER BOARD
RACEWAY
7'
4'
4' -0
M
A X
H
IG
H R
E A
C H
3' -0
M
IN
F
O R
C O
N T
R O
LS
1' -3
M
IN
L
O W
R E
A C
H
1'
4'
M A
X H
IG
H
R E
A C
H
3'
M
IN
F O
R C
O N
T R
O
LS
1' - 0"
3'
6'
2'
M A
X
6'
6"
5'
4'
EQ EQ
6'
7'
4'
5'
ROBE
HOOK
(TYPICAL)
ROBE HOOK
(ACCESSIBLE)
CLOTHES HOOK AND
BUMPER FOLDING
UTILITY SHELF
TOILET
PARTITION
TOP
OF
UNIT
TOP
OF
UNIT
STAINLESS
STEEL SHELF
(BELOW GRAB
BAR)
MOP & BROOM
HOLDER
SHELF WITH
MOP & BROOM
HOLDER &
HOOKS
SHELF WITH
MOP & BROOM
HOLDER &
HOOKS
DIAPER CHANGING
STATION
(SURFACE MTD)
1'
1'
6'
5'
5'
CARD READER,
LOCAL ALARM, OR
ARMING STATION
DARK ROOM
STATUS LIGHT
SWITCH AT
DOOR OR
CASED OPENING
AUDIBLE
AND/OR VISUAL FIRE
ALARM
SECURITY
STROBE LIGHT
(BLUE LIGHT)
FIREMAN'S
TELEPHONE
JACK
DISCONNECT
SWITCH &
MOTOR STARTER
EMERGENCY
STROBE OR
LIGHT AND/OR
NURSE CALL
LIGHT
A
LI
G N
W
IT
H T
O P
O F
A D
JA
C
E N
T F
R A
M E
8" TYP 8" TYP
4'
7'
7'
7'
4'
5'
FEC OR
FHV CABINET,
SURFACE MOUNTED AT
BASEMENT LEVEL ONLY
3'
4'
- 0
TYP.
6"
HA
ND
RA
IL
3'
- 0
STANARD HANDRAIL &
WALL PROTECTION
DETAIL
1'
- 2
4'
- 0
WALL CORNER GUARD
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
31 JAN 2020
ARCHITECTURAL
ABBREVIATIONS & SYMBOLS
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
RFR ARCH
542-18-106
A001
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
RM ROOM R
RO ROUGH OPENING R
S
BOD BASIS OF DESING S
S SOUTH S
SAN SANITARY S
SCHED SCHEDULE S
SF SQUARE FOOT (FEET) S
SHT SHEET S
SIM SIMILAR S
SOW SCOPE OF WORK S
SPEC SPECIFICATION S
SPKLR SPRINKLER S
SPKR SPEAKER S
SQ SQUARE S
SS STAINLESS STEEL S
STD STANDARD S
STL STEEL S
STOR STORAGE S
STRUCT STRUCTURAL S
SUSP SUSPEND S
SV SHEET VINYL S
T
T&G TONGUE AND GROOVE T
T/ TOP OF T
TEMP TEMPERED T
TERR TERRAZZO T
THK THICK T
TO TOP OF T
TSTAT THERMOSTAT T
TYP TYPICAL T
U
UNO UNLESS NOTED OTHERWISE U
V
VAR VARIES V
VC VA SUPPLIED, CONTRACTOR INSTALLED V
VCT VINYL COMPOSITION TILE V
VENT VENTILATION V
VIF VERIFY IN FIELD V
VOL VOLUME V
VV VA SUPPLIED & INSTALLED V
VWC VINYL WALL COVERING V
W
W WEST W
W/ WITH W
W/O WITHOUT W
WC WALL COVERING W
WD WOOD W
WDW WINDOW W
WWM WELDED WIRE FABRIC W
LT LT L
M
M/E/P/FP MECHANICAL, ELECTRICAL, PLUMBING & FIRE
PROTECTION
M
MATL MATERIAL M
MAX MAXIMUM M
MECH MECHANICAL M
MFR MANUFACTURER M
MIN MINIMUM M
MISC MISCELLANEOUS M
MLWK MILLWORK M
MO MASONRY OPENING M
MR MOISTURE RESISTANT M
MTD MOUNTED M
MTG MOUNTING M
MTL METAL M
N
N NORTH N
N/A NOT APPLICABLE N
NAT NATURAL N
NIC NOT IN CONTRACT N
NO NUMBER N
NTS NOT TO SCALE N
O
OA OVERALL O
OC ON CENTER O
OFIC OWNER FURNISHED INSTALLED BY
CONTRACTOR
O
OH OPPOSITE HAND O
OPNG OPENING O
OPT OPTIONAL O
P
P PLUMBING P
PAT PATTERN P
PL PLUMBING P
PLAM PLASTIC LAMINATE P
PLAS PLASTER OR PLASTIC P
PR PAIR P
PRE PREFINISHED P
PREP PREPARATION P
PROVIDE FURNISH AND INSTALL P
PT PAINT P
PTME PAINT TO MATCH EXISTING P
PTN PARTITION P
PWR POWER P
Q
QT QUARRY TILE Q
QTR QUARTER Q
QTY QUANTITY Q
R
R RADIUS R
RB RESILIENT BASE R
RCP REFLECTED CEILING PLAN R
REC RECESSED R
RECPT RECEPTACLE R
REINF REINFORCED R
REQD REQUIRED R
E
E
E EAST E
EA EACH E
EJ EXPANSION JOINT E
EL ELEVATION E
ELEC ELECTRICAL E
ELEV ELEVATOR E
ENCL ENCLOSURE E
EQ EQUAL E
EQUIP EQUIPMENT E
EWC ELECTRIC WATER COOLER E
EXH EXHAUST E
EXIST EXISTING E
EXP EXPOSED E
EXT EXTERIOR E
F
FA FIRE ALARM F
FD FLOOR DRAIN F
FDN FOUNDATION F
FE FIRE EXTINGUISHER F
FEC FIRE EXTINGUISHER CABINET F
FF&E FURNITURE, FIXTURE AND EQUIPMENT F
FHC FIRE HOSE CABINET F
FIG FIGURE F
FIN FINISH F
FIXT FIXTURE F
FL FLOOR F
FO FACE OF F
FP FIRE PROTECTION OR FIREPROOF F
FT FOOT F
FTG FOOTING F
G
GC GENERAL CONTRACTOR G
GL GLASS G
GYP BD GYPSUM BOARD G
H
HAZ MAT HAZARDOUS MATERIALS H
HDW HARWARE H
HM HOLLOW METAL H
HT HEIGHT H
I
INCL INCLUDED I
INSUL INSULATION I
INT INTERIOR I
J
J-BOX JUNCTION BOX J
JAN JANITOR J
JC JANITOR'S CLOSET J
JST JOIST J
JT JOINT J
L
LAM LAMINATE L
LAV LAVATORY L
LED LIGHT EMITTING DIODE L
LF LINEAR FEET (FOOT) L
LL LEAD LINED L
A
ACM ASBESTOS CONTAINING MATERIAL A
ACT ACOUSTICAL CEILING TILE A
ADJ ADJACENT A
AFF ABOVE FINISH FLOOR A
AHU AIR HANDLING UNIT A
ALT ALTERNATE A
ALUM ALUMINUM A
APPROX APPROXIMATE A
AR AS REQUIRED A
ARCH ARCHITECTURAL A
AUTO AUTOMATIC A
AUX AUXILIARY A
AV AUDIO VISUAL A
AVG AVERAGE A
B
B/ BOTTOM OF B
BAT BATTEN B
BD BOARD B
BLDG BUILDING B
BLK BLOCKING B
BM BEAM B
BO BY OWNER B
C
CC CONTRACTOR SUPPLIED & INSTALLED C
CEM CEMENT C
CJ CONTROL JOINT C
CL CENTER LINE C
CLG CEILING C
CLR CLEAR C
CMU CONCRETE MASONRY UNIT C
CO CONTRACTING OFFICER C
COL COLUMN C
CONC CONCRETE C
CONT CONTINUOUS C
COORD COORDINATE C
COR CONSTRUCTION OFFICER'S REPRESENTATIVE C
CORR CORRIDOR C
CPT CARPET C
CT CERAMIC TILE C
CTR CENTER C
CTRL CONTROL C
D
DAT DATUM D
DBL DOUBLE D
DEG DEGREE D
DEMO DEMOLITION D
DEPT DEPARTMENT D
DF DRINKING FOUNTAIN D
DIA DIAMETER D
DIFF DIFFUSER D
DIM DIMENSION D
DN DOWN D
DR DOOR D
DTL DETAIL D
DWG DRAWING D
ARCHITECTURAL ABBREVIATIONS
MATERIAL INDICATIONSGRAPHIC SYMBOLS STANDARD MOUNTING HEIGHTS
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
DN
1 2 3 4 5
6 7
8 9 10 11 12
AA
BB
CC
D.2D.2
E.2E.2
E.8
E.8
F.8F.8
HH
II
JJ
DD
EE
F
F
GG
6.86.2
G.5G.5
C.2 C.1C.1
B9
CRAWL SPACE
B1
B1
B5
B1
B1
B5
B4
B4
B4
B4
B4
B4
B4
B5
B5
B5
B5
B5 B5
B5
B5
B5
B5
B5
B5
B5 B5
B5
B6
B6
B6
B6
B6
B6
B6
B6
B6
B6
B6
B5 B6
B5
B5
B5
B7
B5
B5
B5
B4 B5 B6
B4 B5 B6
B5 B6
B6 B6
B6
B5 B6
B4 B5
B7B4 B5 B6
B7B4 B5 B6
B7B4 B5 B6
B7B4 B5 B6
B7
B4
B5
B6
B7
B6
0 13
A444
SIM
B10
B3
B2
B6B5
B5
B7
B7
B7
B3
B2
B10
B11
B12
B13
MECHANICAL
ROOM
SUB1-4
CUBICLES
B02
CHIEF HIMS
OFFICE
B02C
PIMS
SUPPORT
OFFICE
B02B
LOBBY
B02
CUBICLES
B02A
STORAGE
B02E
CUBICLES
B02F
SW RENE
OFFICE
B02
EXISTING CONSTRUCTION TO REMAIN
EXISTING CONSTRUCTION TO BE REMOVED, INCLUDING ALL
MOUNTED ACCESSORIES, CORNER GUARDS, HANDRAILS, ETC.
PATCH ABUTTING WALLS, FLOORS, CEILINGS AND ROOF AS
REQUIRED. REMOVE EXISTING ITEMS SCHEDULED TO REMAIN
AS NECESSARY TO ALLOW THE COMPLETE DEMOLITION OF
SELECTED ITEMS. REPAIR/REPLACE EXISTING ITEMS ONCE
DEMOLITION IS COMPLETED.
2 HOUR FIRE & SMOKE SEPARATION
1 HOUR FIRE & SMOKE SEPARATION
AREA NOT IN CONTRACT
A. REFER TO GI002 “CONSTRUCTION PERIOD SCHEDULING OF WORK – GENERAL NOTES”
REGARDING THE VA’S DISCRETION IN SELECTING WORK TO BE DONE AFTER-HOURS/OFF-
HOURS.
B. REFER TO GI002 “CONSTRUCTION PERIOD SCHEDULING OF WORK – ADDITIONAL NOTES
FOR STERILE PROCESSING SERVICE (SPS)” REGARDING WORK IN, ADJACENT TO, OR THAT
MAY AFFECT SPS.
C. REFER TO DEMOLITION ONTES ON GI003.
D. AREAS OF OTHER TRADES’ WORK ARE TO BE CONSIDERED APPROXIMATE AS SHOWN AND
ALL AREAS MAY NOT BE SHOWN ON THESE PLANS. REFER TO CORRESPONDING DRAWINGS
IN OTHER DISCIPLINES FOR FULL EXTENT OF WORK. THE CONTRACTOR IS RESPONSIBLE
FOR VERIFYING EXISTING CONDITIONS AND COORDINATING LOCATIONS AND EXTENT OF
WORK ACROSS ALL TRADES AND DISCIPLINES.
E. BOUNDARIES OF AREAS SHOWN AS NOT IN CONTRACT (NIC) ARE TO BE CONSIDERED
APPROXIMATE AND ARE PROVIDED FOR THE CONTRACTOR’S REFERENCE AND
COORDINATION ONLY. ANY WORK IN ANY AREA NECESSARY TO COMPLETE THE INTENT OF
THE DRAWINGS, SPECIFICATIONS, AND BASIS OF DESIGN SHALL BE CONSIDERED TO BE IN
CONTRACT, REGARDLESS OF SUCH AN AREA BEING MARKED AS NIC ON ONE OR MORE
DRAWINGS.
F. INCIDENTAL ARCHITECTURAL WORK MAY BE REQUIRED AT ANY LOCATION OF ANY OTHER
DISCIPLINE’S WORK. THE CONTRACTOR SHALL PERFORM WORK AS REQUIRED TO SUPPORT
ANY AND ALL CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION, AND OTHER WORK SHOWN OR REQUIRED.
G. THE CONTRACTOR’S WORK IN THE BASEMENT WILL INCLUDE BUT IS NOT LIMITED TO:
PROTECTION OF EXISTING SPACES, CONSTRUCTION, WORK, EQUIPMENT, AND THE LIKE
FROM CONSTRUCTION ACTIVITIES; REMOVAL AND REPLACEMENT OF CEILING TILES AND/OR
GRIDS, CREATING NEW OPENINGS AND/OR CLOSING EXISTING OPENINGS IN THE FLOOR
STRUCTURE, AND CLEANING AND DISINFECTING.
H. ANY EXISTING AREAS AND FINISHES DISTURBED BY THE CONTRACTOR’S WORK SHALL BE
RETURNED TO THEIR PRE-WORK CONDITION OR BETTER. BEFORE COMMENCEMENT OF
WORK, THE CONTRACTOR SHALL MAKE THOROUGH AND ANNOTATED PHOTOGRAPHIC
AND/OR VIDEO DOCUMENTATION OF ANY AREAS BEING DISTURBED SO AS TO
DEMONSTRATE COMPLIANCE WITH THIS DIRECTION.
I. THE CONTRACTOR SHALL COORDINATE WITH THE VA REGARDING EXISTING FINISH
PRODUCTS, AVAILABILITY OF ATTIC STOCK, APPROVAL OF PRODUCTS INTENDED TO
REPLACE THOSE EXISTING, INCLUDING BUT NOT LIMITED TO CEILING SYSTEMS OR
COMPONENTS. ALL APPROVALS TO BE OBTAINED PRIOR TO DISTURBING THE PRODUCTS
TO WHICH THOSE APPROVALS PERTAIN.
J. PROTECTION AND CLEANING PROCEDURES SHALL BE SUBMITTED TO AND APPROVED BY
THE VA/COR AND SUCH PROTECTION MEASURES AND CLEANING SHALL BE INSPECTED BY
THE VA/COR AND SHALL MEET THEIR APPROVAL.
A. REFER TO DEMOLITION NOTES ON GI003.
B. NEW SHAFTS AND RISERS: NEW SHAFT AND RISER LOCATIONS ARE INTENDED TO FALL
BETWEEN STRUCTURAL CONCRETE RIBS. UPON COMPLETION OF REMOVAL OF PLASTER
CEILINGS AND OTHER OBSCURING FEATURES IN THE VICINITY OF THE NEW SHAFT/RISER
LOCATIONS AND BEFORE BEGINNING STRUCTURAL DEMO OR FRAMING LAYOUT, GC SHALL
PREPARE AND SUBMIT EXISTING CONDITIONS SHOP DRAWINGS TO VA FOR A/E REVIEW. A/E MAY
ADJUST SHAFT AND PARTITION LOCATIONS AT THIS POINT AS REQUIRED TO MEET DESIGN
INTENT. GC SHALL PLAN AND SCHEDULE WORK TO ACCOMMODATE SUCH REVIEW. REFER TO
GI002 FOR ADDITIONAL DIRECTION.
C. CONTRACTOR TO NOTE EXISTING BUILDING PARTITIONS ARE A MIXTURE OF CLAY BLOCK &
PLASTER PARTITIONS, CONCRETE MASONRY UNIT PARTITIONS, STUD AND PLASTER
PARTITIONS, AND STUD AND GYPSUM BOARD PARTITIONS, REGARDLESS OF PRESUMED WALL
COMPOSITION INDICATED ON PLANS. WHILE TYPICAL CLAY BLOCK & PLASTER PARTITIONS ARE
FULL HEIGHT, PARTITION HEIGHTS MAY VARY.
D. INCIDENTAL ARCHITECTURAL WORK MAY BE REQUIRED AT ANY LOCATION OF ANY OTHER
DISCIPLINE’S WORK. THE CONTRACTOR SHALL PERFORM WORK AS REQUIRED TO SUPPORT ANY
AND ALL MECHANICAL, ELECTRICAL, PLUMBING, FIRE PROTECTION, AND OTHER WORK SHOWN
OR REQUIRED.
E. THE CONTRACTOR’S WORK IN THE BASEMENT WILL INCLUDE BUT IS NOT LIMITED TO:
PROTECTION OF EXISTING SPACES, CONSTRUCTION, WORK, EQUIPMENT, AND THE LIKE FROM
CONSTRUCTION ACTIVITIES; REMOVAL AND REPLACEMENT OF CEILING TILES AND/OR GRIDS,
CREATING NEW OPENINGS AND/OR CLOSING EXISTING OPENINGS IN THE FLOOR STRUCTURE,
AND CLEANING AND DISINFECTING.
F. ANY EXISTING AREAS AND FINISHES DISTURBED BY THE CONTRACTOR’S WORK SHALL BE
RETURNED TO THEIR PRE-WORK CONDITION OR BETTER. BEFORE COMMENCEMENT OF WORK,
THE CONTRACTOR SHALL MAKE THOROUGH AND ANNOTATED PHOTOGRAPHIC AND/OR VIDEO
DOCUMENTATION OF ANY AREAS BEING DISTURBED SO AS TO DEMONSTRATE COMPLIANCE
WITH THIS DIRECTION.
G. THE CONTRACTOR SHALL COORDINATE WITH THE VA REGARDING EXISTING FINISH PRODUCTS, AVAILABILITY OF ATTIC STOCK, APPROVAL OF PRODUCTS INTENDED TO REPLACE THOSE
EXISTING, INCLUDING BUT NOT LIMITED TO CEILING SYSTEMS OR COMPONENTS. ALL
APPROVALS TO BE OBTAINED PRIOR TO DISTURBING THE PRODUCTS TO WHICH THOSE
APPROVALS PERTAIN.
H. PROTECTION AND CLEANING PROCEDURES SHALL BE SUBMITTED TO AND APPROVED BY THE
VA/COR AND SUCH PROTECTION MEASURES AND CLEANING SHALL BE INSPECTED BY THE
VA/COR AND SHALL MEET THEIR APPROVAL.
I. CONCEALED ACM PIPING EXISTS THROUGHOUT THE PROJECT AREA. CONTRACTOR TO TAKE
CARE IN DEMOLITION OF PARTITIONS SO AS TO NOT DISTURB POTENTIAL ACM PIPING
INSULATION. IF CONCEALED ACM MATERIAL IS FOUND, PROCEED WITH HAZARDOUS MATERIAL
PROCEDURES AS OUTLINED IN SPECIFICATIONS.
J. REFER TO CORRESPONDING STRUCTURAL, HAZARDOUS, AND M/E/P/FP SHEETS FOR FULL
SCOPE OF DEMOLITION WORK.
K. SEE M/E/P/FP AND STRUCTURAL DRAWINGS FOR ADDITIONAL OPENINGS THAT MAY BE
REQUIRED THROUGH EXISTING PARTITIONS AND WALLS INDICATED TO REMAIN. PROVIDE SHOP
DRAWINGS FOR COORDINATION.
ELECTRICAL
PANELS
XXX
STORAGE
B05
STORAGE
B05A
STAIR
LOCKERS/
SUIT-UP
B07C
TOILET /
SHOWER
B07B
DECONTAMINATION
ROOM
B07L
ANTE ROOM
B07M
BUILDING
HOUSEKEEPING
B14A
HOUSEKEEPING
AIDS CLOSET
B07A
CLEAN SHIP /
REC
B07H
OFFICE
B07K
ELECTRICAL
CLOSET
B071
STAIR
WOMENS
B08
STAFF
WOMENS
BATHROOM
B08A
STAFF MENS
BATHROOM/
LOCKERS
B14B
ELEVATOR
SERVICE
ROOM
B16A
PRIVACY
OFFICER
OFFICE
B12C
WORKSHOP
B11
BANK
B12
STORAGE
B12E
STORAGE
B10
CLOSET
B09
CORRIDOR
B00W
CLEAN STORE
ROOM
B07F
MECHANICAL
ROOM
B07G
STORAGE
B11A
OFFICE
B11B
PROCESSING /
PREP /
STERILIZATION
B07
STORAGE
B07
OFFICE
B12B
OFFICE
B12A
MECHANICAL
ROOM
B12D
CORRIDOR
B00E
NOTE: NOT ALL KEYNOTES MAY BE USED ON THIS DRAWING.
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
31 JAN 2020
ARCHITECTURAL DEMO PLAN -
BASEMENT
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
RFR ARCH
542-18-106
AD100
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
1/8" = 1'-0"
ARCHITECTURAL DEMO PLAN - BASEMENT
BASEMENT DEMOLITION NOTES
DEMOLITION LEGEND BASEMENT GENERAL NOTES
0 4' 8' 16'
BASEMENT DEMOLITION KEYNOTES
B1 ABOVE: APPROXIMATE LOCATION OF NEW OPENING IN STRUCTURE
ABOVE. SEE STRUCT, ARCH, HAZMAT, AND M/E/P/FP DRAWINGS.
B2 SEE CIVIL, STRUCT AND LANDSCAPE DRAWINGS AND ASSOCIATED
MEPFP AND ARCH DRAWINGS FOR EXTERIOR WORK.
B3 APPROXIMATE LOCATION OF STRUCTURAL WORK. SEE STRUCT,
ARCH, HAZMAT, AND M/E/P/FP DRAWINGS.
B4 FIRE PROTECTION WORK IN THIS ROOM/AREA, SEE FIRE PROTECTION
DWGS.
B5 PLUMBING WORK IN THIS ROOM/AREA, SEE PLUMBING DWGS.
B6 MECHANICAL VENTILATION/PIPING WORK IN THIS ROOM/AREA, SEE
MECHANICAL DWGS.
B7 ELECTRICAL WORK IN THIS ROOM/AREA, SEE ELECTRICAL DWGS.
B8 FILL ABANDONED OPENINGS IN FLOOR ABOVE, SEE STRUCT, ARCH,
HAZMAT, AND M/E/P/FP DRAWINGS.
B9 AREA OF EXISTING UTILITY PIT TO BE FILLED. THE CONTRACTOR MAY
BE REQUIRED TO PERFORM THIS WORK. SEE STRUCTURAL,
ARCHITECTURAL, HAZMAT AND MEPFP DRAWINGS.
B10 REMOVE EXISTING WINDOW AND FRAME. REMOVE PORTION OF
EXISTING MASONRY WALL AS REQD; CENTER NEW OPENING ON
EXISTING OPENING. PROVIDE STEEL LINTEL AT ENLARGED MASONRY
OPENING. SEE STRUCT DWGS FOR DTLS.
B11 REMOVE RAILINGS AND STORE FOR REINSTALLATION
B12 REMOVE PORTION OF EXISTING MASONRY WALL AS REQUIRED.
B13 EXISTING SLAB AND FENCE TO BE REMOVED IN THEIR ENTIRETY
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
M
1 2 3 4 5
6 7
8 9 10 11 12
AA
BB
CC
D.2D.2
E.2E.2
E.8
E.8
F.8F.8
HH
II
JJ
DD
EE
F
F
GG
6.86.2
G.5G.5
C.2
ROOF ROOF
TYP.1
TYP. 1
TYP. 1
TYP.1
TYP. 1
3 3
4 4
4 4 4
TYP. 5
TYP.5
TYP. 5
TYP.5
TYP. 5
TYP.1
TYP.5
TYP. 1
TYP. 5
TYP.13TYP. 13
TYP.13
C.1C.1
111111
10 10
1111 1111
0 13
UP 1 R
OFFICE
120K PATIENT
ROOM
120A
PATIENT
ROOM
120B
PATIENT
ROOM
120J
PATIENT
ROOM
120H
PATIENT
ROOM
120G
PATIENT
ROOM
120F
PATIENT
ROOM
120E
PATIENT
ROOM
126A
PATIENT
ROOM
126B
PATIENT
ROOM
126J
PATIENT
ROOM
126H
PATIENT
ROOM
126C
PATIENT
ROOM
126G
PATIENT
ROOM
126F
PATIENT
ROOM
126E
PATIENT
ROOM
PATIENT
ROOM
114D
PATIENT
ROOM
PATIENT
ROOM
120C
CORRIDOR
CORRIDOR
1201 STORAGE
DAY ROOM
120D
PATIENT
LAUNDRY
ROOM
MEN'S
BATHROOM
STAFF BED
ROOM
STAIR
DR'S OFFICE
PSYCH
NURSE'S
OFFICE
123A
CASE
MANAGER
OFFICE
LOBBY
100A
DIRECTOR'S
OFFICE
OFFICE
LINEN
STORAGE
BATHROOM
101A
WOMEN'S
SHOWER
105A
MEN'S
SHOWER
MEN'S
BATHROOM
BATHROOM
CLOSET
CLOSET
115B
CLOSET
115A
CLOSET
DINING ROOM
113A
STORAGE
113B
BATHROOM
110B
OFFICE
CLOSET
110A
STAIR
PATIENT
LAUNDRY
ROOM
ADMIN OFFICE
114A
UNISEX
BATHROOM
114B
BATHROOM
114C
CORRIDOR
CORRIDOR CORRIDOR
DAY ROOM
126D
ELEVATOR
CORRIDOR
ELECTRICAL
PANELS
CLOSET
121A
CLOSET
ELECTRICAL
PANELS
MEN'S
SHOWER
A. REFER TO GI002 “CONSTRUCTION PERIOD SCHEDULING OF WORK – GENERAL NOTES” REGARDING
THE VA’S DISCRETION IN SELECTING WORK TO BE DONE AFTERHOURS/OFF-HOURS.
B. REFER TO GI002 “CONSTRUCTION PERIOD SCHEDULING OF WORK – ADDITIONAL NOTES FOR
STERILE PROCESSING SERVICE (SPS)” REGARDING WORK IN, ADJACENT TO, OR THAT MAY
AFFECT SPS.
C. REFER TO DEMO NOTES ON GI003.
D. NEW SHAFTS AND RISERS: NEW SHAFT AND RISER LOCATIONS ARE INTENDED TO FALL BETWEEN
STRUCTURAL CONC RIBS. UPON COMPLETION OF REMOVAL OF PLASTER CLGS AND OTHER
OBSCURING FEATURES IN THE VICINITY OF THE NEW SHAFT/RISER LOCATIONS AND BEFORE
BEGINNING STRUCT DEMO OR FRAMING LAYOUT, GC SHALL PREPARE AND SUBMIT EXIST
CONDITIONS SHOP DRAWINGS TO VA FOR A/E REVIEW. A/E MAY ADJUST SHAFT AND PARTITION LOCATIONS AT THIS POINT AS REQD TO MEET DESIGN INTENT. GC SHALL PLAN AND SCHEDULE
WORK TO ACCOMMODATE SUCH REVIEW. REFER TO GI002 FOR ADDITIONAL DIRECTION.
E. EXIST BLDG PARTITIONS CONSIST OF CLAY TILE BLOCK & PLASTER PARTITIONS, CMU PARTITIONS, STUD & PLASTER PARTITIONS, AND STUD & GYPSUM BOARD PARTITIONS REGARDLESS OF
MATERIAL INDICATIONS ON PLANS. VERIFY EXIST CONDITIONS IN FIELD. BATHROOM PARTITIONS INCLUDE WAINSCOT AND FULL HEIGHT CERAMIC TILE. CLAY BLOCK & PLASTER PARTITIONS ARE
TYP FULL HT, ALTHOUGH PARTITION HTS MAY VARY.
F. ON SURFACES AND PARTITIONS INDICATED TO REMAIN, REMOVE ALL WALL MTD ITEMS AND
DEVICES INCL CORNER GUARDS, HANDRAILS, CHAIR RAILS, AND ALL SURFACE FINISHES INCL CERAMIC WALL TILE AND VINYL WALL COVERING. REFER TO NOTES AND SPECS REGARDING PREP
OF SURFACES FOR NEW FINISHES.
G. PLASTER FINISHES ARE INTENDED TO REMAIN ON CLAY BLOCK & PLASTER PARTITIONS & WALLS
INDICATED TO REMAIN, UNO. PATCH & REPAIR AS REQD FOR NEW WORK.
H. CLAY BLOCK & PLASTER PARTITIONS TO BE REMOVED SHALL BE REMOVED IN THEIR ENTIRETY TO
THE STRUCT ABOVE/BELOW. TOPPING SLAB AND REMAINING/ INTERSECTING WALLS SHALL BE
FILLED, PATCHED, AND MADE PLUMB/LEVEL AND PREPARED FOR NEW WORK. SEE DTLS AND
SPECS.
I. EXIST CONSTRUCTION IS INDICATED TO BE REMOVED: REMOVE ALL MTD ACCESSORIES, CORNER GUARDS, HANDRAILS, ETC. PATCH ABUTTING WALLS, FLOORS, CEILINGS, AND ROOF AS REQD TO
ACCOMMODATE NEW CONSTRUCTION. REMOVE EXIST ITEMS SCHED TO REMAIN AS NECESSARY
TO ALLOW THE COMPLETE DEMO WORK. REPAIR/REPLACE SUCH ITEMS ONCE DEMO IS
COMPLETED.
J. IN AREAS OF WORK, CONTRACTOR TO REMOVE ALL EXIST FLOOR FINISHES AND ASSOCIATED
MASTIC AND PREP FOR NEW FLOORING AS SCHED. REFER TO HAZ MAT REPORT IN SPECS AND
HAZ MAT DWGS FOR LOCATIONS OF ACM FLOORING AND MASTIC.
K. CONCEALED ACM PIPING EXISTS THROUGHOUT THE PROJECT AREA. CONTRACTOR TO TAKE
CARE IN DEMO OF PARITIONS SO AS TO NOT DISTURB POTENTIAL ACM PIPING INSULATION. IF
CONCEALED ACM MATERIAL IS FOUND, PROCEED WITH HAZARDOUS MATERIAL PROCEDURES AS
OUTLINED IN SPECS.
L. PLASTER CLGS CONCEALED ABOVE SUSP CLGS CONTAIN ACM ADHESIVE DOTS. REFER TO HAZ
MAT REPORT IN SPECS AND HAZ MAT DWGS FOR LOCATIONS OF ACM ADHESIVE DOTS.
M. REFER TO CORRESPONDING STRUCT, HAZ MAT, AND M/E/P/FP SHEETS FOR FULL SCOPE OF
DEMO WORK.
N. SEE M/E/P/FP AND STRUCT DWGS FOR ADDITIONAL OPNG THAT MAY BE REQD THROUGH EXIST
PARTITIONS AND WALLS INDICATED TO REMAIN. PROVIDE SHOP DWGS FOR COORDINATION.
O. APPROX LOCATION OF EXIST RISER TO ROOF DRAIN CONCEALED WITHIN WALL. RISERS TO REMAIN
SHALL BE PROTECTED DURING CONSTRUCTION. SEE PLUMBING DWGS FOR RELOCATION.
LOCATIONS SHALL BE COORD WITH ALL INTENDED WORK, REPORT ANY CONFLICTS TO THE
RELOCATION AE AND VA/COR. IF DEEMED NECESSARY, CONTRACTOR SHALL RELOCATE RISERS
OR PORTIONS THEREOF TO APPROVED LOCATIONS.
EXISTING CONSTRUCTION TO REMAIN
EXISTING CONSTRUCTION TO BE REMOVED, INCLUDING ALL
MOUNTED ACCESSORIES, CORNER GUARDS, HANDRAILS, ETC.
PATCH ABUTTING WALLS, FLOORS, CEILINGS AND ROOF AS
REQUIRED. REMOVE EXISTING ITEMS SCHEDULED TO REMAIN
AS NECESSARY TO ALLOW THE COMPLETE DEMOLITION OF
SELECTED ITEMS. REPAIR/REPLACE EXISTING ITEMS ONCE
DEMOLITION IS COMPLETED.
2 HOUR FIRE & SMOKE SEPARATION
1 HOUR FIRE & SMOKE SEPARATION
AREA NOT IN CONTRACT
NOTE: NOT ALL KEYNOTES MAY BE USED ON THIS DRAWING.
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
31 JAN 2020
ARCHITECTURAL DEMO PLAN -
FIRST FLOOR
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
RFR ARCH
542-18-106
AD101
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
1/8" = 1'-0"
ARCHITECTURAL DEMO PLAN - FIRST FLOOR
GENERAL DEMOLITION NOTESDEMOLITION LEGEND
DEMOLITION KEYNOTES
0 4' 8' 16'
1 CONC RADIATOR ENCLOSURE TO REMAIN. TYP AT FIRST AND SECOND
FLOOR WINDOWS. REMOVE EXIST GRATES OR COVERS AS REQD. REFER TO
MECH & HAZ MAT DWGS FOR RADIATOR, SHIELD, AND FAN COIL UNIT
REMOVAL. PATCH FLOOR AND WALLS AS REQD & PREPARE FOR NEW WORK.
2 EXIST IT BACKBONE TO REMAIN. PROTECT DURING CONSTRUCTION.
PROTECTION MEASURES TO BE REVIEWED AND APPROVED BY VA COR AND
IT DEPTS.
3 EXIST PLUMBING CHASE WITH FULL HT CLAY BLOCK WALLS TO BE REMOVED.
4 EXIST FURRED CHASE TO BE REMOVED. COORD WI M/E/P/FP DWGS.
5 PARTIAL HT WALL / RADIATOR RECESS. COORD W/ MECH DWGS FOR
RADIATOR AND PIPING REMOVAL.
6 PORTION OF WALL AND CONTENTS TO BE REMOVED, ORIGINAL WALL
(COMPRISED OF CLAY TILE, PLASTER, AND MASONRY) IS TO REMAIN.
CONCEALED CONDITIONS MAY VARY. EXTENT OF REMOVAL SHALL
ACCOMMODATE INTENT AND REQUIREMENTS OF PLANS. TYPICAL ALONG
COLUMN LINES 1 & 12.
7 REMOVE EXIST WALL AS REQD AND PREPARE FOR INSTALLATION OF NEW
DOOR FRAME. COORD WI/ PLANS AND DTLS.
8 REMOVE EXIST WINDOW AND FRAME.
9 REMOVE PORTION OF EXIST MASONRY WALL AS REQD. PROVIDE STEEL
LINTEL AT ENLARGED MASONRY OPENING. SEE STRUCT.
10 REMOVE EXIST STONE THRESHOLD, CERAMIC FLOOR TILE, AND OTHER
FINISHES DOWN TO EXIST CONC SLAB.
11 REMOVE EXIST TILE WAINSCOT OR FULL HT TILE FROM EXIST WALL SHOWN
TO REMAIN, INCLUDING FURRING IF PRESENT. INCLUDES TILED RETURNS TO
EXIST WINDOWS.
12 REMOVE EXIST FLOOR TILE AND ASSOCIATED MASTIC. REFER TO HAZ MAT
DWGS AND SPECS FOR MATERIALS REQUIRING ACM ABATEMENT.
13 REMOVE ALL BLINDS, WINDOW SHADES, AND WINDOW COVERINGS.
14 REMOVE EXIST PLUMBING FIXTS, REFER TO PLUMBING DEMO FOR EXTENT
OF ASSOCIATED PIPING DEMO.
15 EXIST LAUNDRY ROOM: REMOVE EXIST PLUMBING, REFER TO PLUMBING
DEMO FOR EXTENT OF ASSOCIATED DEMO.
16 EXIST WOOD STILE, RAIL, AND PANEL CONSTRUCTION TO REMAIN. REMOVE
EXIST WALL COVERINGS. PREP FOR NEW FINISHES.
17 NEW SLAB OPNG FOR NEW SHAFT/ RISER. SEE STRUCT, ARCH, & M/E/P/FP.
PROVIDE OPENING & FIRESTOPPING AS REQD.
18 SAWCUT/CORE FOR NEW PIPE/CONDUIT RISER. SEE STRUCT, ARCH, &
M/E/P/FP. PROVIDE FIRESTOPPING AS REQD. LOCATE PIPE/CONDUIT RISERS
TO MINIMIZE PROJECTIONS INTO USEABLE SPACE.
19 EXIST 2-HOUR FIRE RESISTANCE RATED CONSTRUCTION TO REMAIN.
DEPRESSIONS OR OPENINGS THROUGH THIS BARRIER CREATED,
ABANDONED, OR DISCOVERED IN THE COURSE OF WORK SHALL BE
PATCHED & FIRESTOPPED AS REQD TO MAINTAIN RATING. SEE GENERAL
NOTES AND SPECS.
20 REMOVE EXIST INFILL AT ORIGINAL MASONRY OPENING; INSPECT CONDITION
OF LINTEL; REPAIR, REPAINT OR REPLACE AS REQD AND PREPARE OPNG
FOR NEW WINDOW. SEE STRUCT AND ARCH DWGS FOR DTLS.
21 GC TO COORD SEQUENCING OF DOOR & FRAME REPLACEMENT SUCH THAT
RATED ENCLOSURES, ICRA BARRIERS & ASBESTOS ENCLOSURES ARE
MAINTAINED AND OTHER REQUIREMENTS ARE MET. REPLACE EXIST WITH
NEW IN ONE CONT WORK SESSION.
22 REMOVE DOOR, FRAME, SIDELIGHTS, AND ASSOCIATED HDW. INSPECT,
REPAIR, REPLACE, & PAINT AS REQD FOR COMPLETED WORK.
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
1 2 3 4 5
6 7
8 9 10 11 12
AA
BB
CC
D.2D.2
E.2E.2
E.8
E.8
F.8F.8
HH
II
JJ
DD
EE
F
F
GG
6.86.2
G.5G.5
C.2
ROOF ROOF
ROOF
C.1C.1
TYP.1
TYP.5
111111
TYP.5
TYP.1
10 10
TYP.1
TYP.5
3 3
111111
TYP.1
TYP.5
0 13
4'
- 1
3/
4" 3'
- 1 0"
4'
- 1
3/
4"
ROOF ROOF
ROOF
STORAGE
214H
PT SAFETY
OFFICE
214A
QI/MH OFFICE
214B
QI/PCS
OFFICE
214C
WOMEN'S
BATHROOM
STAIR
CLOSET
SUPPORT
OFFICE
STORAGE
CONFERENCE
ROOM
BREAK ROOM
210A
STORAGE
208B
OFFICE
207C
OFFICE
207D
OFFICE
207J
OFFICE
207F
NURSES
OFFICE
207B
STORAGE
MRSA OFFICE
SUPPORT
OFFICE
STORAGE
STAIRS
MEN'S
BATHROOM
RISK
MANAGER
OFFICE
207K
STORAGE
(NEURO)
207G
WAITING
ROOM
207H
INFECTION
CONTROL
OFFICE
207A
SAFETY
OFFICE
TRAINING
ROOM
BATHROOM
200B
DIRECTOR QI
OFFICE
220B
WAITING
ROOM
SUPPORT
OFFICE
220A
SUPPORT
OFFICE
SUPPORT
OFFICE
STORAGE
SAFETY
MANAGERS
OFFICE
214D
CLOSET
217A
QI PC OFFICE
214E
QI GEC
OFFICE
214FSTORAGE
214G
ELECTRICAL
PANELS
210A
ELECTRICAL
PANELS
207I
A. REFER TO GI002 “CONSTRUCTION PERIOD SCHEDULING OF WORK – GENERAL NOTES” REGARDING
THE VA’S DISCRETION IN SELECTING WORK TO BE DONE AFTERHOURS/OFF-HOURS.
B. REFER TO GI002 “CONSTRUCTION PERIOD SCHEDULING OF WORK – ADDITIONAL NOTES FOR
STERILE PROCESSING SERVICE (SPS)” REGARDING WORK IN, ADJACENT TO, OR THAT MAY
AFFECT SPS.
C. REFER TO DEMO NOTES ON GI003.
D. NEW SHAFTS AND RISERS: NEW SHAFT AND RISER LOCATIONS ARE INTENDED TO FALL BETWEEN
STRUCTURAL CONC RIBS. UPON COMPLETION OF REMOVAL OF PLASTER CLGS AND OTHER
OBSCURING FEATURES IN THE VICINITY OF THE NEW SHAFT/RISER LOCATIONS AND BEFORE
BEGINNING STRUCT DEMO OR FRAMING LAYOUT, GC SHALL PREPARE AND SUBMIT EXIST
CONDITIONS SHOP DRAWINGS TO VA FOR A/E REVIEW. A/E MAY ADJUST SHAFT AND PARTITION LOCATIONS AT THIS POINT AS REQD TO MEET DESIGN INTENT. GC SHALL PLAN AND SCHEDULE
WORK TO ACCOMMODATE SUCH REVIEW. REFER TO GI002 FOR ADDITIONAL DIRECTION.
E. EXIST BLDG PARTITIONS CONSIST OF CLAY TILE BLOCK & PLASTER PARTITIONS, CMU PARTITIONS, STUD & PLASTER PARTITIONS, AND STUD & GYPSUM BOARD PARTITIONS REGARDLESS OF
MATERIAL INDICATIONS ON PLANS. VERIFY EXIST CONDITIONS IN FIELD. BATHROOM PARTITIONS INCLUDE WAINSCOT AND FULL HEIGHT CERAMIC TILE. CLAY BLOCK & PLASTER PARTITIONS ARE
TYP FULL HT, ALTHOUGH PARTITION HTS MAY VARY.
F. ON SURFACES AND PARTITIONS INDICATED TO REMAIN, REMOVE ALL WALL MTD ITEMS AND
DEVICES INCL CORNER GUARDS, HANDRAILS, CHAIR RAILS, AND ALL SURFACE FINISHES INCL CERAMIC WALL TILE AND VINYL WALL COVERING. REFER TO NOTES AND SPECS REGARDING PREP
OF SURFACES FOR NEW FINISHES.
G. PLASTER FINISHES ARE INTENDED TO REMAIN ON CLAY BLOCK & PLASTER PARTITIONS & WALLS
INDICATED TO REMAIN, UNO. PATCH & REPAIR AS REQD FOR NEW WORK.
H. CLAY BLOCK & PLASTER PARTITIONS TO BE REMOVED SHALL BE REMOVED IN THEIR ENTIRETY TO
THE STRUCT ABOVE/BELOW. TOPPING SLAB AND REMAINING/ INTERSECTING WALLS SHALL BE
FILLED, PATCHED, AND MADE PLUMB/LEVEL AND PREPARED FOR NEW WORK. SEE DTLS AND
SPECS.
I. EXIST CONSTRUCTION IS INDICATED TO BE REMOVED: REMOVE ALL MTD ACCESSORIES, CORNER GUARDS, HANDRAILS, ETC. PATCH ABUTTING WALLS, FLOORS, CEILINGS, AND ROOF AS REQD TO
ACCOMMODATE NEW CONSTRUCTION. REMOVE EXIST ITEMS SCHED TO REMAIN AS NECESSARY
TO ALLOW THE COMPLETE DEMO WORK. REPAIR/REPLACE SUCH ITEMS ONCE DEMO IS
COMPLETED.
J. IN AREAS OF WORK, CONTRACTOR TO REMOVE ALL EXIST FLOOR FINISHES AND ASSOCIATED
MASTIC AND PREP FOR NEW FLOORING AS SCHED. REFER TO HAZ MAT REPORT IN SPECS AND
HAZ MAT DWGS FOR LOCATIONS OF ACM FLOORING AND MASTIC.
K. CONCEALED ACM PIPING EXISTS THROUGHOUT THE PROJECT AREA. CONTRACTOR TO TAKE
CARE IN DEMO OF PARITIONS SO AS TO NOT DISTURB POTENTIAL ACM PIPING INSULATION. IF
CONCEALED ACM MATERIAL IS FOUND, PROCEED WITH HAZARDOUS MATERIAL PROCEDURES AS
OUTLINED IN SPECS.
L. PLASTER CLGS CONCEALED ABOVE SUSP CLGS CONTAIN ACM ADHESIVE DOTS. REFER TO HAZ
MAT REPORT IN SPECS AND HAZ MAT DWGS FOR LOCATIONS OF ACM ADHESIVE DOTS.
M. REFER TO CORRESPONDING STRUCT, HAZ MAT, AND M/E/P/FP SHEETS FOR FULL SCOPE OF
DEMO WORK.
N. SEE M/E/P/FP AND STRUCT DWGS FOR ADDITIONAL OPNG THAT MAY BE REQD THROUGH EXIST
PARTITIONS AND WALLS INDICATED TO REMAIN. PROVIDE SHOP DWGS FOR COORDINATION.
O. APPROX LOCATION OF EXIST RISER TO ROOF DRAIN CONCEALED WITHIN WALL. RISERS TO REMAIN
SHALL BE PROTECTED DURING CONSTRUCTION. SEE PLUMBING DWGS FOR RELOCATION.
LOCATIONS SHALL BE COORD WITH ALL INTENDED WORK, REPORT ANY CONFLICTS TO THE
RELOCATION AE AND VA/COR. IF DEEMED NECESSARY, CONTRACTOR SHALL RELOCATE RISERS
OR PORTIONS THEREOF TO APPROVED LOCATIONS.
EXISTING CONSTRUCTION TO REMAIN
EXISTING CONSTRUCTION TO BE REMOVED, INCLUDING ALL
MOUNTED ACCESSORIES, CORNER GUARDS, HANDRAILS, ETC.
PATCH ABUTTING WALLS, FLOORS, CEILINGS AND ROOF AS
REQUIRED. REMOVE EXISTING ITEMS SCHEDULED TO REMAIN
AS NECESSARY TO ALLOW THE COMPLETE DEMOLITION OF
SELECTED ITEMS. REPAIR/REPLACE EXISTING ITEMS ONCE
DEMOLITION IS COMPLETED.
2 HOUR FIRE & SMOKE SEPARATION
1 HOUR FIRE & SMOKE SEPARATION
AREA NOT IN CONTRACT
NOTE: NOT ALL KEYNOTES MAY BE USED ON THIS DRAWING.
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
3 JAN 2020
ARCHITECTURAL DEMO PLAN -
SECOND FLOOR
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
RFR ARCH
542-18-106
AD102
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
1/8" = 1'-0"
ARCHITECTURAL DEMO PLAN - SECOND FLOOR
GENERAL DEMOLITION NOTESDEMOLITION LEGEND
DEMOLITION KEYNOTES
0 4' 8' 16'
1 CONC RADIATOR ENCLOSURE TO REMAIN. TYP AT FIRST AND SECOND
FLOOR WINDOWS. REMOVE EXIST GRATES OR COVERS AS REQD. REFER TO
MECH & HAZ MAT DWGS FOR RADIATOR, SHIELD, AND FAN COIL UNIT
REMOVAL. PATCH FLOOR AND WALLS AS REQD & PREPARE FOR NEW WORK.
2 EXIST IT BACKBONE TO REMAIN. PROTECT DURING CONSTRUCTION.
PROTECTION MEASURES TO BE REVIEWED AND APPROVED BY VA COR AND
IT DEPTS.
3 EXIST PLUMBING CHASE WITH FULL HT CLAY BLOCK WALLS TO BE REMOVED.
4 EXIST FURRED CHASE TO BE REMOVED. COORD WI M/E/P/FP DWGS.
5 PARTIAL HT WALL / RADIATOR RECESS. COORD W/ MECH DWGS FOR
RADIATOR AND PIPING REMOVAL.
6 PORTION OF WALL AND CONTENTS TO BE REMOVED, ORIGINAL WALL
(COMPRISED OF CLAY TILE, PLASTER, AND MASONRY) IS TO REMAIN.
CONCEALED CONDITIONS MAY VARY. EXTENT OF REMOVAL SHALL
ACCOMMODATE INTENT AND REQUIREMENTS OF PLANS. TYPICAL ALONG
COLUMN LINES 1 & 12.
7 REMOVE EXIST WALL AS REQD AND PREPARE FOR INSTALLATION OF NEW
DOOR FRAME. COORD WI/ PLANS AND DTLS.
8 REMOVE EXIST WINDOW AND FRAME.
9 REMOVE PORTION OF EXIST MASONRY WALL AS REQD. PROVIDE STEEL
LINTEL AT ENLARGED MASONRY OPENING. SEE STRUCT.
10 REMOVE EXIST STONE THRESHOLD, CERAMIC FLOOR TILE, AND OTHER
FINISHES DOWN TO EXIST CONC SLAB.
11 REMOVE EXIST TILE WAINSCOT OR FULL HT TILE FROM EXIST WALL SHOWN
TO REMAIN, INCLUDING FURRING IF PRESENT. INCLUDES TILED RETURNS TO
EXIST WINDOWS.
12 REMOVE EXIST FLOOR TILE AND ASSOCIATED MASTIC. REFER TO HAZ MAT
DWGS AND SPECS FOR MATERIALS REQUIRING ACM ABATEMENT.
13 REMOVE ALL BLINDS, WINDOW SHADES, AND WINDOW COVERINGS.
14 REMOVE EXIST PLUMBING FIXTS, REFER TO PLUMBING DEMO FOR EXTENT
OF ASSOCIATED PIPING DEMO.
15 EXIST LAUNDRY ROOM: REMOVE EXIST PLUMBING, REFER TO PLUMBING
DEMO FOR EXTENT OF ASSOCIATED DEMO.
16 EXIST WOOD STILE, RAIL, AND PANEL CONSTRUCTION TO REMAIN. REMOVE
EXIST WALL COVERINGS. PREP FOR NEW FINISHES.
17 NEW SLAB OPNG FOR NEW SHAFT/ RISER. SEE STRUCT, ARCH, & M/E/P/FP.
PROVIDE OPENING & FIRESTOPPING AS REQD.
18 SAWCUT/CORE FOR NEW PIPE/CONDUIT RISER. SEE STRUCT, ARCH, &
M/E/P/FP. PROVIDE FIRESTOPPING AS REQD. LOCATE PIPE/CONDUIT RISERS
TO MINIMIZE PROJECTIONS INTO USEABLE SPACE.
19 EXIST 2-HOUR FIRE RESISTANCE RATED CONSTRUCTION TO REMAIN.
DEPRESSIONS OR OPENINGS THROUGH THIS BARRIER CREATED,
ABANDONED, OR DISCOVERED IN THE COURSE OF WORK SHALL BE
PATCHED & FIRESTOPPED AS REQD TO MAINTAIN RATING. SEE GENERAL
NOTES AND SPECS.
20 REMOVE EXIST INFILL AT ORIGINAL MASONRY OPENING; INSPECT CONDITION
OF LINTEL; REPAIR, REPAINT OR REPLACE AS REQD AND PREPARE OPNG
FOR NEW WINDOW. SEE STRUCT AND ARCH DWGS FOR DTLS.
21 GC TO COORD SEQUENCING OF DOOR & FRAME REPLACEMENT SUCH THAT
RATED ENCLOSURES, ICRA BARRIERS & ASBESTOS ENCLOSURES ARE
MAINTAINED AND OTHER REQUIREMENTS ARE MET. REPLACE EXIST WITH
NEW IN ONE CONT WORK SESSION.
22 REMOVE DOOR, FRAME, SIDELIGHTS, AND ASSOCIATED HDW. INSPECT,
REPAIR, REPLACE, & PAINT AS REQD FOR COMPLETED WORK.
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
8 9 10 11 12
AA
BB
CC
D.2D.2
E.2E.2
E.8
E.8
F.8
HH
II
JJ
DD
EE
F
6.86.2
G.5G.5
C.2
DN
A1 A2 A3 A4 A5 A6 A7
A8
A8
A8
A8
A3
A4
A7
A3
A4
A7
C.1C.1
A8
A8
0 13
A12
A11 A11
A11 A11
A11A11
A. REFER TO GI002 “CONSTRUCTION PERIOD SCHEDULING OF WORK – GENERAL NOTES”
REGARDING THE VA’S DISCRETION IN SELECTING WORK TO BE DONE AFTERHOURS/OFF-
HOURS.
B. REFER TO GI002 “CONSTRUCTION PERIOD SCHEDULING OF WORK – ADDITIONAL NOTES
FOR STERILE PROCESSING SERVICE (SPS)” REGARDING WORK IN, ADJACENT TO, OR THAT
MAY AFFECT SPS.
C. AREAS OF OTHER TRADES’ WORK ARE TO BE CONSIDERED APPROXIMATE AS SHOWN AND
ARE PROVIDED FOR THE CONTRACTOR’S REFERENCE AND COORDINATION. ALL REQUIRED
WORK IS NOT NECESSARILY SHOWN ON THESE PLANS OR IN DETAIL. REFER TO
CORRESPONDING DRAWINGS IN OTHER DISCIPLINES. THE CONTRACTOR IS RESPONSIBLE
FOR VERIFYING EXISTING CONDITIONS AND COORDINATING LOCATIONS AND EXTENT OF
WORK ACROSS ALL TRADES AND DISCIPLINES.
D. AREAS SHOWN AS NOT IN CONTRACT (NIC) PERTAIN TO THE DISCIPLINES REPRESENTED BY
THOSE DRAWINGS. INCIDENTAL ARCHITECTURAL WORK MAY BE REQUIRED AT ANY
LOCATION OF ANY OTHER DISCIPLINE’S WORK. THE CONTRACTOR SHALL PERFORM WORK
AS REQUIRED TO SUPPORT ANY AND ALL MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION, AND OTHER WORK SHOWN OR REQUIRED.
E. BOUNDARIES OF AREAS SHOWN AS NOT IN CONTRACT (NIC) ARE TO BE CONSIDERED
APPROXIMATE AND ARE PROVIDED FOR THE CONTRACTOR’S REFERENCE AND
COORDINATION ONLY. ANY WORK IN ANY AREA NECESSARY TO COMPLETE THE INTENT OF
THE DRAWINGS, SPECIFICATIONS, AND BASIS OF DESIGN SHALL BE CONSIDERED TO BE IN
CONTRACT, REGARDLESS OF SUCH AN AREA BEING MARKED AS NIC ON ONE OR MORE
DRAWINGS.
F. THE CONTRACTOR’S WORK IN THE ATTIC WILL INCLUDE BUT IS NOT LIMITED TO:
PROTECTION OF EXISTING SPACES, CONSTRUCTION, WORK, EQUIPMENT, AND THE LIKE
FROM CONSTRUCTION ACTIVITIES; REMOVAL AND REPLACEMENT OF INSULATION,
CREATING NEW OPENINGS AND/OR CLOSING EXISTING OPENINGS IN THE FLOOR AND/OR
STRUCTURE, AND CLEANING AND DISINFECTING.
G. ANY EXISTING AREAS AND FINISHES DISTURBED BY THE CONTRACTOR’S WORK SHALL BE
RETURNED TO THEIR PRE-WORK CONDITION OR BETTER. BEFORE COMMENCEMENT OF
WORK, THE CONTRACTOR SHALL MAKE THOROUGH AND ANNOTATED PHOTOGRAPHIC
AND/OR VIDEO DOCUMENTATION OF ANY AREAS BEING DISTURBED SO AS TO
DEMONSTRATE COMPLIANCE WITH THIS DIRECTION.
H. THE CONTRACTOR SHALL COORDINATE WITH THE VA REGARDING EXISTING FINISH
PRODUCTS, AVAILABILITY OF ATTIC STOCK, APPROVAL OF PRODUCTS INTENDED TO
REPLACE THOSE EXISTING, INCLUDING BUT NOT LIMITED TO CEILING SYSTEMS OR
COMPONENTS. ALL APPROVALS TO BE OBTAINED PRIOR TO DISTURBING THE PRODUCTS
TO WHICH THOSE APPROVALS PERTAIN.
I. PROTECTION AND CLEANING PROCEDURES SHALL BE SUBMITTED TO AND APPROVED BY
THE VA/COR AND SUCH PROTECTION MEASURES AND CLEANING SHALL BE INSPECTED BY
THE VA/COR AND SHALL MEET THEIR APPROVAL.
J. AIR HANDLING UNITS (AHUS) SHOWN FOR REFERENCE ONLY: REFER TO MECHANICAL
DRAWINGS FOR DUCTING AND STRUCTURAL DRAWINGS FOR SUPPORTS.
K. COORDINATE MECHANICAL WORK WITH EXISTNG ROOF FRAMING. SELECTIVELY REMOVE
EXISTING COLLAR TIES & PROVIDE NEW COLLAR TIES AS REQUIRED SUBJECT TO APPROVAL
BY STRUCTURAL ENGINEER OF RECORD. SEE MECH & STRUCT DWGS.
L. ADD 2.5 GAL, TYPE 2A SURFACE-MTD FIRE EXTINGUISHERS AS REQD TO HAVE 75' MAX
TRAVEL DISTANCE AND 5 FIRE EXTINGUISHERS MINIMUM.
M. PROVIDE SIGNAGE NOTIFYING OCCUPANTS OF LOW CLEARANCE.
A. REFER TO DEMOLITION NOTES ON GI003.
B. NEW SHAFTS AND RISERS: NEW SHAFT AND RISER LOCATIONS ARE INTENDED TO FALL BETWEEN
STRUCTURAL CONCRETE RIBS. UPON COMPLETION OF REMOVAL OF PLASTER CEILINGS AND
OTHER OBSCURING FEATURES IN THE VICINITY OF THE NEW SHAFT/RISER LOCATIONS AND
BEFORE BEGINNING STRUCTURAL DEMO OR FRAMING LAYOUT, GC SHALL PREPARE AND SUBMIT
EXISTING CONDITIONS SHOP DRAWINGS TO VA FOR A/E REVIEW. A/E MAY ADJUST SHAFT AND
PARTITION LOCATIONS AT THIS POINT AS REQUIRED TO MEET DESIGN INTENT. GC SHALL PLAN
AND SCHEDULE WORK TO ACCOMMODATE SUCH REVIEW. REFER TO GI002 FOR ADDITIONAL
DIRECTION.
C. CONCEALED ACM PIPING EXISTS THROUGHOUT THE PROJECT AREA. CONTRACTOR TO TAKE
CARE IN DEMOLITION OF PARITIONS SO AS TO NOT DISTURB POTENTIAL ACM PIPING INSULATION.
IF CONCEALED ACM MATERIAL IS FOUND, PROCEED WITH HAZARDOUS MATERIAL PROCEDURES
AS OUTLINED IN SPECIFICATIONS.
D. REFER TO CORRESPONDING MECHANICAL, ELECTRICAL, PLUMBING, FIRE PROTECTION,
STRUCTURAL, AND HAZARDOUS MATERIAL DRAWINGS FOR FULL EXTENT OF DEMOLITION OF
RESPECTIVE TRADES.
E. SEE M/E/P/FP AND STRUCTURAL DRAWINGS FOR ADDITIONAL OPENINGS THAT MAY BE REQUIRED
THROUGH EXISTING PARTITIONS AND WALLS INDICATED TO REMAIN. PROVIDE SHOP DRAWINGS
FOR COORDINATION.
EXISTING CONSTRUCTION TO REMAIN
EXISTING CONSTRUCTION TO BE REMOVED, INCLUDING ALL
MOUNTED ACCESSORIES, CORNER GUARDS, HANDRAILS, ETC.
PATCH ABUTTING WALLS, FLOORS, CEILINGS AND ROOF AS
REQUIRED. REMOVE EXISTING ITEMS SCHEDULED TO REMAIN
AS NECESSARY TO ALLOW THE COMPLETE DEMOLITION OF
SELECTED ITEMS. REPAIR/REPLACE EXISTING ITEMS ONCE
DEMOLITION IS COMPLETED.
2 HOUR FIRE & SMOKE SEPARATION
1 HOUR FIRE & SMOKE SEPARATION
AREA NOT IN CONTRACT
NOTE: NOT ALL KEYNOTES MAY BE USED ON THIS DRAWING.
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
3 JAN 2020
ARCHITECTURAL DEMO PLAN -
ATTIC
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
RFR ARCH
542-18-106
AD103
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
1/8" = 1'-0"
ARCHITECTURAL DEMO PLAN - ATTIC
ATTIC DEMOLITION KEYNOTES
ATTIC GENERAL NOTES
ATTIC DEMOLITION NOTES
DEMOLITION LEGEND
0 4' 8' 16'
A10
A10
A1 APPROXIMATE LOCATION ABOVE OF NEW OPENING TO BE CREATED
OR EXISTING OPENING TO BE CLOSED, IN ROOF ABOVE. SEE
STRUCTURAL, ARCHITECTURAL, HAZMAT, AND M/E/P/FP DRAWINGS.
A2 APPROXIMATE LOCATION OF NEW OPENING TO BE CREATED OR
EXISTING OPENING TO BE CLOSED. SEE STRUCTURAL,
ARCHITECTURAL, HAZMAT, AND M/E/P/FP DRAWINGS.
A3 APPROXIMATE LOCATION OF STRUCTURAL WORK TO SUPPORT NEW
OR RELOCATED EQUIPMENT. SEE STRUCTURAL, ARCHITECTURAL,
HAZMAT, AND M/E/P/FP DRAWINGS.
A4 MECHANICAL WORK IN THIS ROOM/AREA, SEE MECHANICAL DRWINGS.
A5 PLUMBING WORK IN THIS ROOM/AREA, SEE PLUMBING DWGS
A6 FIRE PROTECTION WORK IN THIS ROOM/AREA, SEE FIRE PROTECTION.
A7 ELECTRICAL WORK IN THIS ROOM/AREA, SEE ELECTRICAL DRAWINGS.
A8 NEW SHAFT OPENINGS FOR SHAFTS/RISERS: NEW SHAFT/RISER
LOCATIONS ARE INTENDED TO FALL BETWEEN CONCRETE RIBS.
CONCRETE RIBS ARE INACCESSIBLE TO FIELD SURVEY AND ANY
LOCATIONS SHOWN ARE PRESUMED. UPON COMPLETION OF
DEMOLITION IN THE VICINITY OF THE NEW SHAFT/RISER LOCATIONS
AND BEFORE BEGINNING FRAMING LAYOUT, CONTRACTOR SHALL
SUBMIT SHOP DRAWINGS SHOWING LOCATIONS OF EXISTING
STRUCTURE IN THE VICINITY OF THESE SHAFTS/RISERS AND
SHAFT/RISER LOCATIONS SHOWN ON ARCHITECTURAL AND
STRUCTURAL PLANS TO VA COR FOR ARCHITECTURAL AND
STRUCTURAL REVIEW. CONTRACTOR SHALL PLAN AND SCHEDULE
WORK TO ACCOMMODATE SUCH REVIEW. ADJUSTMENTS TO SHAFT
AND PARTITION LOCATIONS MAY BE REQUIRED TO MEET DESIGN
INTENT AND MAXIMIZE OFFICE WIDTHS. GC TO COORDINATE ACROSS
ALL DISCIPLINES.
A9 NEW/ENLARGED MASONRY OPENING WITH LOUVER, SEE STRUCTURAL
AND MECHANICAL. GC COORDINATE ACROSS ALL DICIPLINES.
A10 MECHANICAL EQUIPMENT SHOWN FOR REFERENCE, SEE MECHANICAL
DRAWINGS FOR FULL INFORMATION INCLUDING DUCT ROUTING.
A11 REMOVE EXISTING BRICK TO CREATE NEW, ENLARGED OPENING. SEE
STRUCTURAL DRAWINGS FOR INFORMATION. COORDINATE WORK TO
MAINTAIN TERRA COTTA CORNICE IN PLACE. SALVAGE REMOVED
BRICK FOR RE-USE.
A12 REMOVE EXISTING CORNICE AS REQUIRED FOR NEW ELEVATOR
TOWER. SEE STRUCTURAL DRAWINGS FOR DETAILS.
A13 EXISTING VTR ABOVE TO BE REMOVED. SEE PLUMBING DRAWINGS,
ARCH.ROOF PLAN AND DETAILS.
A13
A8 A8
A8
Revisions: Date:
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
8 9 10 11 12
AA
BB
CC
D.2D.2
E.2E.2
E.8
E.8
F.8F.8
HH
II
JJ
DD
EE
F
F
GG
6.86.2
G.5G.5
C.2
B1
B4
B1
B1
B1
B4
B4
B4
B4
B4
C.1C.1
CRAWL SPACE
B4
B4
B4
B4
B4
B4B4
B4
B4
B4
B4
B4
B4
B4
B5
B5
B5
B6
B5 B6
B5 B6
B5
B6
B5
B6
B5
B6
B5
B6
B5
B5
B6B5
B6
B5 B6
B5 B6
B5
B6
B5 B6
B5 B6
B5
B6
B4
B5
B6
0 13
MECHANICAL
ROOM
SUB1-4
CUBICLES
B02
CHIEF HIMS
OFFICE
B02C
PIMS
SUPPORT
OFFICE
B02B
LOBBY
B02
CUBICLES
B02A
STORAGE
B02E
CUBICLES
B02F
CORRIDOR
B00W
A. REFER TO GI002 “CONSTRUCTION PERIOD SCHEDULING OF WORK – GENERAL NOTES”
REGARDING THE VA’S DISCRETION IN SELECTING WORK TO BE DONE AFTER-HOURS/OFF-
HOURS.
B. REFER TO GI002 “CONSTRUCTION PERIOD SCHEDULING OF WORK – ADDITIONAL NOTES
FOR STERILE PROCESSING SERVICE (SPS)” REGARDING WORK IN, ADJACENT TO, OR THAT
MAY AFFECT SPS.
C. REFER TO DEMOLITION ONTES ON GI003.
D. AREAS OF OTHER TRADES’ WORK ARE TO BE CONSIDERED APPROXIMATE AS SHOWN AND
ALL AREAS MAY NOT BE SHOWN ON THESE PLANS. REFER TO CORRESPONDING DRAWINGS
IN OTHER DISCIPLINES FOR FULL EXTENT OF WORK. THE CONTRACTOR IS RESPONSIBLE
FOR VERIFYING EXISTING CONDITIONS AND COORDINATING LOCATIONS AND EXTENT OF
WORK ACROSS ALL TRADES AND DISCIPLINES.
E. BOUNDARIES OF AREAS SHOWN AS NOT IN CONTRACT (NIC) ARE TO BE CONSIDERED
APPROXIMATE AND ARE PROVIDED FOR THE CONTRACTOR’S REFERENCE AND
COORDINATION ONLY. ANY WORK IN ANY AREA NECESSARY TO COMPLETE THE INTENT OF
THE DRAWINGS, SPECIFICATIONS, AND BASIS OF DESIGN SHALL BE CONSIDERED TO BE IN
CONTRACT, REGARDLESS OF SUCH AN AREA BEING MARKED AS NIC ON ONE OR MORE
DRAWINGS.
F. INCIDENTAL ARCHITECTURAL WORK MAY BE REQUIRED AT ANY LOCATION OF ANY OTHER
DISCIPLINE’S WORK. THE CONTRACTOR SHALL PERFORM WORK AS REQUIRED TO SUPPORT
ANY AND ALL CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION, AND OTHER WORK SHOWN OR REQUIRED.
G. THE CONTRACTOR’S WORK IN THE BASEMENT WILL INCLUDE BUT IS NOT LIMITED TO:
PROTECTION OF EXISTING SPACES, CONSTRUCTION, WORK, EQUIPMENT, AND THE LIKE
FROM CONSTRUCTION ACTIVITIES; REMOVAL AND REPLACEMENT OF CEILING TILES AND/OR
GRIDS, CREATING NEW OPENINGS AND/OR CLOSING EXISTING OPENINGS IN THE FLOOR
STRUCTURE, AND CLEANING AND DISINFECTING.
H. ANY EXISTING AREAS AND FINISHES DISTURBED BY THE CONTRACTOR’S WORK SHALL BE
RETURNED TO THEIR PRE-WORK CONDITION OR BETTER. BEFORE COMMENCEMENT OF
WORK, THE CONTRACTOR SHALL MAKE THOROUGH AND ANNOTATED PHOTOGRAPHIC
AND/OR VIDEO DOCUMENTATION OF ANY AREAS BEING DISTURBED SO AS TO
DEMONSTRATE COMPLIANCE WITH THIS DIRECTION.
I. THE CONTRACTOR SHALL COORDINATE WITH THE VA REGARDING EXISTING FINISH
PRODUCTS, AVAILABILITY OF ATTIC STOCK, APPROVAL OF PRODUCTS INTENDED TO
REPLACE THOSE EXISTING, INCLUDING BUT NOT LIMITED TO CEILING SYSTEMS OR
COMPONENTS. ALL APPROVALS TO BE OBTAINED PRIOR TO DISTURBING THE PRODUCTS
TO WHICH THOSE APPROVALS PERTAIN.
J. PROTECTION AND CLEANING PROCEDURES SHALL BE SUBMITTED TO AND APPROVED BY
THE VA/COR AND SUCH PROTECTION MEASURES AND CLEANING SHALL BE INSPECTED BY
THE VA/COR AND SHALL MEET THEIR APPROVAL.
EXISTING CONSTRUCTION TO REMAIN
NOTE: REFER TO GI003 FOR GENERAL DEMOLITION NOTES. REVIEW THIS DRAWING IN CONJUNCTION WITH CORRESPONDING FIRE PROTECTION, PLUMBING, MECHANICAL AND ELECTRICAL DRAWINGS FOR
FULL SCOPE OF DEMOLITION WORK.
REMOVE WIRELESS ACCESS
POINT
REMOVE NURSE CALL LIGHT
REMOVE EXIT SIGN (DOUBLE
SIDED SHOWN)
REMOVE LIGHT FIXTURE (2'x4'
FIXTURE SHOWN)
WAP
N
EXISTING PARTITION TO BE
REMOVED IN ITS ENTIRETY.
COMPLETELY REMOVE EXISTING
SUSPENDED CEILING AND ALL
ASSOCIATED SUPPORTS.
REMOVE EXISTING GYPSUM BOARD
CEILING AND ALL ASSOCIATED
SUPPORTS.
AREA NOT IN CONTRACT
2 HOUR FIRE & SMOKE SEPARATION
1 HOUR FIRE & SMOKE SEPARATION
ELECTRICAL
PANELS
STORAGE
B05
STORAGE
B05A
STAIR
LOCKERS/
SUIT-UP
B07C
TOILET /
SHOWER
B07B
DECONTAMINATION
ROOM
B07L
ANTE ROOM
B07M
39 SF
BUILDING
HOUSEKEEPING
B14A
HOUSEKEEPING
AIDS CLOSET
B07A
CLEAN
SHIP/REC
B07H
OFFICE
B07K
ELECTRICAL
CLOSET
B071
STAIR
WOMENS
B08
STAFF
WOMENS
BATHROOM
B08A
STAFF MENS
BATHROOM/
LOCKERS
B14B
PRIVACY
OFFICER
OFFICE
B12C
WORKSHOP
B11
BANK
B12
STORAGE
B12E
STORAGE
B10
CLOSET
B09
CORRIDOR
CLEAN STORE
ROOM
B07F
MECHANICAL
ROOM
B07G
STORAGE
B11A
175 SF
OFFICE
B11B
PROCESSING /
PREP /
STERILIZATION
B07
STORAGE
B07
OFFICE
B12B
OFFICE
B12A
MECHANICAL
ROOM
B12D
426 SF
CORRIDOR
B00E
CLEAN
SHIP/REC
B07H ELEVATOR
SERVICE
ROOM 2
B16B
CORRIDOR
B00C
NOTE: NOT ALL KEYNOTES MAY BE USED ON THIS DRAWING.
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
31 JAN 2020
REFLECTED CEILING
DEMOLITION PLAN - BASEMENT
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
RFR ARCH
542-18-106
AD130
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
1/8" = 1'-0"
REFLECTED CEILING DEMOLITION PLAN - BASEMENT
BASEMENT GENERAL NOTES
BASEMENT DEMOLITION KEYNOTES
CEILING DEMOLITION LEGEND
0 4' 8' 16'
B1 ABOVE: APPROXIMATE LOCATION OF NEW OPENING IN STRUCTURE
ABOVE. SEE STRUCT, ARCH, HAZMAT, AND M/E/P/FP DRAWINGS.
B2 SEE CIVIL, STRUCT AND LANDSCAPE DRAWINGS AND ASSOCIATED
MEPFP AND ARCH DRAWINGS FOR EXTERIOR WORK.
B3 APPROXIMATE LOCATION OF STRUCTURAL WORK. SEE STRUCT,
ARCH, HAZMAT, AND M/E/P/FP DRAWINGS.
B4 FIRE PROTECTION WORK IN THIS ROOM/AREA, SEE FIRE
PROTECTION DWGS.
B5 PLUMBING WORK IN THIS ROOM/AREA, SEE PLUMBING DWGS.
B6 MECHANICAL VENTILATION/PIPING WORK IN THIS ROOM/AREA, SEE
MECHANICAL DWGS.
B7 ELECTRICAL WORK IN THIS ROOM/AREA, SEE ELECTRICAL DWGS.
B8 FILL ABANDONED OPENINGS IN FLOOR ABOVE, SEE STRUCT, ARCH,
HAZMAT, AND M/E/P/FP DRAWINGS.
B9 AREA OF EXISTING UTILITY PIT TO BE FILLED. THE CONTRACTOR
MAY BE REQUIRED TO PERFORM THIS WORK. SEE STRUCTURAL,
ARCHITECTURAL, HAZMAT AND MEPFP DRAWINGS.
B10 REMOVE EXISTING WINDOW AND FRAME. REMOVE PORTION OF
EXISTING MASONRY WALL AS REQD; CENTER NEW OPENING ON
EXISTING OPENING. PROVIDE STEEL LINTEL AT ENLARGED
MASONRY OPENING. SEE STRUCT DWGS FOR DTLS.
B11 REMOVE RAILINGS AND STORE FOR REINSTALLATION
B12 REMOVE PORTION OF EXISTING MASONRY WALL AS REQUIRED.
B13 EXISTING SLAB AND FENCE TO BE REMOVED IN THEIR ENTIRETY
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
8 9 10 11 12
AA
BB
CC
D.2D.2
E.2E.2
E.8
E.8
F.8F.8
HH
II
JJ
DD
EE
F
F
GG
6.86.2
C.2 C.1C.1
0 13
OFFICE
120K
PATIENT
ROOM
120A
PATIENT
ROOM
120J
PATIENT
ROOM
126A
PATIENT
ROOM
126B
PATIENT
ROOM
126J
PATIENT
ROOM
126C
PATIENT
ROOM
PATIENT
ROOM
114D
PATIENT
ROOM
CORRIDOR
CORRIDOR
STORAGE
DAY ROOM
120D
PATIENT
LAUNDRY
ROOM
MEN'S
BATHROOM
STAFF BED
ROOM
STAIR
DR'S OFFICE
PSYCH
NURSE'S
OFFICE
123A
CASE
MANAGER
OFFICE
LOBBY
100A
DIRECTOR'S
OFFICE
OFFICE
LINEN
STORAGE
BATHROOM
101A
WOMEN'S
SHOWER
105A
MEN'S
SHOWER
MEN'S
BATHROOM
BATHROOM
CLOSET
CLOSET
115B
CLOSET
115A
CLOSET
DINING ROOM
113A
STORAGE
113B
BATHROOM
110B
OFFICE
CLOSET
110A
STAIR
PATIENT
LAUNDRY
ROOM
ADMIN OFFICE
114A
UNISEX
BATHROOM
114B
BATHROOM
114C
CORRIDOR
CORRIDOR
CORRIDOR
DAY ROOM
126D
ELEVATOR
CORRIDOR
ELECTRICAL
PANELS
CLOSET
121A
CLOSET
ELECTRICAL
PANELS
MEN'S
SHOWER
PATIENT
ROOM
120H
PATIENT
ROOM
120G
PATIENT
ROOM
120F
PATIENT
ROOM
120E
PATIENT
ROOM
120B
PATIENT
ROOM
120C
PATIENT
ROOM
126H
PATIENT
ROOM
126G
PATIENT
ROOM
126F
PATIENT
ROOM
126E
EXISTING CONSTRUCTION TO REMAIN
NOTE: REFER TO GI003 FOR GENERAL DEMOLITION NOTES. REVIEW THIS DRAWING IN CONJUNCTION WITH CORRESPONDING FIRE PROTECTION, PLUMBING, MECHANICAL AND ELECTRICAL DRAWINGS FOR
FULL SCOPE OF DEMOLITION WORK.
REMOVE WIRELESS ACCESS
POINT
REMOVE NURSE CALL LIGHT
REMOVE EXIT SIGN (DOUBLE
SIDED SHOWN)
REMOVE LIGHT FIXTURE (2'x4'
FIXTURE SHOWN)
WAP
N
EXISTING PARTITION TO BE
REMOVED IN ITS ENTIRETY.
COMPLETELY REMOVE EXISTING
SUSPENDED CEILING AND ALL
ASSOCIATED SUPPORTS.
REMOVE EXISTING GYPSUM BOARD
CEILING AND ALL ASSOCIATED
SUPPORTS.
AREA NOT IN CONTRACT
2 HOUR FIRE & SMOKE SEPARATION
1 HOUR FIRE & SMOKE SEPARATION
A. REFER TO GI002 “CONSTRUCTION PERIOD SCHEDULING OF WORK – GENERAL NOTES”
REGARDING THE VA’S DISCRETION IN SELECTING WORK TO BE DONE AFTERHOURS/OFF-
HOURS.
B. REFER TO GI002 “CONSTRUCTION PERIOD SCHEDULING OF WORK – ADDITIONAL NOTES FOR
STERILE PROCESSING SERVICE (SPS)” REGARDING WORK IN, ADJACENT TO, OR THAT MAY
AFFECT SPS.
C. REFER TO DEMOLITION NOTES ON GI003.
D. REFER TO CORRESPONDING STRUCTURAL, HAZMAT, AND M/E/P/FP SHEETS FOR FULL SCOPE
OF DEMOLITION WORK.
E. NEW SHAFTS AND RISERS: NEW SHAFT AND RISER LOCATIONS ARE INTENDED TO FALL
BETWEEN STRUCTURAL CONCRETE RIBS. UPON COMPLETION OF REMOVAL OF PLASTER
CEILINGS AND OTHER OBSCURING FEATURES IN THE VICINITY OF THE NEW SHAFT/RISER
LOCATIONS AND BEFORE BEGINNING STRUCTURAL DEMO OR FRAMING LAYOUT, GC SHALL
PREPARE AND SUBMIT…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .