02 Hazardous 54218106_Drawings_FinalCD_013120.pdf

PDF 764 KB Posted

Attached to
Z2DA--Renovate Building 4 A + B Floors Outpatient Mental Health Clinic, Project No. 542-18-106
Solicitation number
36C24420B0003
Issued by

About this file

This solicitation package describes a federal construction contract opportunity to renovate buildings at a Department of Veterans Affairs medical center. The project involves demolishing and renovating approximately 28,000 square feet of existing space on the first and second floors and 3,000 square feet in the basement to construct an outpatient mental health clinic. The scope of work includes general construction, hazardous material abatement, and mechanical, electrical, and plumbing installations. The solicitation will be available on June 23, 2020 via SAM.gov and seeks bids for general construction as well as electrical and mechanical work. Interested Service-Disabled Veteran-Owned Small Businesses must be verified by CVE and registered in SAM to be considered for the fixed-price contract award, which is subject to FY2020 funding availability and has a performance period of 588 calendar days.

View the file

Other files

File Type Posted
Award Announcement 36C24420C0112.pdf PDF
General Decision Number PA20200083.pdf PDF
36C24420B0003 0003.pdf PDF
00 01 15 - List of Drawing Sheets - ADD-01.pdf PDF
07 Architecture.pdf PDF
36C24420B0003 Amendment 0002.pdf PDF
10 22 26.13 - Operable Partitions - ADD-01.pdf PDF
RFI LOG_542-18-106_08052020.r2.pdf PDF
Sign In Sheet no. 3 B4A B 07162020.pdf PDF
Sign In Sheet B4A B 07162020.pdf PDF
03 Structural 54218106_Drawings_ADD-01_080320.pdf PDF
A012 54218106_Drawings_FinalCD_013120.pdf PDF
08 Interiors 54218106_Drawings_ADD-01_080320.pdf PDF
07 13 52 - Modified Bituminous Sheet Waterproofing - ADD-01.pdf PDF
07 60 00 - Flashing and Sheet Metal - ADD-01.pdf PDF
01 33 23 - Shop Drawings Product Data Samples - ADD-01.pdf PDF
00 01 10 - TOC - ADD-01.pdf PDF
11 Plumbing 54218106_Drawings_ADD-01_080320.pdf PDF
ADD-01 Narrative.pdf PDF
10 21 13 - Toilet Compartments - ADD-01.pdf PDF
07 27 27 - Fluid-Applied Membrane Air Barrier Vapor Retardg - ADD-01.pdf PDF
00 General 54218106_Drawings_ADD-01_080320.pdf PDF
11 73 00 - Ceiling Mounted Patient Lift System - ADD-01.pdf PDF
36C24420B0003 Amendment 0001 - Attachment.pdf PDF
36C24420B0003 AMENDMENT 0001.pdf PDF
36C24420B0003 MAP for Site Visit.pdf PDF
04 Structural 54218106_Drawings_FinalCD_013120.pdf PDF
10 Mechanical 54218106_Drawings_FinalCD_013120.pdf PDF
06 Interiors 54218106_Drawings_FinalCD_013120.pdf PDF
09 Plumbing 54218106_Drawings_FinalCD_013120.pdf PDF
08 Fire Protection 54218106_Drawings_FinalCD_013120.pdf PDF
07 Equipment 54218106_Drawings_FinalCD_013120.pdf PDF
01 General 54218106_Drawings_FinalCD_013120.pdf PDF
05 Architectural 54218106_Drawings_FinalCD_013120.pdf PDF
11 Electrical 54218106_Drawings_FinalCD_013120.pdf PDF
03 Civil Landscape 54218106_Drawings_FinalCD_013120.pdf PDF
54218106-Spec-Vol 3_FinalCD_013120.pdf PDF
36C24420B0003.docx DOCX document
PCRA 3-2019 building 4.pdf PDF
54218106-Spec-Vol 2_FinalCD_013120.pdf PDF
54218106-Spec-Vol 1_FinalCD_013120.pdf PDF
COVID Guidelines.pdf PDF
54218106-Spec-Vol 4_FinalCD_013120.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN

1 2 3 4 5

6 7

8 9 10 11 12

AA

BB

CC

D.2D.2

E.2E.2

E.8

E.8

F.8F.8

HH

II

JJ

DD

EE

F

F

GG

6.86.2

G.5G.5

C.2 C.1C.1

0 13

CRAWL SPACE

A. REFER TO GI002 “CONSTRUCTION PERIOD SCHEDULING OF WORK – GENERAL NOTES”

REGARDING THE VA’S DISCRETION IN SELECTING WORK TO BE DONE AFTERHOURS/OFF-

HOURS.

B. REFER TO GI002 “CONSTRUCTION PERIOD SCHEDULING OF WORK – ADDITIONAL NOTES

FOR STERILE PROCESSING SERVICE (SPS)” REGARDING WORK IN, ADJACENT TO, OR THAT

MAY AFFECT SPS.

C. ESTABLISH FULL CONTAINMENT ASBESTOS ABATEMENT WORK AREAS IN ALL AREAS FOR

THE REMOVAL OF PIPE INSULATION, FLOOR TILES, MASTIC, RADIATOR HEAT SHIELD

INSULATION AND TRANSITE PANELS. MAINTAIN EGRESS PATHS. PROTECT SHAFTS FROM

CONTAMINATION. PHASE ABATEMENT WORK AS REQUIRED. USE SEPARATION BARRIERS AS

REQUIRED.

D. INSTALL HEPA EXHAUST UNITS IN WORK AREAS WITH EXHAUST DIRECTED OUT THROUGH

WINDOWS.

E. RADIATOR HEAT SHIELD INSULATION IS ASSUMED TO BE PRESENT IN ALL RADIATORS

MOUNTED IN THE WALLS. TYPICAL LOCATIONS ARE SHOWN ON THE ASBESTOS

ABATEMENT PLANS. REMOVE ALL RADIATORS AND HEAT SHIELDS IN THE PROJECT AREAS.

F. ASBESTOS PIPE INSULATION IS ENCLOSED INSIDE WALL PIPE CHASES AND ABOVE PLASTER

CEILINGS. REFER TO THE MECHANICAL PIPING DEMO PLANS FOR THE APPROXIMATE

LOCATIONS. REMOVE ALL PIPE INSULATION IN CHASES AND ABOVE PLASTER CEILINGS IN

THE PROJECT AREAS.

G. CONTRACTOR SHALL KEEP DAILY LOG OF NUMBER OF LINEAR FEET OF PIPE ABATED OF

EACH SIZE, AND NUMBER OF JOINTS ABATED.

AREA DESCRIPTION QUANTITY

BASEMENT

BASEMENT

FIRST FLOOR

FIRST FLOOR

SECOND FLOOR

BASEMENT,

FIRST AND SECOND

FLOORS

FLOOR TILES AND MASTIC

CARPET OVER RESIDUAL MASTIC

FLOOR TILES AND MASTIC

TRANSITE CEILING PANELS

FLOOR TILES AND MASTIC

3" AND UNDER PIPE INSULATION

2,025 SF

2,428 SF

10,021 SF

1,250 SF

10,560 SF

8,000 LF + 400 PIPE JOINTS

14 SF

ELECTRICAL

PANELS

XXX

202 SF

STORAGE

B05

193 SF

STORAGE

B05A

STAIR

173 SF

LOCKERS/

SUIT-UP

B07C

65 SF

TOILET /

SHOWER

B07B

213 SF

DECONTAMINATION

ROOM

B07L

45 SF

ANTE ROOM

B07M

39 SF

BUILDING

HOUSEKEEPING

B14A

27 SF

HOUSEKEEPING

AIDS CLOSET

B07A

290 SF

CLEAN

SHIP/REC

B07H

CLEAN SHIP /

REC

B07H

129 SF

OFFICE

B07K

30 SF

ELECTRICAL

CLOSET

B071

STAIR

230 SF

WOMENS

B08

89 SF

STAFF

WOMENS

BATHROOM

B08A

123 SF

STAFF MENS

BATHROOM/

LOCKERS

B14B

85 SF

ELEVATOR

SERVICE

ROOM

B16A

166 SF

PRIVACY

OFFICER

OFFICE

B12C

951 SF

WORKSHOP

B11

851 SF

BANK

B12

159 SF

STORAGE

B12E

120 SF

STORAGE

B10

122 SF

CLOSET

B09

1031 SF

CORRIDOR

B00W

118 SF

CLEAN STORE

ROOM

B07F

309 SF

MECHANICAL

ROOM

B07G

132 SF

STORAGE

B11A

175 SF

OFFICE

B11B

201 SF

PROCESSING /

PREP /

STERILIZATION

B07

422 SF

STORAGE

B07

167 SF

OFFICE

B12B

244 SF

OFFICE

B12A

110 SF

MECHANICAL

ROOM

B12D

426 SF

CORRIDOR

B00E

128 SF

MECHANICAL

ROOM

SUB1-4

1003 SF

CUBICLES

B02

106 SF

CHIEF HIMS

OFFICE

B02C

111 SF

PIMS

SUPPORT

OFFICE

B02B

67 SF

LOBBY

B02

500 SF

CUBICLES

B02A

91 SF

STORAGE

B02E

546 SF

CUBICLES

B02F

185 SF

SW RENE

OFFICE

B02

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked Drawn

VA FORM 08-6231

FULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

31 JAN 2020

BASEMENT ASBESTOS

ABATEMENT PLAN

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

DB/1SSH BAC

542-18-106

HA100

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

1/8" = 1'-0"

BASEMENT ASBESTOS ABATEMENT PLAN

GENERAL NOTES

LOCATIONS AND QUANTITIES OF ASBESTOS MATERIALS

KEYNOTES

1 REMOVE FLOOR TILES AND MASTIC.

2 REMOVE CARPET AND RESIDIUAL FLOOR MASTIC.

3 REMOVE PIPE CHASE TO ACCESS AND REMOVE PIPE

INSULATION (TYPICAL LOCATIONS).

4 REMOVE CEILINGS TO ACCESS AND REMOVE PIPE INSULATION

(TYPICAL LOCATIONS).

5 REMOVE ALL RADIATORS AND RADIATOR HEAT SHIELD

INSULATION (TYPICAL LOCATIONS).

6 REMOVE TRANSITE CEILING PANELS.

7 LOCATION OF PERSONNEL DECONTAMINATION FACILITY.

8 LOCATION OF WASTE AND EQUIPMENT DECONTAMINATION

FACILITY.

9 PATH OF WASTE REMOVAL.

10 REMOVE RESIDUAL FLOOR MASTIC

11 PHASE SEPARATION BARRIER. PLACE DECONTAMINATION

FACILITY ON EITHER SIDE DEPENDING ON PHASE.

0 4' 8' 16'

Revisions: Date:

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

M

1 2 3 4 5

6 7

8 9 10 11 12

AA

BB

CC

D.2D.2

E.2E.2

E.8

E.8

F.8F.8

HH

II

JJ

DD

EE

F

F

GG

6.86.2

G.5G.5

C.2 C.1C.1

0 13

ROOF ROOF

1 1

5 5

5 5

5 5

5 5

1 1

1 1

3 5

1 11

7 8

A. REFER TO GI002 “CONSTRUCTION PERIOD SCHEDULING OF WORK – GENERAL NOTES”

REGARDING THE VA’S DISCRETION IN SELECTING WORK TO BE DONE AFTERHOURS/OFF-

HOURS.

B. REFER TO GI002 “CONSTRUCTION PERIOD SCHEDULING OF WORK – ADDITIONAL NOTES

FOR STERILE PROCESSING SERVICE (SPS)” REGARDING WORK IN, ADJACENT TO, OR THAT

MAY AFFECT SPS.

C. ESTABLISH FULL CONTAINMENT ASBESTOS ABATEMENT WORK AREAS IN ALL AREAS FOR

THE REMOVAL OF PIPE INSULATION, FLOOR TILES, MASTIC, RADIATOR HEAT SHIELD

INSULATION AND TRANSITE PANELS. MAINTAIN EGRESS PATHS. PROTECT SHAFTS FROM

CONTAMINATION. PHASE ABATEMENT WORK AS REQUIRED. USE SEPARATION BARRIERS AS

REQUIRED.

D. INSTALL HEPA EXHAUST UNITS IN WORK AREAS WITH EXHAUST DIRECTED OUT THROUGH

WINDOWS.

E. RADIATOR HEAT SHIELD INSULATION IS ASSUMED TO BE PRESENT IN ALL RADIATORS

MOUNTED IN THE WALLS. TYPICAL LOCATIONS ARE SHOWN ON THE ASBESTOS

ABATEMENT PLANS. REMOVE ALL RADIATORS AND HEAT SHIELDS IN THE PROJECT AREAS.

F. ASBESTOS PIPE INSULATION IS ENCLOSED INSIDE WALL PIPE CHASES AND ABOVE PLASTER

CEILINGS. REFER TO THE MECHANICAL PIPING DEMO PLANS FOR THE APPROXIMATE

LOCATIONS. REMOVE ALL PIPE INSULATION IN CHASES AND ABOVE PLASTER CEILINGS IN

THE PROJECT AREAS.

G. CONTRACTOR SHALL KEEP DAILY LOG OF NUMBER OF LINEAR FEET OF PIPE ABATED OF

EACH SIZE, AND NUMBER OF JOINTS ABATED.

AREA DESCRIPTION QUANTITY

BASEMENT

BASEMENT

FIRST FLOOR

FIRST FLOOR

SECOND FLOOR

BASEMENT,

FIRST AND SECOND

FLOORS

FLOOR TILES AND MASTIC

CARPET OVER RESIDUAL MASTIC

FLOOR TILES AND MASTIC

TRANSITE CEILING PANELS

FLOOR TILES AND MASTIC

3" AND UNDER PIPE INSULATION

2,025 SF

2,428 SF

10,021 SF

1,250 SF

10,560 SF

8,000 LF + 400 PIPE JOINTS

OFFICE

120K

PATIENT

ROOM

120A

PATIENT

ROOM

120J

PATIENT

ROOM

126A

PATIENT

ROOM

126B

PATIENT

ROOM

126J

PATIENT

ROOM

126C

PATIENT

ROOM

PATIENT

ROOM

114D

PATIENT

ROOM

CORRIDOR

CORRIDOR

STORAGE

DAY ROOM

120D

PATIENT

LAUNDRY

ROOM

MEN'S

BATHROOM

STAFF BED

ROOM

STAIR

DR'S OFFICE

PSYCH

NURSE'S

OFFICE

123A

CASE

MANAGER

OFFICE

LOBBY

100A

DIRECTOR'S

OFFICE

OFFICE

LINEN

STORAGE

BATHROOM

101A

WOMEN'S

SHOWER

105A

MEN'S

SHOWER

MEN'S

BATHROOM

BATHROOM

CLOSET

CLOSET

115B

CLOSET

115A

CLOSET

DINING ROOM

113A

STORAGE

113B

BATHROOM

110B

OFFICE

CLOSET

110A

STAIR

PATIENT

LAUNDRY

ROOM

ADMIN OFFICE

114A

UNISEX

BATHROOM

114B

BATHROOM

114C

CORRIDOR

CORRIDOR

CORRIDOR

DAY ROOM

126D

ELEVATOR

CORRIDOR

ELECTRICAL

PANELS

CLOSET

121A

CLOSET

ELECTRICAL

PANELS

MEN'S

SHOWER

PATIENT

ROOM

120H

PATIENT

ROOM

120G

PATIENT

ROOM

120F

PATIENT

ROOM

120E

PATIENT

ROOM

120B

PATIENT

ROOM

120C

PATIENT

ROOM

126H

PATIENT

ROOM

126G

PATIENT

ROOM

126F

PATIENT

ROOM

126E

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked Drawn

VA FORM 08-6231

FULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

31 JAN 2020

FIRST FLOOR ASBESTOS

ABATEMENT PLAN

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

DB/1SSH BAC

542-18-106

HA101

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

1/8" = 1'-0"

FIRST FLOOR ASBESTOS ABATEMENT PLAN

GENERAL NOTES

LOCATIONS AND QUANTITIES OF ASBESTOS MATERIALS

KEYNOTES

1 REMOVE FLOOR TILES AND MASTIC.

2 REMOVE CARPET AND RESIDIUAL FLOOR MASTIC.

3 REMOVE PIPE CHASE TO ACCESS AND REMOVE PIPE

INSULATION (TYPICAL LOCATIONS).

4 REMOVE CEILINGS TO ACCESS AND REMOVE PIPE INSULATION

(TYPICAL LOCATIONS).

5 REMOVE ALL RADIATORS AND RADIATOR HEAT SHIELD

INSULATION (TYPICAL LOCATIONS).

6 REMOVE TRANSITE CEILING PANELS.

7 LOCATION OF PERSONNEL DECONTAMINATION FACILITY.

8 LOCATION OF WASTE AND EQUIPMENT DECONTAMINATION

FACILITY.

9 PATH OF WASTE REMOVAL.

10 REMOVE RESIDUAL FLOOR MASTIC

11 PHASE SEPARATION BARRIER. PLACE DECONTAMINATION

FACILITY ON EITHER SIDE DEPENDING ON PHASE.

0 4' 8' 16'

Revisions: Date:

1 2 3 4 5

6 7

8 9 10 11 12

AA

BB

CC

D.2D.2

E.2E.2

E.8

E.8

F.8F.8

HH

II

JJ

DD

EE

F

F

GG

6.86.2

G.5G.5

C.2 C.1C.1

0 13

ROOF ROOF

ROOF

A. REFER TO GI002 “CONSTRUCTION PERIOD SCHEDULING OF WORK – GENERAL NOTES”

REGARDING THE VA’S DISCRETION IN SELECTING WORK TO BE DONE AFTERHOURS/OFF-

HOURS.

B. REFER TO GI002 “CONSTRUCTION PERIOD SCHEDULING OF WORK – ADDITIONAL NOTES

FOR STERILE PROCESSING SERVICE (SPS)” REGARDING WORK IN, ADJACENT TO, OR THAT

MAY AFFECT SPS.

C. ESTABLISH FULL CONTAINMENT ASBESTOS ABATEMENT WORK AREAS IN ALL AREAS FOR

THE REMOVAL OF PIPE INSULATION, FLOOR TILES, MASTIC, RADIATOR HEAT SHIELD

INSULATION AND TRANSITE PANELS. MAINTAIN EGRESS PATHS. PROTECT SHAFTS FROM

CONTAMINATION. PHASE ABATEMENT WORK AS REQUIRED. USE SEPARATION BARRIERS AS

REQUIRED.

D. INSTALL HEPA EXHAUST UNITS IN WORK AREAS WITH EXHAUST DIRECTED OUT THROUGH

WINDOWS.

E. RADIATOR HEAT SHIELD INSULATION IS ASSUMED TO BE PRESENT IN ALL RADIATORS

MOUNTED IN THE WALLS. TYPICAL LOCATIONS ARE SHOWN ON THE ASBESTOS

ABATEMENT PLANS. REMOVE ALL RADIATORS AND HEAT SHIELDS IN THE PROJECT AREAS.

F. ASBESTOS PIPE INSULATION IS ENCLOSED INSIDE WALL PIPE CHASES AND ABOVE PLASTER

CEILINGS. REFER TO THE MECHANICAL PIPING DEMO PLANS FOR THE APPROXIMATE

LOCATIONS. REMOVE ALL PIPE INSULATION IN CHASES AND ABOVE PLASTER CEILINGS IN

THE PROJECT AREAS.

G. CONTRACTOR SHALL KEEP DAILY LOG OF NUMBER OF LINEAR FEET OF PIPE ABATED OF

EACH SIZE, AND NUMBER OF JOINTS ABATED.

AREA DESCRIPTION QUANTITY

BASEMENT

BASEMENT

FIRST FLOOR

FIRST FLOOR

SECOND FLOOR

BASEMENT,

FIRST AND SECOND

FLOORS

FLOOR TILES AND MASTIC

CARPET OVER RESIDUAL MASTIC

FLOOR TILES AND MASTIC

TRANSITE CEILING PANELS

FLOOR TILES AND MASTIC

3" AND UNDER PIPE INSULATION

2,025 SF

2,428 SF

10,021 SF

1,250 SF

10,560 SF

8,000 LF + 400 PIPE JOINTS

ROOF ROOF

ROOF

STORAGE

214H

PT SAFETY

OFFICE

214A

QI/MH OFFICE

214B

QI/PCS

OFFICE

214C

WOMEN'S

BATHROOM

STAIR

CLOSET

SUPPORT

OFFICE

STORAGE

CONFERENCE

ROOM

BREAK ROOM

210A

STORAGE

208B

OFFICE

207C

OFFICE

207D

OFFICE

207J

OFFICE

207F

NURSES

OFFICE

207B

STORAGE

MRSA OFFICE

SUPPORT

OFFICE

STORAGE

STAIRS

MEN'S

BATHROOM

RISK

MANAGER

OFFICE

207K

STORAGE

(NEURO)

207G

WAITING

ROOM

207H

INFECTION

CONTROL

OFFICE

207A

SAFETY

OFFICE

TRAINING

ROOM

BATHROOM

200B

DIRECTOR QI

OFFICE

220B

WAITING

ROOM

SUPPORT

OFFICE

220A

SUPPORT

OFFICE

SUPPORT

OFFICE

STORAGE

SAFETY

MANAGERS

OFFICE

214D

CLOSET

217A

QI PC OFFICE

214E

QI GEC

OFFICE

214F

STORAGE

214G

ELECTRICAL

PANELS

210A

ELECTRICAL

PANELS

207I

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked Drawn

VA FORM 08-6231

FULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

31 JAN 2020

SECOND FLOOR ASBESTOS

ABATEMENT PLAN

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

DB/1SSH BAC

542-18-106

HA102

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

1/8" = 1'-0"

SECOND FLOOR ASBESTOS ABATEMENT PLAN

GENERAL NOTES

LOCATIONS AND QUANTITIES OF ASBESTOS MATERIALS

KEYNOTES

1 REMOVE FLOOR TILES AND MASTIC.

2 REMOVE CARPET AND RESIDIUAL FLOOR MASTIC.

3 REMOVE PIPE CHASE TO ACCESS AND REMOVE PIPE

INSULATION (TYPICAL LOCATIONS).

4 REMOVE CEILINGS TO ACCESS AND REMOVE PIPE INSULATION

(TYPICAL LOCATIONS).

5 REMOVE ALL RADIATORS AND RADIATOR HEAT SHIELD

INSULATION (TYPICAL LOCATIONS).

6 REMOVE TRANSITE CEILING PANELS.

7 LOCATION OF PERSONNEL DECONTAMINATION FACILITY.

8 LOCATION OF WASTE AND EQUIPMENT DECONTAMINATION

FACILITY.

9 PATH OF WASTE REMOVAL.

10 REMOVE RESIDUAL FLOOR MASTIC

11 PHASE SEPARATION BARRIER. PLACE DECONTAMINATION

FACILITY ON EITHER SIDE DEPENDING ON PHASE.

5 5

5 5

0 4' 8' 16'

Revisions: Date: