This solicitation is for a construction project to renovate approximately 28,000 square feet of existing space and 3,000 square feet of basement space at a Department of Veterans Affairs medical center in Coatesville, Pennsylvania into new outpatient mental health clinics. The project scope includes total demolition and renovation of the first and second floors for new clinics, renovating part of the basement, construction of a new elevator and exterior improvements. The work will be completed according to solicitation, specification and drawing requirements as well as industry, VA and code standards.

The solicitation will be available for download on or around June 23, 2020 from SAM.gov and includes general construction, electrical, and mechanical work in three separate items. Interested service-disabled veteran-owned small businesses must be verified by the Center for Veterans Enterprise and registered in the System for Award Management database. The estimated value is between $10-20 million and work must be completed within 588 calendar days of notice to proceed, contingent on availability of fiscal year 2020 funds. The government will award a firm fixed-price contract and responses are due according to the solicitation.

View the file

Other files

File Type Posted
Award Announcement 36C24420C0112.pdf PDF
General Decision Number PA20200083.pdf PDF
36C24420B0003 0003.pdf PDF
00 01 15 - List of Drawing Sheets - ADD-01.pdf PDF
07 Architecture.pdf PDF
36C24420B0003 Amendment 0002.pdf PDF
10 22 26.13 - Operable Partitions - ADD-01.pdf PDF
RFI LOG_542-18-106_08052020.r2.pdf PDF
Sign In Sheet no. 3 B4A B 07162020.pdf PDF
Sign In Sheet B4A B 07162020.pdf PDF
03 Structural 54218106_Drawings_ADD-01_080320.pdf PDF
A012 54218106_Drawings_FinalCD_013120.pdf PDF
08 Interiors 54218106_Drawings_ADD-01_080320.pdf PDF
07 13 52 - Modified Bituminous Sheet Waterproofing - ADD-01.pdf PDF
07 60 00 - Flashing and Sheet Metal - ADD-01.pdf PDF
01 33 23 - Shop Drawings Product Data Samples - ADD-01.pdf PDF
00 01 10 - TOC - ADD-01.pdf PDF
11 Plumbing 54218106_Drawings_ADD-01_080320.pdf PDF
ADD-01 Narrative.pdf PDF
10 21 13 - Toilet Compartments - ADD-01.pdf PDF
07 27 27 - Fluid-Applied Membrane Air Barrier Vapor Retardg - ADD-01.pdf PDF
00 General 54218106_Drawings_ADD-01_080320.pdf PDF
11 73 00 - Ceiling Mounted Patient Lift System - ADD-01.pdf PDF
36C24420B0003 Amendment 0001 - Attachment.pdf PDF
36C24420B0003 AMENDMENT 0001.pdf PDF
36C24420B0003 MAP for Site Visit.pdf PDF
04 Structural 54218106_Drawings_FinalCD_013120.pdf PDF
06 Interiors 54218106_Drawings_FinalCD_013120.pdf PDF
09 Plumbing 54218106_Drawings_FinalCD_013120.pdf PDF
08 Fire Protection 54218106_Drawings_FinalCD_013120.pdf PDF
02 Hazardous 54218106_Drawings_FinalCD_013120.pdf PDF
07 Equipment 54218106_Drawings_FinalCD_013120.pdf PDF
01 General 54218106_Drawings_FinalCD_013120.pdf PDF
05 Architectural 54218106_Drawings_FinalCD_013120.pdf PDF
11 Electrical 54218106_Drawings_FinalCD_013120.pdf PDF
03 Civil Landscape 54218106_Drawings_FinalCD_013120.pdf PDF
54218106-Spec-Vol 3_FinalCD_013120.pdf PDF
36C24420B0003.docx DOCX document
PCRA 3-2019 building 4.pdf PDF
54218106-Spec-Vol 2_FinalCD_013120.pdf PDF
54218106-Spec-Vol 1_FinalCD_013120.pdf PDF
COVID Guidelines.pdf PDF
54218106-Spec-Vol 4_FinalCD_013120.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

MECHANICAL GENERAL

NOTES AND SYMBOLS

M001

GRS RRR

GENERAL NOTES

B16B

B04

B03C

B03B

B03A

B03B

B03D

B02A

B02

B01A

B01B

B01C

B01D

MECHANICAL DEMOLITION

KEY NOTES

A

B

C

D.2

E.2

E.8

F.8

H

I

J

D

E

F

G

1 2 3 4 5 8 9 10 11 126.86.20 13

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

1 3

KEYPLAN

BASEMENT MECHANICAL

VENTILATION DEMO PLAN

MVD100

SAT DGG

MECHANICAL DEMOLITION

KEY NOTES

MECHANICAL DEMOLITION

KEY NOTES

x4 x6

6x4 x8 x8 x8 x6

24x8 x1

14x 614x8 x8 x6

12x6

20x8

24x8 x6

15x6 x1 x1

18x

30x10

14x10 18x8

18x10

40x8

18x10

24x8 x8 x8 x8

24x8

120J

120H

120G

120F

120E

120B

120C

120A

120K

120D

121 122 123 123A

114A 114D

100A

121A

105 105A 106 107

126C

126B

126A

126H

126J

126G

126F

126E

126D

110A124

1 2 3 4 5 8 9 10 11 126.86.20 13

A

B

C

D.2

E.2

E.8

F.8

H

I

J

D

E

F

G

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

1 3

KEYPLAN

FIRST FLOOR MECHANICAL

VENTILATION DEMO PLAN

MVD101

FE

C

FE

C

FEC

FEC

FE

C

FE

C

FE

C

22x822x6 x6

30x8 x8

22x8 24x6 x6 x6 x6

12x10 30x8

12X9 x6

S x1

30x8

214D

214E

214F 214G

214C

214B

214A

214H

218 219 220A 220

220B

215 211

210A

208B

202 203

205 208

207D

207J

207E

207G

207F

207C

207B

207A

207H

1 2 3 4 5 8 9 10 11 126.86.20 13

A

B

C

D.2

E.2

E.8

F.8

H

I

J

D

E

F

G

MECHANICAL DEMOLITION

KEY NOTES

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

1 3

KEYPLAN

SECOND FLOOR MECHANICAL

VENTILATION DEMO PLAN

MVD102

MECHANICAL CONSTRUCTION

KEY NOTES

1 2 3 4 5 8 9 10 11 126.86.2 13

A

B

C

D.2

E.2

E.8

F.8

H

I

J

D

E

F

G

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

1 3

KEYPLAN

ATTIC MECHANICAL

VENTILATION DEMO PLAN

MVD103

A

B

C

D.2

E.2

E.8

F.8

H

I

J

D

E

F

G

1 2 3 4 5 8 9 10 11 126.86.20 13

MECHANICAL DEMOLITION

KEY NOTES

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

1 3

KEYPLAN

BASEMENT MECHANICAL

PIPING DEMO PLAN

MPD100

KEY NOTES

120J

120H

120G

120F

120E

120B

120C

120A 120K

120D

122 123 123A

115B

115A

114A 114D

114B

113A

113B

101A

100A

121A

105A 106 107

126C

126B

126A

126H

126J

126G

126F

126E

126D

109 108

110B

1 2 3 4 5 8 9 10 11 126.86.20 13

A

B

C

D.2

E.2

E.8

F.8

H

I

J

D

E

F

G

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

1 3

KEYPLAN

FIRST FLOOR MECHANICAL

PIPING DEMO PLAN

MPD101

KEY NOTES

214D

214E

214F 214G

217A

214C

214B

214A 214H

217 218 219 220A 220

220B

210A

202 203 204

205 208

207D

207J

207E

207G 207F

207C

207B

207A 207H

210A

1 2 3 4 5 8 9 10 11 126.86.20 13

A

B

C

D.2

E.2

E.8

F.8

H

I

J

D

E

F

G

5 86.86.2

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

1 3

KEYPLAN

SECOND FLOOR MECHANICAL

PIPING DEMO PLAN

MPD102

1 2 3 4

6 7

8 9 10 11 12

AA

BB

CC

D.2D.2

E.2E.2

E.8

E.8

F.8F.8

HH

II

JJ

DD

EE

F

F

GG

6.86.2

G.5G.5

C.2

0 13

MECHANICAL GENERAL

NOTES

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

1 3

KEYPLAN

BASEMENT MECHANICAL

VENTILATION PLAN

MV010

C.2

B01

B02

B01A

B01B

B01C

B01D

GENERAL NOTES

1 2 3 4 50

MECHANICAL CONSTRUCTION

KEY NOTES

A

B

C

D.2

E.2

E.8

D

E

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

1 3

BASEMENT MECHANICAL

VENTILATION PLAN - ZONE 1

MV100.1

B04

B03C B03B

B03A

B03

B03D

B02A

B00W

GENERAL NOTES

MECHANICAL CONSTRUCTION

KEY NOTES

1 2 3 4 5 6.86.20

E.2

E.8

F.8

H

I

J

F

G

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

1 3

BASEMENT MECHANICAL

VENTILATION PLAN - ZONE 2

MV100.2

B09

8 9 10 11 126.8 13

MECHANICAL CONSTRUCTION

KEY NOTES

A

B

C

D.2

E.2

D

E

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

1 3

BASEMENT MECHANICAL

VENTILATION PLAN - ZONE 3

MV100.3

B16B

MECHANICAL CONSTRUCTION

KEY NOTES

8 9 10 11 126.8 13

E.2

E.8

F.8

H

I

J

F

G

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

1 3

BASEMENT MECHANICAL

VENTILATION PLAN - ZONE 4

MV100.4

1 2 3 4

6 7

8 9 10 11 12

AA

BB

CC

D.2D.2

E.2E.2

E.8

E.8

F.8F.8

HH

II

JJ

DD

EE

F

F

GG

6.86.2

G.5G.5

C.2

0 13

121A

154 155

105A

SUPPLY

114A

119B

PRIMARY CARE

EXAM

ROOM

120A

119A

129A

158 159 160

100W

100C

100E

100B

100A

136A

150A

MECHANICAL GENERAL

NOTES

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

1 3

KEYPLAN

FIRST FLOOR MECHANICAL

VENTILATION PLAN

MV011

154 155

158 159 160

100C

150A

MECHANICAL CONSTRUCTION

KEY NOTES

A

B

C

D.2

E.2

E.8

D

E

1 2 3 4 5 6.20

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

1 3

FIRST FLOOR MECHANICAL

VENTILATION PLAN - ZONE 1

MV101.1

129A

100W

100C

100B

136A

MECHANICAL CONSTRUCTION

KEY NOTES

E.8

F.8

H

I

J

F

G

1 2 3 4 5 6.20

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

1 3

FIRST FLOOR MECHANICAL

VENTILATION PLAN - ZONE 2

MV101.2

105A

119B

100E

100A

MECHANICAL CONSTRUCTION

KEY NOTES

A

B

C

D.2

E.2

D

E

8 9 10 11 126.8 13

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

1 3

FIRST FLOOR MECHANICAL

VENTILATION PLAN - ZONE 3

MV101.3

KEY NOTES

8 9 10 11 126.86.2

E.8

F.8

H

I

J

F

G

121A

SUPPLY

114A

PRIMARY CARE

EXAM

ROOM

120A

119A

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

1 3

FIRST FLOOR MECHANICAL

VENTILATION PLAN - ZONE 4

MV101.4

C

FE

C

FEC

FEC

FE

C

FE

C

FE

C

227228

226A

230A

230229

238 239 240

219A

215A

214214A

210 209

210A

213A

213B

206A

207 208

200C

200A

200E

1 2 3 4

6 7

8 9 10 11 12

AA

BB

CC

D.2D.2

E.2E.2

E.8

E.8

F.8F.8

HH

II

JJ

DD

EE

F

F

GG

6.86.2

G.5G.5

C.2

0 13

200W

200W

200E

MECHANICAL GENERAL

NOTES

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

1 3

KEYPLAN

SECOND FLOOR MECHANICAL

VENTILATION PLAN

MV012

FEC

FE

C

230A

230229

238 239 240

200C

200W

MECHANICAL CONSTRUCTION

KEY NOTES

A

B

C

D.2

E.2

E.8

D

E

1 2 3 4 5 6.86.20

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

1 3

SECOND FLOOR MECHANICAL

VENTILATION PLAN - ZONE 1

MV102.1

FEC

FE

C

FE

C

227228

226A

219A

200C

200W

200W

MECHANICAL CONSTRUCTION

KEY NOTES

E.8

F.8

H

I

J

F

G

1 2 3 4 5 6.86.20

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

1 3

SECOND FLOOR MECHANICAL

VENTILATION PLAN - ZONE 2

MV102.2

C

FEC

213A

213B

206A

207 208

200A

200E

MECHANICAL CONSTRUCTION

KEY NOTES

8 9 10 11 126.8

A

B

C

D.2

E.2

D

E

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

1 3

SECOND FLOOR MECHANICAL

VENTILATION PLAN - ZONE 3

MV102.3

C

FE

C

215A 214214A

210 209

210A

213A

213B 200A

200E

MECHANICAL CONSTRUCTION

KEY NOTES

8 9 10 11 126.8 13

E.2

E.8

F.8

H

I

J

F

G

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

1 3

SECOND FLOOR MECHANICAL

VENTILATION PLAN - ZONE 4

MV102.4

M400

M401

M402

M403

GENERAL NOTES

A

B

C

D.2

E.2

E.8

F.8

H

I

J

D

E

F

G

1 2 3 4 5 8 9 10 11 126.86.20

A

B

C

D.2

E.2

E.8

F.8

H

I

J

D

E

F

G

6 7

MECHANICAL CONSTRUCTION

KEY NOTES

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

1 3

KEYPLAN

ATTIC MECHANICAL

VENTILATION PLAN

MV013

GRS RRR

KEY NOTES

A

B

C

D.2

E.2

E.8

F.8

H

I

J

D

E

F

G

1 2 3 4 5 8 9 10 11 126.86.20 13

1 3

KEYPLAN

BASEMENT MECHANICAL

PIPING PLAN

MP100

SAT DGG31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

161 101

121A

150 105

105A

SUPPLY

114A

PRIMARY CARE

EXAM

ROOM

120A

119A

129A130

PSYCH/SOCIAL

CONSULT

OFFICE

PSYCH/SOCIAL

CONSULT

OFFICE

158 159 160

100W 100C

100E

100B

100A

MEDS

GENERAL NOTES

MECHANICAL CONSTRUCTION

KEY NOTES

1 2 3 4 5 8 9 10 11 126.86.20 13

A

B

C

D.2

E.2

E.8

F.8

H

I

J

D

E

F

G

6 7

1 3

KEYPLAN

FIRST FLOOR MECHANICAL

PIPING PLAN

MP101

SAT DGG31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com

C

FE

C

FEC

FEC

FE

C

FE

C

FE

C

226A

230A

230229

219A

215A

214A

210 209

210A

213B

206A

207 208

200W

200C

200A

200E

GENERAL NOTES

MECHANICAL CONSTRUCTION

KEY NOTES

1 2 3 4 5 8 9 10 11 126.86.20 13

A

B

C

D.2

E.2

E.8

F.8

H

I

J

D

E

F

G

6 7

5 86.86.2

1 3

KEYPLAN

SECOND FLOOR MECHANICAL

PIPING PLAN

MP102

SAT DGG31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com

KEY NOTES

1 2 3 4 5 8 9 10 11 126.86.2

A

B

C

D.2

E.2

E.8

F.8

H

I

J

D

E

F

G

GENERAL NOTES

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

1 3

KEYPLAN

ATTIC MECHANICAL

PIPING PLAN

MP103

E.8F.8HIJ FG21

J I H G F.8 F E.8

GENERAL NOTES

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

MECHANICAL - ENLARGED

SECTIONS - 4-AC-3

M400

RAH TE

ABCD.2 D C.1E.2 E

E.2 E D.2 D C B A

GENERAL NOTES

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

MECHANICAL - ENLARGED

SECTIONS - 4-AC-4

M401

A B C D.2 E.2D EC.1

E.2ED.2DCBA

GENERAL NOTES

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

MECHANICAL - ENLARGED

SECTIONS - 4-AC-5

M402

E.8 F.8 H I JF G

JIHGF.8FE.8

12 11

GENERAL NOTES

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

MECHANICAL - ENLARGED

SECTIONS - 4-AC-6

M403

ACCESS PANEL

ACCESS DOOR

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

MECHANICAL - DETAILS

M500

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

MECHANICAL - DETAILS

M501

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

MECHANICAL - DETAILS

M502

EA

SA

SA

OA EA

MI

N.

1" M

IN

MI

N.

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

MECHANICAL - DETAILS

M503

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

MECHANICAL - SCHEDULES

M600

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

MECHANICAL - SCHEDULES

M601

T ROOM THERMOSTAT/TRANSMITTER - WALL MOUNT

TT TEMPERATURE TRANSMITTER

M ROOM HUMIDISTAT (MOISTURE)/TRANSMITTER - WALL MOUNT

MT MOISTURE (HUMIDITY) TRANSMITTER

PT PRESSURE TRANSMITTER

TT TEMPERATURE TRANSMITTER, AVERAGING ELEMENT

FT FLOW TRANSMITTER

IT CURRENT TRANSMITTER

CT CONDUCTIVITY TRANSMITTER

SPS STATIC PRESSURE SENSOR

SD SMOKE DETECTOR

PDT PRESSURE DIFFERENTIAL TRANSMITTER

KR LOCAL RECORDING TIME CLOCK (RUNTIME)

TSL TEMPERATURE SWITCH, LOW (FREEZESTAT)

HS HAND SWITCH (HAND-OFF-AUTO SWITCH)

ZC ZONE VALVE OR DAMPER POSITION CONTROLLER

LC LEVEL CONTROLLER

LT LEVEL TRANSMITTER

PDS PRESSURE DIFFERENTIAL SWITCH

TSH TEMPERATURE SWITCH, HIGH (FREEZESTAT)

EPT ELECTRONIC TO PNEUMATIC TRANSDUCER

AT CARBON DIOXIDE TRANSMITTER

CARBON MONOXIDE TRANSMITTER

CO2

AT

CO

OCCUPANCY SENSORAT

OC

LTCP LOCAL TEMPERATURE CONTROL PANEL

HVAC HVAC CONTROL PANEL

ECC INTEGRATE CONTROL POINT ON REMOTE GRAPHICS

WORKSTATION AT ENERGY CONTROL CENTER

TC TEMPERATURE CONTROLLER. SEE SEQUENCE OF OPERATION

VSMC VARIABLE SPEED MOTOR CONTROLLER

PC PRESSURE CONTROLLER. SEE SEQUENCE OF OPERATION

SC SPEED CONTROLLER. SEE SEQUENCE OF OPERATION

FC FLOW CONTROLLER. SEE SEQUENCE OF OPERATION

PSH PRESSURE SWITCH HIGH

FSH FLOW SWITCH - HIGH

PSL PRESSURE SWITCH LOW

KC TIME CLOCK CONTROLLING EQUIPMENT ON A SCHEDULE

FSL FLOW SWITCH - LOW

ROOM THERMOSTAT/SENSOR

WALL MOUNTED

48" AFF.

TU

HWS

HWR

V-1

REHEAT

COIL

AIR TERMINAL UNIT

PRIMARY AIR FLOW

T

ATU

CONTROLLER

PC

AI

R

FL

OW

(C

FM

ROOM TEMPERATURE (°F)

HEATING MINIMUM

VAV BOX CONTROL STRATEGY

W/DEADBAND

SET POINT

FE

COOLIN

G FL

OWREHEAT FLOW

1. SET POINTS SHALL BE SET AS FOLLOWS:

COOLING: 75° F (ADJUSTABLE)

HEATING: 70° F (ADJUSTABLE)

MINIMUM DEADBAND OF 5° F BETWEEN HEATING AND COOLING SET POINTS WILL BE

MAINTAINED.

2. UPON FALL IN SPACE TEMPERATURE THE VAV DAMPER WILL MODULATE TO MINIMUM

POSITION.

3. UPON FURTHER DROP IN SPACE TEMPERATURE VALVE V-1 WILL MODULATE TO MAINTAIN

SET POINT + .5° F. THE ADJUSTABLE TOLERANCE OF + .5° F HAS BEEN SELECTED TO

PREVENT VALVE HUNTING.

4. UPON FURTHER DROP IN SPACE TEMPERATURE THE VAV DAMPER WILL MODULATE TO

MAINTAIN SETPOINT UNTIL AIR FLOW REACHES IT MAXIMUM HEATING SETPOINT. THE

REHEAT COIL WILL CONTINUE TO MODULATE TO MAINTAIN MAXIMUM DELTA T LISTED ABOVE.

5. THE REVERSE SHALL OCCUR ON THE RISE IN SPACE TEMPERATURE.

SUPPLY AIR FLOW

NTS

EXHAUST FAN

SEQUENCE OF OPERATION FOR TOILET EXHAUST FAN

LENGTH IN DUCT WHEN SPACE PERMITS.)

A

TEMPERATURE SENSING ELEMENT FOR

TRANSMITTING TEMPERATURE TO EMCS

(PROVIDE 12 INCHES [200mm] MINIMUM

SENSOR WITH AVERAGING ELEMENT TO TRANSMIT

TEMPERATURE TO EMCS

MOTOR STARTER

M ELECTRIC OPERATED CONTROL DAMPER/OR VALVE

EXHAUST FAN POINTS LIST

HARDWARE POINTS SOFTWARE POINTS

POINT NAME AI AO BI BO AV BV SCHED TREND ALARM SHOW ON

GRAPHIC

EXHAUST AIR DAMPER STATUS X X X

FAN STATUS X X X

EXHAUST AIR DAMPER X X X

FAN START/STOP X X X

SCHEDULE X

EXHAUST AIR DAMPER FAILURE X

EXHAUST AIR DAMPER IN HAND X

FAN FAILURE X

FAN IN HAND X

FAN RUNTIME EXCEEDED X

1. RUN CONDITIONS - SCHEDULED:

THE FAN SHALL RUN ACCORDING TO A USER DEFINABLE SCHEDULE.

2. FAN:

THE FAN SHALL HAVE A USER DEFINABLE (ADJ.) MINIMUM RUNTIME.

3. EXHAUST AIR DAMPER:

THE EXHAUST AIR DAMPER SHALL OPEN ANYTIME THE UNIT RUNS AND SHALL CLOSE ANYTIME

THE UNIT STOPS. THE EXHAUST AIR DAMPER SHALL CLOSE 5 SEC (ADJ.) AFTER THE FAN

STOPS.

ALARMS SHALL BE PROVIDED AS FOLLOWS:

DAMPER FAILURE: COMMANDED OPEN, BUT THE STATUS IS CLOSED.

DAMPER IN HAND: COMMANDED CLOSED, BUT THE STATUS IS OPEN.

4. DAMPER STATUS:

THE FAN SHALL BE ENABLED AFTER THE DAMPER STATUS HAS PROVEN.

ALARMS SHALL BE PROVIDED AS FOLLOWS:

DAMPER FAILURE: COMMANDED OPEN, BUT THE STATUS IS CLOSED.

DAMPER IN HAND: COMMANDED CLOSED, BUT THE STATUS IS OPEN.

5. FAN STATUS:

THE CONTROLLER SHALL MONITOR THE FAN STATUS.

ALARMS SHALL BE PROVIDED AS FOLLOWS:

FAN FAILURE: COMMANDED ON, BUT THE STATUS IS OFF.

FAN IN HAND: COMMANDED OFF, BUT THE STATUS IS ON.

FAN RUNTIME EXCEEDED: FAN STATUS RUNTIME EXCEEDS A USER DEFINABLE LIMIT

(ADJ.).

HARDWARE POINTS SOFTWARE POINTS

POINT NAME AI AO BI BO AV BV SCHED TREND ALARM SHOW ON

GRAPHIC

ZONE TEMPERATURE SETPOINT X X X X

ZONE SETPOINT ADJUST X X

AIRFLOW X X X

AIRFLOW MAXIMUM X X

AIRFLOW MINIMUM X X

HOT WATER HEATING VALVE X X X

ZONE DAMPER X X

AIRFLOW SETPOINT X X X

HEATING/COOLING MODE X X

SCHEDULE OCCUPANCY X X

HEATING SETPOINT OCCUPIED X X X

COOLING SETPOINT OCCUPIED X X X

HEATING SETPOINT UNOCCUPIED X X X

COOLING SETPOINT UNOCCUPIED X X X

VARIABLE TERMINAL AIR BOX POINTS LIST

MOTORIZED

DAMPER

AFMD AIRFLOW MEASURING DEVICE

TO BAS SYSTEM (EXISTING)

31 JAN 2020

RENOVATE BUILDING 4A&B FLOORS

OUTPATIENT MENTAL HEALTH CLINIC

VA Medical Center, Coatesville PA

542-18-106

FINAL CONSTRUCTION

DOCUMENTS SUBMISSION

Revisions: Date:

FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019

50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked DrawnFULLY SPRINKLERED

FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION

MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019

100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020

www.bancroft-ae.com www.bancroft-ae.com

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020

TEMPERATURE CONTROLS

AND POINTS LIST

M700

SAT MAI

EXHAUST AIR

D-3

D-2

PR

E

- F

ILT

ER

OUTSIDE

AIR

D-1

CO

IL

PR

EH

EA

T

CO

IL

CO

OL

IN

G

LOCATE SENSOR

OUTSIDE UNDER SUN

SHIELD

LP

S

V-2 V-1

CH

W

R

CH

W S

RETURN FAN

SUPPLY FAN

SUPPLY AIR TO

TERMINAL UNIT

AF

TE

R

- F

ILT

ER

AF

MD

CURRENT

TRANSMITTER FOR

FAN STATUS

TYP.

PRESSURE SWITCH LOW

TO DISABLE RETURN FAN WHEN

SMOKE DAMPER IN RETURN

DUCT CLOSES

PRESSURE SWITCH HIGH

TO DISABLE FAN WHEN HIGH

PRESSURE LIMIT SETPOINT

IS REACHED

SMOKE

DETECTOR

VARIABLE SPEED

MOTOR CONTROLLER,

TYP.

N.O.

SEQUENCE OF OPERATION FOR VARIABLE AIR VOLUME AIR HANDLING UNIT WITH MINIMUM OUTSIDE AIR

1. GENERAL

A. UNIT IS NORMALLY STARTED AND STOPPED REMOTELY AT THE DDC. H-O-A SWITCH

SHALL BE KEPT IN THE "AUTO" POSITION. "HAND" AND "OFF" POSITIONS SHALL BE USED

ONLY FOR MAINTENANCE. WHEN THE UNIT IS "OFF" D-1, D-2, & D-3, SHALL BE FULLY

CLOSED. WHEN THE UNIT IS "ON" D-1, D-2, & D-3 SHALL BE OPEN TO ITS MINIMUM

POSITION. DAMPER

SHALL MODULATE IN ACCORDANCE WITH THE FOLLOWING SEQUENCE:

2. TEMPERATURE CONTROL

A. SUPPLY AIR TEMPERATURE, SENSED BY TT-1, SHALL BE MAINTAINED AT SETPOINT VIA

DDC BY MODULATING D-1, D-2 AND D-3 OR V-1 OR V-2 UNIT IN SEQUENCE.

B. WHEN THE TEMPERATURE OF THE OUTSIDE AIR, SENSED BY TT-2, IS ABOVE 75°F (ADJ),

THE DIGITAL CONTROL PANEL SHALL PREVENT THE MODULATION OF D-1, D-2, & D-3 AND

SHALL ASSUME THE MINIMUM OUTSIDE AIR POSITION. THE DDC SHALL MODULATE V-2 TO

MAINTAIN THE SUPPLY AIR TEMPERATURE 55°F (ADJ), SENSED BY TT-1.

C. WHEN THE TEMPERATURE OF THE OUTSIDE AIR, SENSED BY TT-2, IS BETWEEN 65°F AND

THE SUPPLY AIR TEMPERATURE SENSED BY TT-4, DAMPER D-1, D-2, AND D-3 SHALL BE

FULLY OPEN (MAXIMUM OUTSIDE AIR POSITION). THE DDC SHALL MODULATE V-2 TO

MAINTAIN THE SUPPLY AIR TEMPERATURE, SENSED BY TT-1.

D. WHEN THE TEMPERATURE OF THE OUTSIDE AIR, SENSED BY TT-2, IS BELOW THE SUPPLY

AIR TEMPERATURE, SENSED BY TT-4, DAMPERS D-1, D-2, AND D-3 SHALL MODULATE TO

MAINTAIN THE SCHEDULED SUPPLY AIR TEMPERATURE. IF D-1 D-2, AND D-3 ARE AT THE

MINIMUM OUTSIDE AIR, PRE-HEAT STEAM COIL VALVES SHALL MODULATE OPEN TO

MAINTAIN THE SUPPLY AIR TEMPERATURE 65°F (ADJ), SENSED BY TT-1.

3. PREHEATING COIL STEAM VALVES:

A. THE CONTROLLER SHALL MEASURE THE MIXED AIR TEMPERATURE AND MODULATE THE

PREHEATING COIL STEAM VALVE IN SEQUENCE TO MAINTAIN ITS SETPOINT.

B. THE PREHEATING SHALL BE ENABLED WHENEVER:

a. OUTSIDE AIR TEMPERATURE IS LESS THAN 65°F (ADJ.).

b. AND THE ECONOMIZER (IF PRESENT) IS DISABLED.

c. AND THE HEATING IS ACTIVE.

d. AND COOLING IS NOT ACTIVE.

e. AND THE SUPPLY FAN STATUS IS ON.

C. THE PREHEATING COIL STEAM VALVES SHALL OPEN FOR FREEZE PROTECTION

WHENEVER:

a. MIXED AIR TEMPERATURE DROPS FROM 40°F TO 35°F (ADJ.).

b. OR THE FREEZESTAT IS ON.

4. COOLING COIL:

A. THE CONTROLLER SHALL MEASURE THE SUPPLY TEMPERATURE AND MODULATE THE

COOLONG COIL VALVE TO MAINTAIN ITS COOLING SETPOINT.

B. THE COOLING SHALL BE ENABLED WHENEVER:

a. OUTSIDE AIR TEMPERATURE IS GREATER THAN 60°F (ADJ.).

b. AND THE ECONOMIZER IS DISABLED OR FULLY OPEN.

c. AND THE ZONE TEMPERATURE IS ABOVE COOLING SETPOINT.

d. AND THE SUPPLY FAN STATUS IS ON.

e. AND THE HEATING IS NOT ACTIVE.

5. AIR FLOW CONTROL

A. THE SUPPLY AIR FLOW SHALL BE CONTROLLED BY THE DIGITAL CONTROL PANEL

MODULATING THE SUPPLY FAN VARIABLE FREQUENCY DRIVE (VFD) TO MAINTAIN 0.75" OF

DUCT STATIC PRESSURE (FIELD ADJUSTABLE), SENSED BY SPS. RESET STATIC

PRESSURE BASED ON ACTUAL BUILDING LOAD.

B. THE DDC, USING TOTAL SUPPLY AIR AND RETURN AIR FLOW SIGNALS, SHALL RESET THE

RETURN AIR FAN VARIABLE SPEED MOTOR CONTROLLER (VSMC) TO MAINTAIN A

CONSTANT AIR FLOW DIFFERENCE BETWEEN THE SUPPLY AIR AND THE RETURN AIR

EQUAL TO MINIMUM OUTSIDE AIR.

C. THE DDC, USING HIGH PRESSURE SENSOR SPS LOCATED AT THE SUPPLY FAN

DISCHARGE, SHALL PREVENT THE SUPPLY FAN FROM DEVELOPING OVER 5" OF STATIC

PRESSURE (FIELD ADJUSTABLE). IF STATIC PRESSURE AT SPS DOES EXCEED 5" THE

SUPPLY AIR FAN SHALL STOP. SPS SHALL BE HARDWIRED TO THE SUPPLY FAN VSMC

AND UNIT SHALL BE SHUTDOWN IN HAND, AUTO OR BYPASS MODE. SPS WILL REQUIRE

MANUAL RESET AT THE DEVICE.

6. FREEZE PROTECTION

A. IF THE AIR TEMPERATURE AS SENSED BY TT-3 FALLS BELOW 40°F, AN ALARM SIGNAL

SHALL INDICATE AT THE DDC. IF THIS TEMPERATURE FALLS BELOW 35°F, AS SENSED BY

THE TSL, THE SUPPLY AND RETURN FANS SHALL SHUT DOWN AND A CRITICAL ALARM

SHALL INDICATE AT THE DDC. TSL SHALL BE HARDWIRED TO THE SUPPLY FAN VFD AND

UNIT SHALL BE SHUTDOWN IN HAND, AUTO OR BYPASS MODE. TSL WILL REQUIRE

MANUAL RESET AT THE DEVICE. DURING FAN SHUTDOWN, TT-3 (PREHEAT TEMP) SENSOR

MODULATE PREHEAT VALVE TO MAINTAIN 60°F (ADJ.).

7. AUTOMATIC SHUTDOWN/RESTART

A. WHEN SMOKE IS DETECTED BY DUCT SMOKE DETECTOR, DSD, THE SUPPLY FANS SHALL

SHUT "OFF" AND AN ALARM SIGNAL SHALL BE TRANSMITTED TO THE FIRE ALARM

SYSTEM. ALL SMOKE DAMPERS IN THE SUPPLY AND RETURN DUCTS SHALL CLOSE.

(HARDWIRE CONNECTION FROM FIRE RELAY AND THE VFD SAFETY CIRCUIT.)

B. SUPPLY AND RETURN FANS SHALL RESTART AND SMOKE DAMPERS SHALL OPEN WHEN

FIRE ALARM CIRCUIT IS RESET.

8. EMERGENCY CONSTANT SPEED OPERATION

A. UPON FAILURE OF THE VFD, THE SUPPLY AND RETURN FANS SHALL BE

STARTED/STOPPED MANUALLY AT THE DDC THROUGH THE BY-PASS STARTER. FANS

SHALL THEN BE OPERATED AT CONSTANT SPEED.

9. ALARMS

A. PROVIDE ALARMS FOR SUPPLY FAN VFD FAULT, SUPPLY FAN FAILURE, (COMMANDED ON

BUT "ON" BUT THE STATUS IS "OFF"; SUPPLY FAN RUNNING IN HAND (COMMANDED "OFF"

BUT THE STATUS IS "ON", AND HIGHER PRE FILTER, AFTER FILTER AND FINAL FILTER

DIFFERENTIAL STATIC PRESSURES.

B. ON A RISE IN SUPPLY AIR TEMPERATURE ABOVE (53°F PLUS 1.5°F DEADBAND, ADJ), THE

HEATING WATER VALVE SHALL CLOSE AND V-2 SHALL MODULATE TO MAINTAIN

SETPOINT. ON A FALL IN SUPPLY AIR TEMPERATURE BELOW 53°F (MINUS 1.5°F

DEADBAND, ADJ), V-2 SHALL CLOSE. ON A FURTHER FALL IN SUPPLY AIR TEMPERATURE,

THE HEATING WATER VALVE SHALL OPEN AND MODULATE TO MAINTAIN SETPOINT. ON A

RISE IN SUPPLY AIR TEMPERATURE ABOVE SETPOINT FOR GREATER THAN 5 MINUTES,

AN ALARM SHALL BE SIGNALED TO THE DDC SYSTEM.

10. ECONOMIZER CYCLE

I. PROVIDE THE UNIT WITH AN ECONOMIZER CYCLE. OPERATION SHALL BE SUCH THAT

WHEN

THE OUTSIDE AIR TEMPERATURE IS LESS THAN 65°F (ADJ)

a. THE OUTSIDE AIR TEMPERATURE IS LESS THAN 65°F (ADJ)

b. AND THE OUTSIDE AIR ENTHALPY IS LESS THAN 22 BTU/LB (ADJ)

c. AND THE OUTSIDE AIR TEMPERATURE IS LESS THAN THE RETURN AIR

TEMPERATURE.

d. AND THE OUTSIDE AIR ENTHALPY IS LESS THAN THE RETURN AIR TEMPERATURE.

e. AND THE SUPPLY FAN STATUS IS ON.

f. THE ECONOMIZER SHALL BE DISABLED ANYTIME THE MIXED AIR TEMPERATURE

DROPS LESS THAN 40°F (ADJ) OR THE FREEZESTAT IS ON.

11. BUILDING DIFFERENTIAL PRESSURE

A. PROVIDE BUILDING DIFFERENTIAL PRESSURE SENSORS AT EACH FLOOR SERVED BY THE

AHU. IN OCCUPIED MODE, ON A RISE IN BUILDING DIFFERENTIAL PRESSURE ABOVE

SETPOINT (0.05 W.C., ADJ), THE RELIEF AIR DAMPER SHALL MODULATE OPEN TO

MAINTAIN THE BUILDING STATIC PRESSURE SETPOINT. THE RETURN / RELIEF FAN SHALL

TRACK THE SUPPLY FAN VFD SPEED MINUS AS ADJUSTABLE OFFSET. (THE OFFSET

SHALL BE DETERMINED AT SYSTEM BALANCING.) THE SYSTEM SHALL EMPLOY A "HIGH

SELECT" OF THE FLOOR STATIC PRESSURE SENSORS. THE HIGHEST PRESSURE SHALL

BE USED TO CONTROL BUILDING STATIC PRESSURE.

12. MINIMUM OUTSIDE AIR VENTILATION

A. WHEN IN THE OCCUPIED MODE, THE CONTROLLER SHALL MEASURE THE OUTSIDE AIR

AND MODULATE THE OUTSIDE AIR DAMPERS TO MAINTAIN THE PROPER MINIMUM

OUTSIDE AIR VENTILATION, OVERRIDE NORMAL DAMPER CONTROL IF THE OUTSIDE

AIRFLOW DROPS. THE CONTROLLER SHALL MODULATE THE OUTSIDE AIR DAMPERS OPEN

TO MAINTAIN THE OUTSIDE AIRFLOW SETPOINTS (ADJ).

13. SUPPLY AIR SMOKE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .