This federal contract opportunity solicitation is for the renovation of Building 4A & B Floors at the VA Medical Center in Coatesville, PA to create an Outpatient Mental Health Clinic. The project involves demolishing approximately 28,000 square feet of existing space on the 1st and 2nd floors and renovating it into new outpatient clinics for the Mental Health Department. An additional 3,000 square feet in the basement wing will also be renovated. Scope of work includes construction of a new elevator and shaft at the front of the building, along with site work, structural work, hazardous material abatement, architectural finishes, fire protection, mechanical, plumbing and electrical systems.

The solicitation will be available for download on/after June 23, 2020 from SAM.gov. Interested Service-Disabled Veteran-Owned Small Businesses must be CVE verified and meet OSHA/EPA requirements. The contract will be awarded on a Firm Fixed Price basis to the responsible bidder submitting the lowest priced, technically acceptable offer. The period of performance is 588 calendar days from notice to proceed. Bid due/opening dates will be included in the solicitation. Bidders must be able to provide 100% payment and performance bonds and a 20% bid guarantee.

View the file

Other files

File Type Posted
Award Announcement 36C24420C0112.pdf PDF
General Decision Number PA20200083.pdf PDF
36C24420B0003 0003.pdf PDF
00 01 15 - List of Drawing Sheets - ADD-01.pdf PDF
07 Architecture.pdf PDF
36C24420B0003 Amendment 0002.pdf PDF
10 22 26.13 - Operable Partitions - ADD-01.pdf PDF
RFI LOG_542-18-106_08052020.r2.pdf PDF
Sign In Sheet no. 3 B4A B 07162020.pdf PDF
Sign In Sheet B4A B 07162020.pdf PDF
03 Structural 54218106_Drawings_ADD-01_080320.pdf PDF
A012 54218106_Drawings_FinalCD_013120.pdf PDF
08 Interiors 54218106_Drawings_ADD-01_080320.pdf PDF
07 13 52 - Modified Bituminous Sheet Waterproofing - ADD-01.pdf PDF
07 60 00 - Flashing and Sheet Metal - ADD-01.pdf PDF
01 33 23 - Shop Drawings Product Data Samples - ADD-01.pdf PDF
00 01 10 - TOC - ADD-01.pdf PDF
11 Plumbing 54218106_Drawings_ADD-01_080320.pdf PDF
ADD-01 Narrative.pdf PDF
10 21 13 - Toilet Compartments - ADD-01.pdf PDF
07 27 27 - Fluid-Applied Membrane Air Barrier Vapor Retardg - ADD-01.pdf PDF
00 General 54218106_Drawings_ADD-01_080320.pdf PDF
11 73 00 - Ceiling Mounted Patient Lift System - ADD-01.pdf PDF
36C24420B0003 Amendment 0001 - Attachment.pdf PDF
36C24420B0003 AMENDMENT 0001.pdf PDF
36C24420B0003 MAP for Site Visit.pdf PDF
04 Structural 54218106_Drawings_FinalCD_013120.pdf PDF
10 Mechanical 54218106_Drawings_FinalCD_013120.pdf PDF
09 Plumbing 54218106_Drawings_FinalCD_013120.pdf PDF
08 Fire Protection 54218106_Drawings_FinalCD_013120.pdf PDF
02 Hazardous 54218106_Drawings_FinalCD_013120.pdf PDF
07 Equipment 54218106_Drawings_FinalCD_013120.pdf PDF
01 General 54218106_Drawings_FinalCD_013120.pdf PDF
05 Architectural 54218106_Drawings_FinalCD_013120.pdf PDF
11 Electrical 54218106_Drawings_FinalCD_013120.pdf PDF
03 Civil Landscape 54218106_Drawings_FinalCD_013120.pdf PDF
54218106-Spec-Vol 3_FinalCD_013120.pdf PDF
36C24420B0003.docx DOCX document
PCRA 3-2019 building 4.pdf PDF
54218106-Spec-Vol 2_FinalCD_013120.pdf PDF
54218106-Spec-Vol 1_FinalCD_013120.pdf PDF
COVID Guidelines.pdf PDF
54218106-Spec-Vol 4_FinalCD_013120.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked Drawn

VA FORM 08-6231

FULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

31 JAN 2020

FINISH SCHEDULE - BASEMENT

AND FIRST FLOOR

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

PB DM

542-18-106

I601

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

ROOM FINISH SCHEDULE - BASEMENT AND FIRST FLOOR

ROOM

NO. ROOM NAME

FLOOR BASE WALLS CEILING

REMARKS

FLOOR

MATERIAL

FLOOR

COLOR

BASE

MATERIAL BASE COLOR

NORTH WEST SOUTH EAST

TYPE HEIGHTSMATERIAL FINISH COLOR MATERIAL FINISH COLOR MATERIAL FINISH COLOR MATERIAL FINISH COLOR

BASEMENT

B01 WAITING/ BREAKOUT LVT LVT-1 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-1/P-6 GWB PAINT P-1 GWB PAINT P-1/P-6 ACT-1 / GWB P-6

VARIES SEE A130.1 FOR EXACT CEILING HEIGHTS AND

FINISHES

B01A GROUP ROOM LVT LVT-1 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-6 GWB PAINT P-1 ACT-1 8'-0"

B01B GROUP ROOM LVT LVT-1 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-6 ACT-1 8'-0"

B01C GROUP ROOM LVT LVT-1 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-6 ACT-1 8'-0"

B02 MEN'S RESTROOM PORCELAIN PT-1 PORCELAIN PTB-1 PORCELAIN PT PT-1 PORCELAIN PT PT-1 PORCELAIN PT PT-1 PORCELAIN PT PT-1 GWB/P-7 8'-0" SEE A130.1 FOR EXACT CEILING HEIGHT AND

FINISHES / SEE INTERIOR ELEVATIONS FOR

WALL FINISH DETAILS

B02A WOMEN'S RESTROOM PORCELAIN PT-2 PORCELAIN PTB-2 PORCELAIN PT PT-2 PORCELAIN PT PT-2 PORCELAIN PT PT-2 PORCELAIN PT PT-2 GWB/P-7 8'-0" SEE A130.1 FOR EXACT CEILING HEIGHT AND

FINISHES / SEE INTERIOR ELEVATIONS FOR

WALL FINISH DETAILS

B03 GROUP ROOM LVT LVT-1 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-6 ACT-1 8'-0"

B03A GROUP ROOM LVT LVT-1 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-6 ACT-1 8'-0"

B03B STORAGE LVT LVT-1 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 ACT-1 8'-0"

B03C ELECTRICAL CLOSET SS CS-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 ACT-1 8'-0"

B03D STORAGE QUARTZ QT-1 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 ACT-1 8'-0"

B04 LACTATION ROOM LVT LVT-1 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-6 GWB PAINT P-1 ACT-1 8'-0"

B16B ELEVATOR SERVICE ROOM 2 SS CS-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1

1st FLOOR

100 VESTIBULE WCPT CT-1 VINYL VB-1 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-1 GWB PAINT P-1 ACT-1 9' 9 3/4"

100A WAITING/ BREAK-OUT LVT LVT-1 VINYL VB-1 GWB PAINT P-2/P-6 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-6 ACT-1 9'-0"

100B WHEELCHAIR ALCOVE LVT LVT-1 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 ACT-1 9'-0"

100C CENTER CORRIDOR LVT LVT-1 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 ACT-1 9'-0"

100E EAST CORRIDOR LVT LVT-1 VINYL VB-1 GWB PAINT P-6 GWB PAINT P-1 GWB PAINT P-6 GWB PAINT P-1 ACT-1/GWB P-6

VARIES SEE A131.3 FOR EXACT CEILING HEIGHTS AND

FINISHES

100W WEST CORRIDOR LVT LVT-1 VINYL VB-1 GWB PAINT P-6 GWB PAINT P-1 GWB PAINT P-6 GWB PAINT P-1 ACT-1/GWB P-6

VARIES SEE A131.1 FOR EXACT CEILING HEIGHTS AND

FINISHES

101 WOMENS WAITING LVT LVT-2 VINYL VB-1 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-2 ACT-1 9'-0"

102 ELEC SS CS-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 EXIST'G 9'-0"

103 TOILET PORCELAIN PT-1 PT PTB-1 PORCELAIN PT PT-1 PORCELAIN PT/PAINT PT-1 PORCELAIN PT PT-1 PORCELAIN PT PT-1 GWB/P-7 8'-0" SEE A131.3 FOR EXACT CEILING FINISHES / SEE

INTERIOR ELEVATIONS FOR WALL FINISH

DETAILS

104 TOILET PORCELAIN PT-2 PT PTB-2 PORCELAIN PT PT-2 PORCELAIN PT/PAINT PT-2 PORCELAIN PT PT-2 PORCELAIN PT PT-2 GWB/P-7 8'-0" SEE A131.3 FOR EXACT CEILING FINISHES / SEE

INTERIOR ELEVATIONS FOR WALL FINISH

DETAILS

105 COLLABORATIVE ROOM CPT CT-2 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-6 GWB PAINT P-1 ACT-1 9'-0"

105A SUPERVISOR LVT LVT-1 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-4 ACT-1 9'-0"

106 MENTAL HEALTH CONSULT OFFICE LVT LVT-1 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-4 ACT-1 9'-0"

107 MENTAL HEALTH EXAM ROOM LVT LVT-1 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-5 ACT-1 9'-0"

108 MENTAL HEALTH CONSULT OFFICE LVT LVT-1 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-5 ACT-1 9'-0"

109 MENTAL HEALTH CONSULT OFFICE LVT LVT-1 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-5 ACT-1 9'-0"

110 MENTAL HEALTH EXAM ROOM LVT LVT-1 VINYL VB-1 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-5 ACT-1 9'-0"

111 MENTAL HEALTH CONSULT OFFICE LVT LVT-1 VINYL VB-1 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-4 ACT-1 9'-0"

112 PRIMARY CARE EXAM ROOM LVT LVT-1 VINYL VB-1 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-5 ACT-1 9'-0"

113 PRIMARY CARE EXAM ROOM LVT LVT-1 VINYL VB-1 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-5 ACT-1 9'-0"

114 SUPPLY LVT LVT-1 VINYL VB-1 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-5 ACT-1 9'-0"

114A CRASH CART LVT LVT-1 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 ACT-1 9'-0"

115 PRIMARY CARE EXAM ROOM LVT LVT-1 VINYL VB-1 GWB PAINT P-2 GWB PAINT P-5 GWB PAINT P-2 GWB PAINT P-2 ACT-1 9'-0"

116 PRIMARY CARE EXAM ROOM LVT LVT-1 VINYL VB-1 GWB PAINT P-2 GWB PAINT P-5 GWB PAINT P-2 GWB PAINT P-2 ACT-1 9'-0"

117 PRIMARY CARE EXAM ROOM LVT LVT-1 VINYL VB-1 GWB PAINT P-2 GWB PAINT P-5 GWB PAINT P-2 GWB PAINT P-2 ACT-1 9'-0"

118 PRIMARY CARE EXAM ROOM QUARTZ QT-1 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 ACT-1 9'-0"

119 MEDS QUARTZ QT-1 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 ACT-1 9'-0"

119A STORAGE QUARTZ QT-1 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 EXIST'G

119B STORAGE QUARTZ QT-1 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 EXIST'G

120 GROUP ROOM CPT CT-2 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-6 GWB PAINT P-1 ACT-1 9'-0"

120A EAST STAIR EXIST'G EXIST'G EXIST'G EXIST'G PAINT EXIST'G PAINT EXIST'G PAINT EXIST'G

121 CHECK-IN CLERKS LVT LVT-1 VINYL VB-1 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-2 ACT-1 / GWB P-6

VARIES SEE A131.3 FOR EXACT CEILING FINISHES

121A CLERK AREA LVT LVT-1 VINYL VB-1 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-2 ACT-1 8'-0"

122 SUPERVISOR OFFICE LVT LVT-1 VINYL VB-1 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-4 ACT-1 9'-0"

123 STAFF ROOM LVT LVT-3 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-6 GWB PAINT P-1 ACT-1 9'-0"

124 TOILET PORCELAIN PT-1 PT PTB-1 PORCELAIN PT/PAINT PT-1 PORCELAIN PT/PAINT PT-1 PORCELAIN PT/PAINT PT-1 PORCELAIN PT/PAINT PT-1 GWB 9'-0" SEE A131.2 FOR EXACT CEILING FINISHES

125 TOILET PORCELAIN PT-2 PT PTB-2 PORCELAIN PT/PAINT PT-2 PORCELAIN PT/PAINT PT-2 PORCELAIN PT/PAINT PT-2 PORCELAIN PT/PAINT PT-2 GWB 9'-0" SEE A131.2 FOR EXACT CEILING FINISHES

126 PSYCHIATRIC CONSULT OFFICE LVT LVT-1 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-4 GWB PAINT P-1 GWB PAINT P-1 ACT-1 9'-0"

127 STOR/ EMS QUARTZ QT-1 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB 9'-0"

128 PSYCHIATRIC CONSULT OFFICE LVT LVT-1 VINYL VB-1 GWB PAINT P-4 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 ACT-1 9'-0"

129 PSYCHIATRIC CONSULT OFFICE CPT CT-2 VINYL VB-1 GWB PAINT P-4 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 ACT-1 9'-0"

129A WEST STAIR EXIST'G EXIST'G EXIST'G EXIST'G EXIST'G EXIST'G EXIST'G

130 PSYCHIATRIC CONSULT OFFICE LVT LVT-1 VINYL VB-1 GWB PAINT P-4 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 ACT-1 9'-0"

131 PSYCHIATRIC CONSULT OFFICE LVT LVT-1 VINYL VB-1 GWB PAINT P-4 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 ACT-1 9'-0"

132 TOILET PORCELAIN PT-2 PT PTB-2 PORCELAIN PT PT-2 PORCELAIN PT PT-2 PORCELAIN PT PT-2 PORCELAIN PT PT-2 GWB 9'-0" SEE A131.2 FOR EXACT CEILING FINISHES / SEE

INTERIOR ELEVATIONS FOR WALL FINISH

DETAILS

133 TOILET PORCELAIN PT-1 PT PTB-1 PORCELAIN PT PT-1 PORCELAIN PT PT-1 PORCELAIN PT PT-1 PORCELAIN PT PT-1 GWB 9'-0" SEE A131.2 FOR EXACT CEILING FINISHES / SEE

INTERIOR ELEVATIONS FOR WALL FINISH

DETAILS

134 PSYCH/SOCIAL CONSULT OFFICE LVT LVT-1 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-4 ACT-1 9'-0"

135 PSYCH/SOCIAL CONSULT OFFICE LVT LVT-1 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-4 ACT-1 9'-0"

136 PSYCH/SOCIAL CONSULT OFFICE LVT LVT-1 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 ACT-1 9'-0"

137 PSYCH/SOCIAL CONSULT OFFICE LVT LVT-1 VINYL VB-1 GWB PAINT P-4 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 ACT-1 9'-0"

138 PSYCH/SOCIAL CONSULT OFFICE LVT LVT-1 VINYL VB-1 GWB PAINT P-4 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 ACT-1 9'-0"

139 PSYCH/SOCIAL CONSULT OFFICE LVT LVT-1 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-4 GWB PAINT P-1 GWB PAINT P-1 ACT-1 9'-0"

140 PSYCH/SOCIAL CONSULT OFFICE LVT LVT-1 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-4 GWB PAINT P-1 GWB PAINT P-1 ACT-1 9'-0"

141 PSYCH/SOCIAL CONSULT OFFICE LVT LVT-1 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-4 GWB PAINT P-1 GWB PAINT P-1 ACT-1 9'-0"

142 PSYCH/SOCIAL CONSULT OFFICE LVT LVT-1 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-4 GWB PAINT P-1 GWB PAINT P-1 ACT-1 9'-0"

143 PSYCH/SOCIAL CONSULT OFFICE LVT LVT-1 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-4 GWB PAINT P-1 GWB PAINT P-1 ACT-1 9'-0"

144 SUPERVISOR OFFICE LVT LVT-1 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-4 GWB PAINT P-1 GWB PAINT P-1 ACT-1 9'-0"

145 PSYCH/SOCIAL CONSULT OFFICE LVT LVT-1 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-4 GWB PAINT P-1 GWB PAINT P-1 ACT-1 9'-0"

146 PSYCH/SOCIAL CONSULT OFFICE LVT LVT-1 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-4 GWB PAINT P-1 GWB PAINT P-1 ACT-1 9'-0"

147 PSYCH/SOCIAL CONSULT OFFICE LVT LVT-1 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-4 GWB PAINT P-1 GWB PAINT P-1 ACT-1 9'-0"

148 PSYCH/SOCIAL CONSULT OFFICE LVT LVT-1 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-4 GWB PAINT P-1 GWB PAINT P-1 ACT-1 9'-0"

149 PSYCH/SOCIAL CONSULT OFFICE LVT LVT-1 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-4 GWB PAINT P-1 ACT-1 9'-0"

150 PSYCH/SOCIAL CONSULT OFFICE LVT LVT-1 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-4 GWB PAINT P-1 ACT-1 9'-0"

151 PSYCH/SOCIAL CONSULT OFFICE LVT LVT-1 VINYL VB-1 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-4 ACT-1 9'-0"

152 PSYCH/SOCIAL CONSULT OFFICE LVT LVT-1 VINYL VB-1 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-4 ACT-1 9'-0"

153 PSYCH/SOCIAL CONSULT OFFICE LVT LVT-1 VINYL VB-1 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-4 ACT-1 9'-0"

154 IT QUARTZ QT-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 ACT-1 9'-0" SEE A131.1 FOR EXACT CEILING FINISHES

Revisions: Date:

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked Drawn

VA FORM 08-6231

FULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

31 JAN 2020

FINISH SCHEDULE AND

LEGEND - SECOND FLOOR

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

PB DM

542-18-106

I602

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

ROOM FINISH SCHEDULE - SECOND FLOOR

ROOM

NO. ROOM NAME

FLOOR BASE WALLS CEILING

REMARKS

FLOOR

MATERIAL

FLOOR

COLOR

BASE

MATERIAL

BASE

COLOR

NORTH WEST SOUTH EAST

TYPE HEIGHTMATERIAL FINISH COLOR MATERIAL FINISH COLOR MATERIAL FINISH COLOR MATERIAL FINISH COLOR

2nd FLOOR

200A WAITING/ BREAK-OUT LVT LVT-1/2 VINYL VB-1 GWB PAINT P-2/P-6 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-1 ACT-1 9'-0"

200C CENTER CORRIDOR LVT LVT-1 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 ACT-1 9'-0"

200E EAST CORRIDOR LVT LVT-1 VINYL VB-1 GWB PAINT P-6 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 ACT-1 / GWB P-6

VARIES SEE A132.3 FOR EXACT CEILING HEIGHTS AND

FINISHES

200W WEST CORRIDOR LVT LVT-1 VINYL VB-1 GWB PAINT P-6 GWB PAINT P-1 GWB PAINT P-6 GWB PAINT P-1 ACT-1 / GWB P-6

VARIES SEE A132.1 FOR EXACT CEILING HEIGHTS AND

FINISHES

201 CONSULT CPT CT-2 VINYL VB-1 GWB PAINT P-4 GWB PAINT P-4 GWB PAINT P-4 GWB PAINT P-1 ACT-1 9'-0"

202 WOMENS WAITING LVT LVT-2 VINYL VB-1 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-2 ACT-1 9'-0"

203 ELEC QUARTZ QT-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 EXIST'G

204 TOILET PORCELAIN PT-1 PORCELAIN PTB-1 PORCELAIN PT PT-1 PORCELAIN PT PT-1 PORCELAIN PT/PAINT PT-1 PORCELAIN PT PT-1 GWB/P-7 8'-0" SEE A132.3 FOR EXACT CEILING FINISHES

205 TOILET PORCELAIN PT-2 PORCELAIN PTB-2 PORCELAIN PT PT-2 PORCELAIN PT PT-2 PORCELAIN PT/PAINT PT-2 PORCELAIN PT PT-2 GWB/P-7 8'-0" SEE A132.3 FOR EXACT CEILING FINISHES

206 NEURO PSYCH/ TESTING LVT LVT-1 VINYL VB-1 GWB PAINT P-2 GWB PAINT P-4 GWB PAINT P-2 GWB PAINT P-2 ACT-1 9'-0"

206A STORAGE QUARTZ QT-1 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 ACT-1 8'-0"

207 NEURO PSYCH/ TESTING LVT LVT-1 VINYL VB-1 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-4 GWB PAINT P-2 ACT-1 9'-0"

208 NEURO PSYCH/ TESTING LVT LVT-1 VINYL VB-1 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-4 GWB PAINT P-2 ACT-1 9'-0"

209 NEURO PSYCH/ TESTING LVT LVT-1 VINYL VB-1 GWB PAINT P-4 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-2 ACT-1 9'-0"

210 NEURO PSYCH/ TESTING LVT LVT-1 VINYL VB-1 GWB PAINT P-4 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-2 ACT-1 9'-0"

210A STORAGE QUARTZ QT-1 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 ACT-1 8'-0"

211 NEURO PSYCH/ TESTING LVT LVT-1 VINYL VB-1 GWB PAINT P-2 GWB PAINT P-4 GWB PAINT P-2 GWB PAINT P-2 ACT-1 9'-0"

212 NEURO PSYCH/ TESTING LVT LVT-1 VINYL VB-1 GWB PAINT P-2 GWB PAINT P-4 GWB PAINT P-2 GWB PAINT P-2 ACT-1 9'-0"

213 NEURO PSYCH/ TESTING LVT LVT-1 VINYL VB-1 GWB PAINT P-2 GWB PAINT P-4 GWB PAINT P-2 GWB PAINT P-2 ACT-1 9'-0"

213A STORAGE QUARTZ QT-1 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 EXIST'G

213B STORAGE QUARTZ QT-1 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 EXIST'G

214 GROUP THERAPY CPT CT-2 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-6 GWB PAINT P-1 ACT-1 9'-0"

214A EAST STAIR EXIST'G EXIST'G EXIST'G EXIST'G EXIST'G EXIST'G EXIST'G

215 CHECK-IN CLERKS LVT LVT-1 VINYL VB-1 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-2 ACT-1 8'-0"

215A NURSE/ TRIAGE LVT LVT-1 VINYL VB-1 GWB PAINT P-3 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-2 ACT-1 8'-0"

216 TOILETS PORCELAIN PT-1 PORCELAIN PTB-1 PORCELAIN PT PT-1 PORCELAIN PT PT-1 PORCELAIN PT PT-1 PORCELAIN PT PT-1 GWB/P-7 8'-0" SEE A132.3 FOR EXACT CEILING FINISHES /

SEE INTERIOR ELEVATIONS FOR WALL FINISH

DETAILS

217 TOILETS PORCELAIN PT-2 PORCELAIN PTB-2 PORCELAIN PT PT-2 PORCELAIN PT PT-2 PORCELAIN PT PT-2 PORCELAIN PT PT-2 GWB/P-7 8'-0" SEE A132.4 FOR EXACT CEILING FINISHES /

SEE INTERIOR ELEVATIONS FOR WALL FINISH

DETAILS

218 STAFF ROOM LVT LVT-3 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-6 GWB PAINT P-1 GWB PAINT P-6 ACT-1 9'-0"

219 VJO / TCM / TBI LVT LVT-1 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-6 GWB PAINT P-1 GWB PAINT P-6 ACT-1 9'-0"

219A WEST STAIR EXIST'G EXIST'G EXIST'G EXIST'G EXIST'G EXIST'G EXIST'G

219B HAC EXIST'G EXIST'G EXIST'G EXIST'G EXIST'G EXIST'G EXIST'G

220 SUD CONSULT OFFICE LVT LVT-1 VINYL VB-1 GWB PAINT P-4 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-2 ACT-1 9'-0"

221 SUD CONSULT OFFICE LVT LVT-1 VINYL VB-1 GWB PAINT P-4 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-2 ACT-1 9'-0"

222 TOILET PORCELAIN PT-2 PORCELAIN PTB-2 PORCELAIN PT PT-2 GWB PT PT-2 PORCELAIN PT PT-2 PORCELAIN PT PT-2 GWB/P-7 8'-0" SEE A132.2 FOR EXACT CEILING FINISHES

223 TOILET PORCELAIN PT-1 PORCELAIN PTB-1 PORCELAIN PT PT-1 GWB PT PT-1 PORCELAIN PT PT-1 PORCELAIN PT PT-1 GWB/P-7 8'-0" SEE A132.2 FOR EXACT CEILING FINISHES

224 BIO-FEEDBACK TREATMENT LVT LVT-1 VINYL VB-1 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-4 ACT-1 9'-0"

225 BIO-FEEDBACK DR. PEKALA LVT LVT-1 VINYL VB-1 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-4 ACT-1 9'-0"

226 BIO-FEEDBACK INTAKE AND

WAITING

LVT LVT-1 VINYL VB-1 GWB PAINT P-6 GWB PAINT P-1 GWB PAINT P-6 GWB PAINT P-1 ACT-1 9'-0"

226A BIO-FEEDBACK INTAKE LVT LVT-1 VINYL VB-1 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-4 ACT-1 9'-0"

226B STORAGE QUARTZ QT-1 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 ACT-1 8'-0"

227 BIO-FEEDBACK DANIELLE LVT LVT-1 VINYL VB-1 GWB PAINT P-4 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-2 ACT-1 9'-0"

228 BIO-FEEDBACK OFFICE LVT LVT-1 VINYL VB-1 GWB PAINT P-4 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-2 ACT-1 9'-0"

229 SUD CONSULT OFFICE LVT LVT-1 VINYL VB-1 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-4 GWB PAINT P-2 ACT-1 9'-0"

230 SUD CONSULT OFFICE LVT LVT-1 VINYL VB-1 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-4 GWB PAINT P-2 ACT-1 9'-0"

230A STORAGE QUARTZ QT-1 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 ACT-1 8'-0"

231 SUD CONSULT OFFICE LVT LVT-1 VINYL VB-1 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-4 ACT-1 9'-0"

232 SUD CONSULT OFFICE LVT LVT-1 VINYL VB-1 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-4 ACT-1 9'-0"

233 SUD CONSULT OFFICE LVT LVT-1 VINYL VB-1 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-4 ACT-1 9'-0"

234 IT QUARTZ QT-1 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 EXIST'G

235 ELEC QUARTZ QT-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 EXIST'G

236 SUD CONSULT OFFICE LVT LVT-1 VINYL VB-1 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-4 GWB PAINT P-2 ACT-1 9'-0"

237 SUD CONSULT OFFICE LVT LVT-1 VINYL VB-1 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-4 GWB PAINT P-2 ACT-1 9'-0"

238 SUD CONSULT OFFICE LVT LVT-1 VINYL VB-1 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-4 GWB PAINT P-2 ACT-1 9'-0"

239 HOTEL CONSULT LVT LVT-1 VINYL VB-1 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-4 GWB PAINT P-2 ACT-1 9'-0"

240 HOTEL CONSULT LVT LVT-1 VINYL VB-1 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-4 GWB PAINT P-2 ACT-1 9'-0"

241 CONFERENCE CPT CT-2 VINYL VB-1 GWB PAINT P-6 GWB PAINT P-1 GWB PAINT P-6 GWB PAINT P-1 ACT-1 9'-0"

ROOM FINISH LEGEND

Key Material Manufacturer/Design Basis Product Properties Style/Color (Or Approved Equal) Contact

Miscellaneous Finishes

1 GROUT (PT-1/3) BOSTIK or VA Approved Equal PRE-MIXED/UREATHANE H145/COLOR: MOBE PEARL DARLENE COZZI (847) 561-9582

2 GROUT (PT-2) BOSTIK or VA Approved Equal PRE-MIXED/UREATHANE H144/COLOR: PORTABELLA DARLENE COZZI (847) 561-9582

3 WOOD DOORS VT DOORS or VA Approved Equal SPECIES: RED OAK/COLOR:

CLEAR, CL18

MARK REUSCG (712) 369-0747

4 SIGNAGE TAKEFORM or VA Approved Equal CAMBER COLLECTION/FUSION

20/COLORS & GRAPHICS: TBD

BY VA

5 MILLWORK MIDMARK or VA Approved Equal SYNTHESIS CABINETRY

COLLECTION/SERENITY DOOR

STYLE/PATH WOODGRAIN

LAMINATE/S/M/L GLOVE BOX

HOLDERS IN UPPER CABINET

DOOR

6 MILLWORK HARDWARE 4" PULL/BRUSHED SATIN

7 INTEGRATED LAVATORY (BASEMENT

TOILETS)

CORIAN or VA Approved Equal STYLE: 815P/COLOR: GROUP B

- GLACIER WHITE

ROOM FINISH LEGEND

Key Material Manufacturer/Design Basis Product Properties Style/Color (Or Approved Equal) Contact

Flooring

CT-2 CARPET TILE TARKETT or VA Approval Equall MODULAR ER3 / ETHOS

MODULAR W/ OMNICOAT

TECHNOLOGY - TARKETT

TAUPE

DOUBLE BOULCE/COLOR:

COOL GRAPHITE/SIZE: 18" X

36"

LAURIE LANGE (847) 814-9806

CT-3 ENTRY WALK-OFF/FOOT GRILL

(ALTERNATIVE)

MAT'S INC or VA Approved Equal 5/16" FLEXIBLE VINYL GRID

WITH NYLON FIBER INSERTS

ULTRA ENTRY/LOOSE LAY

WITH SCHLUTER

FRAME/COLOR:TBD

RICH RUHLIN (207) 450-0462

LVT-1 LUXURY VINYL TILE TARKETT or VA Approval Equal 32 MIL WEAR LAYER/3 MM

OVERALL

THICKNESS/SQUARE EDGE

(SE)

PCEX-3324-TK/STYLE:EXOTIC

WOOD PCEX/COLOR:WASHED

TEAK/SIZE 6"X36"

LAURIE LANGE (847) 814-9806

LVT-2 LUXURY VINYL TILE TARKETT or VA Approval Equal 32 MIL WEAR LAYER/3 MM

OVERALL

THICKNESS/SQUARE EDGE

(SE)

PCCH 0974-QU/STYLE:

CHENILLE/COLOR:

PEPPERED/SIZE 6"X36"

LAURIE LANGE (847) 814-9806

LVT-3 LUXURY VINYL TILE TARKETT or VA Approval Equal 32 MIL WEAR LAYER/3 MM

OVERALL

THICKNESS/SQUARE EDGE

(SE)

ITEM: PCBC-0990-QU/STYLE:

BROADCOLTH/COLOR:

BLEACHFIELD/SIZE 6" X

36"/QUARTER TURN

INSTALLATION

LAURIE LANGE (847) 814-9806

PT-1 PORCELAIN TILE CROSSVILLE or VA Approved Equal PORCELAIN NOTORIOUS NTR03/COLOR:

SUGAR DADDY UPS/ 12 X 14

DARLENE COZZI (847) 561-9582

PT-2 PORCELAIN TILE CROSSVILLE or VA Approved Equal PORCELAIN NOTORIOUS NTR02/COLOR:

PRIVATE EYE UPS/12 X 24

DARLENE COZZI (847) 561-9582

QT-1 QUARTZ TILE RICKETT or VA Approved Equal 79% Quartz Tile/ 2.5mm SIZE: 24" X 24" TILE/ STYLE:

RAIN / COLOR: SILVER SPIRIT

HARRY BROWNETT (908)

872-0887

TS-1 TRANSITION STRIP (PT TO LVT OR CPT) SCHLUTER SYSTEMA or Approved Equal STAINLESS STEEL SCHIENE/E100-V4A/3/8" DARLENE COZZI (847) 561-9582

TS-2 TRANSITION STRIP (CPT TO LVT) TARKETT or Approved Equal VINYL SLIM LINE

TRANSITIONS/SLT-55-A/1/4" TO

1/8" SILVER GREY (CARPET TO

LVT)

KIM MATRANGA 224-287-1509

Wall Base

PTB-1 PORCELAIN TILE BASE CROSSVILLE or VA Approved Equal PORCELAIN TILE / 3/8" THICK NOTORIOUS NTR03/COLOR:

SUGAR DADDY UPS/ 6" X 12"

DARLENE COZZI (847) 561-9582

PTB-2 PORCELAIN TILE BASE CROSSVILLE or VA Approved Equal PORCELAIN TILE / 3/8" THICK NOTORIOUS NTR02/COLOR:

PRIVATE EYE UPS/ 6" X 12"

DARLENE COZZI (847) 561-9582

VB-1 VINYL BASE ARMSTRONG or Approved Equal 6"/ TOE BASE/ 1/8" THICK COLOR: FRESH TAUPE 64 KIM MATRANGA 224-287-1509

VB-2 VINYL BASE ARMSTRONG or Approved Equal 6"/ TOELESS BASE/ CARPET

TILE/ 1/8" THICK

COLOR: FRESH TAUPE 64 KIM MATRANGA 224-287-1509

Wall Finish

P-1 PAINT SHERWIN WILLIAMS or VA Approved Equal EGG SHELL/MPI-53-X-GREEN PRO MAR 200 ZERO VOC

INTERIOR LATEX/ EGGSHELL

FINISH/COLOR: SW 7647

CRUSHED ICE (255-C6)

JESSICA NEWELL (224)223-5180

P-2 PAINT SHERWIN WILLIAMS or VA Approved Equal EGG SHELL/MPI-53-X-GREEN PRO MAR 200 ZERO VOC

INTERIOR LATEX/ EGGSHELL

FINISH/COLOR: SW 9109

NATURAL LINEN (205-C1)

JESSICA NEWELL (224) 233-5180

P-3 PAINT SHERWIN WILLIAMS or VA Approved Equal EGG SHELL/MPI-53-X-GREEN PRO MAR 200 ZERO VOC

INTERIOR LATEX/ EGGSHELL

FINISH/COLOR: SW 6204 SEA

SALT (217-C1)

JESSICA NEWELL (224) 233-5180

P-4 PAINT SHERWIN WILLIAMS or VA Approved Equal EGG SHELL/MPI-53-X-GREEN PRO MAR 200 ZERO VOC

INTERIOR LATEX/ EGGSHELL

FINISH/COLOR: SW 6205

COMFORT GREY (217-C2)

JESSICA NEWELL (224) 233-5180

P-5 PAINT SHERWIN WILLIAMS or VA Approved Equal EGG SHELL/MPI-53-X-GREEN PRO MAR 200 ZERO VOC

INTERIOR LATEX/ EGGSHELL

FINISH/COLOR: SW 7652

MINERAL DEPOSIT (238-C4)

JESSICA NEWELL (224) 233-5180

P-6 PAINT SHERWIN WILLIAMS or VA Approved Equal EGG SHELL/MPI-53-X-GREEN PRO MAR 200 ZERO VOC

INTERIOR LATEX/ EGGSHELL

FINISH/COLOR: SW 6227

MEDITATIVE (220-C3)

JESSICA NEWELL (224) 233-5180

PT-1 PORCELAIN TILE (WALL) CROSSVILLE or VA Approved Equal PORCELAIN NOTORIOUS NTR03/COLOR:

SUGAR DADDY UPS/12X24

DARLENE COZZI (847) 561-9582

PT-2 PORCELAIN TILE (WALL) CROSSVILLE or VA Approved Equal PORCELAIN NOTORIOUS NTR02/COLOR:

PRIVATE EYE UPS/12X24

DARLENE COZZI (847) 561-9582

PT-3 PORCELAIN TILE (WALL ACCENT) CROSSVILLE or VA Approved Equal PORCELAIN YING & YANG - LOTUS

BLOSSOM - LINEAR MOSIAC

YY06/.1MIXMOS - 4468

DARLENE COZZI (847) 561-9582

Wall Protection

WP-1 RIGID VINYL ACROVYN or VA Approved Equal PVC-FREE/0.60 THICKNESS 4000/COLOR: FAWN

#196/TEXTURE: SUEDE

ALEXIS DABDOUB (224)651-7935

WP-2 CORNER GUARD ACROVYN or Approved Equal PVC-FREE STYLE: SM-20N/COLOR:

MISSION WHITE

#933/TEXTURE: SUEDE

ALEXIS DABDOUB (224)651-7935

WP-3 HANDRAILS ACROVYN or VA Approved Equal PVC-FREE HRB-4CN/COLOR: MISSION

WHITE #933/TEXTURE: SUEDE

ALEXIS DABDOUB (224)651-7935

WP-4 WALL GUARDS ACROVYN or VA Approved Equal PVC-FREE SCR-64N/8" HEIGHT X 1-1/2"

CLIP/COLOR: SLATE

#209/TEXTURE SUEDE

ALEXIS DABDOUB (224)651-7935

WP-5 RIGID VINYL (CHECK-IN) ACROVYN or VA Approved Equal PVC-FREE/0.60 THICKNESS BRUSHED SILVER 3410/SUEDE

TEXTURE

ALEXIS DABDOUB (224)651-7935

WP-6 END WALL PROTECTION ACROVYN or VA Approved Equal PVC-FREE STYLE 140D/COLOR:MISSION

WHITE #933/ TEXTURE: SUEDE

ALEXIS DABDOUB (224)651-7935

Millwork Surface

AC-1 ACRYLIC PANEL LUMICOR OR VA Approved Equal ACRYLIC / 1/2" STYLE:

KAURI/OLIVEWOOD/SATIN

FINISH FRONT & POLISHED

BACK/SCALE 3-1/2" X 3-1/2"

SANDY SMITH (847) 274-5420

PL-1 PLASTIC LAMINATE (CHECK-IN) WILSONART or VA Approved Equal HD LAMINATE/1/2" COMPACT

LAMINATE

WEBB OAK 17013K-57, ALIGNED

TEXTURE

TRACY VALLE (312) 493-5976

PL-2 PLASTIC LAMINATE (CHECK-IN) WILSONART or VA Approved Equal HD LAMINATE/1/2" COMPACT

LAMINATE

KINGSWOOD WALNUT/SATIN

FINISH FRONT & POLISHED

BACK/SCALE 3-1/2" X 3-1/2"

TRACY VALLE (312) 493-5976

SS-1 SOLID SURFACE CAMBRIA or VA Approved Equal 1/2"/QUARTZ PENDLE HIL LINDSAY MANRING (847) 284-2205

Ceilings

ACT-1 ACOUSTIC CEILING TILE ARMSTRONG or VA Approved Equal SOUND ABSORPTION 0.55 CORTEGA/ANGULAR TEGULA 704A/24" 24" X

5/8"/COLOR:WHITE

TABITHA MCCARTHY (877)

276-7876

P-6 PAINT (ACCENT SOFFIT/CEILING &

SOFFIT See RCP)

SHERWIN WILLIAMS or VA Approved Equal EGG SHELL/MPI-53-X-GREEN PRO MAR 200 ZERO VOC

INTERIOR LATEX/MATT

FINISH/COLOR: SW 6227

MEDITATIVE (220-C3)

JESSICA NEWELL (224)223-5180

P-7 PAINT (GYP BD CEILING & SOFFITS See

RCP)

SHERWIN WILLIAMS or VA Approved Equal EGG SHELL/MPI-53-X-GREEN PRO MAR 200 ZERO VOC

INTERIOR LATEX/MATT

FINISH/COLOR: SW 7551

GREEK VILLA (254-C1)

JESSICA NEWELL (224) 233-5180

NOTE:

1. ALL FINISHES TO HAVE FINAL APPROVAL BY THE VA INTERIOR DESIGNER COATESVILLE VA MEDICAL CENTER VISN 4

2. BASEMENT CORRIDOR FLOORING: MATCH EXITING VINYL TILE IN LOCATIONS DISTURBED BY CONSTRUCTION.

VA INTERIOR DESIGN COATESVILLE HAS FINAL APPROVAL FOR COLOR MATCH.

ROOM FINISH SCHEDULE - FIRST FLOOR

ROOM

NO. ROOM NAME

FLOOR BASE WALLS CEILING

REMARKS

FLOOR

MATERIAL

FLOOR

COLOR

BASE

MATERIAL BASE COLOR

NORTH WEST SOUTH EAST

TYPE HEIGHTSMATERIAL FINISH COLOR MATERIAL FINISH COLOR MATERIAL FINISH COLOR MATERIAL FINISH COLOR

1st FLOOR

155 ELEC SS CS-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 ACT-1 9'-0"

156 PSYCHIATRIC CONSULT OFFICE LVT LVT-1 VINYL VB-1 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-4 GWB PAINT P-2 ACT-1 9'-0"

157 PSYCHIATRIC EXAM LVT LVT-1 VINYL VB-1 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-5 GWB PAINT P-2 ACT-1 9'-0"

158 PSYCHIATRIC CONSULT OFFICE LVT LVT-1 VINYL VB-1 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-4 GWB PAINT P-2 ACT-1 9'-0"

159 PSYCHIATRIC EXAM LVT LVT-1 VINYL VB-1 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-5 GWB PAINT P-2 ACT-1 9'-0"

160 PSYCHIATRIC EXAM LVT LVT-1 VINYL VB-1 GWB PAINT P-2 GWB PAINT P-2 GWB PAINT P-5 GWB PAINT P-2 ACT-1 9'-0"

161 CONFERENCE ROOM LVT CT-2 VINYL VB-1 GWB PAINT P-6 GWB PAINT P-1 GWB PAINT P-6 GWB PAINT P-1 ACT-1 9'-0"

Revisions: Date:

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

DO NOT

ENTER

9"

9"

5"

3/

3/ 4"

/1

6"Fire Equipment

2" 9"

6"

3/8"

1/

4" 1/

2"

3/4"

12345 Braille

3/ 8"

1/ 4"

1/8" MIN. LETTER SPACING

3"

Abcdefgh Abcdefgh

1/ 2"

3/ 4"

3/ 8"

3/ 4"

3/4" 3/4"

3"

9"

3"

3/8"

1/

4" 1/

2"

3/4"

12345 Braille

3/ 8"

1/ 4"

1/8" MIN. LETTER SPACING 3/8" MIN. CLEAR SPACE

3/8" MIN. CLEAR SPACE

3/8"

9"

1' -0

/4

1/

4" 1/

2"

3/4"

12345 Braille

3/ 8"

1/ 4"

1/8" MIN. LETTER SPACING

3"

3/ 4"

6" 3/

4"

RESTROOM1"

9"

9"

1/8"

4" 3/

4" 5/

8" 3/

4" 3/

8" 3/

4"

AUTHORIZED

PERSONNEL

ONLY

3/ 8"

3/ 4"

CL

3/8"

Abcdefgh1 3/

8"

1 1/2"2 1/2"1 1/2"

/1

6"

/1 6"

Abcdefgh1 3/

8"

/1 6"

/1

6"

Abcdefgh1 3/

8"

/1 6"

/1

6"

Abcdefgh1 3/

8"

/1 6"

/1

6"

3" 3"

3" 3"

3" 3"

1' -6

1'-8"

3/8"

Abcdefgh1 3/

8"

1 1/2"2 1/2"1 1/2"

/1

6"

/1 6"

Abcdefgh1 3/

8"

/1 6"

/1

6"

3" 3"

3" 3"

1' -0

1'-8"

Abcdefgh1 3/

8"

/1 6"

/1

6"

IN-01.31

6" = 1'-0"

TYPE D - FIRE EQUIPMENT IDENTIFICATION SIGN

IN-04.02

6" = 1'-0"

TYPE B - PRIMARY ROOM IDENTIFICATION SIGN

IN-03.01

6" = 1'-0"

TYPE A - ROOM NUMBER IDENTIFICATION SIGN

IN-09.03

6" = 1'-0"

TYPE E - RESTROOM IDENTIFICATION SIGN

IN-08.02C

6" = 1'-0"

TYPE C - RESTRICTED ACCESS SIGN

IN-14.04

6" = 1'-0"

TYPE J - WALL DIRECTIONAL SIGN IN-14.05

6" = 1'-0"

TYPE K - WALL DIRECTIONAL SIGN

IN-09.08D

6" = 1'-0"

TYPE F - PICTOGRAM AND SYMBOL

IN-07.02TYPE G - ROOM SIGN WITH INDICATOR

9"

1/8"

STAIRS

CL

/4

/4

/4

3/8"

12345 Braille

Abcdefgh

Abcdefgh

3/4"

3/4"

9"

3" 3"

1/ 4"1

/2

1/

4" 1/

2" 1/

4" 3/

4" 1/

4" 1/

4"

1/ 2"

1/ 4"

/3

3/ 4"

2"

INSTALLATION

KNOB SIDE OF DOOR, 60" TO TOP OF SIGN AND 2" OVER FROM

DOOR FRAME.

SIZE

3"H X 9"W

SIGN COMPONENTS

REFER TO

SPECIFICATIONS

GRAPHIC PROCESS

TACTILE RAISED TEXT

AND BRAILLE ON TOP

SECTION. SURFACE

APPLIED VINYL OR

INSERT IN LOWER SIGN

SECTION

COLORS

TEXT: REFER TO FINISH

PLANS

BACKGROUND: REFER TO

FINISH PLANS

TYPOGRAPHY

HELVETICA BOLD RAISED

TACTILE GRADE 2

BRAILLE DOMED

MOUNTING

DOUBLE SIDED FOAM TAPE OR SILASTIC ADHESIVE

INSTALLATION

KNOB SIDE OF DOOR, 60" TO TOP OF SIGN AND 2" OVER FROM

DOOR FRAME.

SIZE

3"H X 9"W

SIGN COMPONENTS

REFER TO

SPECIFICATIONS

GRAPHIC PROCESS

TACTILE RAISED TEXT

AND BRAILLE ON TOP

SECTION. SURFACE

APPLIED VINYL OR

INSERT IN LOWER SIGN

SECTION

COLORS

TEXT: REFER TO FINISH

PLANS

BACKGROUND: REFER TO

FINISH PLANS

TYPOGRAPHY

HELVETICA BOLD RAISED

TACTILE GRADE 2

BRAILLE DOMED

MOUNTING

DOUBLE SIDED FOAM

TAPE OR SILASTIC

ADHESIVE

SIZE

3"H X 9"W

SIGN COMPONENTS

ACRYLIC PLAQUE

GRAPHIC PROCESS

SILK-SCREENED

COLORS

TEXT: WHITE

BACKGROUND: RED

TYPOGRAPHY

HELVETICA BOLD

MOUNTING

DOUBLE SIDED FOAM

TAPE OR SILASTIC

ADHESIVE

INSTALLATION

CENTERED ON DOOR, 63"

TO TOP OF SIGN

SIZE

9"H X 9"W

SIGN COMPONENTS

ACRYLIC PLAQUE WITH

ALUMINUM BRACKET FOR

FLAG MOUNTING

GRAPHIC PROCESS

SILK-SCREENED

COLORS

TEXT AND SYMBOL:

WHITE

BACKGROUND: RED

BRACKET: ALUMINUM

TYPOGRAPHY

HELVETICA BOLD

MOUNTING

MECHANICAL FASTENERS

WITH ANCHORS

INSTALLATION

CENTERED ABOVE FIRE

EQUIPMENT CABINET

7'-0" TO BOTTOM OF

SIGN; MECHANICALLY

FASTENED TO WALL WITH

EXPANDABLE ANCHORS

AS NEEDED FOR WALL

TYPE

SIZE

12.25"H X 9"W

SIGN COMPONENTS

REFER TO

SPECIFICATIONS

GRAPHIC PROCESS

TACTILE RAISED TEXT

AND BRAILLE ON TOP

SECTION. LOWER

SECTION TO BE RAISED

GRAPHIC TACTILE

SYMBOL

COLORS

TEXT: REFER TO FINISH

PLANS

BACKGROUND: REFER TO

FINISH PLANS

TYPOGRAPHY

HELVETICA BOLD RAISED

TACTILE GRADE 2

BRAILLE DOMED

MOUNTING

DOUBLE SIDED FOAM

TAPE OR SILASTIC

ADHESIVE

INSTALLATION

ON WALL OR DOOR, 60"

TO TOP OF SIGN AND ON

DOOR, CENTER

1/8"

CL

IN-09.08

6" = 1'-0"

TYPE H - PICTOGRAM AND SYMBOL

9"

SIZE

9"H X 9"W

SIGN COMPONENTS

SIGN IS DIGITAL PRINT,

SILKSCREEN OR VINYL

APPLIED GRAPHICS

GRAPHIC PROCESS

SILK-SCREENED OR

SURFACE APPLIED VINYL

COLORS

TEXT AND SYMBOL:

BACKGROUND:

TYPOGRAPHY

HELVETICA BOLD

MOUNTING

DOUBLE SIDED FOAM

TAPE OR SILASTIC

ADHESIVE

INSTALLATION

ON WALL OR DOOR , 60"

TO TOP OF SIGN AND ON

DOOR, CENTER

SIZE

9"H X 9"W

SIGN COMPONENTS

SIGN IS DIGITAL PRINT,

SILKSCREEN OR VINYL

APPLIED GRAPHICS

GRAPHIC PROCESS

SILK-SCREENED OR

SURFACE APPLIED VINYL

COLORS

TEXT AND SYMBOL:

BACKGROUND:

TYPOGRAPHY

HELVETICA BOLD

MOUNTING

DOUBLE SIDED FOAM

TAPE OR SILASTIC

ADHESIVE

INSTALLATION

ON WALL OR DOOR, 60"

TO TOP OF SIGN AND ON

DOOR, CENTER

SIZE

9"H X 9"W

SIGN COMPONENTS

TOP SECTION RAISED

TEXT AND BRAILLE. MID

SECTION CAN BE

DIGITAL PRINT OR VINYL

APPLIED GRAPHICS.

LOWER SECTION

MOVING SLIDER WITH

GRAPHIC REVEAL

GRAPHIC PROCESS

SLIDER SECTION

SURFACE APPLIED

VINYL. TEXT BEHIND

SLIDER IS SECOND

SURFACE

COLORS

TEXT AND SYMBOL:

BACKGROUND:

TYPOGRAPHY

HELVETICA BOLD

GRADE 2 BRAILLE

MOUNTING

DOUBLE SIDED FOAM

TAPE, SILASTIC

ADHESIVE OR SCREW

6" = 1'-0"

INSTALLATION

KNOB SIDE OF DOOR, 60" TO

TOP OF SIGN AND 2" OVER

FROM DOOR FRAME

SIZE

18"H X 20"W

SIGN COMPONENTS

REFER TO

SPECIFICATIONS

GRAPHIC PROCESS

SURFACE APPLIED VINYL

COLORS

TEXT: REFER TO FINISH

PLANS

BACKGROUND: REFER TO

FINISH PLANS

TYPOGRAPHY

HELVETICA BOLD

MOUNTING

SECURE TO WALL WITH

PHYSICAL FASTENERS

INSTALLATION

ON WALL

SIZE

12"H X 20"W

SIGN COMPONENTS

REFER TO

SPECIFICATIONS

GRAPHIC PROCESS

SURFACE APPLIED VINYL

COLORS

TEXT: REFER TO FINISH

PLANS

BACKGROUND: REFER TO

FINISH PLANS

TYPOGRAPHY

HELVETICA BOLD

MOUNTING

SECURE TO WALL WITH

PHYSICAL FASTENERS

INSTALLATION

ON WALL

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked Drawn

VA FORM 08-6231

FULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

31 JAN 2020

SIGNAGE TYPES RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

PB DM

542-18-106

I620

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

MOUNTING DETAIL 2

MOUNTING HEIGHT FOR SIGN TYPE IN-01.31.

MOUNTING DETAIL 1

MOUNTING HEIGHT FOR SIGN TYPES IN-03.01,

IN-04.02, IN-07.02, IN-09.03, IN-09.08D.

2"

FIRE

EQUIPMENT

CABINET

MOUNTING DETAIL 3 - DOOR MOUNTED

MOUNTING HEIGHT FOR SIGN TYPES IN-08.02, IN-01.01.01.

MOUNTING DETAIL 4 - WALL

MOUNTEDMOUNTING HEIGHT FOR SIGN TYPES IN-14.04,

IN-14.05.

MOUNTING DETAIL 5 - DESK/COUNTER MOUNTED

MOUNTING HEIGHT FOR SIGN TYPES IN-12.01.

MOUNTING DETAIL 3 - WALL MOUNTED

MOUNTING DETAIL 6 - WALL MOUNTED

MOUNTING HEIGHT FOR SIGN TYPES IN-02.01,

IN-02.02, IN-02.03.

IN-02.01

IN-02.03

IN-02.02

MOUNTING DETAIL 7 - WALL MOUNTED

MOUNTING HEIGHT FOR SIGN TYPES IN-02.07.

MOUNTING DETAIL 10 - WALL MOUNTED

MOUNTING HEIGHT FOR SIGN TYPES IN-14.11,

IN-14.12, IN-14.13, IN-14.14

IN-14.11

IN-14.12,

IN-14.13

IN-14.14

MOUNTING DETAIL 9- WALL MOUNTED

MOUNTING HEIGHT FOR SIGN TYPE IN-14.25

MOUNTING DETAIL 8 - DOOR

MOUNTEDMOUNTING HEIGHT FOR SIGN TYPE IN-09.08

" 6'

- 0

MOUNTING DETAIL 11 - WALL MOUNTED

MOUNTING HEIGHT FOR SIGN TYPES IN-02.02

L

1'-8"

IN-14.25

3" = 1'-0"

TYPE L - ELEVATOR LOBBY DIRECTIONAL WITH DIGITAL PRINT INSERT

5/8"

3'

- 1

3/

4" 1"

1/ 2"

1/ 2"

1"

1'

- 0

1'

- 3

" DIGITAL PRINT

"YOU ARE

HERE" MAP

SIZE

37"H X 20"W

SIGN COMPONENTS

REFER TO

SPECIFICATIONS

GRAPHIC PROCESS

DIGITAL PRINT GRAPHICS

COLORS

TEXT: REFER TO FINISH

PLANS

BACKGROUND: REFER

TO FINISH PLANS

TYPOGRAPHY

HELVETICA BOLD

MOUNTING

SECURE TO WALL WITH

PHYSICAL FASTENERS

INSTALLATION

ON WALL

1'-8"

IN-14.11-14

3" = 1'-0"

TYPE M - ENTRY DIRECTIONAL WITH DIGITAL PRINT INSERT

5/8"

3/

4" 1"

1/ 2"

1/ 2"

1"

1'

- 0

SIZE

VARIOUSH X 20"W

SIGN COMPONENTS

REFER TO

SPECIFICATIONS

GRAPHIC PROCESS

DIGITAL PRINT WITH

CLEAR LENS COVER

COLORS

TEXT: REFER TO FINISH

PLANS

BACKGROUND: REFER TO

FINISH PLANS

TYPOGRAPHY

HELVETICA BOLD

MOUNTING

SECURE TO WALL WITH

PHYSICAL FASTENERS

INSTALLATION

ON WALL

10 1/4" 1/2"

IN-12.01

3" = 1'-0"

TYPE N - CHECK-IN DIRECTIONAL WITH DIGITAL PRINT INSERT

6"

SIZE

6"H X 20"W

SIGN COMPONENTS

REFER TO

SPECIFICATIONS

GRAPHIC PROCESS

SURFACE APPLIED VINYL

COLORS

TEXT: REFER TO FINISH

PLANS

BACKGROUND: REFER TO

FINISH PLANS

TYPOGRAPHY

HELVETICA BOLD

MOUNTING

FREESTANDING

INSTALLATION

ON COUNTER OR DESK

9"

3/4"

3/ 4"

3/ 4"

1/ 2"

1/ 2"

1/ 4"

1/ 2"

1/2"

2 1/2"

IN-02.02

3" = 1'-0"

TYPE O - NO SMOKING

6"

SIZE

6"H X 20"W

SIGN COMPONENTS

ACRYLIC PLAQUE

GRAPHIC PROCESS

SILK-SCREENED

COLORS

TEXT: REFER TO FINISH

PLANS

BACKGROUND: REFER

TO FINISH PLANS

TYPOGRAPHY

HELVETICA BOLD

MOUNTING

DOUBLE SIDED FOAM

TAPE OR SILASTIC

ADHESIVE

INSTALLATION

ON COUNTER OR DESK

1' - 8"

1/8"

3/ 4"

1/

4" 3/

4" 3"

1/ 4"1/ 2"

1/ 4"

1/ 2"

IN-02.07

NOT TO SCALE

TYPE P - PATIENT RIGHTS AND RESPONSIBILITIES

24" MINIMUM

M

IN

IM

U

M

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked Drawn

VA FORM 08-6231

FULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

31 JAN 2020

SIGNAGE TYPES & MOUNTING

HEIGHTS

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

PB DM

542-18-106

I621

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

1/2" = 1'-0"

SIGNAGE MOUNTING HEIGHT ELEVATIONS

Revisions: Date:

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked Drawn

VA FORM 08-6231

FULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

31 JAN 2020

SIGNAGE SCHEDULE RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

PB DM

542-18-106

I622

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

SIGNAGE SCHEDULE

Mark

LOCATION SIGN

Type RemarksROOM ROOM NAME Type Room ID Count

137 100W WEST CORRIDOR IN-01.31 (UNIVERSAL SYMBOL) FIRE

EQUIPMENT

1 D

138 100W WEST CORRIDOR IN-01.31 (UNIVERSAL SYMBOL) FIRE

EQUIPMENT

1 D

139 100C CENTER CORRIDOR IN-01.31 (UNIVERSAL SYMBOL) FIRE

EQUIPMENT

1 D

140 100E EAST CORRIDOR IN-01.31 (UNIVERSAL SYMBOL) FIRE

EQUIPMENT

1 D

141 100E EAST CORRIDOR IN-01.31 (UNIVERSAL SYMBOL) FIRE

EQUIPMENT

1 D

142 NEXT TO 219 NEXT TO VJO / TCM / TBI IN-01.31 (UNIVERSAL SYMBOL) FIRE

EQUIPMENT

1 D

143 200A WAITING/BREAK-OUT IN-01.31 (UNIVERSAL SYMBOL) FIRE

EQUIPMENT

1 D

144 200E EAST CORRIDOR IN-01.31 (UNIVERSAL SYMBOL) FIRE

EQUIPMENT

1 D

145 200W WEST CORRIDOR IN-01.31 (UNIVERSAL SYMBOL) FIRE

EQUIPMENT

1 D

146 200C CENTER CORRIDOR IN-01.31 (UNIVERSAL SYMBOL) FIRE

EQUIPMENT

1 D

147 100B WHEELCHAIR ALCOVE IN-04.02 WHEELCHAIR ALCOVE 1 B

148 100A WAITING/BREAK-OUT IN-04.02 CHECK-IN 1 B

149 100E EAST CORRIDOR IN-14.04 DIRECTIONAL SIGNAGE 1 J

150 100A WAITING/BREAK-OUT 14.25 ELEVATOR DIRECTIONAL 1 L

151 100A WAITING/BREAK-OUT 14.25 ELEVATOR DIRECTIONAL 1 L

152 100A WAITING/ BREAK-OUT IN-14.04 DIRECTIONAL SIGNAGE 1 J

153 100 VESTIBULE IN 02.02 NO SMOKING 1 O

154 100 VESTIBULE IN 02.07 PATIENT RIGHTS AND

RESPONSIBILITIES

1 P

155 100 VESTIBULE 14.11 DIRECTIONAL SIGNAGE 1 M

156 100C CENTER CORRIDOR IN-14.04 DIRECTIONAL SIGNAGE 1 J

157 100W DIRECTIONAL SIGNAGE IN-14.04 DIRECTIONAL SIGNAGE 1 J

158 200E EAST CORRIDOR IN-14.04 DIRECTIONAL SIGNAGE 1 J

159 200A WAITING/BREAK-OUT 14.25 ELEVATOR SIGNAGE 1 L

160 200A WAITING/BREAK-OUT IN-14.04 DIRECTIONAL SIGNAGE 1 J

161 215 CHECK-IN CLERKS IN-14.04 DIRECTIONAL SIGNAGE 1 J

162 200C CENTER CORRIDOR IN-14.04 DIRECTIONAL SIGNAGE 1 J

163 200W WEST CORRIDOR IN-14.04 DIRECTIONAL SIGNAGE 1 J

164 B02A WOMEN'S RESTROOM IN-09.08 BABY CHANGING STATION 1 H MOUNT ON

DOOR

165 B01 WAITING/BREAK-OUT IN 12.01 CHECK-IN DIRECTIONAL

SIGNAGE

1 N MOUNT ON

COUNTER

166 103 TOILET IN-09.08 BABY CHANGING STATION 1 H MOUNT ON

DOOR

167 132 TOILET IN-09.08 BABY CHANGING STATION 1 H MOUNT ON

DOOR

168 100A WAITING/BREAK-OUT IN 12.01 CHECK-IN DIRECTIONAL

SIGNAGE

1 N MOUNT ON

COUNTER

170 200A WAITING/BREAK-OUT IN 12.01 CHECK-IN DIRECTIONAL

SIGNAGE

1 N MOUNT ON

COUNTER

171 204 TOILET IN-09.08 BABY CHANGING STATION 1 H MOUNT ON

DOOR

172 222 TOILET IN-09.08 BABY CHANGING STATION 1 H MOUNT ON

DOOR

SIGNAGE SCHEDULE

Mark

LOCATION SIGN

Type RemarksROOM ROOM NAME Type Room ID Count

64 144 SUPERVISOR OFFICE IN-04.02 144 OFFICE 1 B

65 145 PSYCH/SOCIAL CONSULT

OFFICE

IN-07.02 145 OFFICE 1 G

66 146 PSYCH/SOCIAL CONSULT

OFFICE

IN-07.02 146 OFFICE 1 G

67 147 PSYCH/SOCIAL CONSULT

OFFICE

IN-07.02 147 OFFICE

Abcdefgh

1 G

68 148 PSYCH/SOCIAL CONSULT

OFFICE

IN-07.02 148 OFFICE

Abcdefgh

1 G

69 149 PSYCH/SOCIAL CONSULT

OFFICE

IN-07.02 149 OFFICE 1 G

70 150 PSYCH/SOCIAL CONSULT

OFFICE

IN-07.02 150 OFFICE 1 G

71 150A STORAGE IN-04.02 150A STORAGE 1 B MOUNT ON

DOOR

72 151 PSYCH/SOCIAL CONSULT

OFFICE

IN-07.02 151 OFFICE 1 G

73 152 PSYCH/SOCIAL CONSULT

OFFICE

IN-07.02 152 OFFICE 1 G

74 153 PSYCH/SOCIAL CONSULT

OFFICE

IN-07.02 153 OFFICE 1 G

75 154 IT IN-03.01 154 1 A

76 155 ELEC IN-03.01 ELEC 1 A

77 156 PYSCHIATRIC CONSULT

OFFICE

IN-07.02 156 OFFICE 1 G

78 157 PSYCHIATRIC EXAM IN-07.02 157 EXAM 1 G

79 158 PYSCHIATRIC CONSULT

OFFICE

IN-07.02 158 OFFICE 1 G

80 159 PSYCHIATRIC EXAM IN-07.02 159 EXAM 1 G

81 160 PSYCHIATRIC EXAM IN-07.02 160 EXAM 1 G

82 161 CONFERENCE ROOM IN-07.02 161 CONFERENCE ROOM 1 G

83 201 CONSULT IN-07.02 201 CONSULT 1 G

84 202 WOMEN'S WAITING IN-04.02 WOMEN'S WAITING 1 B

85 203 ELEC IN-03.01 203 1 A

86 204 TOILET IN-09.03 204 1 E

87 205 TOILET IN-09.03 TOILET 1 E

88 206 NEURO PSYCH/TESTING IN-07.02 NEURO PSYCH/TESTING 1 G

89 206A STORAGE IN-04.02 STORAGE 1 B

90 207 NEURO PSYCH/TESTING IN-07.02 NEURO PSYCH/TESTING 1 G

91 208 NEURO PSYCH/TESTING IN-07.02 NEURO PSYCH/TESTING 1 G

92 209 NEURO PSYCH/TESTING IN-07.02 NEURO PSYCH/TESTING 1 G

93 210 NEURO PSYCH/TESTING IN-07.02 NEURO PSYCH/TESTING 1 G

94 210A STORAGE IN-04.02 STORAGE 1 B

95 211 NEURO PSYCH/TESTING IN-07.02 NEURO PSYCH/TESTING 1 G

96 212 NEURO PSYCH/TESTING IN-07.02 NEURO PSYCH/TESTING 1 G

97 213 NEURO PSYCH/TESTING IN-07.02 NEURO PSYCH/TESTING 1 G

98 213A STORAGE IN-04.02 STORAGE 1 B

99 213B STORAGE IN-04.02 STORAGE 1 B

100 214 GROUP THERAPY IN-07.02 GROUP THERAPY 1 G

101 214A STAIR IN-09.08D STAIR 1 F

102 215 CHECK-IN CLERKS IN-04.02 CHECK-IN CLERKS 1 B

102A 215 CHECK-IN CLERKS IN-08.02C DO NOT ENTER 1 C

103 215A NURSE TRIAGE IN-04.02 108 NURSE TRIAGE 1 B

103A 215A NURSE TRIAGE IN-08.02C DO NOT ENTER 1 C

104 216 TOILETS IN-09.03 216 1 E

105 217 TOILETS IN-09.03 217 1 E

106 218 STAFF ROOM IN-04.02 STAFF ROOM 1 B MOUNT ON

DOOR

107 219 VJO / TCM / TBI IN-04.02 VJO / TCM / TBI 1 B MOUNT ON

DOOR

108 219A WEST STAIR IN-04.02 STAIR 1 B

109 219B HAC IN-09.08D 220 1 F

110 220 SUD CONSULT OFFICE IN-04.02 220 OFFICE 1 B

111 221 SUD CONSULT OFFICE IN-04.02 221 OFFICE 1 B

112 222 TOILET IN-09.03 TOILET 1 E

113 223 TOILET IN-09.03 TOILET 1 E

114 224 BIO-FEEDBACK

TREATMENT

IN-07.02 224 BIO-FEEDBACK

TREATMENT

1 G

115 225 BIO-FEEDBACK DR.

PEKALA

IN-07.02 225 BIO-FEEBACK TREATMENT 1 G

116 226A BIO-FEEDBACK INTAKE IN-07.02 226A BIO-FEEDBACK

TREATMENT

1 G

117 226B STORAGE IN-04.02 226B STORAGE 1 B

118 227 BIO-FEEDBACK DANIELLE IN-07.02 227 BIO-FEEDBACK

TREATMENT

1 G

119 228 BIO-FEEDBACK OFFICE IN-07.02 228 BIO-FEEDBACK

TREATMENT

1 G

120 229 SUD CONSULT OFFICE IN-07.02 229 SUD CONSULT OFFICE 1 G

121 230 SUD CONSULT OFFICE IN-07.02 230 SUD CONSULT OFFICE 1 G

122 230A STORAGE IN-04.02 230A STORAGE 1 B

123 231 SUD CONSULT OFFICE IN-07.02 231 SUD CONSULT OFFICE 1 G

124 232 SUD CONSULT OFFICE IN-07.02 232 SUD CONSULT OFFICE 1 G

125 233 SUD CONSULT OFFICE IN-07.02 223 SUD CONSULT OFFICE 1 G

126 234 IT IN-03.01 234 1 A

127 235 ELEC IN-03.01 235 1 A

128 236 SUD CONSULT OFFICE IN-07.02 236 SUD CONSULT OFFICE 1 G

129 237 SUD CONSULT OFFICE IN-07.02 237 SUD CONSULT OFFICE 1 G

130 238 SUD CONSULT OFFICE IN-07.02 238 SUD CONSULT OFFICE 1 G

131 239 HOTEL CONSULT IN-07.02 239 HOTEL CONSULT 1 G

132 240 HOTEL CONSULT IN-07.02 240 HOTEL CONSULT 1 G

133 241 CONFERENCE IN-07.02 241 CONFERENCE 1 G

134 B01 CORRIDOR IN-01.31 (UNIVERSAL SYMBOL) FIRE

EQUIPMENT

1 D

135 100A WAITING/BREAK-OUT IN-01.31 (UNIVERSAL SYMBOL) FIRE

EQUIPMENT

1 D

136 - [NORTH CORRIDOR] IN-01.31 (UNIVERSAL SYMBOL) FIRE

EQUIPMENT

1 D

SIGNAGE SCHEDULE

Mark

LOCATION SIGN

Type RemarksROOM ROOM NAME Type Room ID Count corner guard 1

LACTATION

ROOM

CABINETS

100A WAITING/BREAK-OUT 14.25 ELEVATOR DIRECTIONAL 1 L

200A WAITING/BREAK-OUT IN-14.04 DIRECTIONAL SIGNAGE 1 J

1 B01A GROUP ROOM IN-07.02 B01A GROUP ROOM

GROUP ROOM

1 G

2 B01B GROUP ROOM IN-07.02 B01B GROUP ROOM 1 G

3 B01C GROUP ROOM IN-07.02 B01C GROUP ROOM 1 G

4 B02 MEN'S RESTROOM IN-09.03 B02 MEN'S RESTROOM 1 E

5 B02A WOMEN'S RESTROOM IN-09.03 B026 WOMEN'S RESTROOOM 1 E

6 B03 GROUP ROOM IN-07.02 B03 GROUP ROOM 1 G

7 B03A GROUP ROOM IN-07.02 B03 GROUP ROOM 1 G

8 B03B STORAGE IN-04.02 B03B STORAGE 1 B

9 B03C STORAGE IN-04.02 B03C STORAGE 1 B

10 B03D STORAGE IN-03.01 B03D STORAGE 1 A

11 B04 LACTATION ROOM IN-07.02 B05 LACTATION ROOM 1 G

12 101 WOMEN'S WAITING IN-04.02 101 WOMENS WAITING ROOM 1 B

13 102 ELEC IN-03.01 102 1 A

14 103 TOILET IN-09.03 103 1 E

15 104 TOILET IN-09.03 104 1 E

16 105 COLLABORATIVE ROOM IN-04.02 105 COLLABORATIVE ROOM 1 B

17 105A SUPERVISOR IN-04.02 105A SUPERVISOR 1 B

18 106 MENTAL HEALTH CONSULT

OFFICE

IN-07.02 106 OFFICE 1 G

19 107 MENTAL HEALTH EXAM

ROOM

IN-07.02 107 EXAM ROOM 1 G

20 108 MENTAL HEALTH CONSULT

OFFICE

IN-07.02 108 OFFICE 1 G

21 109 MENTAL HEALTH CONSULT

OFFICE

IN-07.02 109 OFFICE 1 G

22 110 MENTAL HEALTH EXAM

ROOM

IN-07.02 110 EXAM ROOM 1 G

23 111 MENTAL HEALTH CONSULT

OFFICE

IN-07.02 111 OFFICE 1 G

24 112 PRIMARY CARE EXAM

ROOM

IN-07.02 112 EXAM ROOM 1 G

25 113 PRIMARY CARE EXAM

ROOM

IN-07.02 113 EXAM ROOM 1 G

26 114 PRIMARY CARE EXAM

ROOM

IN-07.02 114 EXAM ROOM 1 G

27 114A CRASH CART IN-04.02 114A CRASH CART 1 B

28 115 PRIMARY CARE EXAM

ROOM

IN-07.02 115 EXAM ROOM 1 G

29 116 PRIMARY CARE EXAM

ROOM

IN-07.02 116 EXAM ROOM 1 G

30 117 PRIMARY CARE EXAM

ROOM

IN-07.02 117 EXAM ROOM 1 G

31 118 SUPPLY IN-04.02 118 SUPPLY 1 B

32 119 MEDS IN-04.02 119 MEDS 1 B

33 119A STORAGE IN-04.02 119A STORAGE 1 B

34 119B STORAGE IN-04.02 119B STORAGE 1 B

35 120 GROUP ROOM IN-07.02 GROUP ROOM 1 G

36 120A STAIR IN-09.08D 120A STAIR 1 F

37 121 CHECK-IN CLERKS IN-04.02 121 CHECK-IN CLERKS 1 B

37A 121 CHECK-IN CLERKS IN-08.02C DO NOT ENTER 1 C

38 121A CLERK AREA IN-08.02C DO NOT ENTER 1 C

38A 121A CLERK AREA IN-04.02 121A CLERK AREA 1 B

39 122 SUPERVISOR OFFICE IN-04.02 122 OFFICE 1 B

40 123 STAFF ROOM IN-04.02 123 STAFF ROOM 1 B

41 124 TOILET IN-09.03 124 1 E

42 124A HAC IN-04.02 124A 1 B

43 125 TOILET IN-09.03 125 1 E

44 126 PSYCHIATRIC CONSULT

OFFICE

IN-07.02 126 OFFICE 1 G

45 127 STOR/EMS IN-04.02 127 STORAGE 1 B

46 128 PSYCHIATRIC CONSULT

OFFICE

IN-07.02 128 OFFICE 1 G

47 129 PSYCHIATRIC CONSULT

OFFICE

IN-07.02 129 OFFICE 1 G

48 129A STAIR IN-09.08D 129A STAIR 1 F

49 130 PSYCHIATRIC CONSULT

OFFICE

IN-07.02 131 OFFICE 1 G

50 131 PSYCHIATRIC CONSULT

OFFICE

IN-07.02 131 OFFICE 1 G

51 132 TOILET IN-09.03 132 1 E

52 133 TOILET IN-09.03 133 1 E

53 134 PSYCH/SOCIAL CONSULT

OFFICE

IN-07.02 134 OFFICE 1 G

54 135 PSYCH/SOCIAL CONSULT

OFFICE

IN-07.02 135 OFFICE 1 G

55 136 PSYCH/SOCIAL CONSULT

OFFICE

IN-07.02 136 OFFICE 1 G

56 136A STORAGE IN-04.02 136A OFFICE 1 B

57 137 PSYCH/SOCIAL CONSULT

OFFICE

IN-07.02 137 OFFICE 1 G

58 138 PSYCH/SOCIAL CONSULT

OFFICE

IN-07.02 138 OFFICE 1 G

59 139 PSYCH/SOCIAL CONSULT

OFFICE

IN-07.02 139 OFFICE 1 G

60 140 PSYCH/SOCIAL CONSULT

OFFICE

IN-07.02 140 OFFICE 1 G

61 141 PSYCH/SOCIAL CONSULT

OFFICE

IN-07.02 141 OFFICE 1 G

62 142 PSYCH/SOCIAL CONSULT

OFFICE

IN-07.02 142 OFFICE 1 G

63 143 PSYCH/SOCIAL CONSULT

OFFICE

IN-07.02 143 OFFICE 1 G

SEE NOTE A14 ON A103.3 / A103.4

Revisions: Date:

DN

1 2 3 4 5

A

B

C

D.2

E.2

E.8

D

E

F

6.2

C.2 C.1

GROUP ROOM

B01B

GROUP ROOM

B01A

174 SF

WOMEN'S

RESTROOM

B02A

194 SF

GROUP ROOM

B01C

165 SF

MEN'S

RESTROOM

B02

1070 SF

CORRIDOR

B00W

/1 IF100.2

900 SF

WAITING/

BREAKOUT

B01

120 SF

CLERK

B01D

P-1

P-6

P-1

P-6

P-6

P-1

P-1

P-6P-1

P-1 P-6

/1 IF100.2

TS - 1

A513 R 35' - 8 1/4"

R 35' - 8 1/4"

R 35' - 8 1/4"

LVT-2

LVT-1

LVT-3

PT-1

PT-2

QT-1

WP - 4

CT-2

CT-1

X

TS - # FLOOR TRANSITION

TAG

WALL FINISH TYPE - SEE

ROOM FINISH SCHEDULE

FOR ADDITIONAL

INFORMATION

WALL GUARD

WP-2 = SURFACE MOUNTED

WP-6 = END WALL PROTECTOR

SEE ROOM FINISH SCHEDULE

FOR ADDITIONAL INFORMATION

X

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked Drawn

VA FORM 08-6231

FULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

31 JAN 2020

BASEMENT - FLOOR AND W.P.

FINISH PLAN ZONE 1

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

PB DM

542-18-106

IF100.1

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

1/4" = 1'-0"

BASEMENT - FLOOR & W.P. PARTIAL FINISH PLAN - ZONE 1

FLOOR AND WALL PROTECTION FINISH LEGEND

0 2' 4' 8'

Revisions: Date:

CRAWL SPACE

/1 IF101.1

900 SF

WAITING/

BREAKOUT

B01

244 SF

GROUP ROOM

B03A

90 SF

LACTATION

ROOM

B04

27 SF

STORAGE

B03D

174 SF

WOMEN'S

RESTROOM

B02A

288 SF

GROUP ROOM

B03

27 SF

ELECTRICAL

CLOSET

B03C

17 SF

STORAGE

B03B

P-6

P-1

P-1

P-1 P-6

P-6

P-1

P-1

P-1

P-1P-6

/1 IF101.1

T S

-1

TS-2

LVT-2

LVT-1

LVT-3

PT-1

PT-2

QT-1

WP - 4

CT-2

CT-1

X

TS - # FLOOR TRANSITION

TAG

WALL FINISH TYPE - SEE

ROOM FINISH SCHEDULE

FOR ADDITIONAL

INFORMATION

WALL GUARD

WP-2 = SURFACE MOUNTED

WP-6 = END WALL PROTECTOR

SEE ROOM FINISH SCHEDULE

FOR ADDITIONAL INFORMATION

X

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked Drawn

VA FORM 08-6231

FULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

31 JAN 2020

BASEMENT - FLOOR AND W.P.

PARTIAL FINISH PLAN ZONE 2

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

PB DM

542-18-106

IF100.2

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

1/4" = 1'-0"

BASEMENT - FLOOR & W.P. PARTIAL FINISH PLAN ZONE 2

FLOOR AND WALL PROTECTION FINISH LEGEND

0 2' 4' 8'

Revisions: Date:

LVT-2

LVT-1

LVT-3

PT-1

PT-2

QT-1

WP - 4

CT-2

CT-1

X

TS - # FLOOR TRANSITION

TAG

WALL FINISH TYPE - SEE

ROOM FINISH SCHEDULE

FOR ADDITIONAL

INFORMATION

WALL GUARD

WP-2 = SURFACE MOUNTED

WP-6 = END WALL PROTECTOR

SEE ROOM FINISH SCHEDULE

FOR ADDITIONAL INFORMATION

X

CLEAN SHIP /

REC

B07H OFFICE

B07K

STAIR

WOMENS

B08

STAFF

WOMENS

BATHROOM

B08A ELEVATOR

SERVICE

ROOM

B16A

WORKSHOP

B11

CLEAN STORE

ROOM

B07F

MECHANICAL

ROOM

B07G

STORAGE

B11A

OFFICE

B11B

426 SF

CORRIDOR

B00E

7 8

8 9 10 11 12

E.8

E.8

F.8F.8

HH

II

JJ

F

F

GG

6.8

G.5G.5

A443

CRAWL SPACE

A .4

/1 A100.4FEC

FE

C

FE

C

A .2

/1 A100.3

ELEVATOR

SERVICE

ROOM 2

B16B

P-1

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked Drawn

VA FORM 08-6231

FULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

31 JAN 2020

BASEMENT - FLOOR AND W.P.

PARTIAL FINISH PLAN ZONE 4

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

PB DM

542-18-106

IF100.4

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

FLOOR AND WALL PROTECTION FINISH LEGEND

1/4" = 1'-0"

CD 00 - Finish Plan Enlarged - Zone 4

Revisions: Date:

F E

C

FEC

VESTIBULE

TOILET

PSYCH/SOCIAL

CONSULT

OFFICE

SUPERVISOR

OFFICE

PSYCH/SOCIAL

CONSULT

OFFICE

PSYCH/SOCIAL

CONSULT

OFFICE

PSYCH/SOCIAL

CONSULT

OFFICE

PSYCH/SOCIAL

CONSULT

OFFICE

PSYCH/SOCIAL

CONSULT

OFFICE

PSYCH/SOCIAL

CONSULT

OFFICE

PSYCH/SOCIAL

CONSULT

OFFICE

PSYCH/SOCIAL

CONSULT

OFFICE

PSYCH/SOCIAL

CONSULT

OFFICE

IT

ELEC

PSYCHIATRIC

CONSULT

OFFICE

PSYCHIATRIC

EXAM

PSYCHIATRIC

CONSULT

OFFICE

PSYCHIATRIC

EXAM

PSYCHIATRIC

EXAM

CONFERENCE

ROOM

/1 IF101.2

IF

. 3

STORAGE

150AP-6

P-1

P-1 P-1

P-2

P-4

P-4P-2

P-4P-2

P-4P-2

P-4 P-1

P-4 P-1

P-4 P-1

P-4 P-1

P-4 P-1

P-2

P-5

P-2

P-4 P-5 P-5

P-2 P-2 P-6

P-6

P-1

P-2

P-1

P-1

P-2

P-1

T S

P-1

/1 IF101.2

IF

. 3

P-4

P-1

P-4

P-1

P-1

WP-2

WP-2

T S

1' - 3" 1' - 3"1' - 3"

1' - 3" 1' - 3" 1' - 3"

LVT-2

LVT-1

LVT-3

PT-1

PT-2

QT-1

WP - 4

CT-2

CT-1

X

TS - # FLOOR TRANSITION

TAG

WALL FINISH TYPE - SEE

ROOM FINISH SCHEDULE

FOR ADDITIONAL

INFORMATION

WALL GUARD

WP-2 = SURFACE MOUNTED

WP-6 = END WALL PROTECTOR

SEE ROOM FINISH SCHEDULE

FOR ADDITIONAL INFORMATION

X

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phas…

This is the start of the file's text. The full file is on GovTribe.