This solicitation is for a construction project to renovate approximately 28,000 square feet of existing space and 3,000 square feet of basement space at a Department of Veterans Affairs medical center in Coatesville, Pennsylvania into new outpatient mental health clinics. The project scope includes total demolition and renovation of the first and second floors for new clinics, renovating part of the basement, construction of a new elevator and exterior improvements. The work will be completed according to solicitation, specification and drawing requirements as well as industry, VA and code standards.
The solicitation will be available for download on or around June 23, 2020 from SAM.gov and includes general construction, electrical, and mechanical work in three separate items. Interested service-disabled veteran-owned small businesses must be verified by the Center for Veterans Enterprise and registered in the System for Award Management database. The estimated value is between $10-20 million and work must be completed within 588 calendar days of notice to proceed, contingent on availability of fiscal year 2020 funds. The government will award a firm fixed-price contract and responses are due according to the solicitation.
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
MECHANICAL GENERAL
NOTES AND SYMBOLS
M001
GRS RRR
GENERAL NOTES
B16B
B04
B03C
B03B
B03A
B03B
B03D
B02A
B02
B01A
B01B
B01C
B01D
MECHANICAL DEMOLITION
KEY NOTES
A
B
C
D.2
E.2
E.8
F.8
H
I
J
D
E
F
G
1 2 3 4 5 8 9 10 11 126.86.20 13
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
1 3
KEYPLAN
BASEMENT MECHANICAL
VENTILATION DEMO PLAN
MVD100
SAT DGG
MECHANICAL DEMOLITION
KEY NOTES
MECHANICAL DEMOLITION
KEY NOTES
x4 x6
6x4 x8 x8 x8 x6
24x8 x1
14x 614x8 x8 x6
12x6
20x8
24x8 x6
15x6 x1 x1
18x
30x10
14x10 18x8
18x10
40x8
18x10
24x8 x8 x8 x8
24x8
120J
120H
120G
120F
120E
120B
120C
120A
120K
120D
121 122 123 123A
114A 114D
100A
121A
105 105A 106 107
126C
126B
126A
126H
126J
126G
126F
126E
126D
110A124
1 2 3 4 5 8 9 10 11 126.86.20 13
A
B
C
D.2
E.2
E.8
F.8
H
I
J
D
E
F
G
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
1 3
KEYPLAN
FIRST FLOOR MECHANICAL
VENTILATION DEMO PLAN
MVD101
FE
C
FE
C
FEC
FEC
FE
C
FE
C
FE
C
22x822x6 x6
30x8 x8
22x8 24x6 x6 x6 x6
12x10 30x8
12X9 x6
S x1
30x8
214D
214E
214F 214G
214C
214B
214A
214H
218 219 220A 220
220B
215 211
210A
208B
202 203
205 208
207D
207J
207E
207G
207F
207C
207B
207A
207H
1 2 3 4 5 8 9 10 11 126.86.20 13
A
B
C
D.2
E.2
E.8
F.8
H
I
J
D
E
F
G
MECHANICAL DEMOLITION
KEY NOTES
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
1 3
KEYPLAN
SECOND FLOOR MECHANICAL
VENTILATION DEMO PLAN
MVD102
MECHANICAL CONSTRUCTION
KEY NOTES
1 2 3 4 5 8 9 10 11 126.86.2 13
A
B
C
D.2
E.2
E.8
F.8
H
I
J
D
E
F
G
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
1 3
KEYPLAN
ATTIC MECHANICAL
VENTILATION DEMO PLAN
MVD103
A
B
C
D.2
E.2
E.8
F.8
H
I
J
D
E
F
G
1 2 3 4 5 8 9 10 11 126.86.20 13
MECHANICAL DEMOLITION
KEY NOTES
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
1 3
KEYPLAN
BASEMENT MECHANICAL
PIPING DEMO PLAN
MPD100
KEY NOTES
120J
120H
120G
120F
120E
120B
120C
120A 120K
120D
122 123 123A
115B
115A
114A 114D
114B
113A
113B
101A
100A
121A
105A 106 107
126C
126B
126A
126H
126J
126G
126F
126E
126D
109 108
110B
1 2 3 4 5 8 9 10 11 126.86.20 13
A
B
C
D.2
E.2
E.8
F.8
H
I
J
D
E
F
G
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
1 3
KEYPLAN
FIRST FLOOR MECHANICAL
PIPING DEMO PLAN
MPD101
KEY NOTES
214D
214E
214F 214G
217A
214C
214B
214A 214H
217 218 219 220A 220
220B
210A
202 203 204
205 208
207D
207J
207E
207G 207F
207C
207B
207A 207H
210A
1 2 3 4 5 8 9 10 11 126.86.20 13
A
B
C
D.2
E.2
E.8
F.8
H
I
J
D
E
F
G
5 86.86.2
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
1 3
KEYPLAN
SECOND FLOOR MECHANICAL
PIPING DEMO PLAN
MPD102
1 2 3 4
6 7
8 9 10 11 12
AA
BB
CC
D.2D.2
E.2E.2
E.8
E.8
F.8F.8
HH
II
JJ
DD
EE
F
F
GG
6.86.2
G.5G.5
C.2
0 13
MECHANICAL GENERAL
NOTES
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
1 3
KEYPLAN
BASEMENT MECHANICAL
VENTILATION PLAN
MV010
C.2
B01
B02
B01A
B01B
B01C
B01D
GENERAL NOTES
1 2 3 4 50
MECHANICAL CONSTRUCTION
KEY NOTES
A
B
C
D.2
E.2
E.8
D
E
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
1 3
BASEMENT MECHANICAL
VENTILATION PLAN - ZONE 1
MV100.1
B04
B03C B03B
B03A
B03
B03D
B02A
B00W
GENERAL NOTES
MECHANICAL CONSTRUCTION
KEY NOTES
1 2 3 4 5 6.86.20
E.2
E.8
F.8
H
I
J
F
G
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
1 3
BASEMENT MECHANICAL
VENTILATION PLAN - ZONE 2
MV100.2
B09
8 9 10 11 126.8 13
MECHANICAL CONSTRUCTION
KEY NOTES
A
B
C
D.2
E.2
D
E
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
1 3
BASEMENT MECHANICAL
VENTILATION PLAN - ZONE 3
MV100.3
B16B
MECHANICAL CONSTRUCTION
KEY NOTES
8 9 10 11 126.8 13
E.2
E.8
F.8
H
I
J
F
G
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
1 3
BASEMENT MECHANICAL
VENTILATION PLAN - ZONE 4
MV100.4
1 2 3 4
6 7
8 9 10 11 12
AA
BB
CC
D.2D.2
E.2E.2
E.8
E.8
F.8F.8
HH
II
JJ
DD
EE
F
F
GG
6.86.2
G.5G.5
C.2
0 13
121A
154 155
105A
SUPPLY
114A
119B
PRIMARY CARE
EXAM
ROOM
120A
119A
129A
158 159 160
100W
100C
100E
100B
100A
136A
150A
MECHANICAL GENERAL
NOTES
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
1 3
KEYPLAN
FIRST FLOOR MECHANICAL
VENTILATION PLAN
MV011
154 155
158 159 160
100C
150A
MECHANICAL CONSTRUCTION
KEY NOTES
A
B
C
D.2
E.2
E.8
D
E
1 2 3 4 5 6.20
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
1 3
FIRST FLOOR MECHANICAL
VENTILATION PLAN - ZONE 1
MV101.1
129A
100W
100C
100B
136A
MECHANICAL CONSTRUCTION
KEY NOTES
E.8
F.8
H
I
J
F
G
1 2 3 4 5 6.20
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
1 3
FIRST FLOOR MECHANICAL
VENTILATION PLAN - ZONE 2
MV101.2
105A
119B
100E
100A
MECHANICAL CONSTRUCTION
KEY NOTES
A
B
C
D.2
E.2
D
E
8 9 10 11 126.8 13
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
1 3
FIRST FLOOR MECHANICAL
VENTILATION PLAN - ZONE 3
MV101.3
KEY NOTES
8 9 10 11 126.86.2
E.8
F.8
H
I
J
F
G
121A
SUPPLY
114A
PRIMARY CARE
EXAM
ROOM
120A
119A
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
1 3
FIRST FLOOR MECHANICAL
VENTILATION PLAN - ZONE 4
MV101.4
C
FE
C
FEC
FEC
FE
C
FE
C
FE
C
227228
226A
230A
230229
238 239 240
219A
215A
214214A
210 209
210A
213A
213B
206A
207 208
200C
200A
200E
1 2 3 4
6 7
8 9 10 11 12
AA
BB
CC
D.2D.2
E.2E.2
E.8
E.8
F.8F.8
HH
II
JJ
DD
EE
F
F
GG
6.86.2
G.5G.5
C.2
0 13
200W
200W
200E
MECHANICAL GENERAL
NOTES
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
1 3
KEYPLAN
SECOND FLOOR MECHANICAL
VENTILATION PLAN
MV012
FEC
FE
C
230A
230229
238 239 240
200C
200W
MECHANICAL CONSTRUCTION
KEY NOTES
A
B
C
D.2
E.2
E.8
D
E
1 2 3 4 5 6.86.20
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
1 3
SECOND FLOOR MECHANICAL
VENTILATION PLAN - ZONE 1
MV102.1
FEC
FE
C
FE
C
227228
226A
219A
200C
200W
200W
MECHANICAL CONSTRUCTION
KEY NOTES
E.8
F.8
H
I
J
F
G
1 2 3 4 5 6.86.20
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
1 3
SECOND FLOOR MECHANICAL
VENTILATION PLAN - ZONE 2
MV102.2
C
FEC
213A
213B
206A
207 208
200A
200E
MECHANICAL CONSTRUCTION
KEY NOTES
8 9 10 11 126.8
A
B
C
D.2
E.2
D
E
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
1 3
SECOND FLOOR MECHANICAL
VENTILATION PLAN - ZONE 3
MV102.3
C
FE
C
215A 214214A
210 209
210A
213A
213B 200A
200E
MECHANICAL CONSTRUCTION
KEY NOTES
8 9 10 11 126.8 13
E.2
E.8
F.8
H
I
J
F
G
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
1 3
SECOND FLOOR MECHANICAL
VENTILATION PLAN - ZONE 4
MV102.4
M400
M401
M402
M403
GENERAL NOTES
A
B
C
D.2
E.2
E.8
F.8
H
I
J
D
E
F
G
1 2 3 4 5 8 9 10 11 126.86.20
A
B
C
D.2
E.2
E.8
F.8
H
I
J
D
E
F
G
6 7
MECHANICAL CONSTRUCTION
KEY NOTES
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
1 3
KEYPLAN
ATTIC MECHANICAL
VENTILATION PLAN
MV013
GRS RRR
KEY NOTES
A
B
C
D.2
E.2
E.8
F.8
H
I
J
D
E
F
G
1 2 3 4 5 8 9 10 11 126.86.20 13
1 3
KEYPLAN
BASEMENT MECHANICAL
PIPING PLAN
MP100
SAT DGG31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
161 101
121A
150 105
105A
SUPPLY
114A
PRIMARY CARE
EXAM
ROOM
120A
119A
129A130
PSYCH/SOCIAL
CONSULT
OFFICE
PSYCH/SOCIAL
CONSULT
OFFICE
158 159 160
100W 100C
100E
100B
100A
MEDS
GENERAL NOTES
MECHANICAL CONSTRUCTION
KEY NOTES
1 2 3 4 5 8 9 10 11 126.86.20 13
A
B
C
D.2
E.2
E.8
F.8
H
I
J
D
E
F
G
6 7
1 3
KEYPLAN
FIRST FLOOR MECHANICAL
PIPING PLAN
MP101
SAT DGG31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com
C
FE
C
FEC
FEC
FE
C
FE
C
FE
C
226A
230A
230229
219A
215A
214A
210 209
210A
213B
206A
207 208
200W
200C
200A
200E
GENERAL NOTES
MECHANICAL CONSTRUCTION
KEY NOTES
1 2 3 4 5 8 9 10 11 126.86.20 13
A
B
C
D.2
E.2
E.8
F.8
H
I
J
D
E
F
G
6 7
5 86.86.2
1 3
KEYPLAN
SECOND FLOOR MECHANICAL
PIPING PLAN
MP102
SAT DGG31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com
KEY NOTES
1 2 3 4 5 8 9 10 11 126.86.2
A
B
C
D.2
E.2
E.8
F.8
H
I
J
D
E
F
G
GENERAL NOTES
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
1 3
KEYPLAN
ATTIC MECHANICAL
PIPING PLAN
MP103
E.8F.8HIJ FG21
J I H G F.8 F E.8
GENERAL NOTES
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
MECHANICAL - ENLARGED
SECTIONS - 4-AC-3
M400
RAH TE
ABCD.2 D C.1E.2 E
E.2 E D.2 D C B A
GENERAL NOTES
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
MECHANICAL - ENLARGED
SECTIONS - 4-AC-4
M401
A B C D.2 E.2D EC.1
E.2ED.2DCBA
GENERAL NOTES
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
MECHANICAL - ENLARGED
SECTIONS - 4-AC-5
M402
E.8 F.8 H I JF G
JIHGF.8FE.8
12 11
GENERAL NOTES
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
MECHANICAL - ENLARGED
SECTIONS - 4-AC-6
M403
ACCESS PANEL
ACCESS DOOR
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
MECHANICAL - DETAILS
M500
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
MECHANICAL - DETAILS
M501
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
MECHANICAL - DETAILS
M502
EA
SA
SA
OA EA
MI
N.
1" M
IN
MI
N.
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
MECHANICAL - DETAILS
M503
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
MECHANICAL - SCHEDULES
M600
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
MECHANICAL - SCHEDULES
M601
T ROOM THERMOSTAT/TRANSMITTER - WALL MOUNT
TT TEMPERATURE TRANSMITTER
M ROOM HUMIDISTAT (MOISTURE)/TRANSMITTER - WALL MOUNT
MT MOISTURE (HUMIDITY) TRANSMITTER
PT PRESSURE TRANSMITTER
TT TEMPERATURE TRANSMITTER, AVERAGING ELEMENT
FT FLOW TRANSMITTER
IT CURRENT TRANSMITTER
CT CONDUCTIVITY TRANSMITTER
SPS STATIC PRESSURE SENSOR
SD SMOKE DETECTOR
PDT PRESSURE DIFFERENTIAL TRANSMITTER
KR LOCAL RECORDING TIME CLOCK (RUNTIME)
TSL TEMPERATURE SWITCH, LOW (FREEZESTAT)
HS HAND SWITCH (HAND-OFF-AUTO SWITCH)
ZC ZONE VALVE OR DAMPER POSITION CONTROLLER
LC LEVEL CONTROLLER
LT LEVEL TRANSMITTER
PDS PRESSURE DIFFERENTIAL SWITCH
TSH TEMPERATURE SWITCH, HIGH (FREEZESTAT)
EPT ELECTRONIC TO PNEUMATIC TRANSDUCER
AT CARBON DIOXIDE TRANSMITTER
CARBON MONOXIDE TRANSMITTER
CO2
AT
CO
OCCUPANCY SENSORAT
OC
LTCP LOCAL TEMPERATURE CONTROL PANEL
HVAC HVAC CONTROL PANEL
ECC INTEGRATE CONTROL POINT ON REMOTE GRAPHICS
WORKSTATION AT ENERGY CONTROL CENTER
TC TEMPERATURE CONTROLLER. SEE SEQUENCE OF OPERATION
VSMC VARIABLE SPEED MOTOR CONTROLLER
PC PRESSURE CONTROLLER. SEE SEQUENCE OF OPERATION
SC SPEED CONTROLLER. SEE SEQUENCE OF OPERATION
FC FLOW CONTROLLER. SEE SEQUENCE OF OPERATION
PSH PRESSURE SWITCH HIGH
FSH FLOW SWITCH - HIGH
PSL PRESSURE SWITCH LOW
KC TIME CLOCK CONTROLLING EQUIPMENT ON A SCHEDULE
FSL FLOW SWITCH - LOW
ROOM THERMOSTAT/SENSOR
WALL MOUNTED
48" AFF.
TU
HWS
HWR
V-1
REHEAT
COIL
AIR TERMINAL UNIT
PRIMARY AIR FLOW
T
ATU
CONTROLLER
PC
AI
R
FL
OW
(C
FM
ROOM TEMPERATURE (°F)
HEATING MINIMUM
VAV BOX CONTROL STRATEGY
W/DEADBAND
SET POINT
FE
COOLIN
G FL
OWREHEAT FLOW
1. SET POINTS SHALL BE SET AS FOLLOWS:
COOLING: 75° F (ADJUSTABLE)
HEATING: 70° F (ADJUSTABLE)
MINIMUM DEADBAND OF 5° F BETWEEN HEATING AND COOLING SET POINTS WILL BE
MAINTAINED.
2. UPON FALL IN SPACE TEMPERATURE THE VAV DAMPER WILL MODULATE TO MINIMUM
POSITION.
3. UPON FURTHER DROP IN SPACE TEMPERATURE VALVE V-1 WILL MODULATE TO MAINTAIN
SET POINT + .5° F. THE ADJUSTABLE TOLERANCE OF + .5° F HAS BEEN SELECTED TO
PREVENT VALVE HUNTING.
4. UPON FURTHER DROP IN SPACE TEMPERATURE THE VAV DAMPER WILL MODULATE TO
MAINTAIN SETPOINT UNTIL AIR FLOW REACHES IT MAXIMUM HEATING SETPOINT. THE
REHEAT COIL WILL CONTINUE TO MODULATE TO MAINTAIN MAXIMUM DELTA T LISTED ABOVE.
5. THE REVERSE SHALL OCCUR ON THE RISE IN SPACE TEMPERATURE.
SUPPLY AIR FLOW
NTS
EXHAUST FAN
SEQUENCE OF OPERATION FOR TOILET EXHAUST FAN
LENGTH IN DUCT WHEN SPACE PERMITS.)
A
TEMPERATURE SENSING ELEMENT FOR
TRANSMITTING TEMPERATURE TO EMCS
(PROVIDE 12 INCHES [200mm] MINIMUM
SENSOR WITH AVERAGING ELEMENT TO TRANSMIT
TEMPERATURE TO EMCS
MOTOR STARTER
M ELECTRIC OPERATED CONTROL DAMPER/OR VALVE
EXHAUST FAN POINTS LIST
HARDWARE POINTS SOFTWARE POINTS
POINT NAME AI AO BI BO AV BV SCHED TREND ALARM SHOW ON
GRAPHIC
EXHAUST AIR DAMPER STATUS X X X
FAN STATUS X X X
EXHAUST AIR DAMPER X X X
FAN START/STOP X X X
SCHEDULE X
EXHAUST AIR DAMPER FAILURE X
EXHAUST AIR DAMPER IN HAND X
FAN FAILURE X
FAN IN HAND X
FAN RUNTIME EXCEEDED X
1. RUN CONDITIONS - SCHEDULED:
THE FAN SHALL RUN ACCORDING TO A USER DEFINABLE SCHEDULE.
2. FAN:
THE FAN SHALL HAVE A USER DEFINABLE (ADJ.) MINIMUM RUNTIME.
3. EXHAUST AIR DAMPER:
THE EXHAUST AIR DAMPER SHALL OPEN ANYTIME THE UNIT RUNS AND SHALL CLOSE ANYTIME
THE UNIT STOPS. THE EXHAUST AIR DAMPER SHALL CLOSE 5 SEC (ADJ.) AFTER THE FAN
STOPS.
ALARMS SHALL BE PROVIDED AS FOLLOWS:
DAMPER FAILURE: COMMANDED OPEN, BUT THE STATUS IS CLOSED.
DAMPER IN HAND: COMMANDED CLOSED, BUT THE STATUS IS OPEN.
4. DAMPER STATUS:
THE FAN SHALL BE ENABLED AFTER THE DAMPER STATUS HAS PROVEN.
ALARMS SHALL BE PROVIDED AS FOLLOWS:
DAMPER FAILURE: COMMANDED OPEN, BUT THE STATUS IS CLOSED.
DAMPER IN HAND: COMMANDED CLOSED, BUT THE STATUS IS OPEN.
5. FAN STATUS:
THE CONTROLLER SHALL MONITOR THE FAN STATUS.
ALARMS SHALL BE PROVIDED AS FOLLOWS:
FAN FAILURE: COMMANDED ON, BUT THE STATUS IS OFF.
FAN IN HAND: COMMANDED OFF, BUT THE STATUS IS ON.
FAN RUNTIME EXCEEDED: FAN STATUS RUNTIME EXCEEDS A USER DEFINABLE LIMIT
(ADJ.).
HARDWARE POINTS SOFTWARE POINTS
POINT NAME AI AO BI BO AV BV SCHED TREND ALARM SHOW ON
GRAPHIC
ZONE TEMPERATURE SETPOINT X X X X
ZONE SETPOINT ADJUST X X
AIRFLOW X X X
AIRFLOW MAXIMUM X X
AIRFLOW MINIMUM X X
HOT WATER HEATING VALVE X X X
ZONE DAMPER X X
AIRFLOW SETPOINT X X X
HEATING/COOLING MODE X X
SCHEDULE OCCUPANCY X X
HEATING SETPOINT OCCUPIED X X X
COOLING SETPOINT OCCUPIED X X X
HEATING SETPOINT UNOCCUPIED X X X
COOLING SETPOINT UNOCCUPIED X X X
VARIABLE TERMINAL AIR BOX POINTS LIST
MOTORIZED
DAMPER
AFMD AIRFLOW MEASURING DEVICE
TO BAS SYSTEM (EXISTING)
31 JAN 2020
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
542-18-106
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked DrawnFULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
www.bancroft-ae.com www.bancroft-ae.com
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
TEMPERATURE CONTROLS
AND POINTS LIST
M700
SAT MAI
EXHAUST AIR
D-3
D-2
PR
E
- F
ILT
ER
OUTSIDE
AIR
D-1
CO
IL
PR
EH
EA
T
CO
IL
CO
OL
IN
G
LOCATE SENSOR
OUTSIDE UNDER SUN
SHIELD
LP
S
V-2 V-1
CH
W
R
CH
W S
RETURN FAN
SUPPLY FAN
SUPPLY AIR TO
TERMINAL UNIT
AF
TE
R
- F
ILT
ER
AF
MD
CURRENT
TRANSMITTER FOR
FAN STATUS
TYP.
PRESSURE SWITCH LOW
TO DISABLE RETURN FAN WHEN
SMOKE DAMPER IN RETURN
DUCT CLOSES
PRESSURE SWITCH HIGH
TO DISABLE FAN WHEN HIGH
PRESSURE LIMIT SETPOINT
IS REACHED
SMOKE
DETECTOR
VARIABLE SPEED
MOTOR CONTROLLER,
TYP.
N.O.
SEQUENCE OF OPERATION FOR VARIABLE AIR VOLUME AIR HANDLING UNIT WITH MINIMUM OUTSIDE AIR
1. GENERAL
A. UNIT IS NORMALLY STARTED AND STOPPED REMOTELY AT THE DDC. H-O-A SWITCH
SHALL BE KEPT IN THE "AUTO" POSITION. "HAND" AND "OFF" POSITIONS SHALL BE USED
ONLY FOR MAINTENANCE. WHEN THE UNIT IS "OFF" D-1, D-2, & D-3, SHALL BE FULLY
CLOSED. WHEN THE UNIT IS "ON" D-1, D-2, & D-3 SHALL BE OPEN TO ITS MINIMUM
POSITION. DAMPER
SHALL MODULATE IN ACCORDANCE WITH THE FOLLOWING SEQUENCE:
2. TEMPERATURE CONTROL
A. SUPPLY AIR TEMPERATURE, SENSED BY TT-1, SHALL BE MAINTAINED AT SETPOINT VIA
DDC BY MODULATING D-1, D-2 AND D-3 OR V-1 OR V-2 UNIT IN SEQUENCE.
B. WHEN THE TEMPERATURE OF THE OUTSIDE AIR, SENSED BY TT-2, IS ABOVE 75°F (ADJ),
THE DIGITAL CONTROL PANEL SHALL PREVENT THE MODULATION OF D-1, D-2, & D-3 AND
SHALL ASSUME THE MINIMUM OUTSIDE AIR POSITION. THE DDC SHALL MODULATE V-2 TO
MAINTAIN THE SUPPLY AIR TEMPERATURE 55°F (ADJ), SENSED BY TT-1.
C. WHEN THE TEMPERATURE OF THE OUTSIDE AIR, SENSED BY TT-2, IS BETWEEN 65°F AND
THE SUPPLY AIR TEMPERATURE SENSED BY TT-4, DAMPER D-1, D-2, AND D-3 SHALL BE
FULLY OPEN (MAXIMUM OUTSIDE AIR POSITION). THE DDC SHALL MODULATE V-2 TO
MAINTAIN THE SUPPLY AIR TEMPERATURE, SENSED BY TT-1.
D. WHEN THE TEMPERATURE OF THE OUTSIDE AIR, SENSED BY TT-2, IS BELOW THE SUPPLY
AIR TEMPERATURE, SENSED BY TT-4, DAMPERS D-1, D-2, AND D-3 SHALL MODULATE TO
MAINTAIN THE SCHEDULED SUPPLY AIR TEMPERATURE. IF D-1 D-2, AND D-3 ARE AT THE
MINIMUM OUTSIDE AIR, PRE-HEAT STEAM COIL VALVES SHALL MODULATE OPEN TO
MAINTAIN THE SUPPLY AIR TEMPERATURE 65°F (ADJ), SENSED BY TT-1.
3. PREHEATING COIL STEAM VALVES:
A. THE CONTROLLER SHALL MEASURE THE MIXED AIR TEMPERATURE AND MODULATE THE
PREHEATING COIL STEAM VALVE IN SEQUENCE TO MAINTAIN ITS SETPOINT.
B. THE PREHEATING SHALL BE ENABLED WHENEVER:
a. OUTSIDE AIR TEMPERATURE IS LESS THAN 65°F (ADJ.).
b. AND THE ECONOMIZER (IF PRESENT) IS DISABLED.
c. AND THE HEATING IS ACTIVE.
d. AND COOLING IS NOT ACTIVE.
e. AND THE SUPPLY FAN STATUS IS ON.
C. THE PREHEATING COIL STEAM VALVES SHALL OPEN FOR FREEZE PROTECTION
WHENEVER:
a. MIXED AIR TEMPERATURE DROPS FROM 40°F TO 35°F (ADJ.).
b. OR THE FREEZESTAT IS ON.
4. COOLING COIL:
A. THE CONTROLLER SHALL MEASURE THE SUPPLY TEMPERATURE AND MODULATE THE
COOLONG COIL VALVE TO MAINTAIN ITS COOLING SETPOINT.
B. THE COOLING SHALL BE ENABLED WHENEVER:
a. OUTSIDE AIR TEMPERATURE IS GREATER THAN 60°F (ADJ.).
b. AND THE ECONOMIZER IS DISABLED OR FULLY OPEN.
c. AND THE ZONE TEMPERATURE IS ABOVE COOLING SETPOINT.
d. AND THE SUPPLY FAN STATUS IS ON.
e. AND THE HEATING IS NOT ACTIVE.
5. AIR FLOW CONTROL
A. THE SUPPLY AIR FLOW SHALL BE CONTROLLED BY THE DIGITAL CONTROL PANEL
MODULATING THE SUPPLY FAN VARIABLE FREQUENCY DRIVE (VFD) TO MAINTAIN 0.75" OF
DUCT STATIC PRESSURE (FIELD ADJUSTABLE), SENSED BY SPS. RESET STATIC
PRESSURE BASED ON ACTUAL BUILDING LOAD.
B. THE DDC, USING TOTAL SUPPLY AIR AND RETURN AIR FLOW SIGNALS, SHALL RESET THE
RETURN AIR FAN VARIABLE SPEED MOTOR CONTROLLER (VSMC) TO MAINTAIN A
CONSTANT AIR FLOW DIFFERENCE BETWEEN THE SUPPLY AIR AND THE RETURN AIR
EQUAL TO MINIMUM OUTSIDE AIR.
C. THE DDC, USING HIGH PRESSURE SENSOR SPS LOCATED AT THE SUPPLY FAN
DISCHARGE, SHALL PREVENT THE SUPPLY FAN FROM DEVELOPING OVER 5" OF STATIC
PRESSURE (FIELD ADJUSTABLE). IF STATIC PRESSURE AT SPS DOES EXCEED 5" THE
SUPPLY AIR FAN SHALL STOP. SPS SHALL BE HARDWIRED TO THE SUPPLY FAN VSMC
AND UNIT SHALL BE SHUTDOWN IN HAND, AUTO OR BYPASS MODE. SPS WILL REQUIRE
MANUAL RESET AT THE DEVICE.
6. FREEZE PROTECTION
A. IF THE AIR TEMPERATURE AS SENSED BY TT-3 FALLS BELOW 40°F, AN ALARM SIGNAL
SHALL INDICATE AT THE DDC. IF THIS TEMPERATURE FALLS BELOW 35°F, AS SENSED BY
THE TSL, THE SUPPLY AND RETURN FANS SHALL SHUT DOWN AND A CRITICAL ALARM
SHALL INDICATE AT THE DDC. TSL SHALL BE HARDWIRED TO THE SUPPLY FAN VFD AND
UNIT SHALL BE SHUTDOWN IN HAND, AUTO OR BYPASS MODE. TSL WILL REQUIRE
MANUAL RESET AT THE DEVICE. DURING FAN SHUTDOWN, TT-3 (PREHEAT TEMP) SENSOR
MODULATE PREHEAT VALVE TO MAINTAIN 60°F (ADJ.).
7. AUTOMATIC SHUTDOWN/RESTART
A. WHEN SMOKE IS DETECTED BY DUCT SMOKE DETECTOR, DSD, THE SUPPLY FANS SHALL
SHUT "OFF" AND AN ALARM SIGNAL SHALL BE TRANSMITTED TO THE FIRE ALARM
SYSTEM. ALL SMOKE DAMPERS IN THE SUPPLY AND RETURN DUCTS SHALL CLOSE.
(HARDWIRE CONNECTION FROM FIRE RELAY AND THE VFD SAFETY CIRCUIT.)
B. SUPPLY AND RETURN FANS SHALL RESTART AND SMOKE DAMPERS SHALL OPEN WHEN
FIRE ALARM CIRCUIT IS RESET.
8. EMERGENCY CONSTANT SPEED OPERATION
A. UPON FAILURE OF THE VFD, THE SUPPLY AND RETURN FANS SHALL BE
STARTED/STOPPED MANUALLY AT THE DDC THROUGH THE BY-PASS STARTER. FANS
SHALL THEN BE OPERATED AT CONSTANT SPEED.
9. ALARMS
A. PROVIDE ALARMS FOR SUPPLY FAN VFD FAULT, SUPPLY FAN FAILURE, (COMMANDED ON
BUT "ON" BUT THE STATUS IS "OFF"; SUPPLY FAN RUNNING IN HAND (COMMANDED "OFF"
BUT THE STATUS IS "ON", AND HIGHER PRE FILTER, AFTER FILTER AND FINAL FILTER
DIFFERENTIAL STATIC PRESSURES.
B. ON A RISE IN SUPPLY AIR TEMPERATURE ABOVE (53°F PLUS 1.5°F DEADBAND, ADJ), THE
HEATING WATER VALVE SHALL CLOSE AND V-2 SHALL MODULATE TO MAINTAIN
SETPOINT. ON A FALL IN SUPPLY AIR TEMPERATURE BELOW 53°F (MINUS 1.5°F
DEADBAND, ADJ), V-2 SHALL CLOSE. ON A FURTHER FALL IN SUPPLY AIR TEMPERATURE,
THE HEATING WATER VALVE SHALL OPEN AND MODULATE TO MAINTAIN SETPOINT. ON A
RISE IN SUPPLY AIR TEMPERATURE ABOVE SETPOINT FOR GREATER THAN 5 MINUTES,
AN ALARM SHALL BE SIGNALED TO THE DDC SYSTEM.
10. ECONOMIZER CYCLE
I. PROVIDE THE UNIT WITH AN ECONOMIZER CYCLE. OPERATION SHALL BE SUCH THAT
WHEN
THE OUTSIDE AIR TEMPERATURE IS LESS THAN 65°F (ADJ)
a. THE OUTSIDE AIR TEMPERATURE IS LESS THAN 65°F (ADJ)
b. AND THE OUTSIDE AIR ENTHALPY IS LESS THAN 22 BTU/LB (ADJ)
c. AND THE OUTSIDE AIR TEMPERATURE IS LESS THAN THE RETURN AIR
TEMPERATURE.
d. AND THE OUTSIDE AIR ENTHALPY IS LESS THAN THE RETURN AIR TEMPERATURE.
e. AND THE SUPPLY FAN STATUS IS ON.
f. THE ECONOMIZER SHALL BE DISABLED ANYTIME THE MIXED AIR TEMPERATURE
DROPS LESS THAN 40°F (ADJ) OR THE FREEZESTAT IS ON.
11. BUILDING DIFFERENTIAL PRESSURE
A. PROVIDE BUILDING DIFFERENTIAL PRESSURE SENSORS AT EACH FLOOR SERVED BY THE
AHU. IN OCCUPIED MODE, ON A RISE IN BUILDING DIFFERENTIAL PRESSURE ABOVE
SETPOINT (0.05 W.C., ADJ), THE RELIEF AIR DAMPER SHALL MODULATE OPEN TO
MAINTAIN THE BUILDING STATIC PRESSURE SETPOINT. THE RETURN / RELIEF FAN SHALL
TRACK THE SUPPLY FAN VFD SPEED MINUS AS ADJUSTABLE OFFSET. (THE OFFSET
SHALL BE DETERMINED AT SYSTEM BALANCING.) THE SYSTEM SHALL EMPLOY A "HIGH
SELECT" OF THE FLOOR STATIC PRESSURE SENSORS. THE HIGHEST PRESSURE SHALL
BE USED TO CONTROL BUILDING STATIC PRESSURE.
12. MINIMUM OUTSIDE AIR VENTILATION
A. WHEN IN THE OCCUPIED MODE, THE CONTROLLER SHALL MEASURE THE OUTSIDE AIR
AND MODULATE THE OUTSIDE AIR DAMPERS TO MAINTAIN THE PROPER MINIMUM
OUTSIDE AIR VENTILATION, OVERRIDE NORMAL DAMPER CONTROL IF THE OUTSIDE
AIRFLOW DROPS. THE CONTROLLER SHALL MODULATE THE OUTSIDE AIR DAMPERS OPEN
TO MAINTAIN THE OUTSIDE AIRFLOW SETPOINTS (ADJ).
13. SUPPLY AIR SMOKE…