09 Plumbing 54218106_Drawings_FinalCD_013120.pdf

PDF 29 MB Posted

Attached to
Z2DA--Renovate Building 4 A + B Floors Outpatient Mental Health Clinic, Project No. 542-18-106
Solicitation number
36C24420B0003
Issued by

About this file

This solicitation is for general construction, electrical, and mechanical work to renovate approximately 28,000 square feet of existing space and 3,000 square feet of basement space into an outpatient mental health clinic at a Department of Veterans Affairs medical center in Coatesville, Pennsylvania. The project involves total demolition and renovation of the first and second floors of Building 4, along with associated basement and attic work, to construct a new outpatient mental health clinic in accordance with VA design guides. The solicitation will be available on June 23, 2020 via SAM.gov and is open only to verified Service-Disabled Veteran-Owned Small Businesses. Interested contractors must be able to provide performance and payment bonds and a 20% bid guarantee. The contract type will be firm-fixed price. The completion period is 588 calendar days from notice to proceed.

View the file

Other files

File Type Posted
Award Announcement 36C24420C0112.pdf PDF
General Decision Number PA20200083.pdf PDF
36C24420B0003 0003.pdf PDF
00 01 15 - List of Drawing Sheets - ADD-01.pdf PDF
07 Architecture.pdf PDF
36C24420B0003 Amendment 0002.pdf PDF
10 22 26.13 - Operable Partitions - ADD-01.pdf PDF
RFI LOG_542-18-106_08052020.r2.pdf PDF
Sign In Sheet no. 3 B4A B 07162020.pdf PDF
Sign In Sheet B4A B 07162020.pdf PDF
03 Structural 54218106_Drawings_ADD-01_080320.pdf PDF
A012 54218106_Drawings_FinalCD_013120.pdf PDF
08 Interiors 54218106_Drawings_ADD-01_080320.pdf PDF
07 13 52 - Modified Bituminous Sheet Waterproofing - ADD-01.pdf PDF
07 60 00 - Flashing and Sheet Metal - ADD-01.pdf PDF
01 33 23 - Shop Drawings Product Data Samples - ADD-01.pdf PDF
00 01 10 - TOC - ADD-01.pdf PDF
11 Plumbing 54218106_Drawings_ADD-01_080320.pdf PDF
ADD-01 Narrative.pdf PDF
10 21 13 - Toilet Compartments - ADD-01.pdf PDF
07 27 27 - Fluid-Applied Membrane Air Barrier Vapor Retardg - ADD-01.pdf PDF
00 General 54218106_Drawings_ADD-01_080320.pdf PDF
11 73 00 - Ceiling Mounted Patient Lift System - ADD-01.pdf PDF
36C24420B0003 Amendment 0001 - Attachment.pdf PDF
36C24420B0003 AMENDMENT 0001.pdf PDF
36C24420B0003 MAP for Site Visit.pdf PDF
04 Structural 54218106_Drawings_FinalCD_013120.pdf PDF
10 Mechanical 54218106_Drawings_FinalCD_013120.pdf PDF
06 Interiors 54218106_Drawings_FinalCD_013120.pdf PDF
08 Fire Protection 54218106_Drawings_FinalCD_013120.pdf PDF
02 Hazardous 54218106_Drawings_FinalCD_013120.pdf PDF
07 Equipment 54218106_Drawings_FinalCD_013120.pdf PDF
01 General 54218106_Drawings_FinalCD_013120.pdf PDF
05 Architectural 54218106_Drawings_FinalCD_013120.pdf PDF
11 Electrical 54218106_Drawings_FinalCD_013120.pdf PDF
03 Civil Landscape 54218106_Drawings_FinalCD_013120.pdf PDF
54218106-Spec-Vol 3_FinalCD_013120.pdf PDF
36C24420B0003.docx DOCX document
PCRA 3-2019 building 4.pdf PDF
54218106-Spec-Vol 2_FinalCD_013120.pdf PDF
54218106-Spec-Vol 1_FinalCD_013120.pdf PDF
COVID Guidelines.pdf PDF
54218106-Spec-Vol 4_FinalCD_013120.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PLUMBING FIXTURE SCHEDULE

PLUMBING GENERAL NOTES PLUMBING MATERIALS AND PROCEDURES NOTES PLUMBING SYMBOL LIST

PROCEDURES:DISCIPLINE SPECIFIC

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

PLUMBING - GENERAL

NOTES AND SYMBOLS

P001

RAH TE

1 2 3 4

6 7

8 9 10 11 12

AA

BB

CC

D.2D.2

E.2E.2

E.8

E.8

F.8F.8

HH

II

JJ

DD

EE

F

F

GG

6.86.2

G.5G.5

C.2

0 13

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

1 3

KEYPLAN

PLUMBING - UNDERGROUND

DEMOLITION PLAN

PD010U

PLUMBING DEMOLITION GENERAL NOTES

6 7

8 9 10 11 12

AA

BB

CC

D.2D.2

E.2E.2

E.8

E.8

F.8F.8

HH

II

JJ

DD

EE

F

F

GG

6.86.2

G.5G.5

C.2

0 13

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

1 3

KEYPLAN

PLUMBING - BASEMENT

DEMOLITION PLAN

PD010

6 7

8 9 10 11 12

AA

BB

CC

D.2D.2

E.2E.2

E.8

E.8

F.8F.8

HH

II

JJ

DD

EE

F

F

GG

6.86.2

G.5G.5

C.2

0 13

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

1 3

KEYPLAN

PLUMBING - FIRST FLOOR

DEMOLITION PLAN

PD011

6 7

8 9 10 11 12

AA

BB

CC

D.2D.2

E.2E.2

E.8

E.8

F.8F.8

HH

II

JJ

DD

EE

F

F

GG

6.86.2

G.5G.5

C.2

0 131 2 3 4

6 7

8 9 10 11 12

AA

BB

CC

D.2D.2

E.2E.2

E.8

E.8

F.8F.8

HH

II

JJ

DD

EE

F

F

GG

6.86.2

G.5G.5

C.2

0 13

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

1 3

KEYPLAN

PLUMBING - SECOND FLOOR

DEMOLITION PLAN

PD012

6 7

8 9 10 11 12

AA

BB

CC

D.2D.2

E.2E.2

E.8

E.8

F.8F.8

HH

II

JJ

DD

EE

F

F

GG

6.86.2

G.5G.5

C.2

0 13

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

1 3

KEYPLAN

PLUMBING - ATTIC

DEMOLITION PLAN

PD013

A

B

C

D.2

E.2

E.8

D

E

C.2

PLUMBING DEMOLITION KEY NOTES

PLUMBING DEMOLITION GENERAL NOTES

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

PLUMBING - UNDERGROUND

DEMOLITION PLAN ZONE 1

PD100U.1

RAH TE

1 3

1 2 3 4 5

E.8

F.8

H

I

J

F

G

6.86.2

G.5

PLUMBING DEMOLITION KEY NOTES

PLUMBING DEMOLITION GENERAL NOTES

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

PLUMBING - UNDERGROUND

DEMOLITION PLAN ZONE 2

PD100U.2

RAH TE

1 3

A

B

C

D.2

E.2

D

E

PLUMBING DEMOLITION GENERAL NOTES

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

PLUMBING - UNDERGROUND

DEMOLITION PLAN ZONE 3

PD100U.3

RAH TE

1 3

8 9 10 11 12

F.8

H

I

J

F

G

6.8

G.5

PLUMBING DEMOLITION GENERAL NOTES

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

PLUMBING - UNDERGROUND

DEMOLITION PLAN ZONE 4

PD100U.4

RAH TE

1 3

A

B

C

D.2

E.2

E.8

D

E

C.2

PLUMBING DEMOLITION GENERAL NOTES

PLUMBING DEMOLITION KEY NOTES

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

PLUMBING - BASEMENT

DEMOLITION PLAN ZONE 1

PD100.1

RAH TE

1 3

F.8

H

I

J

F

G

6.86.2

G.5

PLUMBING DEMOLITION GENERAL NOTES

PLUMBING DEMOLITION KEY NOTES

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

PLUMBING - BASEMENT

DEMOLITION PLAN ZONE 2

PD100.2

RAH TE

1 3

A

B

C

D.2

E.2

D

E

PLUMBING DEMOLITION GENERAL NOTES

PLUMBING DEMOLITION KEY NOTES

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

PLUMBING - BASEMENT

DEMOLITION PLAN ZONE 3

PD100.3

RAH TE

1 3

F.8

H

I

J

F

G

6.8

G.5

PLUMBING DEMOLITION GENERAL NOTES

PLUMBING DEMOLITION KEY NOTES

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

PLUMBING - BASEMENT

DEMOLITION PLAN ZONE 4

PD100.4

RAH TE

1 3

A

B

C

D.2

E.2

E.8

D

E

C.2

PLUMBING DEMOLITION GENERAL NOTES

PLUMBING DEMOLITION KEY NOTES

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

PLUMBING - FIRST FLOOR

DEMOLITION PLAN ZONE 1

PD101.1

RAH TE

1 3

F.8

H

I

J

F

G

6.86.2

G.5

PLUMBING DEMOLITION GENERAL NOTES

PLUMBING DEMOLITION KEY NOTES

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

PLUMBING - FIRST FLOOR

DEMOLITION PLAN ZONE 2

PD101.2

RAH TE

1 3

A

B

C

D.2

E.2

D

E

PLUMBING DEMOLITION GENERAL NOTES

PLUMBING DEMOLITION KEY NOTES

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

PLUMBING - FIRST FLOOR

DEMOLITION PLAN ZONE 3

PD101.3

RAH TE

1 3

F.8

H

I

J

F

G

6.8

G.5

PLUMBING DEMOLITION GENERAL NOTES

PLUMBING DEMOLITION KEY NOTES

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

PLUMBING - FIRST FLOOR

DEMOLITION PLAN ZONE 4

PD101.4

RAH TE

1 3

A

B

C

D.2

E.2

E.8

D

E

C.2

PLUMBING DEMOLITION GENERAL NOTES

PLUMBING DEMOLITION KEY NOTES

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

PLUMBING - SECOND FLOOR

DEMOLITION PLAN ZONE 1

PD102.1

RAH TE

1 3

F.8

H

I

J

F

G

6.86.2

G.5

PLUMBING DEMOLITION GENERAL NOTES

PLUMBING DEMOLITION KEY NOTES

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

PLUMBING - SECOND FLOOR

DEMOLITION PLAN ZONE 2

PD102.2

RAH TE

1 3

A

B

C

D.2

E.2

D

E

PLUMBING DEMOLITION GENERAL NOTES

PLUMBING DEMOLITION KEY NOTES

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

PLUMBING - SECOND FLOOR

DEMOLITION PLAN ZONE 3

PD102.3

RAH TE

1 3

F.8

H

I

J

F

G

6.8

G.5

PLUMBING DEMOLITION GENERAL NOTES

PLUMBING DEMOLITION KEY NOTES

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

PLUMBING - SECOND FLOOR

DEMOLITION PLAN ZONE 4

PD102.4

RAH TE

1 3

A

B

C

D.2

E.2

E.8

D

E

C.2

PLUMBING DEMOLITION GENERAL NOTES

PLUMBING DEMOLITION KEY NOTES

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

PLUMBING - ATTIC

DEMOLITION PLAN ZONE 1

PD103.1

RAH TE

1 3

F.8

H

I

J

F

G

6.86.2

G.5

PLUMBING DEMOLITION GENERAL NOTES

PLUMBING DEMOLITION KEY NOTES

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

PLUMBING - ATTIC

DEMOLITION PLAN ZONE 2

PD103.2

RAH TE

1 3

A

B

C

D.2

E.2

D

E

PLUMBING DEMOLITION GENERAL NOTES

PLUMBING DEMOLITION KEY NOTES

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

PLUMBING - ATTIC

DEMOLITION PLAN ZONE 3

PD103.3

RAH TE

1 3

F.8

H

I

J

F

G

6.8

G.5

PLUMBING DEMOLITION GENERAL NOTES

PLUMBING DEMOLITION KEY NOTES

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

PLUMBING - ATTIC

DEMOLITION PLAN ZONE 4

PD103.4

RAH TE

1 3

6 7

8 9 10 11 12

AA

BB

CC

D.2D.2

E.2E.2

E.8

E.8

F.8F.8

HH

II

JJ

DD

EE

F

F

GG

6.86.2

G.5G.5

C.2

0 13

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

1 3

KEYPLAN

PLUMBING - UNDERGROUND

PLAN

P010U

PLUMBING GENERAL NOTES

6 7

8 9 10 11 12

AA

BB

CC

D.2D.2

E.2E.2

E.8

E.8

F.8F.8

HH

II

JJ

DD

EE

F

F

GG

6.86.2

G.5G.5

C.2

0 13

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

1 3

KEYPLAN

PLUMBING - BASEMENT

PLAN

P010

6 7

8 9 10 11 12

AA

BB

CC

D.2D.2

E.2E.2

E.8

E.8

F.8F.8

HH

II

JJ

DD

EE

F

F

GG

6.86.2

G.5G.5

C.2

0 131 2 3 4

6 7

8 9 10 11 12

AA

BB

CC

D.2D.2

E.2E.2

E.8

E.8

F.8F.8

HH

II

JJ

DD

EE

F

F

GG

6.86.2

G.5G.5

C.2

0 13

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

1 3

KEYPLAN

PLUMBING - FIRST FLOOR

PLAN

P011

6 7

8 9 10 11 12

AA

BB

CC

D.2D.2

E.2E.2

E.8

E.8

F.8F.8

HH

II

JJ

DD

EE

F

F

GG

6.86.2

G.5G.5

C.2

0 131 2 3 4

6 7

8 9 10 11 12

AA

BB

CC

D.2D.2

E.2E.2

E.8

E.8

F.8F.8

HH

II

JJ

DD

EE

F

F

GG

6.86.2

G.5G.5

C.2

0 13

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

1 3

KEYPLAN

PLUMBING - SECOND FLOOR

PLAN

P012

6 7

8 9 10 11 12

AA

BB

CC

D.2D.2

E.2E.2

E.8

E.8

F.8F.8

HH

II

JJ

DD

EE

F

F

GG

6.86.2

G.5G.5

C.2

0 13

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

1 3

KEYPLAN

PLUMBING - ATTIC

PLAN

P013

A

B

C

D.2

E.2

E.8

D

E

C.2

PLUMBING KEY NOTES

PLUMBING GENERAL NOTES

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

PLUMBING - UNDERGROUND

PLAN ZONE 1

P100U.1

RAH TE

1 3

F.8

H

I

J

F

G

6.86.2

G.5

PLUMBING KEY NOTES

PLUMBING GENERAL NOTES

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

PLUMBING - UNDERGROUND

PLAN ZONE 2

P100U.2

RAH TE

1 3

A

B

C

D.2

E.2

D

E

PLUMBING KEY NOTES

PLUMBING GENERAL NOTES

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

PLUMBING - UNDERGROUND

PLAN ZONE 3

P100U.3

RAH TE

1 3

F.8

H

I

J

F

G

6.8

G.5

PLUMBING GENERAL NOTES

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

PLUMBING - UNDERGROUND

PLAN ZONE 4

P100U.4

RAH TE

1 3

A

B

C

D.2

E.2

E.8

D

E

C.2

PLUMBING KEY NOTES

PLUMBING GENERAL NOTES

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

PLUMBING - BASEMENT

PLAN ZONE 1

P100.1

RAH TE

1 3

F.8

H

I

J

F

G

6.86.2

G.5

PLUMBING KEY NOTES

PLUMBING GENERAL NOTES

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

PLUMBING - BASEMENT

PLAN ZONE 2

P100.2

RAH TE

1 3

A

B

C

D.2

E.2

D

E

PLUMBING KEY NOTES

PLUMBING GENERAL NOTES

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

PLUMBING - BASEMENT

PLAN ZONE 3

P100.3

RAH TE

1 3

F.8

H

I

J

F

G

6.8

G.5

PLUMBING KEY NOTES

PLUMBING GENERAL NOTES

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

PLUMBING - BASEMENT

PLAN ZONE 4

P100.4

RAH TE

1 3

A

B

C

D.2

E.2

E.8

D

E

C.2

PLUMBING KEY NOTES

PLUMBING GENERAL NOTES

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

PLUMBING - FIRST FLOOR

PLAN ZONE 1

P101.1

RAH TE

1 3

F.8

H

I

J

F

G

6.86.2

G.5

PLUMBING KEY NOTES

PLUMBING GENERAL NOTES

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

PLUMBING - FIRST FLOOR

PLAN ZONE 2

P101.2

RAH TE

1 3

A

B

C

D.2

E.2

D

E

PLUMBING KEY NOTES

PLUMBING GENERAL NOTES

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

PLUMBING - FIRST FLOOR

PLAN ZONE 3

P101.3

RAH TE

1 3

F.8

H

I

J

F

G

6.8

G.5

PLUMBING KEY NOTES

PLUMBING GENERAL NOTES

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

PLUMBING - FIRST FLOOR

PLAN ZONE 4

P101.4

RAH TE

1 3

A

B

C

D.2

E.2

E.8

D

E

C.2

PLUMBING KEY NOTES

PLUMBING GENERAL NOTES

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

PLUMBING - SECOND FLOOR

PLAN ZONE 1

P102.1

RAH TE

1 3

F.8

H

I

J

F

G

6.86.2

G.5

PLUMBING KEY NOTES

PLUMBING GENERAL NOTES

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

PLUMBING - SECOND FLOOR

PLAN ZONE 2

P102.2

RAH TE

1 3

A

B

C

D.2

E.2

D

E

PLUMBING KEY NOTES

PLUMBING GENERAL NOTES

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

PLUMBING - SECOND FLOOR

PLAN ZONE 3

P102.3

RAH TE

1 3

F.8

H

I

J

F

G

6.8

G.5

PLUMBING KEY NOTES

PLUMBING GENERAL NOTES

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

PLUMBING - SECOND FLOOR

PLAN ZONE 4

P102.4

RAH TE

1 3

A

B

C

D.2

E.2

E.8

D

E

C.2

PLUMBING KEY NOTES

PLUMBING GENERAL NOTES

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

PLUMBING - ATTIC

PLAN ZONE 1

P103.1

RAH TE

1 3

F.8

H

I

J

F

G

6.86.2

G.5

PLUMBING KEY NOTES

PLUMBING GENERAL NOTES

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

PLUMBING - ATTIC

PLAN ZONE 2

P103.2

RAH TE

1 3

A

B

C

D.2

E.2

D

E

PLUMBING KEY NOTES

PLUMBING GENERAL NOTES

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

PLUMBING - ATTIC

PLAN ZONE 3

P103.3

RAH TE

1 3

F.8

H

I

J

F

G

6.8

G.5

PLUMBING KEY NOTES

PLUMBING GENERAL NOTES

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

PLUMBING - ATTIC

PLAN - ZONE 4

P103.4

RAH TE

1 3

PIPE HANGERS

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS…