07 Architecture.pdf
PDF 4 MB Posted
- Attached to
- Z2DA--Renovate Building 4 A + B Floors Outpatient Mental Health Clinic, Project No. 542-18-106
- Solicitation number
- 36C24420B0003
About this file
This solicitation is for construction services to renovate the outpatient mental health clinic at the Department of Veterans Affairs Medical Center in Coatesville, Pennsylvania. The project scope includes demolishing approximately 28,000 square feet of existing space on the first and second floors and renovating it into new outpatient clinics for mental health services. An additional 3,000 square feet in the basement wing will also be renovated. Disciplines required include general construction, electrical, mechanical, plumbing and fire protection work. The solicitation will be available for download on or around June 23, 2020. Interested service-disabled veteran-owned small businesses must be verified by the Center for Veterans Enterprise. The maximum contract value is between $10-20 million. The performance period is 588 calendar days from notice to proceed. Questions regarding small business or OSHA requirements can be referred to the specified websites. The solicitation documents should be monitored for award details and amendments.
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F E
C F
E C
FEC
FEC
F E
C F
E C
F E
C
1 2 3 4 5
6 7
8 9 10 11 12
AA
BB
CC
D.2D.2
E.2E.2
E.8
E.8
F.8F.8
HH
II
JJ
DD
EE
F
F
GG
6.86.2
G.5G.5
C.2
ROOF
ROOF
ROOF
DN
DN
UP
CONSULT
WOMENS
WAITING
ELEC
TOILET
TOILET
NEURO
PSYCH/
TESTING
NEURO
PSYCH/
TESTING
NEURO
PSYCH/
TESTING
NEURO
PSYCH/
TESTING
NEURO
PSYCH/
TESTING
NEURO
PSYCH/
TESTING
NEURO
PSYCH/
TESTING
NEURO
PSYCH/
TESTING
STORAGE
206A
STORAGE
210A
STORAGE
213A
STORAGE
213B
GROUP
THERAPY
EAST STAIR
214A
NURSE/
TRIAGE
215A
CHECK-IN
CLERKS
TOILETS
TOILETS
STAFF ROOM
VJO / TCM /
TBI
SUD CONSULT
OFFICE
SUD CONSULT
OFFICE
TOILET
TOILET
BIO-FEEDBACK
TREATMENT
BIO-FEEDBACK
DR. PEKALA
BIO-FEEDBACK
DANIELLE
BIO-FEEDBACK
OFFICE
STORAGE
226B
WEST STAIR
219A
SUD CONSULT
OFFICE
SUD CONSULT
OFFICE
SUD CONSULT
OFFICE
SUD CONSULT
OFFICE
SUD CONSULT
OFFICE
IT
ELEC
SUD CONSULT
OFFICE
SUD CONSULT
OFFICE
SUD CONSULT
OFFICE
HOTEL
CONSULT
HOTEL
CONSULT
STORAGE
230A
EAST
CORRIDOR
200E
CENTER
CORRIDOR
200C
WEST
CORRIDOR
200W
C.1
A440
CONFERENCE
WAITING/
BREAK-OUT
200A
A440
W01W01 W01
0 13
BIO-FEEDBACK
INTAKE
226A
BIO-FEEDBACK
WAITING
HAC
219B
A. REFER TO GI002 “CONSTRUCTION PERIOD SCHEDULING OF WORK – GENERAL NOTES”
REGARDING THE VA’S DISCRETION IN SELECTING WORK TO BE DONE AFTERHOURS/OFF-
HOURS.
B. REFER TO GI002 “CONSTRUCTION PERIOD SCHEDULING OF WORK – ADDITIONAL NOTES FOR
STERILE PROCESSING SERVICE (SPS)” REGARDING WORK IN, ADJACENT TO, OR THAT MAY
AFFECT SPS.
C. GENERAL ARRANGEMENT AND OVERALL PLANS ARE INTENDED TO GIVE AN OVERVIEW OF
WORK. REFER TO CORRESPONDING DRAWINGS ACROSS ALL DISCIPLINES FOR FULL EXTENT
OF WORK.
EXISTING CONSTRUCTION
TO REMAIN
NEW PARTITION WALL
AREA NOT IN CONTRACT
MATCHLINE
FIRE EXTINGUISHER
CABINET - REFER TO
DETAIL 1/A515
SURFACE MOUNTED FIRE
EXTINGUISHER CABINET
REFER TO DETAIL 2/A515
2 HOUR FIRE &
SMOKE
SEPARATION
1 HOUR FIRE &
SMOKE
SEPARATION
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
03 AUG 2020
GENERAL ARRANGEMENT
PLAN - SECOND FLOOR
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
RFR ARCH
542-18-106
A012
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
1/8" = 1'-0"
GENERAL ARRANGEMENT PLAN - SECOND FLOOR
PLAN GENERAL NOTES
PLAN LEGEND
0 4' 8' 16'
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
ADDENDUM 1 03 AUG 2020
DN
E
C
A L
IG
N
8 9 10 11 12
E.8
E.8
F.8F.8
HH
II
JJ
F
F
GG
6.8
G.5G.5
MENTAL
HEALTH EXAM
ROOM
MENTAL
HEALTH
CONSULT
OFFICE
PRIMARY
CARE EXAM
ROOM
PRIMARY
CARE EXAM
ROOM
SUPPLY
PRIMARY
CARE EXAM
ROOM
PRIMARY
CARE EXAM
ROOM
PRIMARY
CARE EXAM
ROOM
PRIMARY
CARE EXAM
ROOM
MEDS
GROUP ROOM
EAST STAIR
120A
STORAGE
119A
CLERK AREA
121A
CHECK-IN
CLERKS
SUPERVISOR
OFFICE
STAFF ROOM
CRASH CART
114A
DN
121A
4A
/1 A101.3
A .2
9'
- 2
/4
13' - 1 1/4"
1/
2"
29' - 5 7/8" 16' - 5 1/2"
6'
- 8
TYP4
TYP4
TYP4
TYP4
TYP4
TYP7
TYP7
TYP5
TYP5
TYP7
TYP7
TYP 7
0A
0B
11 11
/12 A430
A
A
/10 A430
/1 A401
A
/3 A401
A
/9 A401
A
/11 A401
A
/5 A401
A
A
A4026
4B
9 9
4B
9 9
4B
1 1
9 9
9 9
9A
UP
4B
9A
9 2
4B
/11 A432
/9 A432
A
A
4B
4B
4B
4B
9A
A503
A511
SIM
119A
2' - 0"
2'
- 0
0"
7' - 6"
3/
4"
9'
- 3
/8
9'
- 3
9'
- 3
/8
9'
- 3
/8
8'
- 4
/8
7' - 6"
8'
- 1
3/
4" 8'
- 1
5/ 8"
8'
- 1
3/
8" 9'
- 2
/1 6"
7"
1/
4B
3'
- 1
/8
7' - 6"12' - 8 1/8"
2' - 6 1/2"
8'
- 1
/1
6"
3' - 6" 4' - 9"5'
- 3
7' - 11 1/8"1' - 4 1/2"
A. REFER TO GI002 “CONSTRUCTION PERIOD SCHEDULING OF WORK – GENERAL NOTES”
REGARDING THE VA’S DISCRETION IN SELECTING WORK TO BE DONE AFTERHOURS/OFF-
HOURS.
B. REFER TO GI002 “CONSTRUCTION PERIOD SCHEDULING OF WORK – ADDITIONAL NOTES
FOR STERILE PROCESSING SERVICE (SPS)” REGARDING WORK IN, ADJACENT TO, OR
THAT MAY AFFECT SPS.
C. REFER TO GENERAL NOTES ON GI001 AND GI002.
D. REFER TO SHEET SERIES AI AND QH FOR FINISHES AND EQUIPMENT.
E. REFER TO SHEET A001 & A002 FOR DETAILS FOR WALL GUARDS, CRASH RAILS,
HANDRAILS, INTEGRAL COVE BASE, CORNER GUARDS.
F. REVIEW THIS DRAWING IN CONJUNCTION WITH CORRESPONDING FIRE PROTECTION,
PLUMBING, MECHANICAL AND ELECTRICAL DRAWINGS FOR FULL SCOPE OF
CONSTRUCTION WORK.
G. REFER TO SHEET A501 FOR PARTITION TYPES.
H. REFER TO SHEET SERIES A600 FOR DOOR AND WINDOW SCHEDULES.
I. ALL DIMENSIONS ARE TO THE FINISHED FACE.
J. SEAL/FIRESTOP ALL OPENINGS IN ALL FIRE RATED WALLS TO CREATE A CONTINUOUS
SYSTEM. INCLUDES ALL EXPOSED CONDUIT AND PIPING.
K. EACH PARTITION NOTED TO CARRY AN ACOUSTIC RATING SHALL CARRY THAT RATING
IN THE ENTIRETY OF ITS CONSTRUCTION TO CREATE A CONTINUOUS SYSTEM.
INCLUDES PLACEMENT AND SEALING OF PENETRATIONS, JUNCTION BOXES, ETC.
UNLESS NOTED OTHERWISE, PARTITIONS SHALL EXTEND TO THE STRUCTURE ABOVE
AND ACCOMMODATE ITS PROFILE.
L. NEW DOOR INSTALLATIONS SHALL COMPLY WITH THE FOLLOWING UNLESS OTHERWISE
NOTED: (A) ON THE PUSH SIDE OF DOORS: PROVIDE A MINIMUM CLEARANCE OF 12" AT
THE LOCK/LATCH SIDE FACE OF DOOR FRAME OPENING TO ANY FIXED CONSTRUCTION
THAT WOULD BE ADJACENT TO THE FACE OF PARTITION. (B) ON THE PULL SIDE OF
DOORS: PROVIDE A MINIMUM CLEARANCE OF 18" AT THE LOCK/LATCH SIDE FACE OF
DOOR FRAME OPENING TO ANY FIXED CONSTRUCTION THAT WOULD BE ADJACENT TO
THE FACE OF PARTITION. (C) IN METAL FRAMED GYPSUM BOARD PARTITIONS
TYPICALLY ON THE PULL SIDE OF DOORS WHERE THE HINGE SIDE OF A DOOR FRAME IS
PLACED ADJACENT TO ANY FIXED CONSTRUCTION, LOCATE THE DOOR SIDE FRAME
OPENING 4" FROM THE FIXED CONSTRUCTION.
M. PROVIDE METAL BACKING PLATE AT ALL WALL MOUNTED ITEMS, SEE EQUIPMENT
PLANS AND SCHEDULES.
N. NEW SUBSURFACE FLOOR PREPARATION: THE EXISTING CONCRETE FLOOR SUB-
SURFACES RESULTING FROM THE REMOVAL OF OLD FLOOR FINISHES (I.E., CERAMIC
TILE, VCT, MASTICS, VINYL SHEETS, ABATEMENTS, CARPETING, ETC.) OR GOING OVER
CONCRETE FLOOR REPAIRS OR INFILLS SHALL BE ENTIRELY SKIM COATED TO A
SMOOTH AND LEVEL FINISH, TO BE LEVEL WITH ALL ADJACENT FLOOR SURFACES
REQUIRING EXISTING FLOOR FINISH REMOVALS AND/OR NEW FLOOR FINISHES, SUCH
THAT THE FINAL FINISHED FLOORS ARE SMOOTH AND LEVEL AND HAVE FINISH
TRANSITIONS AS SHOWN AND INTENDED. FOR BIDDING PURPOSES, FLOOR SKIM
COATING SHALL BE FIGURED AT 1/4” THICKNESS AVERAGE
O. FURRED PARTITIONS EXTEND TO STRUCTURE ABOVE, UNLESS NOTED OTHERWISE.
P. PATCH ALL ABANDONED OPENINGS IN EXISTING STRUCTURE, WHETHER CREATED OR
DISCONNECTED IN THE COURSE OF CONSTRUCTION. WHILE LOCATIONS ARE SHOWN FOR
REFERENCE, ALL LOCATIONS MAY NOT BE SHOWN.
EXISTING CONSTRUCTION
TO REMAIN
NEW PARTITION WALL
AREA NOT IN CONTRACT
MATCHLINE
FIRE EXTINGUISHER
CABINET - REFER TO
DETAIL 1/A515
SURFACE MOUNTED FIRE
EXTINGUISHER CABINET
REFER TO DETAIL 2/A515
2 HOUR FIRE &
SMOKE
SEPARATION
1 HOUR FIRE &
SMOKE
SEPARATION
2 4
1 3
NOTE: NOT ALL KEYNOTES MAY BE USED ON THIS DRAWING.
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
03 AUG 2020
ARCHITECTURAL PLAN - FIRST
FLOOR ZONE 4
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
RFR ARCH
542-18-106
A101.4
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
1/4" = 1'-0"
ARCHITECTURAL PLAN - FIRST FLOOR ZONE 4
0 2' 4' 8'
PLAN KEYNOTES
1 NEW DUCT RISER, SEE CORRESPONDING DEMOLITION, STRUCTURAL,
AND M/E/P/FP DRAWINGS.
2 NEW PIPE RISER, SEE CORRESPONDING DEMOLITION, STRUCTURAL, AND
M/E/P/FP DRAWINGS
3 MILLWORK CASEWORK ASSEMBLY WITH SINK, TYP., SEE DETAILS AND
SPECS.
4 SOLID SURFACE SILL ASSEMBLY, SEE DETAILS
5 SEE WALL TYPES FOR TYPICAL FURRING
6 ROUND FURRED ENCLOSURE ON EXISTING COLUMN. SEE DETAIL 7/A502.
7 INTERIOR COLUMN: EXTEND FURRING TO 8” ABOVE CEILING.
8 INSTALL GYPSUM BOARD ON RATED ASSEMBLY PRIOR TO FRAMING
ADJACENT PARTITIONS.
9 EXISTING 2-HOUR FIRE RATED CONSTRUCTION TO REMAIN. ANY
DEPRESSIONS OR OPENINGS THROUGH THIS BARRIER, CREATED,
ABANDONED, OR DISCOVERED IN THE COURSE OF WORK, SHALL BE
FILLED OR SEALED AS REQUIRED TO MAINTAIN RATING. SEE GENERAL
NOTES AND SPECS.
10 NEW MECHANICAL FAN UNIT TO BE INSTAILLED. REPAIR AND PATCH
ROOFING TO NEW ROOF CURB. ALL FLASHING, MEMBRANES AND
ADHESIVES ARE TO BE COMPATIBLE WITH EXISTING ROOF SYSTEM.
11 PATCH ABANDONED OPENINGS IN CONCRETE DECK. APPROX.LOCATION
TAGGED. NUMBER AND SIZE OF OPENINGS VARIES. SEE ARCHITECTURAL,
STRUCTURAL, MEPFP DRAWINGS.
12 1-HOUR FIRE RESISTANCE RATED HORIZONTAL SHAFTWALL CEILING FOR
FULL EXTENT OF ROOM. SUPPORT FROM 1-HOUR FIRE RESISTANCE
RATED WALL PARTITIONS.
13 APPROX.LOCATION OF EXISTING SLAB OPENINGS ABOVE TO BE
ABANDONED AND INFILLED, SEE STRUCTURAL, ARCHITECTURAL,
HAZMAT, AND M/E/P/FP DRAWINGS.
14 FILL ABANDONED RISER OPENINGS. SEE STRUCT.
15 APPROX.LOCATION OF RELOCATED 3" STORM RISER. RISER IS INTENDED
TO FALL WITHIN PARTITION. FURR USING PARTITION TYPE 4, SEE SHEET
A501. IF A STRUCTURAL RIB INTERFERES, LOCATE RISER IN ADJACENT
ROOM 109/112/141/146 IF REQUIRED, SEE PLUMBING AND STRUCTURAL.
16 NEW 4" AND 2" FIRE PROTECTION RISERS. SEE FIRE PROTECTION
DRAWINGS FOR DETAILS.
17 INSTALL INSULATED FURRING PARTITION TIGHT TO EXISTING RISER.
18 CHASE DIMENSIONS ARE SHOWN FOR REFERENCE ONLY. MINIMIZE
CHASE SIZE WHILE PROVIDING INSULATION PER WALL TYPES.
DUCTS/PIPES/CONDUIT BEING FURRED SHALL BE INSTALLED AS TIGHT TO
STRUCTURE AS POSSIBLE.
19 NEW ADA COMPLIANT FLOOR MOUNTED ANODIZED ALUMINUM HANDRAIL
PLAN LEGEND
PLAN GENERAL NOTES
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
PORCELAIN
TILE (PT-1)
PORCELAIN
TILE BASE
(PTB-1)
PORCELAIN
ACCENT
TILE (PT-3)
A5165
P8150
6'
- 6
" A .F
.F
A5109.B
A5109.C
A5109.A
A5200
PORCELAIN
TILE (PT-1)
PORCELAIN
TILE BASE
(PTB-1)
PORCELAIN
ACCENT
TILE (PT-3)
P8150
P9050P9050
3' - 5 1/2" 3' - 9 1/32"
6'
- 6
" A .F
.F
CT020
2'
- 1
0"
A5075
A1067
A5075
A1067A5080
P
PORCELAIN
TILE (PT-1)
PORCELAIN
TILE BASE
(PTB-1)
PORCELAIN
ACCENT
TILE (PT-3)
A5077
6'
- 6
" A .F
.F
CT020
A5109.C
A5109.A
2'
- 1
0"
A5200
A5075
PORCELAIN
TILE (PT-1)
PORCELAIN
TILE BASE
(PTB-1)
PORCELAIN
ACCENT
TILE (PT-3)
GYPSUM BOARD & METAL
FURRING INFILL AT EXISTING
WINDOW BEHIND.
U9050
P9050
6' - 10 1/8"
6'
- 6
" A .F
.F
A5109.A
A5109.C
PORCELAIN
TILE (PT-2)
PORCELAIN
TILE BASE
(PTB-2)
PORCELAIN
TILE (PT-3)
P9050
5' - 10 3/4"
6'
- 6
" A .F
.F
CT020
A5075
A1067
A5075
A1067 A5080
P
PORCELAIN
TILE (PT-2)
PORCELAIN
TILE BASE
(PTB-2)
PORCELAIN
ACCENT
TILE (PT-3)
2'
- 1
0"
6'
- 6
" A .F
.F
A5077
A5109.B
A5109.C
A5109.B
A5109.C
PORCELAIN
TILE (PT-2)
PORCELAIN
TILE BASE
(PTB-2)
PORCELAIN
ACCENT
TILE (PT-3)
P9050
U9050
P9050
U9050
P9050
5' - 2" 3' - 8 1/2" 5' - 1 3/4"
6'
- 6
" A .F
.F
WOMEN'S
RESTROOM
B02A
A5109.A
A5109.C
CT020
A5075
PORCELAIN
TILE (PT-2)
PORCELAIN
TILE BASE
(PTB-2)
U5090
A4995
P9050
U9050
A5165
5' - 7 5/8"
PORCELAIN
ACCENT
TILE (PT-3)
6'
- 6
" A .F
.F
A5109.C
A5109.A
A5200
PORCELAIN
TILE (PT-1)
PORCELAIN
TILE BASE
(PTB-1)
PORCELAIN
ACCENT
TILE (PT-3)
A5165
A4995
P9050
6'
- 6
" A .F
.F
A5090
EQEQ
PORCELAIN
TILE (PT-1)
PORCELAIN
TILE BASE
(PTB-1)
PORCELAIN
ACCENT
TILE (PT-3)
A5165
6'
- 6
" A .F
.FA5109.B
A5075 A1067
PORCELAIN
TILE (PT-1)
PORCELAIN
TILE BASE
(PTB-1)
PORCELAIN
ACCENT
TILE (PT-3)
P9050
P3000
A5077
6'
- 6
" A .F
.F
A5080
F2010 P
PORCELAIN
TILE (PT-1)
PORCELAIN
TILE BASE
(PTB-1)
PORCELAIN
ACCENT
TILE (PT-3)
P3000
6'
- 6
" A .F
.F
A5080
F2010P
PORCELAIN
TILE (PT-2)
PORCELAIN
TILE BASE
(PTB-2)
PORCELAIN
ACCENT
TILE (PT-3)
P3000
L1200
6'
- 6
" A .F
.F A5109.B
P3000
A5075
A1067
A5080
PORCELAIN
TILE (PT-2)
PORCELAIN
TILE (PT-2)
PORCELAIN
ACCENT
TILE (PT-3)
P9050
P3000
6'
- 6
" A .F
.F
A1067
A5077
PORCELAIN
TILE (PT-2)
PORCELAIN
TILE BASE
(PTB-2)
PORCELAIN
ACCENT
TILE (PT-3)
A5165
6'
- 6
" A .F
.FA5109.A
A5109.C
A5090
A5200
PORCELAIN
TILE (PT-2)
PORCELAIN
TILE BASE
(PTB-2)
PORCELAIN
ACCENT
TILE(PT-3)
A5165
P9050
6'
- 6
" A .F
.F
2' - 0"
2'
- 2
4"
M1840
3/4" 2' - 0" 1" 6' - 5"
F2000
F3200
F2000 F2000
CT030
F0410
TYP.
M1801
TYP.
F0275
TYP.
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
03 AUG 2020
INTERIOR ELEVATIONS RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
RFR ARCH
542-18-106
A414
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
1/2" = 1'-0"
Room B02 - East 1/2" = 1'-0"
Room B02 - North
1/2" = 1'-0"
Room B02 - South 1/2" = 1'-0"
Men's Restroom B02 - West
1/2" = 1'-0"
Room B02A - East 1/2" = 1'-0"
Room B02A - North
1/2" = 1'-0"
Room B02A - South 1/2" = 1'-0"
Women's Restroom B02A - West
1/2" = 1'-0"
Toilet 103, 204 - East 1/2" = 1'-0"
Toilet 103, 204 - North
1/2" = 1'-0"
Toilet 103, 204 - South 1/2" = 1'-0"
Toilet 103, 204 - West
1/2" = 1'-0"
Toilet 104, 205 - East 1/2" = 1'-0"
Toilet 104, 205 - North
1/2" = 1'-0"
Toilet 104, 205 - South 1/2" = 1'-0"
Toilet 104, 205 - West
0 1' 2' 4'0 1' 2' 4'0 1' 2' 4'0 1' 2' 4'
0 1' 2' 4'0 1' 2' 4'0 1' 2' 4'0 1' 2' 4'
0 1' 2' 4'0 1' 2' 4'0 1' 2' 4' 0 1' 2' 4'
0 1' 2' 4'0 1' 2' 4'0 1' 2' 4'0 1' 2' 4'
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
ADDENDUM 1 03 AUG 2020
1/2" = 1'-0"
215A Nurse Triage - East
1/2" = 1'-0"
215A Nurse Triage - West 1/2" = 1'-0"
215A Nurse Triage - South
1/2" = 1'-0"
215A Nurse Triage - North
E
C
F E
C F0275
E0220
M1801
A1015
F3200
A5145
A5145
F0420
SCHED. WALL BASE
E0220
A1015
F0275
F2000
M1801
P
D P
F0305 F0305 F0420F0420
A
/7 A430
A
/5 A430
PSYCH/SOCIAL
CONSULT
OFFICE
F0420
F0420
F0305
F0305
E0220
A1015M1801
ACT-1
9' - 0"
ACT-1
9' - 0"
PSYCH/SOCIAL
CONSULT
OFFICE
PRIMARY
CARE EXAM
ROOM
/12 A430
A
A
/10 A430
U1001 F0210
M9025
F0340
M4116
F2010
M4100
M4200
A5180
ACT-1
9' - 0"
PRIMARY
CARE EXAM
ROOM
M4116
M9025
F0210F2010
M4200
PP
U1004
U1802
D2525
M4116
A1132
M4200
P P
M4100
F2010
U1001
D P
M9025
SCHED WALL BASE
D2525
A5080
A5077
A5075
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
03 AUG 2020
TYPICAL ROOMS RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
RFR ARCH
542-18-106
A430
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
1/2" = 1'-0"
Typical Office - East 1/2" = 1'-0"
Typical Office - North
1/2" = 1'-0"
Typical Office - South 1/2" = 1'-0"
Typical Office - West
1/2" = 1'-0"
Floor Plan - Typical Office 1/2" = 1'-0"
Ceiling Plan - Typical Office
Typical Office Axon
1/2" = 1'-0"
Floor Plan - Typical Primary Care Exam Room 1/2" = 1'-0"
Ceiling Plan - Typical Primary Care Exam Room
1/2" = 1'-0"
Typical Primary Care Exam Room - East 1/2" = 1'-0"
Typical Primary Care Exam Room - North
1/2" = 1'-0"
Typical Primary Care Exam Room - South 1/2" = 1'-0"
Typical Primary Care Exam Room - West
Typical Primary Care Exam Room Axon
0 1' 2' 4'0 1' 2' 4'0 1' 2' 4'0 1' 2' 4'
0 1' 2' 4'0 1' 2' 4'0 1' 2' 4'0 1' 2' 4'
0 1' 2' 4'0 1' 2' 4'0 1' 2' 4'0 1' 2' 4'
Revisions: Date:
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
ADDENDUM 1 03 AUG 2020
MENTAL
HEALTH EXAM
ROOM
U1001 F0210
M9025
F0340
/5 A431
A
A
/7 A431
M4116
F2010
M4200 M4100
ACT-1
9' - 0"
MENTAL
HEALTH EXAM
ROOM
M9025
F2010
M4116
P
P F0210
M9025U1001
D P
SCHED.
WALL BASE
A5180
PP
U1004
U1802
D2525
F0340
A1132
M4200M4116
M4100
F2010
A5075
A5077
A5080
BIO-FEEDBACK
DR. PEKALA
F0420 F0420
F0305
F0305
F0265
F0275E0224
A5145A5145
A1015M1801
/12 A431
/10 A431
A 1/
A
BIO-FEEDBACK
DR. PEKALA
F0265
F0305
F0265
F0305
P
F0420 F0420 F0305
E0224
F0275
F3200
F0265
F0305
F0275
E0224
M1801
A1015
F2000P
E0224
F0275
F0420
A1015
M1801
P
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
03 AUG 2020
TYPICAL ROOMS RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
RFR ARCH
542-18-106
A431
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
1/2" = 1'-0"
Floor Plan - Typical Mental Health Exam 1/2" = 1'-0"
Ceiling Plan - Typical Mental Health Exam
1/2" = 1'-0"
Mental Health Exam - East 1/2" = 1'-0"
Mental Health Exam - North
1/2" = 1'-0"
Mental Health Exam - South 1/2" = 1'-0"
Mental Health Exam - West
Mental Health Exam Axon
1/2" = 1'-0"
Floor Plan - Typical Bio-Feedback 1/2" = 1'-0"
Ceiling Plan - Typical Bio-Feedback
1/2" = 1'-0"
Typical Bio-Feedback - East 1/2" = 1'-0"
Typical Bio-Feedback - North
1/2" = 1'-0"
Typical Bio-Feedback - South 1/2" = 1'-0"
Typical Bio-Feedback - West
Typical Bio-Feedback Axon
SCHED.WALL BASE
SCHED. WALL BASE
0 1' 2' 4'0 1' 2' 4'0 1' 2' 4'0 1' 2' 4'
0 1' 2' 4'0 1' 2' 4'0 1' 2' 4'0 1' 2' 4'
0 1' 2' 4'0 1' 2' 4'0 1' 2' 4'0 1' 2' 4'
Revisions: Date:
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
ADDENDUM 1 03 AUG 2020
SE
CT
IO
N
VI
EW
PL
AN
V
IE
W
SE
CT
IO
N
VE
IW
SEE SCHEDULE BELOW FOR PARTITION WIDTH
LINE OF CONCRETE SLAB
METAL STUD AT 16" ON CENTER.
METAL RUNNER. SECURE TO
CONCRETE SLAB 24" ON CENTER.
(1) LAYER OF 5/8" TYPE X GYPSUM BOARD
ON BOTH SIDES OF METAL STUDS (USE
MOISTURE RESISTANT GYPSUM BOARD IF
TO RECEIVE CERAMIC TILE ).
3" SOUND ATTENUATION BATT
INSULATION
LINE OF CEILING
NON-RATED PARTITION
STUD WIDTH PARTITION
WIDTH
3 5/8" 5 1/2"
TAG
1 HR FIRE-RATED PARTITION
STUD WIDTH PARTITION
WIDTH
3 5/8" 4 7/8"
TAG
FURRING PARTITION
STUD WIDTH PARTITION
WIDTH
3 5/8" 4 1/4"
TAG
PLUMBING PARTITION
STUD WIDTH PARTITION
WIDTH
3 5/8" 1'-3 1/4"
TAG
SEE SCHEDULE BELOW FOR PARTITION WIDTH
METAL STUD AT 16" ON CENTER OR
FURRING CHANNEL, SEE SCHEDULE
BELOW FOR DETAILS.
METAL RUNNER. SECURE TO
CONCRETE SLAB 24" ON CENTER.
(1) LAYER OF 5/8" TYPE X GYPSUM BOARD
AT EXPOSED SIDE OF METAL STUDS.
2 ROWS OF METAL STUDS AT 16" ON CENTER.
METAL RUNNER. SECURE TO
CONCRETE SLAB 24" ON CENTER.
(1) LAYER OF 5/8" TYPE X GYPSUM BOARD
AT EXPOSED SIDES OF METAL STUDS.
3" SOUND ATTENUATION BATT
INSULATION.
U419
ACOUSTICAL SEALANT AT BOTH SIDES
ACOUSTICAL SEALANT AT BOTH SIDES ACOUSTICAL SEALANT AT BOTH SIDES
SHAFT PARTITION
STUD WIDTH PARTITION
WIDTH
TAG
METAL C-H STUD FRAMING AT 24" MAX
OC.
METAL J RUNNER. SECURE TO
CONCRETE SLAB 24" ON CENTER.
(1) LAYER 5/8" TYPE "X" GYPSUM BOARD.
UL LISTED FIRE RESISTIVE JOINT
SYSTEM
1" GYPSUM LINER PANEL. FRICTION FIT.
FIRE
RATING
UL DESIGN
NUMBER
1 1/2" HAT
CHANNEL 2 1/8"
FIRE
RATING
STC
RATING
UL DESIGN
NUMBER
STC
RATING
STC
RATING
STC
RATING
STC
RATING
FIRE
RATING
UL DESIGN
NUMBER
FIRE
RATING
UL DESIGN
NUMBER
FIRE
RATING
UL DESIGN
NUMBER
4" 4 5/8"
1 HR
FIRE
U415
SYSTEM A
1 3A 4
4B
5 6
4A 3 5/8"
UL LISTED FIRE RESISTIVE JOINT
SYSTEM
CROSS CONNECTION STUDS AT 16" OC
LOCATED HORIZONTALLY 48" OC MAX.
CROSS CONNECTION STUDS AT 16" OC
LOCATED HORIZONTALLY 48" OC MAX.
CONCRETE PAN STRUCTURE ABOVE -
PARTITION TO ATTACH TO UNDERSIDE
OF RIBS AND DECK CONTOURS
LINE OF CEILING
TY
P.8"
(1) ADD'L LAYER OF 5/8" TYPE X GYPSUM
BOARD ONE SIDE ONLY AT STC-50
PARTITIONS. (USE MOISTURE RESISTANT
GYPSUM BOARD IF TO RECEIVE CERAMIC
TILE ).
MASONRY - EXTERIOR WALL
STUD WIDTH PARTITION
WIDTH
1' 2 1/4"
TAG FIRE
RATING
UL DESIGN
NUMBER
2 HR
FIRE
U415
SYSTEM B
STC
RATING
LINE OF CEILING
FACE BRICK TO MATCH EXISTING
1" AIR BARRIER
2" CONTINUOUS RIGID INSULATION
VAPOR PERMEABLE AIR BARRIER
8" CMU WALL
ELEVATOR SERVICE RM PARTITION
STUD WIDTH PARTITION
WIDTH
11 7/8"
TAG FIRE
RATING
UL DESIGN
NUMBER
1 HR
FIRE
U914
STC
RATING
8" NOMINAL CMU WALL
3 5/8" METAL STUD AT 16" ON CENTER AT
PARTITION TYPE 8.
(1) LAYER OF 5/8" TYPE X GYPSUM BOARD
AT ONE SIDE OF METAL STUDS AT
PARTITION TYPE 8.
METAL RUNNER. SECURE TO CONCRETE
SLAB 24" ON CENTER.
UL LISTED FIRE RESISTIVE JOINT SYSTEM
3 5/8"
SOUND ATTENUATION INSULATION AT
PARTITION TYPE 8. THICKNESS AS
REQUIRED TO FILL STUD CAVITY.
ACOUSTICAL SEALANT
4 1/4"
3" SOUND ATTENUATION INSULATION AS
REQUIRED. NO SOUND ATTENUATION
INSULATION AT WALL TYPE 4A AND 4B.
5A
5B
5C
3 5/8"
3 5/8"
3 5/8"
2'-8 5/8"
1'-8 1/2"
1'-0 7/8"
LINE OF CONCRETE SLAB
METAL STUD AT 16" ON CENTER.
METAL RUNNER. SECURE TO
CONCRETE SLAB 24" ON CENTER.
(1) LAYER OF 5/8" TYPE X GYPSUM BOARD
ON BOTH SIDES OF METAL STUDS (USE
MOISTURE RESISTANT GYPSUM BOARD IF
TO RECEIVE CERAMIC TILE ).
LINE OF CEILING
NON-RATED PARTITION
STUD WIDTH PARTITION
WIDTH
3 5/8" 4 7/8"
TAG
ACOUSTICAL SEALANT AT BOTH SIDES
FIRE
RATING
STC
RATING
UL DESIGN
NUMBER
CONCRETE PAN STRUCTURE ABOVE -
PARTITION TO ATTACH TO UNDERSIDE
OF RIBS AND DECK CONTOURS
CONCRETE PAN STRUCTURE ABOVE -
PARTITION TO ATTACH TO UNDERSIDE
OF RIBS AND DECK CONTOURS
CONCRETE PAN STRUCTURE ABOVE -
PARTITION TO ATTACH TO UNDERSIDE
OF RIBS AND DECK CONTOURS
(1) LAYER OF 5/8" FIRE RATED GYPSUM
BOARD ON EACH SIDE. 3 5/8" METAL
STUDS AT 16" O.C.EXTEND TO
UNDERSIDE OF METAL DECK.
SEE REFLECTED CEILING PLAN FOR
CEILING FINISH.
UL LISTED FIRE RESISTIVE
JOINT SYSTEM
CONTINUOUS RUNNER AT
TOP AND BOTTOM.
POWER DRIVEN FASTENER.
WALL BASE. SEE FINISH
SCHEDULE.
CONTINUOUS RUNNER AT
BOTH TOP AND BOTTOM.
20 GA. METAL CLOSURE PLATE AS
REQUIRED. COVER TWO LOWER
DECK RIBS FASTEN AT 24" OC.
3" SOUND ATTENUATION INSULATION
AS REQUIRED TO MAINTAIN STC50
ACOUSTIC SEPARATION FROM
ADJACENT ROOM.
16 GA. LONG LEG CHANNEL FASTENED
TO CLOSURE PLATE. DO NOT SCREW
GYP. BD. TO LONG LEG CHANNEL.
EXISTING RIBBED CONCRETE
DECK
1 HR
WALL BASE. SEE FINISH SCHEDULE.
WALL BASE. SEE FINISH SCHEDULE. WALL BASE. SEE FINISH SCHEDULE. WALL BASE. SEE FINISH SCHEDULE.
WALL BASE. SEE FINISH SCHEDULE.
3" SOUND ATTENUATION BATT
INSULATION.
FURRING - EXTERIOR WALL
STUD WIDTH PARTITION
WIDTH
2 1/2" 5 3/4" UNO
TAG
METAL STUD AT 16" ON CENTER OR
FURRING CHANNEL. SEE SCHEDULE
BELOW FOR ADDITIONAL INFORMATION.
METAL RUNNER. SECURE TO
CONCRETE SLAB 24" ON CENTER.
(1) LAYER OF 5/8" TYPE X GYPSUM BOARD
AT EXPOSED SIDE OF METAL STUDS.
ACOUSTICAL SEALANT
STC
RATING
FIRE
RATING
UL DESIGN
NUMBER
WALL BASE. SEE FINISH SCHEDULE.
STRUCTURE ABOVE. PARTITION
ATTACHMENT TO FOLLOW PROFILE.
LINE OF CEILING.
SEALANT & BACKER.
MEAL DEFLECTION TRACK. FASTEN TO
STRUCTURE ABOVE.
PARTITION WIDTH UNO
3" SPRAY INSULATION ON INTERIOR
SURFACE OF EXISTING WALL (FILL
CAVITY AT TYPE 9A).
EXISTING STRUCTURE.
-4C 2 1/2" 3 1/8"
2 1/2" 3 3/4" UNO9A
WALL BASE. SEE FINISH SCHEDULE.
7 5/8"
1 HR
FIRE
U914
8A NA
LINE OF CEILING
ELEVATOR SERVICE RM PARTITION
STUD WIDTH PARTITION
WIDTH
8 1/8"
TAG FIRE
RATING
UL DESIGN
NUMBER
NA NA
STC
RATING
6" NOMINAL CMU WALL
7/8" METAL FURRING AT 16" ON CENTER
FASTENED TO CMU.
(1) LAYER OF 5/8" TYPE X GYPSUM BOARD
FASTENED TO METAL FURRING.
UL LISTED FIRE RESISTIVE JOINT SYSTEM
7/8"
ACOUSTICAL SEALANT. TYPICAL.
WALL BASE. SEE FINISH SCHEDULE.
CONTINUOUS 7/8" METAL FURRING
BACKING AT BASE. FASTEN TO CMU.
STEEL SUPPORT ANGLES ANCHORED TO
STRUCTURE. SEE STRUCT DWGS. TYPICAL.
ACOUSTICAL SEALANT AT BOTH SIDESACOUSTICAL SEALANT AT BOTH SIDES
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
03 AUG 2020
PARTITION SCHEDULE AND
DETAILS
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
RFR ARCH
542-18-106
A501
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
1" = 1'-0"
PARTITION TYPES
0 1/2' 1' 2'
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
VARIES
SEALANT AT BOTH SIDES
HM FRAME
(2) 4" X 20 GA STUDS
SEE PARTITION
TYPE
REFER TO PLANS AND DOOR
SCHEDULE FOR DOOR TYPE.
5 3/4"
2"
1/
4"
1/2" 1/2"
EQ 1 9/16" EQ
VA
RI
ES
SEALANT-BOTH SIDES
MINIMUM (3) JAMB ANCHORS.
ATTACH JAMB TABS TO DOUBLE
STUDS, TYPICAL.
FLOOR ANCHOR.
HM FRAME
(3) STUD CLIP ANCHORS PER
JAMB.
RETURN-LEG, TYP.
DOUBLE STUD, TYP.
SE
E
PA
RT
IT
IO
N
TY
PE
DOOR
EQ
9/
EQ
3/
4"
1/ 2"
1/ 2"
2"
3 1/4"
EXTERIOR INTERIOR
WALL BEYOND. REFER TO PARTITION
TYPES.
HOLLOW METAL DOOR FRAME.
8"STEEL THRESHOLD EXPANSION ANCHOR INTO
CONCRETE SLAB @ 8" O.C. (INTERIOR)
HOLLOW
METAL DOOR
SLOPE
1 15/16" 1 9/16"
5/ 8"
2"
1/2" 1/2"
VARIES
SEALANT AT BOTH SIDES
HM FRAME
(2) 4" X 20 GA STUDS
VARIES
SEE PARTITION
TYPE
REFER TO PLANS AND DOOR
SCHEDULE FOR DOOR TYPE.
4"
A
O
NL
Y
9/
/1 6"
5/8"2"
1/ 2"
1/ 2"
VA
RI
ES
SEALANT-BOTH SIDES
MINIMUM (3) JAMB ANCHORS.
ATTACH JAMB TABS TO DOUBLE
STUDS, TYPICAL.
FLOOR ANCHOR.
HM FRAME
(3) STUD CLIP ANCHORS PER
JAMB.
RETURN-LEG, TYP.
DOUBLE STUD, TYP.
VA
RI
ES
SE
E
PA
RT
IT
IO
N
TY
PE
DOOR
1 15/16" 1 15/16"
5/ 8"
2" O
R 4"
CONTINUOUS BACKER ROD
AND CAULK AT EACH SIDE.
HM FRAME
GROUT FILL FRAME.
AL
IG
N
7 5/8"
NOTE:
• COORDINATE FRAME DEPTH W/WALL
COMPONENT THICKNESS. 1" INCREMENT
ON STANDARD FRAME SIZES (4 3/4" - 8 3/4").
• COORDINATE DOOR AND FRAME WITH
COURSING OF MASONRY OPENING.
EXISTING LINTEL TO REMAIN
S E
E F
R A
M E
TY
P
E F
O R
D E
TA
IL
S
/1 6"
/1 6"
5/8"2"
ALIGN
NOTE:
• COORDINATE FRAME DEPTH W/WALL
COMPONENT THICKNESS. 1" INCREMENT ON
STANDARD FRAME SIZES (4 3/4" - 8 3/4").
• COORDINATE DOOR AND FRAME WITH
COURSING OF MASONRY OPENING.
CONTINUOUS BACKER ROD AND
SEALANT AT EACH SIDE.
GROUT FILL FRAME.
HOLLOW METAL FRAME.
MASONRY ANCHOR.
CMU WALL.
EQ
E
Q
VI
F
CONTINUOUS BACKER ROD AND
SEALANT AT EACH SIDE.
GROUT FILL FRAME.
HOLLOW METAL FRAME.
5/8" GYPSUM BOARD ON 3 5/8"
METAL STUD 16" O.C. TYP.
DOOR AS SCHEDULED
/1 6"
/1 6"
MASONRY ANCHOR.
EXISTING PLASTER TO REMAIN
CORNER BEAD TYP.
SOUND ATTENUATING INSULATION
/1 6"
/1 6"
5/8"2"
ALIGN
NOTE:
• COORDINATE FRAME DEPTH W/WALL
COMPONENT THICKNESS. 1" INCREMENT ON
STANDARD FRAME SIZES (4 3/4" - 8 3/4").
• COORDINATE DOOR AND FRAME WITH
COURSING OF MASONRY OPENING.
CONTINUOUS BACKER ROD AND
SEALANT AT EACH SIDE.
GROUT FILL FRAME.
HOLLOW METAL FRAME.
MASONRY ANCHOR.
EXISTING STRUCTURE TO REMAIN.
CORNER BEAD TYP.
(1) LAYER OF 5/8" TYPE X GYPSUM
BOARD AT EXPOSED SIDE OF METAL
STUDS.METAL STUD AT 16" ON
CENTER OR FURRING
CHANNEL. SEE SCHEDULE
BELOW FOR ADDITIONAL
INFORMATION.
3" SPRAY INSULATION ON INTERIOR
SURFACE OF EXISTING WALL (EXCEPT
AT TYPE 9A).
E Q
5/8" GYPSUM BOARD ON 3 5/8"
METAL STUD 16" O.C. TYP.
/1 6"
/1 6"
CORNER BEAD TYP.
SOUND ATTENUATING INSULATION
SEALANT-BOTH SIDES
FLOOR ANCHOR.
HM FRAME
DOUBLE STUD, TYP.
DOOR
E Q
(3) STUD CLIP ANCHORS PER
JAMB.
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
03 AUG 2020
DOOR DETAILS RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
RFR ARCH
542-18-106
A602
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
3" = 1'-0"
DOUBLE EGRESS HEADER
3" = 1'-0"
DOUBLE EGRESS JAMB
0 6" 9"3"0 6" 9"3"
3" = 1'-0"
EXTERIOR THRESHOLD
0 6" 9"3"
3" = 1'-0"
NOT USED
3" = 1'-0"
NOT USED
3" = 1'-0"
TYPICAL HEADER AT STUD WALL
3" = 1'-0"
TYPICAL JAMB AT STUD WALL
3" = 1'-0"
TYPICAL HEADER AT CMU WALL
3" = 1'-0"
TYPICAL JAMB AT CMU WALL
0 6" 9"3"0 6" 9"3"0 6" 9"3"0 6" 9"3"
3" = 1'-0"
TYPICAL JAMB AT EXISTING MASONRY WALL
3" = 1'-0"
TYPICAL JAMB AT EXISITING EXTERIOR WALL
0 6" 9"3"0 6" 9"3"
3" = 1'-0"
TYPICAL JAMB AT DEMOLISHED MASONRY WALL
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
MANUAL DROP SEAL PROVIDES 2"
OPERATING CLEARANCE (+0.5" / -1.5")
FINISHED FLOOR
NOTE: FOR ADDITIONAL STRUCTURAL
FRAMING TO SUPPORT OPERABLE
PARTITION TRACK SYSTEM. SEE
STRUCTURAL DETAIL
0.38" DIA HANGER RODS
SOUND BAFFLE AS
REQD TO MEET
STC-50
UNISTRUT NUT
SPACER LOCATED IN
REMOVABLE TRACK ONLY
TRACK
PRE-PAINTED OFF WHITE
DUAL ROTATING STEEL
REINFORCED NYLON
TROLLEY
FENDER WASHER
VINYL TOP SEAL
5 1/4"
TRACK
M
IN
8"
FINISHED
CEILING
1"
2 1/2"
BASIS OF DESIGN FOR STC-50
OPERABLE PARTITION:
MODERNFOLD ACOUSTI-SEAL 931 OR
VA APPROVED EQUAL.
ALUMINUM CURVED THRESHOLD
FILL WITH CLOSED CELL SOUNDPROOFING FOAM
DOOR GASKET
2" 1/
4" 1/
4" 2"
1/ 4"
ACOUSTICAL THRESHOLD SEAL
50 STC PRE-ENGINEERED ACOUSTICAL DOOR
JAMB ACOUSTICAL SEAL FASTENED DIRECTLY TO
THE DOOR STOP OR JAMB
HEAD ACOUSTICAL SEAL FASTENED DIRECTLY TO
THE DOOR STOP OR JAMB
HEAD VIEW
SILL VIEW
FINISHED FLOOR
FILL WITH CLOSED CELL SOUNDPROOFING FOAM
PLAN VIEW
FILL WITH CLOSED CELL SOUNDPROOFING FOAM
ACOUSTICAL THRESHOLD SEAL
JAMB ACOUSTICAL SEAL FASTENED DIRECTLY TO
THE DOOR STOP OR JAMB
50 STC PRE-ENGINEERED ACOUSTICAL DOOR TO MEET
VA SPECIFICATION'S REQUIREMENTS
(1) JAMB ANCHOR AT FLOOR (2) ADDITIONAL
JAMB ANCHORS ATTACHED TO VERT MTL
STUD AND FIRE TREATED WOOD BLOCKING
50 STC WALL - TAG 1 SIMILAR - SEE SHEET
A501 AND DETAIL 14/530 FOR WALL
TERMINATION AT BOTTOM OF STRUCTURE
FIRE TREATED WOOD BLOCKING
(1) JAMB ANCHOR AT FLOOR
VERIFY WITH MANUFACTURER
SEE DETAIL 14/A530 FOR
GLASS ASSEMBLY
FOR WOOD DOOR WITH 50 STC GLASS
SIDELIGHT. VERIFY WITH MANUFACTURER
FOR SPECIAL CONDITION DETAILS
1 1/4"
3/4"
3/4"
3 3/4"
3/4"
1 1/4"
5 1/2"
BACKER ROD AND SEALANT
3/8" FLAT HEAD SLEEVE
ANCHORS 24" O.C. MAX. TYPICAL
3/8" FLAT HEAD SLEEVE
ANCHORS 24" O.C. MAX.
TYPICAL2" 2"
1/ 4"
2" 1"
2" 1"
4" MINIMUM AIR SPACE
1/4" OPAQUE LAMINATED GLASS
PURGE PORT
SHIMS AS REQUIRED
JAMB DETAILS
AT CMU WALL
FILL WITH CLOSED CELL
SOUNDPROOFING FOAM
PROVIDE HEAVY DUTY FRAME
AS PER MAUFACTURER'S SPECIFICATIONS
SILL
HEAD
PROVIDE SHIMS, BACKER ROD AND
SOUNDROOFING SEALANT AS PER
MAUFACTURER'S SPECIFICATIONS
PROVIDE SHIMS, BACKER ROD AND
SOUNDROOFING SEALANT AS PER
MAUFACTURER'S SPECIFICATIONS
UNDERSIDE OF EXISTING
FLOOR STRUCTURE
1 1/4" 3/4" 3/4"
3 3/4" 3/4"
1 1/4"
DOUBLE DEFLECTION TRACK SYSTEM
WITH 6" LEG TOP RUNNER
ATTACH 6" LEG TOP RUNNER TO EXISTING STRUCTURE
ATTACH CAPPING TRACK TO 3 5/8"
VERTICAL METAL STUD
FILL WITH CLOSED CELL SOUNDPROOFING FOAM
AND BACKER ROD AND SEALANT
FILL VERTICAL DEFLECTION GAP
WITH SOUND BATT INSULATION
FIRE TREATED WOOD BLOCKING
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
03 AUG 2020
DOOR DETAILS RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
RFR ARCH
542-18-106
A603
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
1 1/2" = 1'-0"
OPERABLE PARTITION DETAIL
1 1/2" = 1'-0"
STC 50 DOOR DETAIL
1 1/2" = 1'-0"
GLASS ASSEMBLY DETAILS
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020