07 13 52 - Modified Bituminous Sheet Waterproofing - ADD-01.pdf

PDF 60 KB Posted

Attached to
Z2DA--Renovate Building 4 A + B Floors Outpatient Mental Health Clinic, Project No. 542-18-106
Solicitation number
36C24420B0003
Issued by

About this file

This solicitation package is for a construction project to renovate building 4A and 4B at the Coatesville VA Medical Center in Pennsylvania. The project scope includes demolishing and renovating approximately 28,000 square feet of existing space on the first and second floors into new outpatient mental health clinics, along with 3,000 square feet in the basement. Work will be completed across three items: general construction, electrical work, and mechanical work (HVAC, plumbing, fire protection). The solicitation is only available to verified Service-Disabled Veteran-Owned Small Businesses. The pre-bid meeting date and bid due date will be specified in the solicitation documents available on June 23, 2020. Interested contractors must be able to provide 100% performance and payment bonds and a 20% bid guarantee. The contract type is firm fixed price with an anticipated award value between $10-20 million. The project completion deadline is 588 calendar days from notice to proceed.

View the file

Other files

File Type Posted
Award Announcement 36C24420C0112.pdf PDF
General Decision Number PA20200083.pdf PDF
36C24420B0003 0003.pdf PDF
00 01 15 - List of Drawing Sheets - ADD-01.pdf PDF
07 Architecture.pdf PDF
36C24420B0003 Amendment 0002.pdf PDF
10 22 26.13 - Operable Partitions - ADD-01.pdf PDF
RFI LOG_542-18-106_08052020.r2.pdf PDF
Sign In Sheet no. 3 B4A B 07162020.pdf PDF
Sign In Sheet B4A B 07162020.pdf PDF
03 Structural 54218106_Drawings_ADD-01_080320.pdf PDF
A012 54218106_Drawings_FinalCD_013120.pdf PDF
08 Interiors 54218106_Drawings_ADD-01_080320.pdf PDF
07 60 00 - Flashing and Sheet Metal - ADD-01.pdf PDF
01 33 23 - Shop Drawings Product Data Samples - ADD-01.pdf PDF
00 01 10 - TOC - ADD-01.pdf PDF
11 Plumbing 54218106_Drawings_ADD-01_080320.pdf PDF
ADD-01 Narrative.pdf PDF
10 21 13 - Toilet Compartments - ADD-01.pdf PDF
07 27 27 - Fluid-Applied Membrane Air Barrier Vapor Retardg - ADD-01.pdf PDF
00 General 54218106_Drawings_ADD-01_080320.pdf PDF
11 73 00 - Ceiling Mounted Patient Lift System - ADD-01.pdf PDF
36C24420B0003 Amendment 0001 - Attachment.pdf PDF
36C24420B0003 AMENDMENT 0001.pdf PDF
36C24420B0003 MAP for Site Visit.pdf PDF
04 Structural 54218106_Drawings_FinalCD_013120.pdf PDF
10 Mechanical 54218106_Drawings_FinalCD_013120.pdf PDF
06 Interiors 54218106_Drawings_FinalCD_013120.pdf PDF
09 Plumbing 54218106_Drawings_FinalCD_013120.pdf PDF
08 Fire Protection 54218106_Drawings_FinalCD_013120.pdf PDF
02 Hazardous 54218106_Drawings_FinalCD_013120.pdf PDF
07 Equipment 54218106_Drawings_FinalCD_013120.pdf PDF
01 General 54218106_Drawings_FinalCD_013120.pdf PDF
05 Architectural 54218106_Drawings_FinalCD_013120.pdf PDF
11 Electrical 54218106_Drawings_FinalCD_013120.pdf PDF
03 Civil Landscape 54218106_Drawings_FinalCD_013120.pdf PDF
54218106-Spec-Vol 3_FinalCD_013120.pdf PDF
36C24420B0003.docx DOCX document
PCRA 3-2019 building 4.pdf PDF
54218106-Spec-Vol 2_FinalCD_013120.pdf PDF
54218106-Spec-Vol 1_FinalCD_013120.pdf PDF
COVID Guidelines.pdf PDF
54218106-Spec-Vol 4_FinalCD_013120.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Coatesville VA Medical Center

Coatesville, Pennsylvania 19320

Renovate Building 4 A & B Floors Outpatient Mental Health Clinic

Bancroft Architects + Engineers

08-01-16

Contract No. 36C24418C0144

Station Project No. 542-18-106

Bancroft-AE Project No. 18-102 07 13 52-1 08-03-2020

SECTION 07 13 52

MODIFIED BITUMINOUS SHEET WATERPROOFING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Modified bituminous sheet material used for exterior below grade waterproofing and split slab waterproofing.

1.2 APPLICABLE PUBLICATIONS

A. Comply with references to extent specified in this section.

B. Federal Specifications (Fed. Spec.):

1. UU-B-790A Notice 2- Building Paper, Vegetable Fiber: (Kraft, Waterproofed, Water Repellent, and Fire Resistant).

C. ASTM International (ASTM):

1. C578-15b - Rigid, Cellular Polystyrene Thermal Insulation.

2. D41/D41M-11 - Asphalt Primer Used in Roofing, Dampproofing and

Waterproofing.

3. D4586/D4586M-07(2012)e1 - Asphalt Roof Cement, Asbestos-Free.

4. D6380/D6380M-03(2012)e1 - Asphalt Roll Roofing (Organic Felt).

D. American Hardboard Association (AHA):

1. A135.4-2012 - Basic Hardboard.

1.3 PREINSTALLATION MEETINGS

A. Conduct preinstallation meeting at project site minimum 30 days before beginning Work of this section.

1. Required Participants:

a. Contracting Officer's Representative.

b. Contractor.

c. Installer.

d. Other installers responsible for adjacent and intersecting work, including substrate and flashing installers.

2. Meeting Agenda: Distribute agenda to participants minimum 3 days before meeting.

a. Installation schedule.

b. Installation sequence.

Renovate Building 4 A & B Floors Outpatient Mental Health Clinic

Bancroft Architects + Engineers

08-01-16

Contract No. 36C24418C0144

Station Project No. 542-18-106

Bancroft-AE Project No. 18-102 07 13 52-2 08-03-2020

c. Preparatory work.

d. Protection before, during, and after installation.

e. Installation.

f. Terminations.

g. Transitions and connections to other work.

h. Other items affecting successful completion.

3. Document and distribute meeting minutes to participants to record decisions affecting installation.

1.4 SUBMITTALS

A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.

B. Submittal Drawings:

1. Show size, configuration, and installation details.

C. Manufacturer's Literature and Data:

1. Description of each product.

2. Installation instructions.

3. Warranty.

D. Samples:

1. Waterproofing and Flashing Sheet: 200 mm (8 inch) square, each type and color.

2. Insulation: 200 mm (8 inch) square.

E. Test reports: Certify products comply with specifications.

F. Certificates: Certify products comply with specifications.

G. Qualifications: Substantiate qualifications comply with specifications.

1. Installer with project experience list.

1.5 QUALITY ASSURANCE

A. Installer Qualifications:

1. Regularly installs specified products.

2. Installed specified products with satisfactory service on five similar installations for minimum five years.

a. Project Experience List: Provide contact names and addresses for completed projects.

1.6 DELIVERY

A. Deliver products in manufacturer's original sealed packaging.

B. Mark packaging, legibly. Indicate manufacturer's name or brand, type, color, production run number, and manufacture date.

Renovate Building 4 A & B Floors Outpatient Mental Health Clinic

Bancroft Architects + Engineers

08-01-16

Contract No. 36C24418C0144

Station Project No. 542-18-106

Bancroft-AE Project No. 18-102 07 13 52-3 08-03-2020

C. Before installation, return or dispose of products within distorted, damaged, or opened packaging.

1.7 STORAGE AND HANDLING

A. Store products indoors in dry, weathertight conditioned facility.

B. Protect products from damage during handling and construction operations.

1.8 FIELD CONDITIONS

A. Environment:

1. Product Temperature: Minimum 4 degrees C (40 degrees F) for minimum

48 hours before installation.

2. Weather Limitations: Install waterproofing only during dry current and forecasted weather conditions.

1.9 WARRANTY

A. Construction Warranty: FAR clause 52.246-21, "Warranty of

Construction."

B. Manufacturer's Warranty: Warrant waterproofing system against material and manufacturing defects and agree to repair any leak caused by a defect in the waterproofing system materials or workmanship of the installer.

1. Warranty Period: 10 years.

PART 2 - PRODUCTS

2.1 SYSTEM DESCRIPTION

A. Waterproofing System: Modified bituminous sheet material for exterior below grade and split slab waterproofing.

2.2 PRODUCTS - GENERAL

A. Provide each product from one manufacturer.

B. Sustainable Construction Requirements:

1. Insulation Recycled Content:

a. Rigid Foam: 9 percent total recycled content, minimum.

2.3 BITUMINOUS SHEET

A. Cold applied waterproofing membrane composed primarily of modified bituminous material prefabricated in sheet form designed for below grade exterior and split slab waterproofing. Sheet reinforced with fibers at manufacturer's option.

Renovate Building 4 A & B Floors Outpatient Mental Health Clinic

Bancroft Architects + Engineers

08-01-16

Contract No. 36C24418C0144

Station Project No. 542-18-106

Bancroft-AE Project No. 18-102 07 13 52-4 08-03-2020

B. Thickness: 1.5 mm (60 mils), plus or minus 0.13 mm (5 mils), and bonded to 0.1 mm (4 mil) thick plastic sheet.

C. Provide release sheet to prevent bonding of bituminous sheet to itself.

2.4 PROTECTION MATERIAL

A. Polystyrene Insulation: ASTM C578, Type I or VIII, 13 mm (1/2 inch) minimum thickness.

B. Hardboard: AHA A135.4, Service Type, 6 mm (1/4 inch) thick.

C. Waterproofed Building Paper: Fed. Spec. UU-B-790A Notice 2, Type I, Grade C.

D. Roll Roofing: ASTM D6380/D6380M, Class S (smooth), Type III with minimum net mass per unit area of roofing, 2495 g/sq. m

(51 lbs./100 sq. ft.).

2.5 ACCESSORIES

A. Patching Compound: Factory-prepared, non-shrinking, fast-setting, cementitious adhesive compound containing no ferrous metal or oxide.

B. Primer: ASTM D41/D41M.

C. Roof Cement: ASTM D4586/D4586M.

PART 3 - EXECUTION

3.1 PREPARATION

A. Examine and verify substrate suitability for product installation.

1. Concrete surfaces cured minimum time recommended by waterproofing manufacturer.

2. Substrate to be dry as recommended by waterproofing manufacturer.

B. Protect existing construction and completed work from damage.

C. Correct substrate deficiencies.

1. Fill voids, joints, and cracks with patching compound.

D. Clean substrates. Remove contaminants capable of preventing full adhesion.

E. Priming:

1. Prime concrete and masonry surfaces.

2. Application method, amount of primer and condition or primer before installation of bituminous sheet as recommended by primer manufacturer.

3. Reprime when required according to manufacturer's instructions.

Renovate Building 4 A & B Floors Outpatient Mental Health Clinic

Bancroft Architects + Engineers

08-01-16

Contract No. 36C24418C0144

Station Project No. 542-18-106

Bancroft-AE Project No. 18-102 07 13 52-5 08-03-2020

3.2 INSTALLATION - GENERAL

A. Install products according to manufacturer's instructions and approved submittal drawings.

1. When manufacturer's instructions deviate from specifications, submit proposed resolution for Contracting Officer's Representative consideration.

3.3 WATERPROOFING INSTALLATION

A. Bituminous Sheet Installation:

1. Remove release sheet before application.

2. Lay bituminous sheet from low point to high point so laps shed water.

3. Treat expansion, construction and control joints and evident working cracks as expansion joints. Apply bituminous sheet in double thickness over joint by first applying a strip of bituminous sheet minimum 200 mm (8 inches) wide, centered over joint.

4. Lap seams minimum 50 mm (2 inches).

5. Lay succeeding sheet with laps, and roll or press into place.

6. Repair misaligned or inadequately lapped seams according to manufacturer’s instructions.

7. Seal seams and terminations according to sheet manufacturer’s instructions.

B. Corner Treatment:

1. At inside and outside corners, apply double cover using an initial strip minimum 280 mm (11 inches) wide, centered along axis of corner.

2. Cover each strip completely by the regular application of bituminous sheet.

3. Provide a fillet or cant on inside corners.

4. Form cants using patching compound.

5. Do not use wood, fiber, and insulating materials for cants.

C. Projection Treatment:

1. Apply a double layer of bituminous sheet around pipes and similar projections at least 150 mm (6 inches) wide.

2. At drains, apply a bead of roof cement over a double layer of bituminous sheet under clamping rings.

D. Patching:

Renovate Building 4 A & B Floors Outpatient Mental Health Clinic

Bancroft Architects + Engineers

08-01-16

Contract No. 36C24418C0144

Station Project No. 542-18-106

Bancroft-AE Project No. 18-102 07 13 52-6 08-03-2020

1. Repair tears, punctures, air blisters, and inadequately lapped seams, according to manufacturer’s instructions before protection course is applied.

E. Permanent Protection:

1. Vertical Surfaces:

a. Install hardboard, polystyrene insulation, or roll roofing protection material.

b. Extend protection full height from footing to top of backfill.

c. If graded backfill is used, use roll roofing or hardboard.

F. Horizontal Surfaces:

1. Install roll roofing protection under concrete wearing courses.

2. Install roll roofing, hardboard, or polystyrene insulation under earth backfill.

3. Where no concrete wearing course occurs or when surfaces will bear heavy traffic and will not immediately be covered with a wearing course, use protection specified for vertical surfaces.

G. Temporary Protection:

1. When waterproofing materials are subjected to damage by sunlight and cannot be immediately protected as specified, protect waterproofing materials by waterproof building paper or suitable coating approved by manufacturer of waterproofing system used.

3.4 FIELD QUALITY CONTROL

A. Testing:

1. Before any protection or wearing course is applied, test all horizontal applications of waterproofing with a minimum of 25 mm

(1 inch) head of water above highest point and leave for 24 hours.

2. Mark leaks and repair when waterproofing is dry.

3. Certify, to Contracting Officer's Representative, that water tests have been made and that areas tested were found watertight.

B. Inspection:

1. Do not cover waterproofed surfaces by other materials or backfill until work is approved by Contracting Officer's Representative.

3.5 CLEANING

A. Remove excess adhesive before adhesive sets.

B. Clean exposed waterproofing surfaces. Remove contaminants and stains.

Renovate Building 4 A & B Floors Outpatient Mental Health Clinic

Bancroft Architects + Engineers

08-01-16

Contract No. 36C24418C0144

Station Project No. 542-18-106

Bancroft-AE Project No. 18-102 07 13 52-7 08-03-2020

3.6 PROTECTION

A. Protect waterproofing from construction operations.

B. Remove protective materials immediately before acceptance.

C. Repair damage.

- - - E N D - - -