36C24420B0003 0003.pdf
PDF 209 KB Posted
- Attached to
- Z2DA--Renovate Building 4 A + B Floors Outpatient Mental Health Clinic, Project No. 542-18-106
- Solicitation number
- 36C24420B0003
About this file
This solicitation package seeks bids for a construction project to renovate building spaces at a Department of Veterans Affairs medical center. Key details include:
-
The project involves renovating approximately 28,000 square feet on the first and second floors and 3,000 square feet in the basement of Building 4 at the VA Medical Center in Coatesville, Pennsylvania to create new outpatient mental health clinics. Scope of work includes demolition, construction, alterations to building systems.
-
The solicitation is set aside exclusively for service-disabled veteran-owned small businesses verified through the Center for Veterans Enterprise. Bids are due on a date specified in the forthcoming solicitation package to be posted on June 23, 2020.
-
The project is estimated to cost between $10-20 million. The contract will be a firm fixed price contract awarded for 588 calendar days upon notice to proceed. Bidders must meet bonding and SDVOSB qualification requirements and be registered in the System for Award Management.
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 1
0003 08-10-2020
542-20-2-5306-0027
542-18-106
Y 00244
Department of Veterans Affairs
Network Contracting Office 4
VA Medical Center
1400 Blackhorse Hill Road
Coatesville, PA 19320
Elizabeth Morin, Contracting Officer elizabeth.morin3@va.gov
Y 00244
Department of Veterans Affairs
Network Contracting Office 4
VA Medical Center
1400 Blackhorse Hill Road
Coatesville, PA 19320
To all Offerors/Bidders
36C24420B0003
06-24-2020
X
X X
** HOUR & DATE for Receipt of Offers is EXTENDED to:
X 1
Renovate Building 4A & B Floors Mental Health Outpatient Clinic, Project No. 542-18-106
Solicitation No. 36C24420B0003 is hereby amended as follows:
1. To provide responses to contractor request for information which were inadvertently not included in Amendment 0002.
2. To Correct Poject Number in Block 14, Amendment 0001 and Amendment 0002 from Project 542-18-105 to Project 542-18-106.
Elizabeth Morin
Contracting Officer
RENOVATE BUILDING 4A & B MENTAL HEALTH OUTPATIENT CLINIC
PROJECT 542-18-106, SOLICITATION 36C24420B0003
AMENDMENT NO. 00003
1. Could you king provide an anticipated phasing schedule as one is not shown in the contract documents?
VA Response: There is no phasing plan as the project is intended to occur in a single phase.
Thus, the phases in Spec 01 00 00 1.6 I are left blank. As noted in that specification, sequencing during the project shall be the contractor’s responsibility. As noted in the drawings (particularly the GI-series), work in certain areas must be coordinated with the VA/COR.
General notes regarding scheduling of work are on GI002. Additional notes regarding scheduling of work that may impact SPS are on GI002. I am including the notes verbatim from Drawing G1002, which pertain to work in the Basement, over the SPS area.
CONSTRUCTION PERIOD SCHEDULING OF WORK AND
PROTECTION AND CLEANING - ADDITIONAL NOTES FOR
STERILE PROCESSING SERVICE (SPS)
THE STERILE PROCESSING SERVICE (SPS) AREA SHALL BE CONSIDERED TO BE ALL
BASEMENT LEVEL SPACES BETWEEN THE EXISTING STAIRWELLS AND NORTH OF THE
EXISTING CORRIDOR. EXISTING MECHANICAL ROOM B07G, OFFICE B07K, BUILDING
HOUSEKEEPING B14A, AND ELECTRICAL CLOSET B071 ARE EXCLUDED FROM THIS
AREA.
1. ABOVE-CEILING WORK IN THE EXISTING STERILE PROCESSING SERVICE (SPS)
AREA MUST BE CLOSELY COORDINATED WITH VA COR AND SPD PERSONNEL.
2. SCHEDULING OF ACTIVITIES AND PROTECTION MEASURES FOR THIS AREA TO BE
SUBMITTED TO AND APPROVED BY VA/COR AND SPD BEFORE BEGINNING WORK.
3. THE MAXIMUM SHUTDOWN OF THIS AREA SHALL BE FIVE (5) DAYS. THE
CONTRACTOR MAY WORK FROM FRIDAY EVENING THROUGH SUNDAY EVENING
(APPROXIMATELY NINE (9)
CALENDER DAYS). COORD EXACT START AND FINISH TIMES WITH VA/SPS.
4. WORK IN THIS AREA SHALL INCLUDE BUT IS NOT LIMITED TO THE FOLLOWING:
a. PROTECTION OF SPS AREAS, EQUIPMENT, AND SURFACES NOT REQUIRED TO
BE WORKED ON, FROM DUST, DEBRIS, AND CONSTRUCTION ACTIVITIES
b. SELECTIVE REMOVAL OF EXISTING CEILING TILES TO ACCOMMODATE ABOVE-
CEILING WORK; REPLACEMENT OF TILES UPON COMPLETION OF WORK OR DAILY
c. REMOVAL OF PLUMBING AND MECHANICAL PIPING, DUCTS, CONDUIT, AND
OTHER ITEMS AS REQUIRED TO ACCOMPLISH THE INTENT SHOWN IN THE DRAWINGS
AND SPECS.
d. INSTALLATION OF MECHANICAL AND PLUMBING PIPING, DUCTS, CONDUIT, ETC
e. PATCHING OF WALLS WITH LIKE CONSTRUCTION AS REQD BY DEMOLITION
AND CONSTRUCTION ACTIVITIES, TO BE SEALED AND TIGHT TO ADJACENT
CONSTRUCTION
f. CLEANUP INCLUDING BUT NOT LIMITED TO DISINFECTING AND CLEANING ALL
WALLS, FLOORS, AND CEILINGS
5. REFER TO ALL DEMOLITION AND CONSTRUCTION DRAWINGS, DETAILS, AND
SPECIFICATIONS FOR EXTENT OF WORK. ALL INFORMATION MAY NOT BE
SPECIFICALLY SHOWN. CONTRACTOR IS REQUIRED TO PERFORM ALL WORK TO
ACCOMPLISH THE INTENT SHOWN IN THE CONTRACT DOCUMENTS
6. GC TO COORDINATE ALL WORK ACROSS TRADES AND COORDINATE WITH
VA/COR AND SPS TO MEET ANY AND ALL REQUIREMENTS
7. ANY WORK OCCURRING IN THE CRAWL SPACE ADJACENT TO SPD SHALL BE
SCHEDULED WITH VA/COR AND SPS. ANY AND ALL EXISTING DUCTS, PIPING, ETC IN
THE CRAWL SPACE THAT SERVE SPD SHALL BE IDENTIFIED AND MARKED IN
COORDINATION WITH VA/COR AND SPS BEFORE BEGINNING WORK. SUCH DUCTS,
PIPING, ETC SHALL BE PROTECTED FROM CONSTRUCTION ACTIVITIES IN A MANNER
RENOVATE BUILDING 4A & B MENTAL HEALTH OUTPATIENT CLINIC
PROJECT 542-18-106, SOLICITATION 36C24420B0003
AMENDMENT NO. 00003
APPROVED BY VA/COR AND SPS, AND SHALL NOT BE DISTURBED DURING THE
COURSE OF THE PROJECT.
8. SCHEDULING OF ANY WORK IN EXISTING MECHANICAL ROOM B07G, OFFICE
B07K, OR ANY OTHER AREAS ADJACENT TO (INCLUDING ABOVE) SPD MUST BE
COORDINATED WITH AND APPROVED BY VA/COR AND SPS, AND IN ACCORDANCE
WITH ALL NOTES AND SPECIFICATIONS. PROTECTION PROTOCOLS FOR SPS DURING
THE DURATION OF THE PROJECT MUST BE COORDINATED WITH AND APPROVED BY
VA/COR AND SPS, AND MAY NOT BE LIMITED TO THOSE DESCRIBED WITHIN THE
CONSTRUCTION DOCUMENTS.
2. It appears that all of the wage rates provided in the above solicitation are not the most current could you kindly re-issue with updated rates?
VA Response: See attached updated Wage Rate Determination.
See attached document: General Decision Number PA20200083, dated 07/24/2020
End of Document