11 Electrical 54218106_Drawings_FinalCD_013120.pdf
PDF 45 MB Posted
- Attached to
- Z2DA--Renovate Building 4 A + B Floors Outpatient Mental Health Clinic, Project No. 542-18-106
- Solicitation number
- 36C24420B0003
About this file
This solicitation is for a construction project to renovate the first and second floors and part of the basement of Building 4 at the Department of Veterans Affairs medical center in Coatesville, Pennsylvania into an outpatient mental health clinic. The project includes total demolition and renovation of approximately 28,000 square feet of existing space, along with 3,000 square feet in the basement wing. Scope of work includes site work, structural upgrades, hazardous material abatement, architectural finishes, fire protection, mechanical, plumbing and electrical systems. The solicitation will be available on June 23, 2020 via SAM.gov. Contract awards are subject to availability of FY2020 funds. Interested service-disabled veteran-owned small businesses must be verified by the Center for Veterans Enterprise and registered in the System for Award Management database to be considered. The performance period is 588 calendar days from notice to proceed.
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
MOUNTING HEIGHTS FOR ELECTRICAL DEVICES
WIRE SIZING TABLE
ELECTRICAL GENERAL NOTES
ELECTRICAL GENERAL NOTES
PTP YY
E001
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
ELECTRICAL ABBREVIATIONSELECTRICAL SYMBOLS - DIAGRAM
ELECTRICAL SYMBOLS - MOTORS AND CONTROLS
ELECTRICAL SYMBOLS - LIGHTING PLAN
ELECTRICAL SYMBOLS - SAFETY AND SECURITY
ELECTRICAL SYMBOLS - COMM. / DATA PLAN
ELECTRICAL SYMBOLS - FIRE ALARMELECTRICAL SYMBOL - POWER PLAN
ELECTRICAL SYMBOLS - HVAC POWER PLAN
GENERAL NOTES
ELECTRICAL SYMBOLS AND
ABBREVATIONS
PTP YY
E002
EX.PNL PP
EX.PNL NMDP
EX.PNL CB-4A
EX.PNL LS-4A
EX.PNL MR
36"
1 2 3 4
6 7
8 9 10 11 12
AA
BB
CC
D.2D.2
E.2E.2
E.8
E.8
F.8F.8
HH
II
JJ
DD
EE
F
F
GG
6.86.2
G.5G.5
C.2
0 13
FC
FC
FC
FC
FC
FC
FC FC
EX.FA MAIN PANEL
2-4" CONDUIT
TO 1ST FLOOR
DH
TYP.
TYP.
EX.PNL CB-4D
EX.PNL 4BR
EX.PNL 4BCA
EX.JB
EX.PNL LS-4D
EX.PNL 4BCB
EX. ELP4
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
RECEPTACLE,TWO DUPLEX MOUNTED IN A SINGLE GANG BOX
EMERGENCY RECEPTACLE, TWO DUPLEX MOUNTED IN A
SINGLE GANG BOX
DUPLEX RECEPTACLE - 20A., 120V., 2 POLE 3 WIRE, NEMA
5-20R
A. REFER TO GI002 "CONSTRUCTION PERIOD SCHEDULING OF WORK -
GENERAL NOTES" REGARDING THE VA'S DISCRETION IN SELECTING
WORK TO BE DONE AFTERHOURS/OFF-HOURS.
B. REFER TO GI002 "CONSTRUCTION PERIOD SCHEDULING OF WORK -
ADDITIONAL NOTES FOR STERILE PROCESSING SERVICE (SPS)"
REGARDING WORK IN, ADJACENT TO, OR THAT MAY AFFECT SPS.
C. CLEAN AND SEAL ALL EXISTING DUCTWORK THAT WILL BE REUSED.
D. ALL ELECTRICAL DEVICES SHOWN WITH DARK DASH LINES SHALL BE
REMOVED AND DEMOLISHED. UNLESS OTHERWISE NOTED REMOVE
AND DEMOLISH ALL EXISTING CONDUIT AND CABLE BACK TO SOURCE
PANEL FOR ALL DEMOLISHED DEVICES. CONTRACTOR SHALL
PERFORMED OSHA MANDATED LOCK OUT TAG OUT TO DISCONTINUE
ALL SOURCE OF ENERGY SUPPLY.
E. UNLESS OTHERWISE NOTED, REMOVE AND DEMOLISH ALL EXISTING
CABLE TRAY AND IT'S ASSOCIATED SUPPORT SYSTEM.
F. UNLESS OTHERWISE NOTED ALL ELECTRICAL DEVICE SHOWN WITH
SOLID LIGHT LINES SCHEDULE TO REMAIN. .
G. ALL LINE VOLTAGE WIRING AND LOW VOLTAGE WIRING (POWER,
LIGHTING, FIRE ALARM/SECURITY, PUBLIC ANNOUNCEMENT,
TELECOMMUNICATION/DATA, NURSE CALL, AND PHYSICAL ACCESS
CONTROL SYSTEM, ETC.) TO ALL DEMOLISHED DEVICES OR
ABANDONED IN PLACE WITHIN THE PROJECT SCOPE AREAS SHALL BE
DISCONNECTED AT THE SOURCE PANELS AND REMOVED
COMPLETELY (REMOVED IN IT'S ENTIRELY) BACK TO
SOURCE/ASSOCIATED PANELS BY CORRESPONDING CONTRACTOR.
EMPTY CONDUITS TO BE REMOVED BACK TO SOURCE PANELS. NO
EXISTING JUNCTIONS OR CONDUIT SHALL BE BURIED IN NEW WALLS.
H. IT IS MANDATORY THAT THE EXISTING BUILDING REMAIN IN
CONTINUOUS AND NON-INTERRUPTED OPERATION DURING
REMODELING/ALTERING. SERVICES TO EXISTING BUILDING SHALL BE
KEPT ON CONTINUOUS OPERATION INCLUDING POWER, LIGHTING,
TELEPHONE, FIRE ALARM, ETC. ANY ABSOLUTELY NECESSARY
INTERRUPTION OF THESE SERVICES TO ACCOMPLISH PROJECT
CONSTRUCTION SHALL BE HELD TO A MINIMUM AND ARRANGED WITH
THE OWNER THROUGH THE GENERAL CONTRACTOR TWO (2) WEEKS
IN ADVANCE. TEMPORARY SERVICES SHALL BE FURNISHED AND
INSTALLED WHERE NECESSARY TO ACCOMPLISH THIS PURPOSE.
TEMPORARIES SHALL BE REMOVED ONLY AFTER NEW PERMANENT
SERVICES ARE INSTALLED AND FULLY OPERATIONAL.
I. EXISTING FIRE PROTECTION SYSTEMS, INCLUDING FIRE ALARM
SYSTEMS, SMOKE DETECTION SYSTEMS, AND SPRINKLER SYSTEMS
SHALL NOT BE IMPAIRED DURING CONSTRUCTION. SMOKE
DETECTOR DISABLE REQUESTS: OUTAGE REQUESTS TO BE
SUBMITTED TO FM ENGINEER FOR APPROVAL FOR SPECIFIC DATE
AND TIME. ALARMS WILL ONLY BE TURNED OFF FOR SPECIFIC SHIFTS
REQUESTED AND WHEN CONTRACTORS ARE IN CONSTRUCTION
AREA. ALARMS WILL BE RESTORED AT END OF WORK DAY BY
CALLING SAME EXTENSION. AT NO TIME WILL DETECTION,
ALARMS/SPRINKLER SYSTEM DISABLE OVERNIGHT.
J. COORDINATE WITH MECHANICAL CONTRACTOR AND REMOVE AND
DEMO ELECTRICAL WIRING AND CONDUIT BACK TO SOURCE PANEL
FOR ANY MECHANICAL EQUIPMENT IS BEING DEMOED AS A PART OF
PROJECT SCOPE.
ELECTRICAL POWER DEMO
PLAN - BASEMENT
PTP YY
EPD100
AREA NOT IN PROJECT SCOPE
1. REFER TO DRAWING ED501 FOR DEMOLITION OF FEEDER BREAKER
ASSOCIATED CABLE, AND PANEL AS SHOWN ED501.
2. CONTRACTOR SHALL REMOVE EXISTING WIRELESS ACCESS POINT
DEVICES, WRAPPED, BAGGED LABELED, AND STORE ON SITE AT
SECURE PLACE FOR RE-USING. CONTRACTOR SHALL MARK THE
LOCATION OF EACH EXISTING DEVICE. SAME DEVICES SHALL BE
RE-INSTALL WITHIN 2 FEET RADIUS OF MARKED LOCATION IN
RENOVATED AREA. DEMOLISH EXISTING CA+5/6 CABLE TO THESE
DEVICES.
3. CONTRACTOR SHALL CAREFULLY REMOVE ALL EXISTING INITIATION,
DETECTION, AND NOTIFICATION FIRE ALARM DEVICES, TAMPER AND
FLOW SWITCHES. WRAPPED, BAGGED, LABELED, AND STORE ON
SITE AT VA DESIGNATED SECURE SITE. SAME DEVICES SHALL BE
RE-INSTALLED IN RENOVATED AREA. REMOVE AND DEMO ALL FIRE
ALARM DEVICES CABLES, AND CONDUIT BACK TO SOURCE PANEL.
DURING BIDDING, CONTRACTOR SHALL CONSULT VA AND ASK, VA
PREFER ALL NEW FA DEVICES INSTEAD OF REUSING EXISTING AND
PROCEED ACCORDINGLY.
EXISTING FAN COIL UNITFC
GFCI
GFCI
GFCI
EX.PNL 41R
EX.PNL CB-4E
EX.PNL LS-4E
EX.KITC-4
EX.JB
EX.4-EF2EX.4-EF1
EX.JB
EX.EXH FAN
EX.SUPPLY FAN
EX.JB
74"
44"
FCFC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
GFCI
GFCI
GFCI
EX.CONTROL
EX.CONTROL
GFCI
2-4" CONDUIT
DOWN TO BASEMENT
1 2 3 4
6 7
8 9 10 11 12
AA
BB
CC
D.2D.2
E.2E.2
E.8
E.8
F.8F.8
HH
II
JJ
DD
EE
F
F
GG
6.86.2
G.5G.5
C.2
0 13
4" CONDUIT FROM BASEMENT IT ROOM
2-4" CONDUIT
TYP
FC FC FC
FC
FC
FCFCFCFC
TYP
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
ELECTRICAL POWER DEMO
PLAN - FIRST FLOOR
PTP YY
EPD101
RECEPTACLE,TWO DUPLEX MOUNTED IN A SINGLE GANG BOX
EMERGENCY RECEPTACLE, TWO DUPLEX MOUNTED IN A SINGLE
GANG BOX
DUPLEX RECEPTACLE - 20A., 120V., 2 POLE 3 WIRE, NEMA 5-20R
A. REFER TO GI002 "CONSTRUCTION PERIOD SCHEDULING OF WORK -
GENERAL NOTES" REGARDING THE VA'S DISCRETION IN SELECTING
WORK TO BE DONE AFTERHOURS/OFF-HOURS.
B. REFER TO GI002 "CONSTRUCTION PERIOD SCHEDULING OF WORK -
ADDITIONAL NOTES FOR STERILE PROCESSING SERVICE (SPS)"
REGARDING WORK IN, ADJACENT TO, OR THAT MAY AFFECT SPS.
C. CLEAN AND SEAL ALL EXISTING DUCTWORK THAT WILL BE REUSED.
D. REFER TO DEMOLITION GENERAL NOTES ON DRAWING EPD100.
1. REFER TO SINGLE LINE DIAGRAM ED501 FOR THE SCOPE OF
RE-USING EXISTING PANELS. REMOVE ALL EXISTING PANELS THAT
HAVE BEEN CALLED OUT TO RE-USE AND STORE ON SITE. REMOVE
AND DEMOLISH ALL EXISTING PANELS THAT HAVE BEEN CALLED
OUT TO DEMO. SOURCE PANEL INFORMATION IS GIVEN ON SINGLE
LINE DIAGRAM ED501 IS BASED ON AS-BUILT DRAWINGS AND
FIELDS SURVEY. CONTRACTOR SHALL PROVIDE ALL THE CIRCUIT
TRACING AS NECESSARY. SET THE SOURCE CIRCUIT BREAKER TO
OFF POSITION AND LABEL IT AS SPARE FOR FUTURE USE.
2. REMOVE AND DEMOLISH ALL EXISTING ANALOG STANDARD PHONE
CABLE FROM BASEMENT IT ROOM B09 TO FIRST FLOOR IT ROOM
AND SECOND FLOOR IT ROOM. DEMOLISH EXISTING 2 - 4" CONDUIT
AND SEAL THE FLOOR TO MATCH EXISTING.
3. CONTRACTOR IS RESPONSIBLE FOR DEMOLISHING ANY LINE
WIRING ALONG WITH ITS ASSOCIATE CONDUIT BACK SOURCE
PANEL FOR ALL EXISTING FAN COIL UNIT.
EXISTING FAN COIL UNITFC
GFCI
GFCI
GFCI
EX.PNL 4-2L
EX.PNL CB-4C
EX.PNL LS-4C EX.PNL 4C
EX.PNL CB-4F
EX.PNL LS-4F EX.PNL 4-2R
GFCI GFCI
GFCI
GFCI
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC FC FC
FC
FC
FC
FC FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
1 2 3 4
6 7
8 9 10 11 12
AA
BB
CC
D.2D.2
E.2E.2
E.8
E.8
F.8F.8
HH
II
JJ
DD
EE
F
F
GG
6.86.2
G.5G.5
C.2
0 13
4" CONDUIT
ROOF
ROOF
ROOF
TYP
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
PTP YY
EPD102
RECEPTACLE,TWO DUPLEX MOUNTED IN A SINGLE GANG BOX
EMERGENCY RECEPTACLE, TWO DUPLEX MOUNTED IN A SINGLE
GANG BOX
1. REFER TO KEY NOTE 1 ON DRAWING EPD101.
2. REFER TO KEY NOTE 2 ON DRAWING EPD101.
3. REFER TO KEY NOTE 2 ON DRAWING EPD101.
A. REFER TO GI002 "CONSTRUCTION PERIOD SCHEDULING OF WORK -
GENERAL NOTES" REGARDING THE VA'S DISCRETION IN SELECTING
WORK TO BE DONE AFTERHOURS/OFF-HOURS.
B. REFER TO GI002 "CONSTRUCTION PERIOD SCHEDULING OF WORK -
ADDITIONAL NOTES FOR STERILE PROCESSING SERVICE (SPS)"
REGARDING WORK IN, ADJACENT TO, OR THAT MAY AFFECT SPS.
C. CLEAN AND SEAL ALL EXISTING DUCTWORK THAT WILL BE REUSED.
D. REFER TO DEMOLITION GENERAL NOTES ON DRAWING EPD100.
1 2 3 4
6 7
8 9 10 11 12
AA
BB
CC
D.2D.2
E.2E.2
E.8
E.8
F.8F.8
HH
II
JJ
DD
EE
F
F
GG
6.86.2
G.5G.5
C.2
0 13
EX. MCP-4B
EX. PANEL PPA
EX. 4-AC-2
EX. 4-AC-1
EX. 4-PEF1 EX. 4-PEF2
EX. EXHAUST
FAN DAMPER
EX. EXHAUST
FAN DAMPER
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
ELECTRICAL HVAC POWER
DEMO PLAN - ATTIC
PTP YY
EPD103
A. REFER TO DEMOLITION GENERAL NOTES ON DRAWING EPD100.
1. EXISTING ATTIC EXHAUST AIR FAN IS BEING RELOCATED.
COORDINATE WITH MECHANICAL DRAWINGS FOR NEW LOCATION.
CONTRACTOR SHALL REMOVE FAN LINE VOLTAGE POWER AND LINE
VOLTAGE POWER TO DAMPER CONTROL POWER SUPPLY. REMOVE
THE WIRING AND CONDUIT BACK TO NEAREST JUNCTION BOX. SAME
WIRING SHALL BE SPLICED AND EXTEND TO NEW LOCATION IN NEW
CONDUIT. STORE ALL DEVICES ASSOCIATED WITH EXISTING FANS
DAMPER CONTROL ON SITE FOR RE-INSTALLATION.
6 7
8 9 10 11 12
AA
BB
CC
D.2D.2
E.2E.2
E.8
E.8
F.8F.8
HH
II
JJ
DD
EE
F
F
GG
6.86.2
G.5G.5
C.2
0 13
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
ELECTRICAL LIGHTING DEMO
PLAN - BASEMENT
PTP YY
ELD100
AREA NOT IN PROJECT SCOPE
A. REFER TO GI002 "CONSTRUCTION PERIOD SCHEDULING OF WORK -
GENERAL NOTES" REGARDING THE VA'S DISCRETION IN SELECTING
WORK TO BE DONE AFTER HOURS/OFF-HOURS.
B. REFER TO GI002 "CONSTRUCTION PERIOD SCHEDULING OF WORK -
ADDITIONAL NOTES FOR STERILE PROCESSING SERVICE (SPS)"
REGARDING WORK IN, ADJACENT TO, OR THAT MAY AFFECT SPS.
C. CLEAN AND SEAL ALL EXISTING DUCTWORK THAT WILL BE REUSED.
D. REFER TO DEMOLITION GENERAL NOTES ON DRAWING EPD100.
1. CONTRACTOR SHALL RELOCATE EXISTING BATTERY BACKUP LIGHT.
REFER TO CONSTRUCTION DRAWING EL100 FOR MORE
INFORMATION.
EX.PNL CB-4B
EX.PNL 4-1L
EX.PNL LS-4B
EX.PNL 41R
EX.PNL CB-4E
EX.PNL LS-4E
EX.KITC-4
1 2 3 4
6 7
8 9 10 11 12
AA
BB
CC
D.2D.2
E.2E.2
E.8
E.8
F.8F.8
HH
II
JJ
DD
EE
F
F
GG
6.86.2
G.5G.5
C.2
0 13
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
ELECTRICAL LIGHTING DEMO
PLAN - FIRST FLOOR
PTP YY
ELD101
A. REFER TO GI002 "CONSTRUCTION PERIOD SCHEDULING OF WORK -
GENERAL NOTES" REGARDING THE VA'S DISCRETION IN SELECTING
WORK TO BE DONE AFTER HOURS/OFF-HOURS.
B. REFER TO GI002 "CONSTRUCTION PERIOD SCHEDULING OF WORK -
ADDITIONAL NOTES FOR STERILE PROCESSING SERVICE (SPS)"
REGARDING WORK IN, ADJACENT TO, OR THAT MAY AFFECT SPS.
6 7
8 9 10 11 12
AA
BB
CC
D.2D.2
E.2E.2
E.8
E.8
F.8F.8
HH
II
JJ
DD
EE
F
F
GG
6.86.2
G.5G.5
C.2
0 13
EX.PNL 4-2L
EX.PNL CB-4C
EX.PNL LS-4C
EX.PNL 4C
EX.PNL CB-4F
EX.PNL LS-4F
EX.PNL 4-2R
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
ELECTRICAL LIGHTING DEMO
PLAN - SECOND FLOOR
PTP YY
ELD102
A. REFER TO GI002 "CONSTRUCTION PERIOD SCHEDULING OF WORK -
GENERAL NOTES" REGARDING THE VA'S DISCRETION IN SELECTING
WORK TO BE DONE AFTERHOURS/OFF-HOURS.
B. REFER TO GI002 "CONSTRUCTION PERIOD SCHEDULING OF WORK -
ADDITIONAL NOTES FOR STERILE PROCESSING SERVICE (SPS)"
REGARDING WORK IN, ADJACENT TO, OR THAT MAY AFFECT SPS.
FE
C
FE
C
FEC
FE
C
FEC
FE
C
FE
C
M
1 2 3 4
6 7
8 9 10 11 12
AA
BB
CC
D.2D.2
E.2E.2
E.8
E.8
F.8F.8
HH
II
JJ
DD
EE
F
F
GG
6.86.2
G.5G.5
C.2
0 13
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
COMM. AND TECHNOLOGY
DEMO PLAN - FIRST FLOOR
PTP YY
ETD101
A. REFER TO GI002 "CONSTRUCTION PERIOD SCHEDULING OF WORK -
GENERAL NOTES" REGARDING THE VA'S DISCRETION IN SELECTING
WORK TO BE DONE AFTERHOURS/OFF-HOURS.
B. REFER TO GI002 "CONSTRUCTION PERIOD SCHEDULING OF WORK -
ADDITIONAL NOTES FOR STERILE PROCESSING SERVICE (SPS)"
REGARDING WORK IN, ADJACENT TO, OR THAT MAY AFFECT SPS.
C. CLEAN AND SEAL ALL EXISTING DUCTWORK THAT WILL BE REUSED.
D. REFER TO DEMOLITION GENERAL NOTES ON DRAWING EPD100.
1. CONTRACTOR SHALL COORDINATE WITH VA IT PERSONNEL FOR
DEACTIVATION OF VA MANAGED SWITCHES AND SERVERS.
HANDOVER ALL SWITCHES, SERVERS AND ALL OTHER EQUIPMENT
THAT VA PREFERS TO RETAIN. PROVIDE DEMOLITION OF
REMAINING EQUIPMENT.
2. CONTRACTOR SHALL REMOVE EXISTING WIRELESS ACCESS POINT
DEVICES, WRAPPED, BAGGED LABELED, AND STORE ON SITE AT
SECURE PLACE FOR RE-USING. CONTRACTOR SHALL MARK THE
LOCATION OF EACH EXISTING DEVICE. SAME DEVICES SHALL
RE-INSTALL WITHIN 2 FEET RADIUS OF MARKED LOCATION IN
RENOVATED AREA. DEMOLISH EXISTING CA+5/6 CABLE TO THESE
DEVICES.
3. REMOVE AND DEMOLISH ALL EXISTING PUBLIC ANNOUNCEMENT
SYSTEM SPEAKER.
4. DEMOLISH EXISTING CABLE TRAYS AND IT'S SUPPORT SYSTEMS.
FE
C
FEC
FEC
FE
C
FE
C
FE
C
1 2 3 4
6 7
8 9 10 11 12
AA
BB
CC
D.2D.2
E.2E.2
E.8
E.8
F.8F.8
HH
II
JJ
DD
EE
F
F
GG
6.86.2
G.5G.5
C.2
0 13
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
COMM. AND TECHNOLOGY
DEMO PLAN - SECOND FLOOR
PTP YY
ETD102
A. REFER TO GI002 "CONSTRUCTION PERIOD SCHEDULING OF WORK -
GENERAL NOTES" REGARDING THE VA'S DISCRETION IN
SELECTING WORK TO BE DONE AFTERHOURS/OFF-HOURS.
B. REFER TO GI002 "CONSTRUCTION PERIOD SCHEDULING OF WORK -
ADDITIONAL NOTES FOR STERILE PROCESSING SERVICE (SPS)"
REGARDING WORK IN, ADJACENT TO, OR THAT MAY AFFECT SPS.
C. CLEAN AND SEAL ALL EXISTING DUCTWORK THAT WILL BE
REUSED.
D. REFER TO DEMOLITION GENERAL NOTES ON DRAWING EPD100.
1. REFER TO KEY NOTE 1 ON DRAWING ETD101.
2. REFER TO KEY NOTE 2 ON DRAWING ETD101.
3. REFER TO KEY NOTE 3 ON DRAWING ETD101.
4. REFER TO KEY NOTE 4 ON DRAWING ETD101.
6 7
8 9 10 11 12
AA
BB
CC
D.2D.2
E.2E.2
E.8
E.8
F.8F.8
HH
II
JJ
DD
EE
F
F
GG
6.86.2
G.5G.5
C.2
0 13
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
FIRE ALARM AND NURSE CALL
DEMO PLAN - FIRST FLOOR
PTP YY
EFD101
A. REFER TO GI002 "CONSTRUCTION PERIOD SCHEDULING OF WORK -
GENERAL NOTES" REGARDING THE VA'S DISCRETION IN SELECTING
WORK TO BE DONE AFTERHOURS/OFF-HOURS.
B. REFER TO GI002 "CONSTRUCTION PERIOD SCHEDULING OF WORK -
ADDITIONAL NOTES FOR STERILE PROCESSING SERVICE (SPS)"
REGARDING WORK IN, ADJACENT TO, OR THAT MAY AFFECT SPS.
C. CLEAN AND SEAL ALL EXISTING DUCTWORK THAT WILL BE REUSED.
D. REFER TO DEMOLITION GENERAL NOTES ON DRAWING EPD100.
1. CONTRACTOR SHALL CAREFULLY REMOVE ALL EXISTING
INITIATION, DETECTION, AND NOTIFICATION FIRE ALARM DEVICES,
TAMPER AND FLOW SWITCHES. WRAPPED, BAGGED, LABELED,
AND STORE ON SITE AT VA DESIGNATED SECURE SITE. SAME
DEVICES SHALL BE RE-INSTALLED IN RENOVATED AREA. REMOVE
AND DEMO ALL FIRE ALARM DEVICES, CABLES, AND CONDUIT BACK
TO SOURCE PANEL. DURING BIDDING, CONTRACTOR SHALL
CONSULT VA AND ASK, VA PREFER ALL NEW DEVICES INSTEAD OF
REUSING EXISTING AND PROCEED ACCORDINGLY.
2. REMOVE AND DEMOLISH ABANDONED NURSE CALL DEVICES AND
ITS ASSOCIATED CABLES AND CONDUITS.
6 7
8 9 10 11 12
AA
BB
CC
D.2D.2
E.2E.2
E.8
E.8
F.8F.8
HH
II
JJ
DD
EE
F
F
GG
6.86.2
G.5G.5
C.2
0 13
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
FIRE ALARM AND NURSE CALL
DEMO PLAN - SECOND FLOOR
PTP YY
EFD102
A. REFER TO GI002 "CONSTRUCTION PERIOD SCHEDULING OF WORK -
GENERAL NOTES" REGARDING THE VA'S DISCRETION IN SELECTING
WORK TO BE DONE AFTERHOURS/OFF-HOURS.
B. REFER TO GI002 "CONSTRUCTION PERIOD SCHEDULING OF WORK -
ADDITIONAL NOTES FOR STERILE PROCESSING SERVICE (SPS)"
REGARDING WORK IN, ADJACENT TO, OR THAT MAY AFFECT SPS.
C. CLEAN AND SEAL ALL EXISTING DUCTWORK THAT WILL BE REUSED.
D. REFER TO DEMOLITION GENERAL NOTES ON DRAWING EPD100.
1. REFER TO KEY NOTE 1 ON DRAWING EFD101.
2. REFER TO KEY NOTE 2 ON DRAWING EFD101.
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
ITEMS WITH DARK DASH LINE INDICATES DISCONNECT AND
DEMO.
EXISTING ELECTRICAL
ONE-LINE DIAGRAM
PTP YY
ED501
ITEMS WITH DARK PHANTOM LINE INDICATES
DISCONNECT AND REUSE.
1. DEMOLISH CABLE AND CONDUIT FROM SOURCE TO DESTINATION.
2. REFER TO KEY NOTE 1 ON DRAWING EPD101 AND EPD 102.
ITEMS WITH LIGHT PHANTOM LINE INDICATES
ELECTRICAL CLOSET. REFER TO ARCH PLAN FOR DEMO
SCOPE.
ITEMS WITH LIGHT SOLID LINE INDICATES SCHEDULE
TO REMAIN.
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
COMM. AND TECHNOLOGY
DEMO RISER DIAGRAM
PTP YY
ED801
FIBER
DISTRIBUTION
ENCLOSURE
FIBER DISTRIBUTION PANEL
SWITCH 1
SWITCH 2
TELECOMMUNICATION ROOM B09 (BASEMENT)
TELECOMMUNICATION ROOM 217A (SECOND FLOOR)
TELECOMMUNICATION ROOM 121A (FIRST FLOOR)
TO VOICE/DATA
OUTLETS
MAIN FIBER
RISER FROM
BUILDING 9
SWITCH 1
PATCH PANEL 1
PATCH PANEL 2
SWITCH 2
TO VOICE/DATA
OUTLETS
REFER PLAN DRAWING FOR
OUTLET LOCATION
TO VOICE/DATA
OUTLETS
REFER PLAN DRAWING FOR
OUTLET LOCATION
CAT5
HORIZONTAL
CABLE
PATCH PANEL 1
PATCH PANEL 2
CAT5
HORIZONTAL
CABLE
TO VOICE/DATA
OUTLETS
REFER PLAN DRAWING FOR
OUTLET LOCATION
CAT5
HORIZONTAL
CABLE
PATCH PANEL 1
SWITCH 1
62.5/125 MICRON,
2 STRAND,
MM FIBER
SIZE UNKNOWN
217A
121A
62.5/125 MICRON, 2 STRAND, MM FIBER
217A
121A
62.5/125 MICRON,
2 STRAND,
MM FIBER
FIBER
DISTRIBUTION
BOX
FIBER
DISTRIBUTION
BOX
A. REFER TO GI002 "CONSTRUCTION PERIOD SCHEDULING OF WORK -
GENERAL NOTES" REGARDING THE VA'S DISCRETION IN SELECTING
WORK TO BE DONE AFTERHOURS/OFF-HOURS.
B. REFER TO GI002 "CONSTRUCTION PERIOD SCHEDULING OF WORK -
ADDITIONAL NOTES FOR STERILE PROCESSING SERVICE (SPS)"
REGARDING WORK IN, ADJACENT TO, OR THAT MAY AFFECT SPS.
C. CLEAN AND SEAL ALL EXISTING DUCTWORK THAT WILL BE REUSED.
D. REFER TO DEMOLITION GENERAL NOTES ON DRAWING EPD100.
1. REFER TO KEY NOTE 1 ON DRAWING ETD101.
COMMUNICATION CLOSET. REFER TO ARCH PLAN FOR
DEMOLITION SCOPE.
UNLESS OTHERWISE NOTED, ITEMS WITH DARK DASH
LINE INDICATES DISCONNECT AND DEMO.
ITEMS WITH CONTINUOUS LIGHT COLOR LINES
INDICATES EXISTING SCHEDULE TO REMAIN.
6 7
A
B
C
D.2
E.2
E.8
D
E
C.2
EX.PNL NMDP
EX.PNL CB-4A
EX.PNL LS-4A
3 3
TYP.
TYP.
TYP.
CONDUIT UP TO
1ST FLOOR
(PNL 4-2R, 4-2L, 4-1R)
CONDUIT UP TO
1ST FLOOR
(PNL CB-4B)
CONDUIT UP TO
1ST FLOOR
(PNL 4-1L)
+60" +60"
+60"
7 +72"
TV
1 2 3 4 5 86.86.20
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
1 3
ELECTRICAL POWER PLAN -
BASEMENT - ZONE 1
PTP YY
EP100.1
CIRCUIT
NO.
CONDUCTOR/CONDUIT
BRANCH CIRCUIT SCHEDULE
2 #10 THWN, 1 #12 G, 3 4" C
CCT 3
CCT 1
2 #10 THWN, 1 #12 G, 3 4" C
CCT 5 2 #10 THWN, 1 #12 G, 3 4" C
CCT 7 2 #10 THWN, 1 #12 G, 3 4" C
AREA NOT IN PROJECT SCOPE
E
P
1 / EP100.2
CIRCUIT
NO.
CONDUCTOR/CONDUIT
BRANCH CIRCUIT SCHEDULE
2 #10 THWN, 1 #12 G, 3 4" CCCT 22
CCT 8 2 #10 THWN, 1 #12 G, 3 4" C
A. CIRCUIT NUMBERS ARE SHOWN ADJACENT TO RECEPTACLES,
JUNCTION BOXES, AND EQUIPMENT CONNECTIONS. FURNISH,
INSTALL, AND CONNECT THE CORRECT QUANTITY AND SIZE OF
CONDUCTORS AS REQUIRED FOR THE RECEPTACLES AND
EQUIPMENT CONNECTIONS ASSIGNED. PROVIDE NEW CONDUCTOR
IN NEW CONDUIT.
B. ALL ELECTRICAL EQUIPMENT, (i.e. MAIN DISTRIBUTION BOARD, SWITCH BOARDS, PANEL BOARDS, DISCONNECT SWITCHES) SHALL
BE LABELED WITH SOURCE OF POWER THEY ARE FED FROM AND
EQUIPMENT/DEVICES THEY SERVED.
C. CONTRACTOR SHALL PROVIDE LABEL ON EACH RECEPTACLE
FACEPLATE INDICATING CIRCUIT NUMBER AND PANEL THEY ARE
FED FROM.
D. COORDINATE AND CO-LOCATE WALL MOUNTED RECEPTACLE
LOCATIONS WITH VOICE/DATA OUTLET SHOWN ON ET SERIES
DRAWINGS.
E. OUTLET BOXES MOUNTED BACK TO BACK IN THE SAME WALL ARE
PROHIBITED. A MINIMUM 24 INCH CENTER-TO-CENTER LATERAL
SPACING SHALL MAINTAIN BETWEEN BOXES.
F. CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE GFCI OUTLET
WITHIN 5 FEET RADIUS OF SINK OR WATER OUTLET.
G. COORDINATE ET SERIES DRAWINGS FOR SECURITY DEVICE
LOCATIONS AND PROVIDE WALL/CEILING, AND 3/4" CONDUIT
STUB-UP ABOVE CEILING FOR FUTURE CAMERAS, DURESS
BUTTONS, AND DURESS INDICATOR LIGHTS.
H. ALL EMERGENCY POWER RECEPTACLES SHALL BE OF RED COLOR
HOSPITAL GRADE ARE CONNECTED TO CRITICAL (EMERGENCY)
PANEL.
1. FOR WALL MOUNTED OUTLETS IN ALL GROUP ROOMS, PROVIDE
LEGRAND MODEL ARTRUSB153M4 OR APPROVED EQUAL USB
COMBO OUTLETS.
2. CONTRACTOR SHALL SAW CUT THE FLOOR AND PROVIDE
CONDUITS TO ALL FLOOR MOUNTED RECEPTACLES IN THE
PROJECT. PROVIDE LEGRAND EVOLUTION SERIES 4G AND FLOOR
BOX FOR POWER AND DATA OUTLETS.
3. FOR EXTERIOR WALL WITH ARCHITECTURE WORK VERIFY
EXISTING OUTLET LOCATION AND PROVIDE NEW OUTLET AS
SHOWN ON EXISTING EXTERIOR WALL. FISH THROUGH NEW WIRE
IN EXISTING CONDUIT.
4. REFER TO SINGLE LINE DIAGRAM AND CABLE SCHEDULE FOR
CABLE AND CONDUIT SIZES.
E.8
F.8
H
I
J
F
G
G.5
EX.MEP-4A
208/120V 225A
EX.T EX.T
NEW ELP4
208/120V 400A
EX.ATS-ELP4
208V,400A
EX.JB
EX.PB
EX.FCU-4
208/120V, 100A
EX.MDP-4
208/120V
800A
EX.T-CB-4B (75KVA)
EX.T-CB-4E (75KVA)
EX.SURGE SUPPRESOR PANEL
GFCI
2 2
4 4
6 6
EX.ELEVATOR
ECB 200A
EX.MTS-FCU-4
100A
EX.TEMP POWER DISC
EX.TEMP POWER PB
NEW 4-BL
120/208V 225A,3Ø,4W
TYP.
GFCI
FREEZER
CONDUIT UP TO
NEW PANEL MCP-4
IN ATTIC
NURSE CALL SYSTEM
POWER SUPPLY
+60"
+60"
CONDUIT UP
TO 1ST FLOOR
(PNL CB-4B, CB-4E)
4T16
1 2 3 4 5 86.86.20
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
1 3
ELECTRICAL POWER PLAN -
BASEMENT - ZONE 2
PTP YY
EP100.2
CIRCUIT
NO.
CONDUCTOR/CONDUIT
BRANCH CIRCUIT SCHEDULE
2 #10 THWN, 1 #12 G, 3 4" C
CCT 4
CCT 2
2 #10 THWN, 1 #12 G, 3 4" C
CCT 6 2 #10 THWN, 1 #12 G, 3 4" C
CCT 8 2 #10 THWN, 1 #12 G, 3 4" C
AREA NOT IN PROJECT SCOPE
E
P
1 / EP100.1
A. REFER TO DRAWING EP100.1 FOR ELECTRICAL GENERAL NOTES.
1. REFER TO KEY NOTE 1 ON DRAWING EP100.1.
2. REFER TO KEY NOTE 2 ON DRAWING EP100.1.
3. THIS NEW PANEL LOCATED AT SAME LOCATION AS THE OLD PANEL,
CONTRACTOR SHALL FOLLOW EXISTING CONDUIT ROUTE GOING
INTO ELECTRICAL VAULT TO PANEL MDP-4. REFER TO CABLE
SCHEDULE DRAWING FOR CABLE / CONDUIT SIZE.
4. REFER TO SINGLE LINE DIAGRAM AND CABLE SCHEDULE FOR
CABLE AND CONDUIT SIZES.
5. REFER TO EP100A FOR MORE INFORMATION.
CIRCUIT
NO.
CONDUCTOR/CONDUIT
BRANCH CIRCUIT SCHEDULE
2 #10 THWN, 1 #12 G, 3 4" CCCT5
A
B
C
D.2
E.2
E.8
D
E
FOR CONTINUATION
SEE SHEET EP100.4
FOR CONTINUATION
SEE SHEET EP100.3
EX.PNL PP
CONDUIT UP TO
1ST FLOOR
(PNL CB-4E)
EX.FA MAIN PANEL
4a
F5
SUMP PUMP
4a2b 3w
GFCI
GFCI
D.2
D
8 9 10 11 12 13
E.8
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
1 3
ELECTRICAL POWER PLAN -
BASEMENT - ZONE 3
PTP YY
EP100.3
E
P
1 / EP100.4
EX.LS-4D ( ELEC B071)
CIRCUIT
NO.
CONDUCTOR/CONDUIT
BRANCH CIRCUIT SCHEDULE
2 #10 THWN, 1 #12 G, 3 4" CCCT 1
EX.4BR ( ELEC B071)
CIRCUIT
NO.
CONDUCTOR/CONDUIT
BRANCH CIRCUIT SCHEDULE
2 #10 THWN, 1 #12 G, 3 4" CCCT 41
AREA NOT IN PROJECT SCOPE
2 #10 THWN, 1 #12 G, 3 4" CCCT 2
2 #10 THWN, 1 #12 G, 3 4" CCCT 4
EX.LS-4F (ELEC 203)
CIRCUIT
NO.
CONDUCTOR/CONDUIT
BRANCH CIRCUIT SCHEDULE
2 #10 THWN, 1 #12 G, 3 4" CCCT 2
A. REFER TO DRAWING EP100.1 FOR ELECTRICAL GENERAL NOTES.
1. REFER TO KEY NOTE 3 ON DRAWING EP100.1.
2. REFER TO SINGLE LINE DIAGRAM AND CABLE SCHEDULE FOR
CABLE AND CONDUIT SIZES.
H
I
J
F
G
G.5
ES-1
SUBMERSIBLE
POWER UNIT
MICROPROCESSOR
CONTROL
FOR CONTINUATION
SEE SHEET EP100.3
SUMP PUMP
CONTROL PANEL
ELEVATOR
CAB LIGHT
+84"
GFCI
GFCI
8 9 10 11 12 13
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
1 3
ELECTRICAL POWER PLAN -
BASEMENT - ZONE 4
PTP YY
EP100.4
E
P
1 / EP100.3
AREA NOT IN PROJECT SCOPE
1. CONTRACTOR SHALL PROVIDE EATON MODEL ES 4 T2 R1 G F1 B OR
APPROVED EQUAL ELEVATOR CONTROL SWITCH. CONTRACTOR SHALL
COORDINATE WITH FIRE ALARM CONTRACTOR FOR FIRE SAFETY
INTERFACE RELAY VOLTAGE CLASS AND FIRE ALARM VOLTAGE
MONITORING RELAY POLE TYPE BEFORE PLACING ORDER.
2. PROVIDE GFCI OUTLET FOR SPLIT SYSTEM CONDENSING PUMP. FIELD
VERIFY PUMP LOCATION AND PROVIDE OUTLET NEAR TO PUMP
CIRCUIT
NO.
CONDUCTOR/CONDUIT
BRANCH CIRCUIT SCHEDULE
2 #10 THWN, 1 #12 G, 3 4" CCCT 1
2 #10 THWN, 1 #12 G, 3 4" CCCT 3
2 #10 THWN, 1 #12 G, 3 4" CCCT 5
A. REFER TO DRAWING EP100.1 FOR ELECTRICAL GENERAL NOTES.
2 #10 THWN, 1 #12 G, 3 4" CCCT 7
EX.4BR ( ELEC B071)
CIRCUIT
NO.
CONDUCTOR/CONDUIT
BRANCH CIRCUIT SCHEDULE
2 #10 THWN, 1 #12 G, 3 4" CCCT 39
6 7
8 9 10 11 12
AA
BB
CC
D.2D.2
E.2E.2
E.8
E.8
F.8F.8
HH
II
JJ
DD
EE
F
F
GG
6.86.2
G.5G.5
C.2
0 13
EX.PNL CB-4A
EX.PNL LS-4A
NEW 4-BL
T
T
T
T
T
T
T
T
PSVB-2
PSVB-1
SUBMERSIBLE
POWER UNIT
T
EX.PNL NMDP
NEW ELP4
T
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
ELECTRICAL HVAC POWER
PLAN - BASEMENT
PTP YY
EP100A
CIRCUIT
NO.
CONDUCTOR/CONDUIT
BRANCH CIRCUIT SCHEDULE
2 #10 THWN, 1 #12 G, 3 4" C
CCT 14
CCT 12
2 #10 THWN, 1 #12 G, 3 4" C
A. COORDINATE WITH MECHANICAL DRAWING FOR THERMOSTAT
LOCATION AND PROVIDE JUNCTION BOX AND 3/4" CONDUIT STUB-UP
ABOVE CEILING FOR ALL WALL MOUNTED THERMOSTAT. THERMOSTAT
AND CONTROL WIRING FURNISHED BY OTHERS.
B. LOCATION AND QUANTITY OF VAV BOX POWER SUPPLY SHOWN HERE
IS FOR BIDDING LINE POWER SCOPE. CONTRACTOR SHALL
COORDINATE WITH CONTROL CONTRACTOR FOR EXACT QUANTITY
AND LOCATION INSTALL VAV BOX CONTROLLER POWER SUPPLY
PROVIDE BY CONTROL CONTRACTOR. PROVIDE LINE VOLTAGE POWER
AS SHOWN.
C. PROVIDE CEILING MOUNTED JUNCTION BOX WITH FLEXIBLE
CONNECTION TO VAV BOX CONTROLLER POWER. INSTALL JUNCTION
BOX IN ACCESSIBLE LOCATION CLOSE TO EACH VAV BOX. COORDINATE
WITH MECHANICAL CONTRACTOR FOR DISCONNECT SWITCH
LOCATION.
AREA NOT IN PROJECT SCOPE
1. POWER SUPPLY 1 (PSVB-1) FEEDS VAV-B01, VAV-B03, VAV-B03A, VAV-B04 &
VAV-B05, VAV-B00W.
2. POWER SUPPLY 2 (PSVB-2) FEEDS VAV-B01A, VAV-B01B, VAV-B01C &
VAV-B01D.
3. POWER TO INDOOR UNIT DFSS-B16B IS FROM OUTDOOR CONDENSING
UNIT ACCU-B16B. PROVIDE 2 #10, 1 #12 GND CABLE IN 3/4" CONDUIT
FROM OUTDOOR UNIT TO INDOOR UNIT. REFER TO DRAWING EP102A
FOR OUTDOOR UNIT LOCATION.
GFCIGFCI
+60"
+60"+60"
EX.4-1L
CB-4B
EX.LS-4B
RECEPTACLE W/USB
(TYP.)
1 1 1
15 18
17 17
19 19
27 27
16 16
15 15
6 7
A
B
C
D.2
E.2
E.8
D
E
C.2
18 18
5,7 2,4
5,7 2,4
TV
+72"
POWER FOR DOOR HOLDER
CONDUIT UP TO 2ND FL
DOWN TO BASEMENT
(PNL 4-2R, 4-2L)
CONDUIT DOWN
TO BASEMENT (PNL 4-1R)
11,13
NURSE CALL SYSTEM
POWER SUPPLY
ACCESS CONTROL PANEL
TGB GB
ES
N
KI
T
+60"
+60"
+60"
+60"
+60"
+60"
+60"+60"
+60"
+60"
+60"
+60"
+60" +60"
+84"
GFCI
KIOSK POWER
4T16
1 2 3 4 5 86.86.20
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
1 3
ELECTRICAL POWER PLAN -
FIRST FLOOR - ZONE 1
PTP YY
EP101.1
E
P
1 / EP101.2
A. REFER TO DRAWING EP100.1 FOR ELECTRICAL GENERAL NOTES.
CIRCUIT
NO.
CONDUCTOR/CONDUIT
BRANCH CIRCUIT SCHEDULE
2 #10 THWN, 1 #12 G, 3 4" C
CCT 3
CCT 1
2 #10 THWN, 1 #12 G, 3 4" C
4-1L (ELEC 155)
CCT 5 2 #10 THWN, 1 #12 G, 3 4" C
CCT 9 2 #10 THWN, 1 #12 G, 3 4" C
CCT 11 2 #10 THWN, 1 #12 G, 3 4" C
CCT 13 2 #10 THWN, 1 #12 G, 3 4" C
CCT 15 2 #10 THWN, 1 #12 G, 3 4" C
CCT 17 2 #10 THWN, 1 #12 G, 3 4" C
CCT 19 2 #10 THWN, 1 #12 G, 3 4" C
CCT 21 2 #10 THWN, 1 #12 G, 3 4" C
CIRCUIT
NO.
CONDUCTOR/CONDUIT
BRANCH CIRCUIT SCHEDULE
2 #10 THWN, 1 #12 G, 3 4" C
CCT 4
CCT 2
2 #10 THWN, 1 #12 G, 3 4" C
CB-4B (ELEC 155)
CCT 6 2 #10 THWN, 1 #12 G, 3 4" C
CCT 10 2 #10 THWN, 1 #12 G, 3 4" C
CCT 12 2 #10 THWN, 1 #12 G, 3 4" C
CCT 14 2 #10 THWN, 1 #12 G, 3 4" C
CCT 16 2 #10 THWN, 1 #12 G, 3 4" C
CCT 8 2 #10 THWN, 1 #12 G, 3 4" C
CCT 7 2 #10 THWN, 1 #12 G, 3 4" C
CCT 2 2 #10 THWN, 1 #12 G, 3 4" C
CCT 25 2 #10 THWN, 1 #12 G, 3 4" C
CCT 27 2 #10 THWN, 1 #12 G, 3 4" C
CCT 18 2 #10 THWN, 1 #12 G, 3 4" C
CIRCUIT
NO.
CONDUCTOR/CONDUIT
BRANCH CIRCUIT SCHEDULE
4-1R (ELEC 102)
CIRCUIT
NO.
CONDUCTOR/CONDUIT
BRANCH CIRCUIT SCHEDULE
2 #10 THWN, 1 #12 G, 3 4" C
CCT 17
CCT 15
2 #10 THWN, 1 #12 G, 3 4" C
CB-4E (ELEC 102)
2 #10 THWN, 1 #12 G, 3 4" CCCT 18
1. PROVIDE LEGRAND MODEL ARTRUSB153M4 OR APPROVED EQUAL USB
COMBO OUTLETS.
2. REFER TO SINGLE LINE DIAGRAM AND CABLE SCHEDULE FOR CABLE
AND CONDUIT SIZES.
3. PROVIDE GFCI OUTLET FOR SPLIT SYSTEM CONDENSING PUMP. FIELD
VERIFY PUMP LOCATION AND PROVIDE OUTLET NEAR TO PUMP.
4. REFER TO EP100A FOR MORE INFORMATION.
LS-4B (ELEC 155)
CIRCUIT
NO.
CONDUCTOR/CONDUIT
BRANCH CIRCUIT SCHEDULE
2 #10 THWN, 1 #12 G, 3 4" C
CCT 4
CCT 2
2 #10 THWN, 1 #12 G, 3 4" C
CIRCUIT
NO.
CONDUCTOR/CONDUIT
BRANCH CIRCUIT SCHEDULE
2 #10 THWN, 1 #12 G, 3 4" C
CCT 7
CCT 6
2 #10 THWN, 1 #12 G, 3 4" C
CCT 36 2 #10 THWN, 1 #12 G, 3 4" C
CCT 23 2 #10 THWN, 1 #12 G, 3 4" C
LUTRON - ENERGI SAVR NODE QSN-4T 16-S
ESN LUTRON - PROGRAMMING INTERFACE QSE-CI-AP-D
KIT LUTRON - WIRELESS SETUP KIT C-ESN-SETUP
4T16
CCT 8 2 #10 THWN, 1 #12 G, 3 4" C
CCT 11,13 2 #10 THWN, 1 #12 G, 3 4" C
CCT 5 2 #10 THWN, 1 #12 G, 3 4" C
CCT 9 2 #10 THWN, 1 #12 G, 3 4" C
GFCI
GFCI
GFCI
GFCI
7 7 9
E.8
F.8
H
I
J
F
G
G.5
26 28 30
+72"
TV
REF
MICROCOFF
COPIER
SHREDDER
CONDUIT UP 2ND FLOOR
DOWN TO BASEMENT PNL MDP-4
(PNL MCP-4C)
CONDUIT DOWN
TO BASEMENT PNL ELP4
+60"
+60"
+60"
+60"
+60"
+60"
+60"
+60"
+60"
+60" +60" +60"
+60"
+60"
+60"
1 2 3 4 5 86.86.20
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
1 3
ELECTRICAL POWER PLAN -
FIRST FLOOR - ZONE 2
PTP YY
EP101.2
E
P
1 / EP101.1
A. REFER TO DRAWING EP100.1 FOR ELECTRICAL GENERAL NOTES.
CIRCUIT
NO.
CONDUCTOR/CONDUIT
BRANCH CIRCUIT SCHEDULE
2 #10 THWN, 1 #12 G, 3 4" C
CCT 3
CCT 1
2 #10 THWN, 1 #12 G, 3 4" C
4-1L (ELEC 155)
CCT 5 2 #10 THWN, 1 #12 G, 3 4" C
CCT 7 2 #10 THWN, 1 #12 G, 3 4" C
CCT 9 2 #10 THWN, 1 #12 G, 3 4" C
CIRCUIT
NO.
CONDUCTOR/CONDUIT
BRANCH CIRCUIT SCHEDULE
2 #10 THWN, 1 #12 G, 3 4" C
CCT 4
CCT 2
2 #10 THWN, 1 #12 G, 3 4" C
CB-4B (ELEC 155)
CCT 6 2 #10 THWN, 1 #12 G, 3 4" C
CCT 8 2 #10 THWN, 1 #12 G, 3 4" C
CCT 10 2 #10 THWN, 1 #12 G, 3 4" C
CCT 12 2 #10 THWN, 1 #12 G, 3 4" C
CCT 14 2 #10 THWN, 1 #12 G, 3 4" C
CCT 16 2 #10 THWN, 1 #12 G, 3 4" C
CCT 18 2 #10 THWN, 1 #12 G, 3 4" C
CCT 20 2 #10 THWN, 1 #12 G, 3 4" C
CIRCUIT
NO.
CONDUCTOR/CONDUIT
BRANCH CIRCUIT SCHEDULE
4-1R (ELEC 102)
CIRCUIT
NO.
CONDUCTOR/CONDUIT
BRANCH CIRCUIT SCHEDULE
2 #10 THWN, 1 #12 G, 3 4" C
CCT 21
CCT 17
2 #10 THWN, 1 #12 G, 3 4" C
CB-4E (ELEC 102)
2 #10 THWN, 1 #12 G, 3 4" CCCT 17
CCT 22 2 #10 THWN, 1 #12 G, 3 4" C
CCT 24 2 #10 THWN, 1 #12 G, 3 4" C
CCT 26 2 #10 THWN, 1 #12 G, 3 4" C
CCT 28 2 #10 THWN, 1 #12 G, 3 4" C
CCT 30 2 #10 THWN, 1 #12 G, 3 4" C
2 #10 THWN, 1 #12 G, 3 4" CCCT 9
1. REFER TO SINGLE LINE DIAGRAM AND CABLE SCHEDULE FOR CABLE
AND CONDUIT SIZES.
GFCI
RECEPTACLE W/USB
+60" 4-1R
CB-4E
EX.LS-4E
17 15
A
B
C
D.2
E.2
E.8
D
E18
4 7
GFCI
36 +72"
TV
GB
+60" +60"
+60"
+60"
+60"
KIOSK POWER
4T16
8 9 10 11 126.8 13
E.8
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
1 3
ELECTRICAL POWER PLAN -
FIRST FLOOR - ZONE 3
PTP YY
EP101.3
E
P
1 / EP101.4
A. REFER TO DRAWING EP100.1 FOR ELECTRICAL GENERAL NOTES.
CIRCUIT
NO.
CONDUCTOR/CONDUIT
BRANCH CIRCUIT SCHEDULE
2 #10 THWN, 1 #12 G, 3 4" C
CCT 6
CCT 4
2 #10 THWN, 1 #12 G, 3 4" C
4-1R (ELEC 102)
CCT 8 2 #10 THWN, 1 #12 G, 3 4" C
CCT 10 2 #10 THWN, 1 #12 G, 3 4" C
CCT 12 2 #10 THWN, 1 #12 G, 3 4" C
CIRCUIT
NO.
CONDUCTOR/CONDUIT
BRANCH CIRCUIT SCHEDULE
2 #10 THWN, 1 #12 G, 3 4" C
CCT 3
CCT 1
2 #10 THWN, 1 #12 G, 3 4" C
CB-4E (ELEC 102)
CCT 7 2 #10 THWN, 1 #12 G, 3 4" C
CCT 11 2 #10 THWN, 1 #12 G, 3 4" C
CCT 14 2 #10 THWN, 1 #12 G, 3 4" C
CCT 16 2 #10 THWN, 1 #12 G, 3 4" C
CCT 18 2 #10 THWN, 1 #12 G, 3 4" C
CCT 5 2 #10 THWN, 1 #12 G, 3 4" C
CCT 13 2 #10 THWN, 1 #12 G, 3 4" C
2 #10 THWN, 1 #12 G, 3 4" CCCT 2
CCT 15 2 #10 THWN, 1 #12 G, 3 4" C
CCT 17 2 #10 THWN, 1 #12 G, 3 4" C
CCT 20 2 #10 THWN, 1 #12 G, 3 4" C
CCT 29 2 #10 THWN, 1 #12 G, 3 4" C
CCT 9 2 #10 THWN, 1 #12 G, 3 4" C
CCT 36 2 #10 THWN, 1 #12 G, 3 4" C
1. PROVIDE SWITCH FOR SOLENOID VALVE POWER SUPPLY. LOCATE
OUTSIDE THE TOILET AS SHOWN. POWER SUPPLY FURNISHED BY
PLUMBING CONTRACTOR.
2. REFER TO SINGLE LINE DIAGRAM AND CABLE SCHEDULE FOR CABLE
AND CONDUIT SIZES.
3. REFER TO EP101A FOR MORE INFORMATION.
+44"
+60"
GFCI
+60"
GFCI
+60"
+60"
GFCI
GFCI
GFCI
GFCI
8 9 10 11 12
E.8
F.8
H
I
J
F
G
6.8
G.5
11 13
LIFT
+60"
+60"
+60"
+60"
+84"
GFCI
17 19
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
1 3
ELECTRICAL POWER PLAN -
FIRST FLOOR - ZONE 4
PTP YY
EP101.4
E
P
1 / EP101.3
A. REFER TO DRAWING EP100.1 FOR ELECTRICAL GENERAL NOTES.
CIRCUIT
NO.
CONDUCTOR/CONDUIT
BRANCH CIRCUIT SCHEDULE
2 #10 THWN, 1 #12 G, 3 4" C
CCT 3
CCT 1
2 #10 THWN, 1 #12 G, 3 4" C
4-1R (ELEC102)
CCT 5 2 #10 THWN, 1 #12 G, 3 4" C
CCT 7 2 #10 THWN, 1 #12 G, 3 4" C
CCT 9 2 #10 THWN, 1 #12 G, 3 4" C
CIRCUIT
NO.
CONDUCTOR/CONDUIT
BRANCH CIRCUIT SCHEDULE
2 #10 THWN, 1 #12 G, 3 4" C
CCT 4
CCT 2
2 #10 THWN, 1 #12 G, 3 4" C
CB-4E (ELEC 102)
CCT 6 2 #10 THWN, 1 #12 G, 3 4" C
CCT 8 2 #10 THWN, 1 #12 G, 3 4" C
CCT 10 2 #10 THWN, 1 #12 G, 3 4" C
CCT 17 2 #10 THWN, 1 #12 G, 3 4" C
CCT 18 2 #10 THWN, 1 #12 G, 3 4" C
CCT 19 2 #10 THWN, 1 #12 G, 3 4" C
CCT 20 2 #10 THWN, 1 #12 G, 3 4" C
CCT 7 2 #10 THWN, 1 #12 G, 3 4" C
CCT 11 2 #10 THWN, 1 #12 G, 3 4" C
CCT 13 2 #10 THWN, 1 #12 G, 3 4" C
CCT 11 2 #10 THWN, 1 #12 G, 3 4" C
CCT 15 2 #10 THWN, 1 #12 G, 3 4" C
1. CONTRACTOR SHALL COORDINATE WITH PATIENT LIFT SHOP
SUBMITTAL, PROVIDE AND LOCATE POWER OUTLET ACCORDINGLY.
2. PROVIDE GFCI OUTLET FOR SPLIT SYSTEM CONDENSING PUMP. FIELD
VERIFY PUMP LOCATION AND PROVIDE OUTLET NEAR TO PUMP.
CCT 41 2 #10 THWN, 1 #12 G, 3 4" C
EX.4-1L
CB-4B
EX.LS-4B
1 2 3 4
6 7
8 9 10 11 12
AA
BB
CC
D.2D.2
E.2E.2
E.8
E.8
F.8F.8
HH
II
JJ
DD
EE
F
F
GG
6.86.2
G.5G.5
C.2
0 13
T
T
T
T
T
T
T
T T
T
4-1R
CB-4E
EX.LS-4ET
T
T
T
T T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
PSV1-1
PSV1-2 PSV1-3
PSV1-4
PSV1-5
PSV1-6
PSV1-7
T
30A
T
30A
T
T
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .