Z2DA--Renovate Building 4 A + B Floors Outpatient Mental Health Clinic, Project No. 542-18-106
Solicitation number
36C24420B0003
Issued by

About this file

This solicitation is for a construction project to renovate the first and second floors and part of the basement of Building 4 at the Department of Veterans Affairs medical center in Coatesville, Pennsylvania into an outpatient mental health clinic. The project includes total demolition and renovation of approximately 28,000 square feet of existing space, along with 3,000 square feet in the basement wing. Scope of work includes site work, structural upgrades, hazardous material abatement, architectural finishes, fire protection, mechanical, plumbing and electrical systems. The solicitation will be available on June 23, 2020 via SAM.gov. Contract awards are subject to availability of FY2020 funds. Interested service-disabled veteran-owned small businesses must be verified by the Center for Veterans Enterprise and registered in the System for Award Management database to be considered. The performance period is 588 calendar days from notice to proceed.

View the file

Other files

File Type Posted
Award Announcement 36C24420C0112.pdf PDF
General Decision Number PA20200083.pdf PDF
36C24420B0003 0003.pdf PDF
00 01 15 - List of Drawing Sheets - ADD-01.pdf PDF
07 Architecture.pdf PDF
36C24420B0003 Amendment 0002.pdf PDF
10 22 26.13 - Operable Partitions - ADD-01.pdf PDF
RFI LOG_542-18-106_08052020.r2.pdf PDF
Sign In Sheet no. 3 B4A B 07162020.pdf PDF
Sign In Sheet B4A B 07162020.pdf PDF
03 Structural 54218106_Drawings_ADD-01_080320.pdf PDF
A012 54218106_Drawings_FinalCD_013120.pdf PDF
08 Interiors 54218106_Drawings_ADD-01_080320.pdf PDF
07 13 52 - Modified Bituminous Sheet Waterproofing - ADD-01.pdf PDF
07 60 00 - Flashing and Sheet Metal - ADD-01.pdf PDF
01 33 23 - Shop Drawings Product Data Samples - ADD-01.pdf PDF
00 01 10 - TOC - ADD-01.pdf PDF
11 Plumbing 54218106_Drawings_ADD-01_080320.pdf PDF
ADD-01 Narrative.pdf PDF
10 21 13 - Toilet Compartments - ADD-01.pdf PDF
07 27 27 - Fluid-Applied Membrane Air Barrier Vapor Retardg - ADD-01.pdf PDF
00 General 54218106_Drawings_ADD-01_080320.pdf PDF
11 73 00 - Ceiling Mounted Patient Lift System - ADD-01.pdf PDF
36C24420B0003 Amendment 0001 - Attachment.pdf PDF
36C24420B0003 AMENDMENT 0001.pdf PDF
36C24420B0003 MAP for Site Visit.pdf PDF
04 Structural 54218106_Drawings_FinalCD_013120.pdf PDF
10 Mechanical 54218106_Drawings_FinalCD_013120.pdf PDF
06 Interiors 54218106_Drawings_FinalCD_013120.pdf PDF
09 Plumbing 54218106_Drawings_FinalCD_013120.pdf PDF
08 Fire Protection 54218106_Drawings_FinalCD_013120.pdf PDF
02 Hazardous 54218106_Drawings_FinalCD_013120.pdf PDF
07 Equipment 54218106_Drawings_FinalCD_013120.pdf PDF
01 General 54218106_Drawings_FinalCD_013120.pdf PDF
05 Architectural 54218106_Drawings_FinalCD_013120.pdf PDF
03 Civil Landscape 54218106_Drawings_FinalCD_013120.pdf PDF
54218106-Spec-Vol 3_FinalCD_013120.pdf PDF
36C24420B0003.docx DOCX document
PCRA 3-2019 building 4.pdf PDF
54218106-Spec-Vol 2_FinalCD_013120.pdf PDF
54218106-Spec-Vol 1_FinalCD_013120.pdf PDF
COVID Guidelines.pdf PDF
54218106-Spec-Vol 4_FinalCD_013120.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

MOUNTING HEIGHTS FOR ELECTRICAL DEVICES

WIRE SIZING TABLE

ELECTRICAL GENERAL NOTES

ELECTRICAL GENERAL NOTES

PTP YY

E001

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

ELECTRICAL ABBREVIATIONSELECTRICAL SYMBOLS - DIAGRAM

ELECTRICAL SYMBOLS - MOTORS AND CONTROLS

ELECTRICAL SYMBOLS - LIGHTING PLAN

ELECTRICAL SYMBOLS - SAFETY AND SECURITY

ELECTRICAL SYMBOLS - COMM. / DATA PLAN

ELECTRICAL SYMBOLS - FIRE ALARMELECTRICAL SYMBOL - POWER PLAN

ELECTRICAL SYMBOLS - HVAC POWER PLAN

GENERAL NOTES

ELECTRICAL SYMBOLS AND

ABBREVATIONS

PTP YY

E002

EX.PNL PP

EX.PNL NMDP

EX.PNL CB-4A

EX.PNL LS-4A

EX.PNL MR

36"

1 2 3 4

6 7

8 9 10 11 12

AA

BB

CC

D.2D.2

E.2E.2

E.8

E.8

F.8F.8

HH

II

JJ

DD

EE

F

F

GG

6.86.2

G.5G.5

C.2

0 13

FC

FC

FC

FC

FC

FC

FC FC

EX.FA MAIN PANEL

2-4" CONDUIT

TO 1ST FLOOR

DH

TYP.

TYP.

EX.PNL CB-4D

EX.PNL 4BR

EX.PNL 4BCA

EX.JB

EX.PNL LS-4D

EX.PNL 4BCB

EX. ELP4

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

RECEPTACLE,TWO DUPLEX MOUNTED IN A SINGLE GANG BOX

EMERGENCY RECEPTACLE, TWO DUPLEX MOUNTED IN A

SINGLE GANG BOX

DUPLEX RECEPTACLE - 20A., 120V., 2 POLE 3 WIRE, NEMA

5-20R

A. REFER TO GI002 "CONSTRUCTION PERIOD SCHEDULING OF WORK -

GENERAL NOTES" REGARDING THE VA'S DISCRETION IN SELECTING

WORK TO BE DONE AFTERHOURS/OFF-HOURS.

B. REFER TO GI002 "CONSTRUCTION PERIOD SCHEDULING OF WORK -

ADDITIONAL NOTES FOR STERILE PROCESSING SERVICE (SPS)"

REGARDING WORK IN, ADJACENT TO, OR THAT MAY AFFECT SPS.

C. CLEAN AND SEAL ALL EXISTING DUCTWORK THAT WILL BE REUSED.

D. ALL ELECTRICAL DEVICES SHOWN WITH DARK DASH LINES SHALL BE

REMOVED AND DEMOLISHED. UNLESS OTHERWISE NOTED REMOVE

AND DEMOLISH ALL EXISTING CONDUIT AND CABLE BACK TO SOURCE

PANEL FOR ALL DEMOLISHED DEVICES. CONTRACTOR SHALL

PERFORMED OSHA MANDATED LOCK OUT TAG OUT TO DISCONTINUE

ALL SOURCE OF ENERGY SUPPLY.

E. UNLESS OTHERWISE NOTED, REMOVE AND DEMOLISH ALL EXISTING

CABLE TRAY AND IT'S ASSOCIATED SUPPORT SYSTEM.

F. UNLESS OTHERWISE NOTED ALL ELECTRICAL DEVICE SHOWN WITH

SOLID LIGHT LINES SCHEDULE TO REMAIN. .

G. ALL LINE VOLTAGE WIRING AND LOW VOLTAGE WIRING (POWER,

LIGHTING, FIRE ALARM/SECURITY, PUBLIC ANNOUNCEMENT,

TELECOMMUNICATION/DATA, NURSE CALL, AND PHYSICAL ACCESS

CONTROL SYSTEM, ETC.) TO ALL DEMOLISHED DEVICES OR

ABANDONED IN PLACE WITHIN THE PROJECT SCOPE AREAS SHALL BE

DISCONNECTED AT THE SOURCE PANELS AND REMOVED

COMPLETELY (REMOVED IN IT'S ENTIRELY) BACK TO

SOURCE/ASSOCIATED PANELS BY CORRESPONDING CONTRACTOR.

EMPTY CONDUITS TO BE REMOVED BACK TO SOURCE PANELS. NO

EXISTING JUNCTIONS OR CONDUIT SHALL BE BURIED IN NEW WALLS.

H. IT IS MANDATORY THAT THE EXISTING BUILDING REMAIN IN

CONTINUOUS AND NON-INTERRUPTED OPERATION DURING

REMODELING/ALTERING. SERVICES TO EXISTING BUILDING SHALL BE

KEPT ON CONTINUOUS OPERATION INCLUDING POWER, LIGHTING,

TELEPHONE, FIRE ALARM, ETC. ANY ABSOLUTELY NECESSARY

INTERRUPTION OF THESE SERVICES TO ACCOMPLISH PROJECT

CONSTRUCTION SHALL BE HELD TO A MINIMUM AND ARRANGED WITH

THE OWNER THROUGH THE GENERAL CONTRACTOR TWO (2) WEEKS

IN ADVANCE. TEMPORARY SERVICES SHALL BE FURNISHED AND

INSTALLED WHERE NECESSARY TO ACCOMPLISH THIS PURPOSE.

TEMPORARIES SHALL BE REMOVED ONLY AFTER NEW PERMANENT

SERVICES ARE INSTALLED AND FULLY OPERATIONAL.

I. EXISTING FIRE PROTECTION SYSTEMS, INCLUDING FIRE ALARM

SYSTEMS, SMOKE DETECTION SYSTEMS, AND SPRINKLER SYSTEMS

SHALL NOT BE IMPAIRED DURING CONSTRUCTION. SMOKE

DETECTOR DISABLE REQUESTS: OUTAGE REQUESTS TO BE

SUBMITTED TO FM ENGINEER FOR APPROVAL FOR SPECIFIC DATE

AND TIME. ALARMS WILL ONLY BE TURNED OFF FOR SPECIFIC SHIFTS

REQUESTED AND WHEN CONTRACTORS ARE IN CONSTRUCTION

AREA. ALARMS WILL BE RESTORED AT END OF WORK DAY BY

CALLING SAME EXTENSION. AT NO TIME WILL DETECTION,

ALARMS/SPRINKLER SYSTEM DISABLE OVERNIGHT.

J. COORDINATE WITH MECHANICAL CONTRACTOR AND REMOVE AND

DEMO ELECTRICAL WIRING AND CONDUIT BACK TO SOURCE PANEL

FOR ANY MECHANICAL EQUIPMENT IS BEING DEMOED AS A PART OF

PROJECT SCOPE.

ELECTRICAL POWER DEMO

PLAN - BASEMENT

PTP YY

EPD100

AREA NOT IN PROJECT SCOPE

1. REFER TO DRAWING ED501 FOR DEMOLITION OF FEEDER BREAKER

ASSOCIATED CABLE, AND PANEL AS SHOWN ED501.

2. CONTRACTOR SHALL REMOVE EXISTING WIRELESS ACCESS POINT

DEVICES, WRAPPED, BAGGED LABELED, AND STORE ON SITE AT

SECURE PLACE FOR RE-USING. CONTRACTOR SHALL MARK THE

LOCATION OF EACH EXISTING DEVICE. SAME DEVICES SHALL BE

RE-INSTALL WITHIN 2 FEET RADIUS OF MARKED LOCATION IN

RENOVATED AREA. DEMOLISH EXISTING CA+5/6 CABLE TO THESE

DEVICES.

3. CONTRACTOR SHALL CAREFULLY REMOVE ALL EXISTING INITIATION,

DETECTION, AND NOTIFICATION FIRE ALARM DEVICES, TAMPER AND

FLOW SWITCHES. WRAPPED, BAGGED, LABELED, AND STORE ON

SITE AT VA DESIGNATED SECURE SITE. SAME DEVICES SHALL BE

RE-INSTALLED IN RENOVATED AREA. REMOVE AND DEMO ALL FIRE

ALARM DEVICES CABLES, AND CONDUIT BACK TO SOURCE PANEL.

DURING BIDDING, CONTRACTOR SHALL CONSULT VA AND ASK, VA

PREFER ALL NEW FA DEVICES INSTEAD OF REUSING EXISTING AND

PROCEED ACCORDINGLY.

EXISTING FAN COIL UNITFC

GFCI

GFCI

GFCI

EX.PNL 41R

EX.PNL CB-4E

EX.PNL LS-4E

EX.KITC-4

EX.JB

EX.4-EF2EX.4-EF1

EX.JB

EX.EXH FAN

EX.SUPPLY FAN

EX.JB

74"

44"

FCFC

FC

FC

FC

FC

FC

FC

FC

FC

FC

FC

FC

FC

FC

FC

FC

FC

FC

FC

FC

FC

FC

FC FC

FC

FC

FC

FC

FC

FC

FC

FC

FC

FC

FC

FC

FC

FC

GFCI

GFCI

GFCI

EX.CONTROL

EX.CONTROL

GFCI

2-4" CONDUIT

DOWN TO BASEMENT

1 2 3 4

6 7

8 9 10 11 12

AA

BB

CC

D.2D.2

E.2E.2

E.8

E.8

F.8F.8

HH

II

JJ

DD

EE

F

F

GG

6.86.2

G.5G.5

C.2

0 13

4" CONDUIT FROM BASEMENT IT ROOM

2-4" CONDUIT

TYP

FC FC FC

FC

FC

FCFCFCFC

TYP

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

ELECTRICAL POWER DEMO

PLAN - FIRST FLOOR

PTP YY

EPD101

RECEPTACLE,TWO DUPLEX MOUNTED IN A SINGLE GANG BOX

EMERGENCY RECEPTACLE, TWO DUPLEX MOUNTED IN A SINGLE

GANG BOX

DUPLEX RECEPTACLE - 20A., 120V., 2 POLE 3 WIRE, NEMA 5-20R

A. REFER TO GI002 "CONSTRUCTION PERIOD SCHEDULING OF WORK -

GENERAL NOTES" REGARDING THE VA'S DISCRETION IN SELECTING

WORK TO BE DONE AFTERHOURS/OFF-HOURS.

B. REFER TO GI002 "CONSTRUCTION PERIOD SCHEDULING OF WORK -

ADDITIONAL NOTES FOR STERILE PROCESSING SERVICE (SPS)"

REGARDING WORK IN, ADJACENT TO, OR THAT MAY AFFECT SPS.

C. CLEAN AND SEAL ALL EXISTING DUCTWORK THAT WILL BE REUSED.

D. REFER TO DEMOLITION GENERAL NOTES ON DRAWING EPD100.

1. REFER TO SINGLE LINE DIAGRAM ED501 FOR THE SCOPE OF

RE-USING EXISTING PANELS. REMOVE ALL EXISTING PANELS THAT

HAVE BEEN CALLED OUT TO RE-USE AND STORE ON SITE. REMOVE

AND DEMOLISH ALL EXISTING PANELS THAT HAVE BEEN CALLED

OUT TO DEMO. SOURCE PANEL INFORMATION IS GIVEN ON SINGLE

LINE DIAGRAM ED501 IS BASED ON AS-BUILT DRAWINGS AND

FIELDS SURVEY. CONTRACTOR SHALL PROVIDE ALL THE CIRCUIT

TRACING AS NECESSARY. SET THE SOURCE CIRCUIT BREAKER TO

OFF POSITION AND LABEL IT AS SPARE FOR FUTURE USE.

2. REMOVE AND DEMOLISH ALL EXISTING ANALOG STANDARD PHONE

CABLE FROM BASEMENT IT ROOM B09 TO FIRST FLOOR IT ROOM

AND SECOND FLOOR IT ROOM. DEMOLISH EXISTING 2 - 4" CONDUIT

AND SEAL THE FLOOR TO MATCH EXISTING.

3. CONTRACTOR IS RESPONSIBLE FOR DEMOLISHING ANY LINE

WIRING ALONG WITH ITS ASSOCIATE CONDUIT BACK SOURCE

PANEL FOR ALL EXISTING FAN COIL UNIT.

EXISTING FAN COIL UNITFC

GFCI

GFCI

GFCI

EX.PNL 4-2L

EX.PNL CB-4C

EX.PNL LS-4C EX.PNL 4C

EX.PNL CB-4F

EX.PNL LS-4F EX.PNL 4-2R

GFCI GFCI

GFCI

GFCI

FC

FC

FC

FC

FC

FC

FC

FC

FC

FC

FC FC FC

FC

FC

FC

FC FC

FC

FC

FC

FC

FC

FC

FC

FC

FC

FC

FC

FC

FC

FC

1 2 3 4

6 7

8 9 10 11 12

AA

BB

CC

D.2D.2

E.2E.2

E.8

E.8

F.8F.8

HH

II

JJ

DD

EE

F

F

GG

6.86.2

G.5G.5

C.2

0 13

4" CONDUIT

ROOF

ROOF

ROOF

TYP

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

PTP YY

EPD102

RECEPTACLE,TWO DUPLEX MOUNTED IN A SINGLE GANG BOX

EMERGENCY RECEPTACLE, TWO DUPLEX MOUNTED IN A SINGLE

GANG BOX

1. REFER TO KEY NOTE 1 ON DRAWING EPD101.

2. REFER TO KEY NOTE 2 ON DRAWING EPD101.

3. REFER TO KEY NOTE 2 ON DRAWING EPD101.

A. REFER TO GI002 "CONSTRUCTION PERIOD SCHEDULING OF WORK -

GENERAL NOTES" REGARDING THE VA'S DISCRETION IN SELECTING

WORK TO BE DONE AFTERHOURS/OFF-HOURS.

B. REFER TO GI002 "CONSTRUCTION PERIOD SCHEDULING OF WORK -

ADDITIONAL NOTES FOR STERILE PROCESSING SERVICE (SPS)"

REGARDING WORK IN, ADJACENT TO, OR THAT MAY AFFECT SPS.

C. CLEAN AND SEAL ALL EXISTING DUCTWORK THAT WILL BE REUSED.

D. REFER TO DEMOLITION GENERAL NOTES ON DRAWING EPD100.

1 2 3 4

6 7

8 9 10 11 12

AA

BB

CC

D.2D.2

E.2E.2

E.8

E.8

F.8F.8

HH

II

JJ

DD

EE

F

F

GG

6.86.2

G.5G.5

C.2

0 13

EX. MCP-4B

EX. PANEL PPA

EX. 4-AC-2

EX. 4-AC-1

EX. 4-PEF1 EX. 4-PEF2

EX. EXHAUST

FAN DAMPER

EX. EXHAUST

FAN DAMPER

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

ELECTRICAL HVAC POWER

DEMO PLAN - ATTIC

PTP YY

EPD103

A. REFER TO DEMOLITION GENERAL NOTES ON DRAWING EPD100.

1. EXISTING ATTIC EXHAUST AIR FAN IS BEING RELOCATED.

COORDINATE WITH MECHANICAL DRAWINGS FOR NEW LOCATION.

CONTRACTOR SHALL REMOVE FAN LINE VOLTAGE POWER AND LINE

VOLTAGE POWER TO DAMPER CONTROL POWER SUPPLY. REMOVE

THE WIRING AND CONDUIT BACK TO NEAREST JUNCTION BOX. SAME

WIRING SHALL BE SPLICED AND EXTEND TO NEW LOCATION IN NEW

CONDUIT. STORE ALL DEVICES ASSOCIATED WITH EXISTING FANS

DAMPER CONTROL ON SITE FOR RE-INSTALLATION.

6 7

8 9 10 11 12

AA

BB

CC

D.2D.2

E.2E.2

E.8

E.8

F.8F.8

HH

II

JJ

DD

EE

F

F

GG

6.86.2

G.5G.5

C.2

0 13

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

ELECTRICAL LIGHTING DEMO

PLAN - BASEMENT

PTP YY

ELD100

AREA NOT IN PROJECT SCOPE

A. REFER TO GI002 "CONSTRUCTION PERIOD SCHEDULING OF WORK -

GENERAL NOTES" REGARDING THE VA'S DISCRETION IN SELECTING

WORK TO BE DONE AFTER HOURS/OFF-HOURS.

B. REFER TO GI002 "CONSTRUCTION PERIOD SCHEDULING OF WORK -

ADDITIONAL NOTES FOR STERILE PROCESSING SERVICE (SPS)"

REGARDING WORK IN, ADJACENT TO, OR THAT MAY AFFECT SPS.

C. CLEAN AND SEAL ALL EXISTING DUCTWORK THAT WILL BE REUSED.

D. REFER TO DEMOLITION GENERAL NOTES ON DRAWING EPD100.

1. CONTRACTOR SHALL RELOCATE EXISTING BATTERY BACKUP LIGHT.

REFER TO CONSTRUCTION DRAWING EL100 FOR MORE

INFORMATION.

EX.PNL CB-4B

EX.PNL 4-1L

EX.PNL LS-4B

EX.PNL 41R

EX.PNL CB-4E

EX.PNL LS-4E

EX.KITC-4

1 2 3 4

6 7

8 9 10 11 12

AA

BB

CC

D.2D.2

E.2E.2

E.8

E.8

F.8F.8

HH

II

JJ

DD

EE

F

F

GG

6.86.2

G.5G.5

C.2

0 13

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

ELECTRICAL LIGHTING DEMO

PLAN - FIRST FLOOR

PTP YY

ELD101

A. REFER TO GI002 "CONSTRUCTION PERIOD SCHEDULING OF WORK -

GENERAL NOTES" REGARDING THE VA'S DISCRETION IN SELECTING

WORK TO BE DONE AFTER HOURS/OFF-HOURS.

B. REFER TO GI002 "CONSTRUCTION PERIOD SCHEDULING OF WORK -

ADDITIONAL NOTES FOR STERILE PROCESSING SERVICE (SPS)"

REGARDING WORK IN, ADJACENT TO, OR THAT MAY AFFECT SPS.

6 7

8 9 10 11 12

AA

BB

CC

D.2D.2

E.2E.2

E.8

E.8

F.8F.8

HH

II

JJ

DD

EE

F

F

GG

6.86.2

G.5G.5

C.2

0 13

EX.PNL 4-2L

EX.PNL CB-4C

EX.PNL LS-4C

EX.PNL 4C

EX.PNL CB-4F

EX.PNL LS-4F

EX.PNL 4-2R

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

ELECTRICAL LIGHTING DEMO

PLAN - SECOND FLOOR

PTP YY

ELD102

A. REFER TO GI002 "CONSTRUCTION PERIOD SCHEDULING OF WORK -

GENERAL NOTES" REGARDING THE VA'S DISCRETION IN SELECTING

WORK TO BE DONE AFTERHOURS/OFF-HOURS.

B. REFER TO GI002 "CONSTRUCTION PERIOD SCHEDULING OF WORK -

ADDITIONAL NOTES FOR STERILE PROCESSING SERVICE (SPS)"

REGARDING WORK IN, ADJACENT TO, OR THAT MAY AFFECT SPS.

FE

C

FE

C

FEC

FE

C

FEC

FE

C

FE

C

M

1 2 3 4

6 7

8 9 10 11 12

AA

BB

CC

D.2D.2

E.2E.2

E.8

E.8

F.8F.8

HH

II

JJ

DD

EE

F

F

GG

6.86.2

G.5G.5

C.2

0 13

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

COMM. AND TECHNOLOGY

DEMO PLAN - FIRST FLOOR

PTP YY

ETD101

A. REFER TO GI002 "CONSTRUCTION PERIOD SCHEDULING OF WORK -

GENERAL NOTES" REGARDING THE VA'S DISCRETION IN SELECTING

WORK TO BE DONE AFTERHOURS/OFF-HOURS.

B. REFER TO GI002 "CONSTRUCTION PERIOD SCHEDULING OF WORK -

ADDITIONAL NOTES FOR STERILE PROCESSING SERVICE (SPS)"

REGARDING WORK IN, ADJACENT TO, OR THAT MAY AFFECT SPS.

C. CLEAN AND SEAL ALL EXISTING DUCTWORK THAT WILL BE REUSED.

D. REFER TO DEMOLITION GENERAL NOTES ON DRAWING EPD100.

1. CONTRACTOR SHALL COORDINATE WITH VA IT PERSONNEL FOR

DEACTIVATION OF VA MANAGED SWITCHES AND SERVERS.

HANDOVER ALL SWITCHES, SERVERS AND ALL OTHER EQUIPMENT

THAT VA PREFERS TO RETAIN. PROVIDE DEMOLITION OF

REMAINING EQUIPMENT.

2. CONTRACTOR SHALL REMOVE EXISTING WIRELESS ACCESS POINT

DEVICES, WRAPPED, BAGGED LABELED, AND STORE ON SITE AT

SECURE PLACE FOR RE-USING. CONTRACTOR SHALL MARK THE

LOCATION OF EACH EXISTING DEVICE. SAME DEVICES SHALL

RE-INSTALL WITHIN 2 FEET RADIUS OF MARKED LOCATION IN

RENOVATED AREA. DEMOLISH EXISTING CA+5/6 CABLE TO THESE

DEVICES.

3. REMOVE AND DEMOLISH ALL EXISTING PUBLIC ANNOUNCEMENT

SYSTEM SPEAKER.

4. DEMOLISH EXISTING CABLE TRAYS AND IT'S SUPPORT SYSTEMS.

FE

C

FEC

FEC

FE

C

FE

C

FE

C

1 2 3 4

6 7

8 9 10 11 12

AA

BB

CC

D.2D.2

E.2E.2

E.8

E.8

F.8F.8

HH

II

JJ

DD

EE

F

F

GG

6.86.2

G.5G.5

C.2

0 13

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

COMM. AND TECHNOLOGY

DEMO PLAN - SECOND FLOOR

PTP YY

ETD102

A. REFER TO GI002 "CONSTRUCTION PERIOD SCHEDULING OF WORK -

GENERAL NOTES" REGARDING THE VA'S DISCRETION IN

SELECTING WORK TO BE DONE AFTERHOURS/OFF-HOURS.

B. REFER TO GI002 "CONSTRUCTION PERIOD SCHEDULING OF WORK -

ADDITIONAL NOTES FOR STERILE PROCESSING SERVICE (SPS)"

REGARDING WORK IN, ADJACENT TO, OR THAT MAY AFFECT SPS.

C. CLEAN AND SEAL ALL EXISTING DUCTWORK THAT WILL BE

REUSED.

D. REFER TO DEMOLITION GENERAL NOTES ON DRAWING EPD100.

1. REFER TO KEY NOTE 1 ON DRAWING ETD101.

2. REFER TO KEY NOTE 2 ON DRAWING ETD101.

3. REFER TO KEY NOTE 3 ON DRAWING ETD101.

4. REFER TO KEY NOTE 4 ON DRAWING ETD101.

6 7

8 9 10 11 12

AA

BB

CC

D.2D.2

E.2E.2

E.8

E.8

F.8F.8

HH

II

JJ

DD

EE

F

F

GG

6.86.2

G.5G.5

C.2

0 13

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

FIRE ALARM AND NURSE CALL

DEMO PLAN - FIRST FLOOR

PTP YY

EFD101

A. REFER TO GI002 "CONSTRUCTION PERIOD SCHEDULING OF WORK -

GENERAL NOTES" REGARDING THE VA'S DISCRETION IN SELECTING

WORK TO BE DONE AFTERHOURS/OFF-HOURS.

B. REFER TO GI002 "CONSTRUCTION PERIOD SCHEDULING OF WORK -

ADDITIONAL NOTES FOR STERILE PROCESSING SERVICE (SPS)"

REGARDING WORK IN, ADJACENT TO, OR THAT MAY AFFECT SPS.

C. CLEAN AND SEAL ALL EXISTING DUCTWORK THAT WILL BE REUSED.

D. REFER TO DEMOLITION GENERAL NOTES ON DRAWING EPD100.

1. CONTRACTOR SHALL CAREFULLY REMOVE ALL EXISTING

INITIATION, DETECTION, AND NOTIFICATION FIRE ALARM DEVICES,

TAMPER AND FLOW SWITCHES. WRAPPED, BAGGED, LABELED,

AND STORE ON SITE AT VA DESIGNATED SECURE SITE. SAME

DEVICES SHALL BE RE-INSTALLED IN RENOVATED AREA. REMOVE

AND DEMO ALL FIRE ALARM DEVICES, CABLES, AND CONDUIT BACK

TO SOURCE PANEL. DURING BIDDING, CONTRACTOR SHALL

CONSULT VA AND ASK, VA PREFER ALL NEW DEVICES INSTEAD OF

REUSING EXISTING AND PROCEED ACCORDINGLY.

2. REMOVE AND DEMOLISH ABANDONED NURSE CALL DEVICES AND

ITS ASSOCIATED CABLES AND CONDUITS.

6 7

8 9 10 11 12

AA

BB

CC

D.2D.2

E.2E.2

E.8

E.8

F.8F.8

HH

II

JJ

DD

EE

F

F

GG

6.86.2

G.5G.5

C.2

0 13

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

FIRE ALARM AND NURSE CALL

DEMO PLAN - SECOND FLOOR

PTP YY

EFD102

A. REFER TO GI002 "CONSTRUCTION PERIOD SCHEDULING OF WORK -

GENERAL NOTES" REGARDING THE VA'S DISCRETION IN SELECTING

WORK TO BE DONE AFTERHOURS/OFF-HOURS.

B. REFER TO GI002 "CONSTRUCTION PERIOD SCHEDULING OF WORK -

ADDITIONAL NOTES FOR STERILE PROCESSING SERVICE (SPS)"

REGARDING WORK IN, ADJACENT TO, OR THAT MAY AFFECT SPS.

C. CLEAN AND SEAL ALL EXISTING DUCTWORK THAT WILL BE REUSED.

D. REFER TO DEMOLITION GENERAL NOTES ON DRAWING EPD100.

1. REFER TO KEY NOTE 1 ON DRAWING EFD101.

2. REFER TO KEY NOTE 2 ON DRAWING EFD101.

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

ITEMS WITH DARK DASH LINE INDICATES DISCONNECT AND

DEMO.

EXISTING ELECTRICAL

ONE-LINE DIAGRAM

PTP YY

ED501

ITEMS WITH DARK PHANTOM LINE INDICATES

DISCONNECT AND REUSE.

1. DEMOLISH CABLE AND CONDUIT FROM SOURCE TO DESTINATION.

2. REFER TO KEY NOTE 1 ON DRAWING EPD101 AND EPD 102.

ITEMS WITH LIGHT PHANTOM LINE INDICATES

ELECTRICAL CLOSET. REFER TO ARCH PLAN FOR DEMO

SCOPE.

ITEMS WITH LIGHT SOLID LINE INDICATES SCHEDULE

TO REMAIN.

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

COMM. AND TECHNOLOGY

DEMO RISER DIAGRAM

PTP YY

ED801

FIBER

DISTRIBUTION

ENCLOSURE

FIBER DISTRIBUTION PANEL

SWITCH 1

SWITCH 2

TELECOMMUNICATION ROOM B09 (BASEMENT)

TELECOMMUNICATION ROOM 217A (SECOND FLOOR)

TELECOMMUNICATION ROOM 121A (FIRST FLOOR)

TO VOICE/DATA

OUTLETS

MAIN FIBER

RISER FROM

BUILDING 9

SWITCH 1

PATCH PANEL 1

PATCH PANEL 2

SWITCH 2

TO VOICE/DATA

OUTLETS

REFER PLAN DRAWING FOR

OUTLET LOCATION

TO VOICE/DATA

OUTLETS

REFER PLAN DRAWING FOR

OUTLET LOCATION

CAT5

HORIZONTAL

CABLE

PATCH PANEL 1

PATCH PANEL 2

CAT5

HORIZONTAL

CABLE

TO VOICE/DATA

OUTLETS

REFER PLAN DRAWING FOR

OUTLET LOCATION

CAT5

HORIZONTAL

CABLE

PATCH PANEL 1

SWITCH 1

62.5/125 MICRON,

2 STRAND,

MM FIBER

SIZE UNKNOWN

217A

121A

62.5/125 MICRON, 2 STRAND, MM FIBER

217A

121A

62.5/125 MICRON,

2 STRAND,

MM FIBER

FIBER

DISTRIBUTION

BOX

FIBER

DISTRIBUTION

BOX

A. REFER TO GI002 "CONSTRUCTION PERIOD SCHEDULING OF WORK -

GENERAL NOTES" REGARDING THE VA'S DISCRETION IN SELECTING

WORK TO BE DONE AFTERHOURS/OFF-HOURS.

B. REFER TO GI002 "CONSTRUCTION PERIOD SCHEDULING OF WORK -

ADDITIONAL NOTES FOR STERILE PROCESSING SERVICE (SPS)"

REGARDING WORK IN, ADJACENT TO, OR THAT MAY AFFECT SPS.

C. CLEAN AND SEAL ALL EXISTING DUCTWORK THAT WILL BE REUSED.

D. REFER TO DEMOLITION GENERAL NOTES ON DRAWING EPD100.

1. REFER TO KEY NOTE 1 ON DRAWING ETD101.

COMMUNICATION CLOSET. REFER TO ARCH PLAN FOR

DEMOLITION SCOPE.

UNLESS OTHERWISE NOTED, ITEMS WITH DARK DASH

LINE INDICATES DISCONNECT AND DEMO.

ITEMS WITH CONTINUOUS LIGHT COLOR LINES

INDICATES EXISTING SCHEDULE TO REMAIN.

6 7

A

B

C

D.2

E.2

E.8

D

E

C.2

EX.PNL NMDP

EX.PNL CB-4A

EX.PNL LS-4A

3 3

TYP.

TYP.

TYP.

CONDUIT UP TO

1ST FLOOR

(PNL 4-2R, 4-2L, 4-1R)

CONDUIT UP TO

1ST FLOOR

(PNL CB-4B)

CONDUIT UP TO

1ST FLOOR

(PNL 4-1L)

+60" +60"

+60"

7 +72"

TV

1 2 3 4 5 86.86.20

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

1 3

ELECTRICAL POWER PLAN -

BASEMENT - ZONE 1

PTP YY

EP100.1

CIRCUIT

NO.

CONDUCTOR/CONDUIT

BRANCH CIRCUIT SCHEDULE

2 #10 THWN, 1 #12 G, 3 4" C

CCT 3

CCT 1

2 #10 THWN, 1 #12 G, 3 4" C

CCT 5 2 #10 THWN, 1 #12 G, 3 4" C

CCT 7 2 #10 THWN, 1 #12 G, 3 4" C

AREA NOT IN PROJECT SCOPE

E

P

1 / EP100.2

CIRCUIT

NO.

CONDUCTOR/CONDUIT

BRANCH CIRCUIT SCHEDULE

2 #10 THWN, 1 #12 G, 3 4" CCCT 22

CCT 8 2 #10 THWN, 1 #12 G, 3 4" C

A. CIRCUIT NUMBERS ARE SHOWN ADJACENT TO RECEPTACLES,

JUNCTION BOXES, AND EQUIPMENT CONNECTIONS. FURNISH,

INSTALL, AND CONNECT THE CORRECT QUANTITY AND SIZE OF

CONDUCTORS AS REQUIRED FOR THE RECEPTACLES AND

EQUIPMENT CONNECTIONS ASSIGNED. PROVIDE NEW CONDUCTOR

IN NEW CONDUIT.

B. ALL ELECTRICAL EQUIPMENT, (i.e. MAIN DISTRIBUTION BOARD, SWITCH BOARDS, PANEL BOARDS, DISCONNECT SWITCHES) SHALL

BE LABELED WITH SOURCE OF POWER THEY ARE FED FROM AND

EQUIPMENT/DEVICES THEY SERVED.

C. CONTRACTOR SHALL PROVIDE LABEL ON EACH RECEPTACLE

FACEPLATE INDICATING CIRCUIT NUMBER AND PANEL THEY ARE

FED FROM.

D. COORDINATE AND CO-LOCATE WALL MOUNTED RECEPTACLE

LOCATIONS WITH VOICE/DATA OUTLET SHOWN ON ET SERIES

DRAWINGS.

E. OUTLET BOXES MOUNTED BACK TO BACK IN THE SAME WALL ARE

PROHIBITED. A MINIMUM 24 INCH CENTER-TO-CENTER LATERAL

SPACING SHALL MAINTAIN BETWEEN BOXES.

F. CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE GFCI OUTLET

WITHIN 5 FEET RADIUS OF SINK OR WATER OUTLET.

G. COORDINATE ET SERIES DRAWINGS FOR SECURITY DEVICE

LOCATIONS AND PROVIDE WALL/CEILING, AND 3/4" CONDUIT

STUB-UP ABOVE CEILING FOR FUTURE CAMERAS, DURESS

BUTTONS, AND DURESS INDICATOR LIGHTS.

H. ALL EMERGENCY POWER RECEPTACLES SHALL BE OF RED COLOR

HOSPITAL GRADE ARE CONNECTED TO CRITICAL (EMERGENCY)

PANEL.

1. FOR WALL MOUNTED OUTLETS IN ALL GROUP ROOMS, PROVIDE

LEGRAND MODEL ARTRUSB153M4 OR APPROVED EQUAL USB

COMBO OUTLETS.

2. CONTRACTOR SHALL SAW CUT THE FLOOR AND PROVIDE

CONDUITS TO ALL FLOOR MOUNTED RECEPTACLES IN THE

PROJECT. PROVIDE LEGRAND EVOLUTION SERIES 4G AND FLOOR

BOX FOR POWER AND DATA OUTLETS.

3. FOR EXTERIOR WALL WITH ARCHITECTURE WORK VERIFY

EXISTING OUTLET LOCATION AND PROVIDE NEW OUTLET AS

SHOWN ON EXISTING EXTERIOR WALL. FISH THROUGH NEW WIRE

IN EXISTING CONDUIT.

4. REFER TO SINGLE LINE DIAGRAM AND CABLE SCHEDULE FOR

CABLE AND CONDUIT SIZES.

E.8

F.8

H

I

J

F

G

G.5

EX.MEP-4A

208/120V 225A

EX.T EX.T

NEW ELP4

208/120V 400A

EX.ATS-ELP4

208V,400A

EX.JB

EX.PB

EX.FCU-4

208/120V, 100A

EX.MDP-4

208/120V

800A

EX.T-CB-4B (75KVA)

EX.T-CB-4E (75KVA)

EX.SURGE SUPPRESOR PANEL

GFCI

2 2

4 4

6 6

EX.ELEVATOR

ECB 200A

EX.MTS-FCU-4

100A

EX.TEMP POWER DISC

EX.TEMP POWER PB

NEW 4-BL

120/208V 225A,3Ø,4W

TYP.

GFCI

FREEZER

CONDUIT UP TO

NEW PANEL MCP-4

IN ATTIC

NURSE CALL SYSTEM

POWER SUPPLY

+60"

+60"

CONDUIT UP

TO 1ST FLOOR

(PNL CB-4B, CB-4E)

4T16

1 2 3 4 5 86.86.20

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

1 3

ELECTRICAL POWER PLAN -

BASEMENT - ZONE 2

PTP YY

EP100.2

CIRCUIT

NO.

CONDUCTOR/CONDUIT

BRANCH CIRCUIT SCHEDULE

2 #10 THWN, 1 #12 G, 3 4" C

CCT 4

CCT 2

2 #10 THWN, 1 #12 G, 3 4" C

CCT 6 2 #10 THWN, 1 #12 G, 3 4" C

CCT 8 2 #10 THWN, 1 #12 G, 3 4" C

AREA NOT IN PROJECT SCOPE

E

P

1 / EP100.1

A. REFER TO DRAWING EP100.1 FOR ELECTRICAL GENERAL NOTES.

1. REFER TO KEY NOTE 1 ON DRAWING EP100.1.

2. REFER TO KEY NOTE 2 ON DRAWING EP100.1.

3. THIS NEW PANEL LOCATED AT SAME LOCATION AS THE OLD PANEL,

CONTRACTOR SHALL FOLLOW EXISTING CONDUIT ROUTE GOING

INTO ELECTRICAL VAULT TO PANEL MDP-4. REFER TO CABLE

SCHEDULE DRAWING FOR CABLE / CONDUIT SIZE.

4. REFER TO SINGLE LINE DIAGRAM AND CABLE SCHEDULE FOR

CABLE AND CONDUIT SIZES.

5. REFER TO EP100A FOR MORE INFORMATION.

CIRCUIT

NO.

CONDUCTOR/CONDUIT

BRANCH CIRCUIT SCHEDULE

2 #10 THWN, 1 #12 G, 3 4" CCCT5

A

B

C

D.2

E.2

E.8

D

E

FOR CONTINUATION

SEE SHEET EP100.4

FOR CONTINUATION

SEE SHEET EP100.3

EX.PNL PP

CONDUIT UP TO

1ST FLOOR

(PNL CB-4E)

EX.FA MAIN PANEL

4a

F5

SUMP PUMP

4a2b 3w

GFCI

GFCI

D.2

D

8 9 10 11 12 13

E.8

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

1 3

ELECTRICAL POWER PLAN -

BASEMENT - ZONE 3

PTP YY

EP100.3

E

P

1 / EP100.4

EX.LS-4D ( ELEC B071)

CIRCUIT

NO.

CONDUCTOR/CONDUIT

BRANCH CIRCUIT SCHEDULE

2 #10 THWN, 1 #12 G, 3 4" CCCT 1

EX.4BR ( ELEC B071)

CIRCUIT

NO.

CONDUCTOR/CONDUIT

BRANCH CIRCUIT SCHEDULE

2 #10 THWN, 1 #12 G, 3 4" CCCT 41

AREA NOT IN PROJECT SCOPE

2 #10 THWN, 1 #12 G, 3 4" CCCT 2

2 #10 THWN, 1 #12 G, 3 4" CCCT 4

EX.LS-4F (ELEC 203)

CIRCUIT

NO.

CONDUCTOR/CONDUIT

BRANCH CIRCUIT SCHEDULE

2 #10 THWN, 1 #12 G, 3 4" CCCT 2

A. REFER TO DRAWING EP100.1 FOR ELECTRICAL GENERAL NOTES.

1. REFER TO KEY NOTE 3 ON DRAWING EP100.1.

2. REFER TO SINGLE LINE DIAGRAM AND CABLE SCHEDULE FOR

CABLE AND CONDUIT SIZES.

H

I

J

F

G

G.5

ES-1

SUBMERSIBLE

POWER UNIT

MICROPROCESSOR

CONTROL

FOR CONTINUATION

SEE SHEET EP100.3

SUMP PUMP

CONTROL PANEL

ELEVATOR

CAB LIGHT

+84"

GFCI

GFCI

8 9 10 11 12 13

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

1 3

ELECTRICAL POWER PLAN -

BASEMENT - ZONE 4

PTP YY

EP100.4

E

P

1 / EP100.3

AREA NOT IN PROJECT SCOPE

1. CONTRACTOR SHALL PROVIDE EATON MODEL ES 4 T2 R1 G F1 B OR

APPROVED EQUAL ELEVATOR CONTROL SWITCH. CONTRACTOR SHALL

COORDINATE WITH FIRE ALARM CONTRACTOR FOR FIRE SAFETY

INTERFACE RELAY VOLTAGE CLASS AND FIRE ALARM VOLTAGE

MONITORING RELAY POLE TYPE BEFORE PLACING ORDER.

2. PROVIDE GFCI OUTLET FOR SPLIT SYSTEM CONDENSING PUMP. FIELD

VERIFY PUMP LOCATION AND PROVIDE OUTLET NEAR TO PUMP

CIRCUIT

NO.

CONDUCTOR/CONDUIT

BRANCH CIRCUIT SCHEDULE

2 #10 THWN, 1 #12 G, 3 4" CCCT 1

2 #10 THWN, 1 #12 G, 3 4" CCCT 3

2 #10 THWN, 1 #12 G, 3 4" CCCT 5

A. REFER TO DRAWING EP100.1 FOR ELECTRICAL GENERAL NOTES.

2 #10 THWN, 1 #12 G, 3 4" CCCT 7

EX.4BR ( ELEC B071)

CIRCUIT

NO.

CONDUCTOR/CONDUIT

BRANCH CIRCUIT SCHEDULE

2 #10 THWN, 1 #12 G, 3 4" CCCT 39

6 7

8 9 10 11 12

AA

BB

CC

D.2D.2

E.2E.2

E.8

E.8

F.8F.8

HH

II

JJ

DD

EE

F

F

GG

6.86.2

G.5G.5

C.2

0 13

EX.PNL CB-4A

EX.PNL LS-4A

NEW 4-BL

T

T

T

T

T

T

T

T

PSVB-2

PSVB-1

SUBMERSIBLE

POWER UNIT

T

EX.PNL NMDP

NEW ELP4

T

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

ELECTRICAL HVAC POWER

PLAN - BASEMENT

PTP YY

EP100A

CIRCUIT

NO.

CONDUCTOR/CONDUIT

BRANCH CIRCUIT SCHEDULE

2 #10 THWN, 1 #12 G, 3 4" C

CCT 14

CCT 12

2 #10 THWN, 1 #12 G, 3 4" C

A. COORDINATE WITH MECHANICAL DRAWING FOR THERMOSTAT

LOCATION AND PROVIDE JUNCTION BOX AND 3/4" CONDUIT STUB-UP

ABOVE CEILING FOR ALL WALL MOUNTED THERMOSTAT. THERMOSTAT

AND CONTROL WIRING FURNISHED BY OTHERS.

B. LOCATION AND QUANTITY OF VAV BOX POWER SUPPLY SHOWN HERE

IS FOR BIDDING LINE POWER SCOPE. CONTRACTOR SHALL

COORDINATE WITH CONTROL CONTRACTOR FOR EXACT QUANTITY

AND LOCATION INSTALL VAV BOX CONTROLLER POWER SUPPLY

PROVIDE BY CONTROL CONTRACTOR. PROVIDE LINE VOLTAGE POWER

AS SHOWN.

C. PROVIDE CEILING MOUNTED JUNCTION BOX WITH FLEXIBLE

CONNECTION TO VAV BOX CONTROLLER POWER. INSTALL JUNCTION

BOX IN ACCESSIBLE LOCATION CLOSE TO EACH VAV BOX. COORDINATE

WITH MECHANICAL CONTRACTOR FOR DISCONNECT SWITCH

LOCATION.

AREA NOT IN PROJECT SCOPE

1. POWER SUPPLY 1 (PSVB-1) FEEDS VAV-B01, VAV-B03, VAV-B03A, VAV-B04 &

VAV-B05, VAV-B00W.

2. POWER SUPPLY 2 (PSVB-2) FEEDS VAV-B01A, VAV-B01B, VAV-B01C &

VAV-B01D.

3. POWER TO INDOOR UNIT DFSS-B16B IS FROM OUTDOOR CONDENSING

UNIT ACCU-B16B. PROVIDE 2 #10, 1 #12 GND CABLE IN 3/4" CONDUIT

FROM OUTDOOR UNIT TO INDOOR UNIT. REFER TO DRAWING EP102A

FOR OUTDOOR UNIT LOCATION.

GFCIGFCI

+60"

+60"+60"

EX.4-1L

CB-4B

EX.LS-4B

RECEPTACLE W/USB

(TYP.)

1 1 1

15 18

17 17

19 19

27 27

16 16

15 15

6 7

A

B

C

D.2

E.2

E.8

D

E

C.2

18 18

5,7 2,4

5,7 2,4

TV

+72"

POWER FOR DOOR HOLDER

CONDUIT UP TO 2ND FL

DOWN TO BASEMENT

(PNL 4-2R, 4-2L)

CONDUIT DOWN

TO BASEMENT (PNL 4-1R)

11,13

NURSE CALL SYSTEM

POWER SUPPLY

ACCESS CONTROL PANEL

TGB GB

ES

N

KI

T

+60"

+60"

+60"

+60"

+60"

+60"

+60"+60"

+60"

+60"

+60"

+60"

+60" +60"

+84"

GFCI

KIOSK POWER

4T16

1 2 3 4 5 86.86.20

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

1 3

ELECTRICAL POWER PLAN -

FIRST FLOOR - ZONE 1

PTP YY

EP101.1

E

P

1 / EP101.2

A. REFER TO DRAWING EP100.1 FOR ELECTRICAL GENERAL NOTES.

CIRCUIT

NO.

CONDUCTOR/CONDUIT

BRANCH CIRCUIT SCHEDULE

2 #10 THWN, 1 #12 G, 3 4" C

CCT 3

CCT 1

2 #10 THWN, 1 #12 G, 3 4" C

4-1L (ELEC 155)

CCT 5 2 #10 THWN, 1 #12 G, 3 4" C

CCT 9 2 #10 THWN, 1 #12 G, 3 4" C

CCT 11 2 #10 THWN, 1 #12 G, 3 4" C

CCT 13 2 #10 THWN, 1 #12 G, 3 4" C

CCT 15 2 #10 THWN, 1 #12 G, 3 4" C

CCT 17 2 #10 THWN, 1 #12 G, 3 4" C

CCT 19 2 #10 THWN, 1 #12 G, 3 4" C

CCT 21 2 #10 THWN, 1 #12 G, 3 4" C

CIRCUIT

NO.

CONDUCTOR/CONDUIT

BRANCH CIRCUIT SCHEDULE

2 #10 THWN, 1 #12 G, 3 4" C

CCT 4

CCT 2

2 #10 THWN, 1 #12 G, 3 4" C

CB-4B (ELEC 155)

CCT 6 2 #10 THWN, 1 #12 G, 3 4" C

CCT 10 2 #10 THWN, 1 #12 G, 3 4" C

CCT 12 2 #10 THWN, 1 #12 G, 3 4" C

CCT 14 2 #10 THWN, 1 #12 G, 3 4" C

CCT 16 2 #10 THWN, 1 #12 G, 3 4" C

CCT 8 2 #10 THWN, 1 #12 G, 3 4" C

CCT 7 2 #10 THWN, 1 #12 G, 3 4" C

CCT 2 2 #10 THWN, 1 #12 G, 3 4" C

CCT 25 2 #10 THWN, 1 #12 G, 3 4" C

CCT 27 2 #10 THWN, 1 #12 G, 3 4" C

CCT 18 2 #10 THWN, 1 #12 G, 3 4" C

CIRCUIT

NO.

CONDUCTOR/CONDUIT

BRANCH CIRCUIT SCHEDULE

4-1R (ELEC 102)

CIRCUIT

NO.

CONDUCTOR/CONDUIT

BRANCH CIRCUIT SCHEDULE

2 #10 THWN, 1 #12 G, 3 4" C

CCT 17

CCT 15

2 #10 THWN, 1 #12 G, 3 4" C

CB-4E (ELEC 102)

2 #10 THWN, 1 #12 G, 3 4" CCCT 18

1. PROVIDE LEGRAND MODEL ARTRUSB153M4 OR APPROVED EQUAL USB

COMBO OUTLETS.

2. REFER TO SINGLE LINE DIAGRAM AND CABLE SCHEDULE FOR CABLE

AND CONDUIT SIZES.

3. PROVIDE GFCI OUTLET FOR SPLIT SYSTEM CONDENSING PUMP. FIELD

VERIFY PUMP LOCATION AND PROVIDE OUTLET NEAR TO PUMP.

4. REFER TO EP100A FOR MORE INFORMATION.

LS-4B (ELEC 155)

CIRCUIT

NO.

CONDUCTOR/CONDUIT

BRANCH CIRCUIT SCHEDULE

2 #10 THWN, 1 #12 G, 3 4" C

CCT 4

CCT 2

2 #10 THWN, 1 #12 G, 3 4" C

CIRCUIT

NO.

CONDUCTOR/CONDUIT

BRANCH CIRCUIT SCHEDULE

2 #10 THWN, 1 #12 G, 3 4" C

CCT 7

CCT 6

2 #10 THWN, 1 #12 G, 3 4" C

CCT 36 2 #10 THWN, 1 #12 G, 3 4" C

CCT 23 2 #10 THWN, 1 #12 G, 3 4" C

LUTRON - ENERGI SAVR NODE QSN-4T 16-S

ESN LUTRON - PROGRAMMING INTERFACE QSE-CI-AP-D

KIT LUTRON - WIRELESS SETUP KIT C-ESN-SETUP

4T16

CCT 8 2 #10 THWN, 1 #12 G, 3 4" C

CCT 11,13 2 #10 THWN, 1 #12 G, 3 4" C

CCT 5 2 #10 THWN, 1 #12 G, 3 4" C

CCT 9 2 #10 THWN, 1 #12 G, 3 4" C

GFCI

GFCI

GFCI

GFCI

7 7 9

E.8

F.8

H

I

J

F

G

G.5

26 28 30

+72"

TV

REF

MICROCOFF

COPIER

SHREDDER

CONDUIT UP 2ND FLOOR

DOWN TO BASEMENT PNL MDP-4

(PNL MCP-4C)

CONDUIT DOWN

TO BASEMENT PNL ELP4

+60"

+60"

+60"

+60"

+60"

+60"

+60"

+60"

+60"

+60" +60" +60"

+60"

+60"

+60"

1 2 3 4 5 86.86.20

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

1 3

ELECTRICAL POWER PLAN -

FIRST FLOOR - ZONE 2

PTP YY

EP101.2

E

P

1 / EP101.1

A. REFER TO DRAWING EP100.1 FOR ELECTRICAL GENERAL NOTES.

CIRCUIT

NO.

CONDUCTOR/CONDUIT

BRANCH CIRCUIT SCHEDULE

2 #10 THWN, 1 #12 G, 3 4" C

CCT 3

CCT 1

2 #10 THWN, 1 #12 G, 3 4" C

4-1L (ELEC 155)

CCT 5 2 #10 THWN, 1 #12 G, 3 4" C

CCT 7 2 #10 THWN, 1 #12 G, 3 4" C

CCT 9 2 #10 THWN, 1 #12 G, 3 4" C

CIRCUIT

NO.

CONDUCTOR/CONDUIT

BRANCH CIRCUIT SCHEDULE

2 #10 THWN, 1 #12 G, 3 4" C

CCT 4

CCT 2

2 #10 THWN, 1 #12 G, 3 4" C

CB-4B (ELEC 155)

CCT 6 2 #10 THWN, 1 #12 G, 3 4" C

CCT 8 2 #10 THWN, 1 #12 G, 3 4" C

CCT 10 2 #10 THWN, 1 #12 G, 3 4" C

CCT 12 2 #10 THWN, 1 #12 G, 3 4" C

CCT 14 2 #10 THWN, 1 #12 G, 3 4" C

CCT 16 2 #10 THWN, 1 #12 G, 3 4" C

CCT 18 2 #10 THWN, 1 #12 G, 3 4" C

CCT 20 2 #10 THWN, 1 #12 G, 3 4" C

CIRCUIT

NO.

CONDUCTOR/CONDUIT

BRANCH CIRCUIT SCHEDULE

4-1R (ELEC 102)

CIRCUIT

NO.

CONDUCTOR/CONDUIT

BRANCH CIRCUIT SCHEDULE

2 #10 THWN, 1 #12 G, 3 4" C

CCT 21

CCT 17

2 #10 THWN, 1 #12 G, 3 4" C

CB-4E (ELEC 102)

2 #10 THWN, 1 #12 G, 3 4" CCCT 17

CCT 22 2 #10 THWN, 1 #12 G, 3 4" C

CCT 24 2 #10 THWN, 1 #12 G, 3 4" C

CCT 26 2 #10 THWN, 1 #12 G, 3 4" C

CCT 28 2 #10 THWN, 1 #12 G, 3 4" C

CCT 30 2 #10 THWN, 1 #12 G, 3 4" C

2 #10 THWN, 1 #12 G, 3 4" CCCT 9

1. REFER TO SINGLE LINE DIAGRAM AND CABLE SCHEDULE FOR CABLE

AND CONDUIT SIZES.

GFCI

RECEPTACLE W/USB

+60" 4-1R

CB-4E

EX.LS-4E

17 15

A

B

C

D.2

E.2

E.8

D

E18

4 7

GFCI

36 +72"

TV

GB

+60" +60"

+60"

+60"

+60"

KIOSK POWER

4T16

8 9 10 11 126.8 13

E.8

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

1 3

ELECTRICAL POWER PLAN -

FIRST FLOOR - ZONE 3

PTP YY

EP101.3

E

P

1 / EP101.4

A. REFER TO DRAWING EP100.1 FOR ELECTRICAL GENERAL NOTES.

CIRCUIT

NO.

CONDUCTOR/CONDUIT

BRANCH CIRCUIT SCHEDULE

2 #10 THWN, 1 #12 G, 3 4" C

CCT 6

CCT 4

2 #10 THWN, 1 #12 G, 3 4" C

4-1R (ELEC 102)

CCT 8 2 #10 THWN, 1 #12 G, 3 4" C

CCT 10 2 #10 THWN, 1 #12 G, 3 4" C

CCT 12 2 #10 THWN, 1 #12 G, 3 4" C

CIRCUIT

NO.

CONDUCTOR/CONDUIT

BRANCH CIRCUIT SCHEDULE

2 #10 THWN, 1 #12 G, 3 4" C

CCT 3

CCT 1

2 #10 THWN, 1 #12 G, 3 4" C

CB-4E (ELEC 102)

CCT 7 2 #10 THWN, 1 #12 G, 3 4" C

CCT 11 2 #10 THWN, 1 #12 G, 3 4" C

CCT 14 2 #10 THWN, 1 #12 G, 3 4" C

CCT 16 2 #10 THWN, 1 #12 G, 3 4" C

CCT 18 2 #10 THWN, 1 #12 G, 3 4" C

CCT 5 2 #10 THWN, 1 #12 G, 3 4" C

CCT 13 2 #10 THWN, 1 #12 G, 3 4" C

2 #10 THWN, 1 #12 G, 3 4" CCCT 2

CCT 15 2 #10 THWN, 1 #12 G, 3 4" C

CCT 17 2 #10 THWN, 1 #12 G, 3 4" C

CCT 20 2 #10 THWN, 1 #12 G, 3 4" C

CCT 29 2 #10 THWN, 1 #12 G, 3 4" C

CCT 9 2 #10 THWN, 1 #12 G, 3 4" C

CCT 36 2 #10 THWN, 1 #12 G, 3 4" C

1. PROVIDE SWITCH FOR SOLENOID VALVE POWER SUPPLY. LOCATE

OUTSIDE THE TOILET AS SHOWN. POWER SUPPLY FURNISHED BY

PLUMBING CONTRACTOR.

2. REFER TO SINGLE LINE DIAGRAM AND CABLE SCHEDULE FOR CABLE

AND CONDUIT SIZES.

3. REFER TO EP101A FOR MORE INFORMATION.

+44"

+60"

GFCI

+60"

GFCI

+60"

+60"

GFCI

GFCI

GFCI

GFCI

8 9 10 11 12

E.8

F.8

H

I

J

F

G

6.8

G.5

11 13

LIFT

+60"

+60"

+60"

+60"

+84"

GFCI

17 19

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

1 3

ELECTRICAL POWER PLAN -

FIRST FLOOR - ZONE 4

PTP YY

EP101.4

E

P

1 / EP101.3

A. REFER TO DRAWING EP100.1 FOR ELECTRICAL GENERAL NOTES.

CIRCUIT

NO.

CONDUCTOR/CONDUIT

BRANCH CIRCUIT SCHEDULE

2 #10 THWN, 1 #12 G, 3 4" C

CCT 3

CCT 1

2 #10 THWN, 1 #12 G, 3 4" C

4-1R (ELEC102)

CCT 5 2 #10 THWN, 1 #12 G, 3 4" C

CCT 7 2 #10 THWN, 1 #12 G, 3 4" C

CCT 9 2 #10 THWN, 1 #12 G, 3 4" C

CIRCUIT

NO.

CONDUCTOR/CONDUIT

BRANCH CIRCUIT SCHEDULE

2 #10 THWN, 1 #12 G, 3 4" C

CCT 4

CCT 2

2 #10 THWN, 1 #12 G, 3 4" C

CB-4E (ELEC 102)

CCT 6 2 #10 THWN, 1 #12 G, 3 4" C

CCT 8 2 #10 THWN, 1 #12 G, 3 4" C

CCT 10 2 #10 THWN, 1 #12 G, 3 4" C

CCT 17 2 #10 THWN, 1 #12 G, 3 4" C

CCT 18 2 #10 THWN, 1 #12 G, 3 4" C

CCT 19 2 #10 THWN, 1 #12 G, 3 4" C

CCT 20 2 #10 THWN, 1 #12 G, 3 4" C

CCT 7 2 #10 THWN, 1 #12 G, 3 4" C

CCT 11 2 #10 THWN, 1 #12 G, 3 4" C

CCT 13 2 #10 THWN, 1 #12 G, 3 4" C

CCT 11 2 #10 THWN, 1 #12 G, 3 4" C

CCT 15 2 #10 THWN, 1 #12 G, 3 4" C

1. CONTRACTOR SHALL COORDINATE WITH PATIENT LIFT SHOP

SUBMITTAL, PROVIDE AND LOCATE POWER OUTLET ACCORDINGLY.

2. PROVIDE GFCI OUTLET FOR SPLIT SYSTEM CONDENSING PUMP. FIELD

VERIFY PUMP LOCATION AND PROVIDE OUTLET NEAR TO PUMP.

CCT 41 2 #10 THWN, 1 #12 G, 3 4" C

EX.4-1L

CB-4B

EX.LS-4B

1 2 3 4

6 7

8 9 10 11 12

AA

BB

CC

D.2D.2

E.2E.2

E.8

E.8

F.8F.8

HH

II

JJ

DD

EE

F

F

GG

6.86.2

G.5G.5

C.2

0 13

T

T

T

T

T

T

T

T T

T

4-1R

CB-4E

EX.LS-4ET

T

T

T

T T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

PSV1-1

PSV1-2 PSV1-3

PSV1-4

PSV1-5

PSV1-6

PSV1-7

T

30A

T

30A

T

T

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .