This solicitation package describes a federal construction contract opportunity to renovate buildings at a Department of Veterans Affairs medical center. The project involves demolishing and renovating approximately 28,000 square feet of existing space on the first and second floors and 3,000 square feet in the basement to construct an outpatient mental health clinic. The scope of work includes general construction, hazardous material abatement, and mechanical, electrical, and plumbing installations. The solicitation will be available on June 23, 2020 via SAM.gov and seeks bids for general construction as well as electrical and mechanical work. Interested Service-Disabled Veteran-Owned Small Businesses must be verified by CVE and registered in SAM to be considered for the fixed-price contract award, which is subject to FY2020 funding availability and has a performance period of 588 calendar days.
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DN
1 2 3 4 5
6 7
8 9 10 11 12
AA
BB
CC
D.2D.2
E.2E.2
E.8
E.8
F.8F.8
HH
II
JJ
DD
EE
F
F
GG
6.86.2
G.5G.5
C.2 C.1C.1
0 13
CRAWL SPACE
A. REFER TO GI002 “CONSTRUCTION PERIOD SCHEDULING OF WORK – GENERAL NOTES”
REGARDING THE VA’S DISCRETION IN SELECTING WORK TO BE DONE AFTERHOURS/OFF-
HOURS.
B. REFER TO GI002 “CONSTRUCTION PERIOD SCHEDULING OF WORK – ADDITIONAL NOTES
FOR STERILE PROCESSING SERVICE (SPS)” REGARDING WORK IN, ADJACENT TO, OR THAT
MAY AFFECT SPS.
C. ESTABLISH FULL CONTAINMENT ASBESTOS ABATEMENT WORK AREAS IN ALL AREAS FOR
THE REMOVAL OF PIPE INSULATION, FLOOR TILES, MASTIC, RADIATOR HEAT SHIELD
INSULATION AND TRANSITE PANELS. MAINTAIN EGRESS PATHS. PROTECT SHAFTS FROM
CONTAMINATION. PHASE ABATEMENT WORK AS REQUIRED. USE SEPARATION BARRIERS AS
REQUIRED.
D. INSTALL HEPA EXHAUST UNITS IN WORK AREAS WITH EXHAUST DIRECTED OUT THROUGH
WINDOWS.
E. RADIATOR HEAT SHIELD INSULATION IS ASSUMED TO BE PRESENT IN ALL RADIATORS
MOUNTED IN THE WALLS. TYPICAL LOCATIONS ARE SHOWN ON THE ASBESTOS
ABATEMENT PLANS. REMOVE ALL RADIATORS AND HEAT SHIELDS IN THE PROJECT AREAS.
F. ASBESTOS PIPE INSULATION IS ENCLOSED INSIDE WALL PIPE CHASES AND ABOVE PLASTER
CEILINGS. REFER TO THE MECHANICAL PIPING DEMO PLANS FOR THE APPROXIMATE
LOCATIONS. REMOVE ALL PIPE INSULATION IN CHASES AND ABOVE PLASTER CEILINGS IN
THE PROJECT AREAS.
G. CONTRACTOR SHALL KEEP DAILY LOG OF NUMBER OF LINEAR FEET OF PIPE ABATED OF
EACH SIZE, AND NUMBER OF JOINTS ABATED.
AREA DESCRIPTION QUANTITY
BASEMENT
BASEMENT
FIRST FLOOR
FIRST FLOOR
SECOND FLOOR
BASEMENT,
FIRST AND SECOND
FLOORS
FLOOR TILES AND MASTIC
CARPET OVER RESIDUAL MASTIC
FLOOR TILES AND MASTIC
TRANSITE CEILING PANELS
FLOOR TILES AND MASTIC
3" AND UNDER PIPE INSULATION
2,025 SF
2,428 SF
10,021 SF
1,250 SF
10,560 SF
8,000 LF + 400 PIPE JOINTS
14 SF
ELECTRICAL
PANELS
XXX
202 SF
STORAGE
B05
193 SF
STORAGE
B05A
STAIR
173 SF
LOCKERS/
SUIT-UP
B07C
65 SF
TOILET /
SHOWER
B07B
213 SF
DECONTAMINATION
ROOM
B07L
45 SF
ANTE ROOM
B07M
39 SF
BUILDING
HOUSEKEEPING
B14A
27 SF
HOUSEKEEPING
AIDS CLOSET
B07A
290 SF
CLEAN
SHIP/REC
B07H
CLEAN SHIP /
REC
B07H
129 SF
OFFICE
B07K
30 SF
ELECTRICAL
CLOSET
B071
STAIR
230 SF
WOMENS
B08
89 SF
STAFF
WOMENS
BATHROOM
B08A
123 SF
STAFF MENS
BATHROOM/
LOCKERS
B14B
85 SF
ELEVATOR
SERVICE
ROOM
B16A
166 SF
PRIVACY
OFFICER
OFFICE
B12C
951 SF
WORKSHOP
B11
851 SF
BANK
B12
159 SF
STORAGE
B12E
120 SF
STORAGE
B10
122 SF
CLOSET
B09
1031 SF
CORRIDOR
B00W
118 SF
CLEAN STORE
ROOM
B07F
309 SF
MECHANICAL
ROOM
B07G
132 SF
STORAGE
B11A
175 SF
OFFICE
B11B
201 SF
PROCESSING /
PREP /
STERILIZATION
B07
422 SF
STORAGE
B07
167 SF
OFFICE
B12B
244 SF
OFFICE
B12A
110 SF
MECHANICAL
ROOM
B12D
426 SF
CORRIDOR
B00E
128 SF
MECHANICAL
ROOM
SUB1-4
1003 SF
CUBICLES
B02
106 SF
CHIEF HIMS
OFFICE
B02C
111 SF
PIMS
SUPPORT
OFFICE
B02B
67 SF
LOBBY
B02
500 SF
CUBICLES
B02A
91 SF
STORAGE
B02E
546 SF
CUBICLES
B02F
185 SF
SW RENE
OFFICE
B02
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
31 JAN 2020
BASEMENT ASBESTOS
ABATEMENT PLAN
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
DB/1SSH BAC
542-18-106
HA100
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
1/8" = 1'-0"
BASEMENT ASBESTOS ABATEMENT PLAN
GENERAL NOTES
LOCATIONS AND QUANTITIES OF ASBESTOS MATERIALS
KEYNOTES
1 REMOVE FLOOR TILES AND MASTIC.
2 REMOVE CARPET AND RESIDIUAL FLOOR MASTIC.
3 REMOVE PIPE CHASE TO ACCESS AND REMOVE PIPE
INSULATION (TYPICAL LOCATIONS).
4 REMOVE CEILINGS TO ACCESS AND REMOVE PIPE INSULATION
(TYPICAL LOCATIONS).
5 REMOVE ALL RADIATORS AND RADIATOR HEAT SHIELD
INSULATION (TYPICAL LOCATIONS).
6 REMOVE TRANSITE CEILING PANELS.
7 LOCATION OF PERSONNEL DECONTAMINATION FACILITY.
8 LOCATION OF WASTE AND EQUIPMENT DECONTAMINATION
FACILITY.
9 PATH OF WASTE REMOVAL.
10 REMOVE RESIDUAL FLOOR MASTIC
11 PHASE SEPARATION BARRIER. PLACE DECONTAMINATION
FACILITY ON EITHER SIDE DEPENDING ON PHASE.
0 4' 8' 16'
Revisions: Date:
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
M
1 2 3 4 5
6 7
8 9 10 11 12
AA
BB
CC
D.2D.2
E.2E.2
E.8
E.8
F.8F.8
HH
II
JJ
DD
EE
F
F
GG
6.86.2
G.5G.5
C.2 C.1C.1
0 13
ROOF ROOF
1 1
5 5
5 5
5 5
5 5
1 1
1 1
3 5
1 11
7 8
A. REFER TO GI002 “CONSTRUCTION PERIOD SCHEDULING OF WORK – GENERAL NOTES”
REGARDING THE VA’S DISCRETION IN SELECTING WORK TO BE DONE AFTERHOURS/OFF-
HOURS.
B. REFER TO GI002 “CONSTRUCTION PERIOD SCHEDULING OF WORK – ADDITIONAL NOTES
FOR STERILE PROCESSING SERVICE (SPS)” REGARDING WORK IN, ADJACENT TO, OR THAT
MAY AFFECT SPS.
C. ESTABLISH FULL CONTAINMENT ASBESTOS ABATEMENT WORK AREAS IN ALL AREAS FOR
THE REMOVAL OF PIPE INSULATION, FLOOR TILES, MASTIC, RADIATOR HEAT SHIELD
INSULATION AND TRANSITE PANELS. MAINTAIN EGRESS PATHS. PROTECT SHAFTS FROM
CONTAMINATION. PHASE ABATEMENT WORK AS REQUIRED. USE SEPARATION BARRIERS AS
REQUIRED.
D. INSTALL HEPA EXHAUST UNITS IN WORK AREAS WITH EXHAUST DIRECTED OUT THROUGH
WINDOWS.
E. RADIATOR HEAT SHIELD INSULATION IS ASSUMED TO BE PRESENT IN ALL RADIATORS
MOUNTED IN THE WALLS. TYPICAL LOCATIONS ARE SHOWN ON THE ASBESTOS
ABATEMENT PLANS. REMOVE ALL RADIATORS AND HEAT SHIELDS IN THE PROJECT AREAS.
F. ASBESTOS PIPE INSULATION IS ENCLOSED INSIDE WALL PIPE CHASES AND ABOVE PLASTER
CEILINGS. REFER TO THE MECHANICAL PIPING DEMO PLANS FOR THE APPROXIMATE
LOCATIONS. REMOVE ALL PIPE INSULATION IN CHASES AND ABOVE PLASTER CEILINGS IN
THE PROJECT AREAS.
G. CONTRACTOR SHALL KEEP DAILY LOG OF NUMBER OF LINEAR FEET OF PIPE ABATED OF
EACH SIZE, AND NUMBER OF JOINTS ABATED.
AREA DESCRIPTION QUANTITY
BASEMENT
BASEMENT
FIRST FLOOR
FIRST FLOOR
SECOND FLOOR
BASEMENT,
FIRST AND SECOND
FLOORS
FLOOR TILES AND MASTIC
CARPET OVER RESIDUAL MASTIC
FLOOR TILES AND MASTIC
TRANSITE CEILING PANELS
FLOOR TILES AND MASTIC
3" AND UNDER PIPE INSULATION
2,025 SF
2,428 SF
10,021 SF
1,250 SF
10,560 SF
8,000 LF + 400 PIPE JOINTS
OFFICE
120K
PATIENT
ROOM
120A
PATIENT
ROOM
120J
PATIENT
ROOM
126A
PATIENT
ROOM
126B
PATIENT
ROOM
126J
PATIENT
ROOM
126C
PATIENT
ROOM
PATIENT
ROOM
114D
PATIENT
ROOM
CORRIDOR
CORRIDOR
STORAGE
DAY ROOM
120D
PATIENT
LAUNDRY
ROOM
MEN'S
BATHROOM
STAFF BED
ROOM
STAIR
DR'S OFFICE
PSYCH
NURSE'S
OFFICE
123A
CASE
MANAGER
OFFICE
LOBBY
100A
DIRECTOR'S
OFFICE
OFFICE
LINEN
STORAGE
BATHROOM
101A
WOMEN'S
SHOWER
105A
MEN'S
SHOWER
MEN'S
BATHROOM
BATHROOM
CLOSET
CLOSET
115B
CLOSET
115A
CLOSET
DINING ROOM
113A
STORAGE
113B
BATHROOM
110B
OFFICE
CLOSET
110A
STAIR
PATIENT
LAUNDRY
ROOM
ADMIN OFFICE
114A
UNISEX
BATHROOM
114B
BATHROOM
114C
CORRIDOR
CORRIDOR
CORRIDOR
DAY ROOM
126D
ELEVATOR
CORRIDOR
ELECTRICAL
PANELS
CLOSET
121A
CLOSET
ELECTRICAL
PANELS
MEN'S
SHOWER
PATIENT
ROOM
120H
PATIENT
ROOM
120G
PATIENT
ROOM
120F
PATIENT
ROOM
120E
PATIENT
ROOM
120B
PATIENT
ROOM
120C
PATIENT
ROOM
126H
PATIENT
ROOM
126G
PATIENT
ROOM
126F
PATIENT
ROOM
126E
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
31 JAN 2020
FIRST FLOOR ASBESTOS
ABATEMENT PLAN
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
DB/1SSH BAC
542-18-106
HA101
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
1/8" = 1'-0"
FIRST FLOOR ASBESTOS ABATEMENT PLAN
GENERAL NOTES
LOCATIONS AND QUANTITIES OF ASBESTOS MATERIALS
KEYNOTES
1 REMOVE FLOOR TILES AND MASTIC.
2 REMOVE CARPET AND RESIDIUAL FLOOR MASTIC.
3 REMOVE PIPE CHASE TO ACCESS AND REMOVE PIPE
INSULATION (TYPICAL LOCATIONS).
4 REMOVE CEILINGS TO ACCESS AND REMOVE PIPE INSULATION
(TYPICAL LOCATIONS).
5 REMOVE ALL RADIATORS AND RADIATOR HEAT SHIELD
INSULATION (TYPICAL LOCATIONS).
6 REMOVE TRANSITE CEILING PANELS.
7 LOCATION OF PERSONNEL DECONTAMINATION FACILITY.
8 LOCATION OF WASTE AND EQUIPMENT DECONTAMINATION
FACILITY.
9 PATH OF WASTE REMOVAL.
10 REMOVE RESIDUAL FLOOR MASTIC
11 PHASE SEPARATION BARRIER. PLACE DECONTAMINATION
FACILITY ON EITHER SIDE DEPENDING ON PHASE.
0 4' 8' 16'
Revisions: Date:
1 2 3 4 5
6 7
8 9 10 11 12
AA
BB
CC
D.2D.2
E.2E.2
E.8
E.8
F.8F.8
HH
II
JJ
DD
EE
F
F
GG
6.86.2
G.5G.5
C.2 C.1C.1
0 13
ROOF ROOF
ROOF
A. REFER TO GI002 “CONSTRUCTION PERIOD SCHEDULING OF WORK – GENERAL NOTES”
REGARDING THE VA’S DISCRETION IN SELECTING WORK TO BE DONE AFTERHOURS/OFF-
HOURS.
B. REFER TO GI002 “CONSTRUCTION PERIOD SCHEDULING OF WORK – ADDITIONAL NOTES
FOR STERILE PROCESSING SERVICE (SPS)” REGARDING WORK IN, ADJACENT TO, OR THAT
MAY AFFECT SPS.
C. ESTABLISH FULL CONTAINMENT ASBESTOS ABATEMENT WORK AREAS IN ALL AREAS FOR
THE REMOVAL OF PIPE INSULATION, FLOOR TILES, MASTIC, RADIATOR HEAT SHIELD
INSULATION AND TRANSITE PANELS. MAINTAIN EGRESS PATHS. PROTECT SHAFTS FROM
CONTAMINATION. PHASE ABATEMENT WORK AS REQUIRED. USE SEPARATION BARRIERS AS
REQUIRED.
D. INSTALL HEPA EXHAUST UNITS IN WORK AREAS WITH EXHAUST DIRECTED OUT THROUGH
WINDOWS.
E. RADIATOR HEAT SHIELD INSULATION IS ASSUMED TO BE PRESENT IN ALL RADIATORS
MOUNTED IN THE WALLS. TYPICAL LOCATIONS ARE SHOWN ON THE ASBESTOS
ABATEMENT PLANS. REMOVE ALL RADIATORS AND HEAT SHIELDS IN THE PROJECT AREAS.
F. ASBESTOS PIPE INSULATION IS ENCLOSED INSIDE WALL PIPE CHASES AND ABOVE PLASTER
CEILINGS. REFER TO THE MECHANICAL PIPING DEMO PLANS FOR THE APPROXIMATE
LOCATIONS. REMOVE ALL PIPE INSULATION IN CHASES AND ABOVE PLASTER CEILINGS IN
THE PROJECT AREAS.
G. CONTRACTOR SHALL KEEP DAILY LOG OF NUMBER OF LINEAR FEET OF PIPE ABATED OF
EACH SIZE, AND NUMBER OF JOINTS ABATED.
AREA DESCRIPTION QUANTITY
BASEMENT
BASEMENT
FIRST FLOOR
FIRST FLOOR
SECOND FLOOR
BASEMENT,
FIRST AND SECOND
FLOORS
FLOOR TILES AND MASTIC
CARPET OVER RESIDUAL MASTIC
FLOOR TILES AND MASTIC
TRANSITE CEILING PANELS
FLOOR TILES AND MASTIC
3" AND UNDER PIPE INSULATION
2,025 SF
2,428 SF
10,021 SF
1,250 SF
10,560 SF
8,000 LF + 400 PIPE JOINTS
ROOF ROOF
ROOF
STORAGE
214H
PT SAFETY
OFFICE
214A
QI/MH OFFICE
214B
QI/PCS
OFFICE
214C
WOMEN'S
BATHROOM
STAIR
CLOSET
SUPPORT
OFFICE
STORAGE
CONFERENCE
ROOM
BREAK ROOM
210A
STORAGE
208B
OFFICE
207C
OFFICE
207D
OFFICE
207J
OFFICE
207F
NURSES
OFFICE
207B
STORAGE
MRSA OFFICE
SUPPORT
OFFICE
STORAGE
STAIRS
MEN'S
BATHROOM
RISK
MANAGER
OFFICE
207K
STORAGE
(NEURO)
207G
WAITING
ROOM
207H
INFECTION
CONTROL
OFFICE
207A
SAFETY
OFFICE
TRAINING
ROOM
BATHROOM
200B
DIRECTOR QI
OFFICE
220B
WAITING
ROOM
SUPPORT
OFFICE
220A
SUPPORT
OFFICE
SUPPORT
OFFICE
STORAGE
SAFETY
MANAGERS
OFFICE
214D
CLOSET
217A
QI PC OFFICE
214E
QI GEC
OFFICE
214F
STORAGE
214G
ELECTRICAL
PANELS
210A
ELECTRICAL
PANELS
207I
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
31 JAN 2020
SECOND FLOOR ASBESTOS
ABATEMENT PLAN
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
DB/1SSH BAC
542-18-106
HA102
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
1/8" = 1'-0"
SECOND FLOOR ASBESTOS ABATEMENT PLAN
GENERAL NOTES
LOCATIONS AND QUANTITIES OF ASBESTOS MATERIALS
KEYNOTES
1 REMOVE FLOOR TILES AND MASTIC.
2 REMOVE CARPET AND RESIDIUAL FLOOR MASTIC.
3 REMOVE PIPE CHASE TO ACCESS AND REMOVE PIPE
INSULATION (TYPICAL LOCATIONS).
4 REMOVE CEILINGS TO ACCESS AND REMOVE PIPE INSULATION
(TYPICAL LOCATIONS).
5 REMOVE ALL RADIATORS AND RADIATOR HEAT SHIELD
INSULATION (TYPICAL LOCATIONS).
6 REMOVE TRANSITE CEILING PANELS.
7 LOCATION OF PERSONNEL DECONTAMINATION FACILITY.
8 LOCATION OF WASTE AND EQUIPMENT DECONTAMINATION
FACILITY.
9 PATH OF WASTE REMOVAL.
10 REMOVE RESIDUAL FLOOR MASTIC
11 PHASE SEPARATION BARRIER. PLACE DECONTAMINATION
FACILITY ON EITHER SIDE DEPENDING ON PHASE.
5 5