About this file

This document summarizes a federal contract opportunity to renovate an outpatient mental health clinic at a Department of Veterans Affairs medical center. The project involves demolishing and renovating approximately 28,000 square feet of existing space on the first and second floors and 3,000 square feet in the basement of Building 4 to construct a new outpatient mental health clinic. The scope of work includes site work, structural, hazardous material abatement and MEP trades. The contract has been set aside for Service-Disabled Veteran-Owned Small Businesses and will be awarded on a firm fixed price basis. The pre-bid site visit and bid due date will be specified in the solicitation document available on June 23, 2020. The completion period is 588 calendar days. Bidders must be registered in SAM and verified by the Center for Veterans Enterprise as an SDVOSB.

View the file

Other files

File Type Posted
Award Announcement 36C24420C0112.pdf PDF
General Decision Number PA20200083.pdf PDF
36C24420B0003 0003.pdf PDF
00 01 15 - List of Drawing Sheets - ADD-01.pdf PDF
07 Architecture.pdf PDF
36C24420B0003 Amendment 0002.pdf PDF
10 22 26.13 - Operable Partitions - ADD-01.pdf PDF
RFI LOG_542-18-106_08052020.r2.pdf PDF
Sign In Sheet no. 3 B4A B 07162020.pdf PDF
Sign In Sheet B4A B 07162020.pdf PDF
03 Structural 54218106_Drawings_ADD-01_080320.pdf PDF
A012 54218106_Drawings_FinalCD_013120.pdf PDF
08 Interiors 54218106_Drawings_ADD-01_080320.pdf PDF
07 13 52 - Modified Bituminous Sheet Waterproofing - ADD-01.pdf PDF
07 60 00 - Flashing and Sheet Metal - ADD-01.pdf PDF
01 33 23 - Shop Drawings Product Data Samples - ADD-01.pdf PDF
00 01 10 - TOC - ADD-01.pdf PDF
11 Plumbing 54218106_Drawings_ADD-01_080320.pdf PDF
10 21 13 - Toilet Compartments - ADD-01.pdf PDF
07 27 27 - Fluid-Applied Membrane Air Barrier Vapor Retardg - ADD-01.pdf PDF
00 General 54218106_Drawings_ADD-01_080320.pdf PDF
11 73 00 - Ceiling Mounted Patient Lift System - ADD-01.pdf PDF
36C24420B0003 Amendment 0001 - Attachment.pdf PDF
36C24420B0003 AMENDMENT 0001.pdf PDF
36C24420B0003 MAP for Site Visit.pdf PDF
04 Structural 54218106_Drawings_FinalCD_013120.pdf PDF
10 Mechanical 54218106_Drawings_FinalCD_013120.pdf PDF
06 Interiors 54218106_Drawings_FinalCD_013120.pdf PDF
09 Plumbing 54218106_Drawings_FinalCD_013120.pdf PDF
08 Fire Protection 54218106_Drawings_FinalCD_013120.pdf PDF
02 Hazardous 54218106_Drawings_FinalCD_013120.pdf PDF
07 Equipment 54218106_Drawings_FinalCD_013120.pdf PDF
01 General 54218106_Drawings_FinalCD_013120.pdf PDF
05 Architectural 54218106_Drawings_FinalCD_013120.pdf PDF
11 Electrical 54218106_Drawings_FinalCD_013120.pdf PDF
03 Civil Landscape 54218106_Drawings_FinalCD_013120.pdf PDF
54218106-Spec-Vol 3_FinalCD_013120.pdf PDF
36C24420B0003.docx DOCX document
PCRA 3-2019 building 4.pdf PDF
54218106-Spec-Vol 2_FinalCD_013120.pdf PDF
54218106-Spec-Vol 1_FinalCD_013120.pdf PDF
COVID Guidelines.pdf PDF
54218106-Spec-Vol 4_FinalCD_013120.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COATESVILLE VA MEDICAL CENTER

COATESVILLE, PA

PROJECT NAME: Renovate Building 4 A & B Floors Outpatient Mental Health Clinic

VA PROJECT NO: 542-18-106

A/E PROJECT NO: 18-102

ADDENDUM 1

Page | 1

ADDENDUM NO. 1

ISSUE DATE: 8/3/2020

TITLE: Addendum 1

This Addendum consists of:

1. Narrative – (___)

Pages

2. Specifications - (____) sections were ADDED

(____) sections were MODIFIED

3. Drawings – (____) drawings were ADDED

(____) drawings were MODIFIED

The following instructions herein and the listed documents below are hereby modified to be incorporated as part of the contract documents.

CHANGES TO SPECIFICATIONS (see accompanying PDFs):

1. 00 01 10 – TABLE OF CONTENTS

The following revisions are required:

a. ADDED line 01 01 10, Table of Contents.

b. ADDED line 07 13 52 – Modified Bituminous Sheet Waterproofing.

c. ADDED line 07 27 27 – Fluid-Applied Membrane Air Barrier, Vapor Retarding.

d. DELETED line 08 36 16.13, Barn (Sliding) Doors).

e. DELETED line 09 65 16, Resilient Sheet Flooring

f. ADDED line 10 21 13, Toilet Compartments.

g. ADDED line 10 22 26.13, Operable Partitions.

h. ADDED line 10 51 00, Lockers.

i. ADDED line 11 73 00, Ceiling Mounted Patient Lift System.

j. MODIFIED section no. 12.36.0061.16 to 12 36 61.16

k. DELETED line 23 22 23, Steam Condensate Pumps

l. ADDED line 32 33 00, Site Furnishings

2. 00 01 15 – LIST OF DRAWING SHEETS

The following revisions are required:

a. ADDED line C107, CONSTRUCTION DETAILS

b. ADDED line SB100, STRUCTURAL BASEMENT FOUNDATION PLAN

c. MODIFIED line SB101 from STRUCTURAL BASEMENT FOUNDATION PLAN to

STRUCTURAL BASEMENT FOUNDATION PLANS

d. MODIFIED name of A414 from TOILET ROOM ELEVATIONS to INTERIOR

ELEVATIONS

e. MODIFIED order of Interiors sheets

f. ADDED line IF100.4, BASEMENT – FLOOR AND W.P. PARTIAL FINISH PLAN

ZONE 4

g. DELETED line IG103

PROJECT NAME: Renovate Building 4 A & B Floors Outpatient Mental Health Clinic

Page | 2

h. DELETED line MPD103

i. MODIFIED order of MV-series sheets

j. DELETED line MV103

k. DELETED lines MP100.1, MP100.2, MP100.3, MP100.4

l. DELETED lines MP101.1, MP101.2, MP101.3, MP101.4

m. DELETED lines MP102.1, MP102.2, MP102.3, MP102.4

n. DELETED line MP103.1

o. MODIFIED sheet number ED502 to ED802

p. ADDED line EL103, ELECTRICAL LIGHTING PLAN – ATTIC

3. 01 33 23 – SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

a. MODIFIED this section to indicate the use of Submittal Exchange, and directions and information pertaining to its use.

4. 07 13 52 – Modified Bituminous Sheet Waterproofing. ADDED this section.

5. 07 27 27 – Fluid-Applied Membrane Air Barrier, Vapor Retarding. ADDED this section.

6. 07 60 00 – Flashing and Sheet Metal.

a. EDITED 2.11 Hanging Gutters and Gutter Liners.

b. EDITED 2.12 Conductors (Downspouts).

7. 10 21 13 – Toilet Compartments. ADDED this section.

8. 10 22 26.13 – Operable Partitions. ADDED this section.

9. 10 51 00 – Lockers. ADDED this section.

10. 11 73 00 – Ceiling Mounted Patient Lift System. ADDED this section.

CHANGES TO DRAWINGS (see accompanying sheet PDFs):

1. G002 – SHEET INDEX

a. MODIFIED Sheet Index. Same as Change to Specifications above, #2, items a-m.

2. G003 – CODE AND BUILDING INFORMATION, PROJECT TEAM

a. MODIFIED Sheet Index. Same as Change to Specifications above

#2, items n-o.

3. SB100 - STRUCTURAL BASEMENT FOUNDATION PLAN

a. Operable partition located on plan.

4. SF101 - STRUCTURAL FIRST FLOOR FRAMING PLAN

a. Operable partition framing below 1st floor added.

b. Additional floor opening added.

PROJECT NAME: Renovate Building 4 A & B Floors Outpatient Mental Health Clinic

Page | 3

c. Note added for infill of abandoned openings.

5. SF102 – STRUCTURAL SECOND FLOOR FRAMING PLAN

a. Patient lift framing below 2nd floor added.

b. Additional floor opening added.

c. Note added for infill of abandoned openings.

6. SF103 – STRUCTURAL ATTIC FRAMING PLAN

a. Additional attic openings indicated and note added for infill of abandoned openings.

7. SF104 – STRUCTURAL ENLARGED FRAMING PLANS

a. Plans added for operable partition and patient lift framing.

b. Framing detail for patient lift added.

8. SF300 – STRUCTURAL FRAMING DETAILS

a. Detail 6/S300 updated for plate sizes.

b. Details 10 and 11 added for infill of abandoned openings.

9. SF301 – STRUCTURAL FRAMING DETAILS

a. SF-301 Details 3,4 and 5/S301 added for operable partition framing.

10. A012 – GENERAL ARRANGEMENT PLAN – SECOND FLOOR

a. ADDED this sheet.

11. A101.4 – ARCHITECTURAL PLAN – FIRST FLOOR ZONE 3

a. REVISED locations of Plan Keynote 3.

12. A414 – INTERIOR ELEVATIONS

a. Renamed sheet from “Toilet Room Elevations” to “Interior

Elevations”

b. ADDED views 17-20 – interior elevations of 215A Nurse Triage.

13. A430 – TYPICAL ROOMS

a. REVISED equipment shown in views 5, 7, 12 and their tags.

PROJECT NAME: Renovate Building 4 A & B Floors Outpatient Mental Health Clinic

Page | 4

14. A431 – TYPICAL ROOMS

a. REVISED equipment shown in views 1, 5, 6, 7 and their tags.

15. A501 – PARTITION SCHEDULE AND DETAILS

a. REVISED verbiage for Furring – Exterior Wall.

16. A602 – DOOR DETAILS

a. Detail 7 and 8: Removed details & revised title to Not Used.

17. A603 – DOOR DETAILS

a. Detail 1: Revised verbiage of several notes.

18. A620 – SIGNAGE TYPES

a. Revised entire sheet.

19. A620 – SIGNAGE TYPES & MOUNTING HEIGHTS

a. Revised Type M and Type L.

20. IF100.2 – BASEMENT - FLOOR AND W.P. PARTIAL FINISH PLAN

ZONE 2

a. REVISED locations of Wall Protection.

21. IF101.1 – FIRST FLOOR - FLOOR AND W.P. PARTIAL FINISH

PLAN ZONE 1

22. IF101.3 – FIRST FLOOR - FLOOR AND W.P. PARTIAL FINISH

PLAN ZONE 3

23. IF102.3 – SECOND FLOOR - FLOOR AND W.P. PARTIAL FINISH

PLAN ZONE 3

PROJECT NAME: Renovate Building 4 A & B Floors Outpatient Mental Health Clinic

Page | 5

24. IF102.4 – SECOND FLOOR - FLOOR AND W.P. PARTIAL FINISH

PLAN ZONE 4

25. QH602 – EQUIPMENT SCHEDULE

a. REVISED item D2525 to be CC.

26. QH605 – EQUIPMENT SCHEDULE

a. REVISED item D2525 to be CC.

27. P700 – PLUMBING - SCHEDULES

a. Revised verbiage for SK-1.

END OF ADDENDUM NO. 1