09 Plumbing 54218106_Drawings_FinalCD_013120.pdf
PDF 29 MB Posted
- Attached to
- Z2DA--Renovate Building 4 A + B Floors Outpatient Mental Health Clinic, Project No. 542-18-106
- Solicitation number
- 36C24420B0003
About this file
This solicitation is for general construction, electrical, and mechanical work to renovate approximately 28,000 square feet of existing space and 3,000 square feet of basement space into an outpatient mental health clinic at a Department of Veterans Affairs medical center in Coatesville, Pennsylvania. The project involves total demolition and renovation of the first and second floors of Building 4, along with associated basement and attic work, to construct a new outpatient mental health clinic in accordance with VA design guides. The solicitation will be available on June 23, 2020 via SAM.gov and is open only to verified Service-Disabled Veteran-Owned Small Businesses. Interested contractors must be able to provide performance and payment bonds and a 20% bid guarantee. The contract type will be firm-fixed price. The completion period is 588 calendar days from notice to proceed.
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PLUMBING FIXTURE SCHEDULE
PLUMBING GENERAL NOTES PLUMBING MATERIALS AND PROCEDURES NOTES PLUMBING SYMBOL LIST
PROCEDURES:DISCIPLINE SPECIFIC
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
PLUMBING - GENERAL
NOTES AND SYMBOLS
P001
RAH TE
1 2 3 4
6 7
8 9 10 11 12
AA
BB
CC
D.2D.2
E.2E.2
E.8
E.8
F.8F.8
HH
II
JJ
DD
EE
F
F
GG
6.86.2
G.5G.5
C.2
0 13
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
1 3
KEYPLAN
PLUMBING - UNDERGROUND
DEMOLITION PLAN
PD010U
PLUMBING DEMOLITION GENERAL NOTES
6 7
8 9 10 11 12
AA
BB
CC
D.2D.2
E.2E.2
E.8
E.8
F.8F.8
HH
II
JJ
DD
EE
F
F
GG
6.86.2
G.5G.5
C.2
0 13
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
1 3
KEYPLAN
PLUMBING - BASEMENT
DEMOLITION PLAN
PD010
6 7
8 9 10 11 12
AA
BB
CC
D.2D.2
E.2E.2
E.8
E.8
F.8F.8
HH
II
JJ
DD
EE
F
F
GG
6.86.2
G.5G.5
C.2
0 13
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
1 3
KEYPLAN
PLUMBING - FIRST FLOOR
DEMOLITION PLAN
PD011
6 7
8 9 10 11 12
AA
BB
CC
D.2D.2
E.2E.2
E.8
E.8
F.8F.8
HH
II
JJ
DD
EE
F
F
GG
6.86.2
G.5G.5
C.2
0 131 2 3 4
6 7
8 9 10 11 12
AA
BB
CC
D.2D.2
E.2E.2
E.8
E.8
F.8F.8
HH
II
JJ
DD
EE
F
F
GG
6.86.2
G.5G.5
C.2
0 13
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
1 3
KEYPLAN
PLUMBING - SECOND FLOOR
DEMOLITION PLAN
PD012
6 7
8 9 10 11 12
AA
BB
CC
D.2D.2
E.2E.2
E.8
E.8
F.8F.8
HH
II
JJ
DD
EE
F
F
GG
6.86.2
G.5G.5
C.2
0 13
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
1 3
KEYPLAN
PLUMBING - ATTIC
DEMOLITION PLAN
PD013
A
B
C
D.2
E.2
E.8
D
E
C.2
PLUMBING DEMOLITION KEY NOTES
PLUMBING DEMOLITION GENERAL NOTES
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
PLUMBING - UNDERGROUND
DEMOLITION PLAN ZONE 1
PD100U.1
RAH TE
1 3
1 2 3 4 5
E.8
F.8
H
I
J
F
G
6.86.2
G.5
PLUMBING DEMOLITION KEY NOTES
PLUMBING DEMOLITION GENERAL NOTES
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
PLUMBING - UNDERGROUND
DEMOLITION PLAN ZONE 2
PD100U.2
RAH TE
1 3
A
B
C
D.2
E.2
D
E
PLUMBING DEMOLITION GENERAL NOTES
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
PLUMBING - UNDERGROUND
DEMOLITION PLAN ZONE 3
PD100U.3
RAH TE
1 3
8 9 10 11 12
F.8
H
I
J
F
G
6.8
G.5
PLUMBING DEMOLITION GENERAL NOTES
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
PLUMBING - UNDERGROUND
DEMOLITION PLAN ZONE 4
PD100U.4
RAH TE
1 3
A
B
C
D.2
E.2
E.8
D
E
C.2
PLUMBING DEMOLITION GENERAL NOTES
PLUMBING DEMOLITION KEY NOTES
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
PLUMBING - BASEMENT
DEMOLITION PLAN ZONE 1
PD100.1
RAH TE
1 3
F.8
H
I
J
F
G
6.86.2
G.5
PLUMBING DEMOLITION GENERAL NOTES
PLUMBING DEMOLITION KEY NOTES
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
PLUMBING - BASEMENT
DEMOLITION PLAN ZONE 2
PD100.2
RAH TE
1 3
A
B
C
D.2
E.2
D
E
PLUMBING DEMOLITION GENERAL NOTES
PLUMBING DEMOLITION KEY NOTES
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
PLUMBING - BASEMENT
DEMOLITION PLAN ZONE 3
PD100.3
RAH TE
1 3
F.8
H
I
J
F
G
6.8
G.5
PLUMBING DEMOLITION GENERAL NOTES
PLUMBING DEMOLITION KEY NOTES
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
PLUMBING - BASEMENT
DEMOLITION PLAN ZONE 4
PD100.4
RAH TE
1 3
A
B
C
D.2
E.2
E.8
D
E
C.2
PLUMBING DEMOLITION GENERAL NOTES
PLUMBING DEMOLITION KEY NOTES
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
PLUMBING - FIRST FLOOR
DEMOLITION PLAN ZONE 1
PD101.1
RAH TE
1 3
F.8
H
I
J
F
G
6.86.2
G.5
PLUMBING DEMOLITION GENERAL NOTES
PLUMBING DEMOLITION KEY NOTES
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
PLUMBING - FIRST FLOOR
DEMOLITION PLAN ZONE 2
PD101.2
RAH TE
1 3
A
B
C
D.2
E.2
D
E
PLUMBING DEMOLITION GENERAL NOTES
PLUMBING DEMOLITION KEY NOTES
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
PLUMBING - FIRST FLOOR
DEMOLITION PLAN ZONE 3
PD101.3
RAH TE
1 3
F.8
H
I
J
F
G
6.8
G.5
PLUMBING DEMOLITION GENERAL NOTES
PLUMBING DEMOLITION KEY NOTES
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
PLUMBING - FIRST FLOOR
DEMOLITION PLAN ZONE 4
PD101.4
RAH TE
1 3
A
B
C
D.2
E.2
E.8
D
E
C.2
PLUMBING DEMOLITION GENERAL NOTES
PLUMBING DEMOLITION KEY NOTES
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
PLUMBING - SECOND FLOOR
DEMOLITION PLAN ZONE 1
PD102.1
RAH TE
1 3
F.8
H
I
J
F
G
6.86.2
G.5
PLUMBING DEMOLITION GENERAL NOTES
PLUMBING DEMOLITION KEY NOTES
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
PLUMBING - SECOND FLOOR
DEMOLITION PLAN ZONE 2
PD102.2
RAH TE
1 3
A
B
C
D.2
E.2
D
E
PLUMBING DEMOLITION GENERAL NOTES
PLUMBING DEMOLITION KEY NOTES
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
PLUMBING - SECOND FLOOR
DEMOLITION PLAN ZONE 3
PD102.3
RAH TE
1 3
F.8
H
I
J
F
G
6.8
G.5
PLUMBING DEMOLITION GENERAL NOTES
PLUMBING DEMOLITION KEY NOTES
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
PLUMBING - SECOND FLOOR
DEMOLITION PLAN ZONE 4
PD102.4
RAH TE
1 3
A
B
C
D.2
E.2
E.8
D
E
C.2
PLUMBING DEMOLITION GENERAL NOTES
PLUMBING DEMOLITION KEY NOTES
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
PLUMBING - ATTIC
DEMOLITION PLAN ZONE 1
PD103.1
RAH TE
1 3
F.8
H
I
J
F
G
6.86.2
G.5
PLUMBING DEMOLITION GENERAL NOTES
PLUMBING DEMOLITION KEY NOTES
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
PLUMBING - ATTIC
DEMOLITION PLAN ZONE 2
PD103.2
RAH TE
1 3
A
B
C
D.2
E.2
D
E
PLUMBING DEMOLITION GENERAL NOTES
PLUMBING DEMOLITION KEY NOTES
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
PLUMBING - ATTIC
DEMOLITION PLAN ZONE 3
PD103.3
RAH TE
1 3
F.8
H
I
J
F
G
6.8
G.5
PLUMBING DEMOLITION GENERAL NOTES
PLUMBING DEMOLITION KEY NOTES
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
PLUMBING - ATTIC
DEMOLITION PLAN ZONE 4
PD103.4
RAH TE
1 3
6 7
8 9 10 11 12
AA
BB
CC
D.2D.2
E.2E.2
E.8
E.8
F.8F.8
HH
II
JJ
DD
EE
F
F
GG
6.86.2
G.5G.5
C.2
0 13
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
1 3
KEYPLAN
PLUMBING - UNDERGROUND
PLAN
P010U
PLUMBING GENERAL NOTES
6 7
8 9 10 11 12
AA
BB
CC
D.2D.2
E.2E.2
E.8
E.8
F.8F.8
HH
II
JJ
DD
EE
F
F
GG
6.86.2
G.5G.5
C.2
0 13
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
1 3
KEYPLAN
PLUMBING - BASEMENT
PLAN
P010
6 7
8 9 10 11 12
AA
BB
CC
D.2D.2
E.2E.2
E.8
E.8
F.8F.8
HH
II
JJ
DD
EE
F
F
GG
6.86.2
G.5G.5
C.2
0 131 2 3 4
6 7
8 9 10 11 12
AA
BB
CC
D.2D.2
E.2E.2
E.8
E.8
F.8F.8
HH
II
JJ
DD
EE
F
F
GG
6.86.2
G.5G.5
C.2
0 13
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
1 3
KEYPLAN
PLUMBING - FIRST FLOOR
PLAN
P011
6 7
8 9 10 11 12
AA
BB
CC
D.2D.2
E.2E.2
E.8
E.8
F.8F.8
HH
II
JJ
DD
EE
F
F
GG
6.86.2
G.5G.5
C.2
0 131 2 3 4
6 7
8 9 10 11 12
AA
BB
CC
D.2D.2
E.2E.2
E.8
E.8
F.8F.8
HH
II
JJ
DD
EE
F
F
GG
6.86.2
G.5G.5
C.2
0 13
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
1 3
KEYPLAN
PLUMBING - SECOND FLOOR
PLAN
P012
6 7
8 9 10 11 12
AA
BB
CC
D.2D.2
E.2E.2
E.8
E.8
F.8F.8
HH
II
JJ
DD
EE
F
F
GG
6.86.2
G.5G.5
C.2
0 13
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
1 3
KEYPLAN
PLUMBING - ATTIC
PLAN
P013
A
B
C
D.2
E.2
E.8
D
E
C.2
PLUMBING KEY NOTES
PLUMBING GENERAL NOTES
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
PLUMBING - UNDERGROUND
PLAN ZONE 1
P100U.1
RAH TE
1 3
F.8
H
I
J
F
G
6.86.2
G.5
PLUMBING KEY NOTES
PLUMBING GENERAL NOTES
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
PLUMBING - UNDERGROUND
PLAN ZONE 2
P100U.2
RAH TE
1 3
A
B
C
D.2
E.2
D
E
PLUMBING KEY NOTES
PLUMBING GENERAL NOTES
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
PLUMBING - UNDERGROUND
PLAN ZONE 3
P100U.3
RAH TE
1 3
F.8
H
I
J
F
G
6.8
G.5
PLUMBING GENERAL NOTES
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
PLUMBING - UNDERGROUND
PLAN ZONE 4
P100U.4
RAH TE
1 3
A
B
C
D.2
E.2
E.8
D
E
C.2
PLUMBING KEY NOTES
PLUMBING GENERAL NOTES
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
PLUMBING - BASEMENT
PLAN ZONE 1
P100.1
RAH TE
1 3
F.8
H
I
J
F
G
6.86.2
G.5
PLUMBING KEY NOTES
PLUMBING GENERAL NOTES
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
PLUMBING - BASEMENT
PLAN ZONE 2
P100.2
RAH TE
1 3
A
B
C
D.2
E.2
D
E
PLUMBING KEY NOTES
PLUMBING GENERAL NOTES
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
PLUMBING - BASEMENT
PLAN ZONE 3
P100.3
RAH TE
1 3
F.8
H
I
J
F
G
6.8
G.5
PLUMBING KEY NOTES
PLUMBING GENERAL NOTES
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
PLUMBING - BASEMENT
PLAN ZONE 4
P100.4
RAH TE
1 3
A
B
C
D.2
E.2
E.8
D
E
C.2
PLUMBING KEY NOTES
PLUMBING GENERAL NOTES
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
PLUMBING - FIRST FLOOR
PLAN ZONE 1
P101.1
RAH TE
1 3
F.8
H
I
J
F
G
6.86.2
G.5
PLUMBING KEY NOTES
PLUMBING GENERAL NOTES
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
PLUMBING - FIRST FLOOR
PLAN ZONE 2
P101.2
RAH TE
1 3
A
B
C
D.2
E.2
D
E
PLUMBING KEY NOTES
PLUMBING GENERAL NOTES
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
PLUMBING - FIRST FLOOR
PLAN ZONE 3
P101.3
RAH TE
1 3
F.8
H
I
J
F
G
6.8
G.5
PLUMBING KEY NOTES
PLUMBING GENERAL NOTES
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
PLUMBING - FIRST FLOOR
PLAN ZONE 4
P101.4
RAH TE
1 3
A
B
C
D.2
E.2
E.8
D
E
C.2
PLUMBING KEY NOTES
PLUMBING GENERAL NOTES
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
PLUMBING - SECOND FLOOR
PLAN ZONE 1
P102.1
RAH TE
1 3
F.8
H
I
J
F
G
6.86.2
G.5
PLUMBING KEY NOTES
PLUMBING GENERAL NOTES
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
PLUMBING - SECOND FLOOR
PLAN ZONE 2
P102.2
RAH TE
1 3
A
B
C
D.2
E.2
D
E
PLUMBING KEY NOTES
PLUMBING GENERAL NOTES
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
PLUMBING - SECOND FLOOR
PLAN ZONE 3
P102.3
RAH TE
1 3
F.8
H
I
J
F
G
6.8
G.5
PLUMBING KEY NOTES
PLUMBING GENERAL NOTES
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
PLUMBING - SECOND FLOOR
PLAN ZONE 4
P102.4
RAH TE
1 3
A
B
C
D.2
E.2
E.8
D
E
C.2
PLUMBING KEY NOTES
PLUMBING GENERAL NOTES
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
PLUMBING - ATTIC
PLAN ZONE 1
P103.1
RAH TE
1 3
F.8
H
I
J
F
G
6.86.2
G.5
PLUMBING KEY NOTES
PLUMBING GENERAL NOTES
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
PLUMBING - ATTIC
PLAN ZONE 2
P103.2
RAH TE
1 3
A
B
C
D.2
E.2
D
E
PLUMBING KEY NOTES
PLUMBING GENERAL NOTES
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
PLUMBING - ATTIC
PLAN ZONE 3
P103.3
RAH TE
1 3
F.8
H
I
J
F
G
6.8
G.5
PLUMBING KEY NOTES
PLUMBING GENERAL NOTES
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
PLUMBING - ATTIC
PLAN - ZONE 4
P103.4
RAH TE
1 3
PIPE HANGERS
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .