07 27 27 - Fluid-Applied Membrane Air Barrier Vapor Retardg - ADD-01.pdf

PDF 64 KB Posted

Attached to
Z2DA--Renovate Building 4 A + B Floors Outpatient Mental Health Clinic, Project No. 542-18-106
Solicitation number
36C24420B0003
Issued by

About this file

This document outlines specifications for a fluid-applied membrane air barrier and vapor retarding system. The project involves renovating two floors of an outpatient mental health clinic at the Coatesville VA Medical Center in Pennsylvania. The specifications require a fluid-applied, vapor-retarding membrane air barrier with an air permeance of 0.2 L/s/sq. m at 75 Pa differential pressure and a vapor permeance no greater than 5.8 ng/Pa/s/sq. m. Accessories must include primer, counterflashing sheet, substrate patching material, sprayed polyurethane foam sealant, and flexible opening transitions. Installation must meet air leakage requirements and provide a continuous vapor retarding air barrier and moisture drainage plane with transitions at joints, edges, penetrations and perimeter conditions.

The related federal contract opportunity is a solicitation for construction services to renovate approximately 28,000 square feet of space across three floors of Building 4 at the Coatesville VA Medical Center. The project involves demolishing and renovating existing spaces to create new outpatient mental health clinics. The solicitation will be available on SAM.gov on or around June 23, 2020. The opportunity is set aside for verified SDVOSB contractors. The contract is for a maximum of 588 calendar days and has a magnitude between $10-20 million. Interested contractors must have bonding and meet SAM, CVE, OSHA and EPA requirements.

View the file

Other files

File Type Posted
Award Announcement 36C24420C0112.pdf PDF
General Decision Number PA20200083.pdf PDF
36C24420B0003 0003.pdf PDF
00 01 15 - List of Drawing Sheets - ADD-01.pdf PDF
07 Architecture.pdf PDF
36C24420B0003 Amendment 0002.pdf PDF
10 22 26.13 - Operable Partitions - ADD-01.pdf PDF
RFI LOG_542-18-106_08052020.r2.pdf PDF
Sign In Sheet no. 3 B4A B 07162020.pdf PDF
Sign In Sheet B4A B 07162020.pdf PDF
03 Structural 54218106_Drawings_ADD-01_080320.pdf PDF
A012 54218106_Drawings_FinalCD_013120.pdf PDF
08 Interiors 54218106_Drawings_ADD-01_080320.pdf PDF
07 13 52 - Modified Bituminous Sheet Waterproofing - ADD-01.pdf PDF
07 60 00 - Flashing and Sheet Metal - ADD-01.pdf PDF
01 33 23 - Shop Drawings Product Data Samples - ADD-01.pdf PDF
00 01 10 - TOC - ADD-01.pdf PDF
11 Plumbing 54218106_Drawings_ADD-01_080320.pdf PDF
ADD-01 Narrative.pdf PDF
10 21 13 - Toilet Compartments - ADD-01.pdf PDF
00 General 54218106_Drawings_ADD-01_080320.pdf PDF
11 73 00 - Ceiling Mounted Patient Lift System - ADD-01.pdf PDF
36C24420B0003 Amendment 0001 - Attachment.pdf PDF
36C24420B0003 AMENDMENT 0001.pdf PDF
36C24420B0003 MAP for Site Visit.pdf PDF
04 Structural 54218106_Drawings_FinalCD_013120.pdf PDF
10 Mechanical 54218106_Drawings_FinalCD_013120.pdf PDF
06 Interiors 54218106_Drawings_FinalCD_013120.pdf PDF
09 Plumbing 54218106_Drawings_FinalCD_013120.pdf PDF
08 Fire Protection 54218106_Drawings_FinalCD_013120.pdf PDF
02 Hazardous 54218106_Drawings_FinalCD_013120.pdf PDF
07 Equipment 54218106_Drawings_FinalCD_013120.pdf PDF
01 General 54218106_Drawings_FinalCD_013120.pdf PDF
05 Architectural 54218106_Drawings_FinalCD_013120.pdf PDF
11 Electrical 54218106_Drawings_FinalCD_013120.pdf PDF
03 Civil Landscape 54218106_Drawings_FinalCD_013120.pdf PDF
54218106-Spec-Vol 3_FinalCD_013120.pdf PDF
36C24420B0003.docx DOCX document
PCRA 3-2019 building 4.pdf PDF
54218106-Spec-Vol 2_FinalCD_013120.pdf PDF
54218106-Spec-Vol 1_FinalCD_013120.pdf PDF
COVID Guidelines.pdf PDF
54218106-Spec-Vol 4_FinalCD_013120.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Coatesville VA Medical Center

Coatesville, Pennsylvania 19320

Renovate Building 4 A & B Floors Outpatient Mental Health Clinic

Bancroft Architects + Engineers

02-01-16

Contract No. 36C24418C0144

Station Project No. 542-18-106

Bancroft-AE Project No. 18-102 07 27 27-1 08-03-2020

SECTION 07 27 27

FLUID-APPLIED MEMBRANE AIR BARRIERS, VAPOR RETARDING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Fluid-applied vapor-retarding air barrier at exterior above grade wall assemblies.

2. Connection to adjacent air barrier components providing a durable, continuous, full building air barrier.

1.2 RELATED REQUIREMENTS

A. General Quality Assurance and Quality Control Requirements: Section

01 45 29 TESTING LABORATORY SERVICES.

B. General Sustainable Construction Requirements: Section 01 81 13

SUSTAINABLE CONSTRUCTION REQUIREMENTS.

C. Commissioning of Building Envelope Components: Section 01 91 00 GENERAL

COMMISSIONING REQUIREMENTS.

D. Masonry Unit Air Barrier Substrates: Section 04 20 00 UNIT MASONRY.

E. Not used.

F. Flashing Components of Factory Finished Roofing and Wall Systems Air

Barriers Requiring Air Barrier Transitions: Division 07 roofing and wall system sections.

G. Metal Flashing Requiring Air Barrier Transitions: Section 07 60 00

FLASHING AND SHEET METAL.

H. Joint Sealants: Section 07 92 00 JOINT SEALANTS.

I. Exterior Wall Openings Requiring Air Barrier Transitions: Division 08 sections for hollow metal doors and frames, aluminum-framed entrances and storefronts, aluminum windows, louvers and vents.

J. Wall Sheathings Air Barrier Substrates: Section 09 29 00 GYPSUM BOARD.

1.3 APPLICABLE PUBLICATIONS

A. Comply with references to extent specified in this section.

B. Air Barrier Association of America (ABAA):

1. Quality Assurance Program.

C. ASTM International (ASTM):

1. C920-14a - Elastomeric Joint Sealants.

Bancroft-AE Project No. 18-102 07 27 27-2 08-03-2020

2. C1193-13 - Use of Joint Sealants.

3. D412-06a(2013) - Vulcanized Rubber and Thermoplastic

Elastomers-Tension.

4. E84-15a - Surface Burning Characteristics of Building Materials.

5. E96/E96M-15 - Water Vapor Transmission of Materials.

6. E162-15a - Surface Flammability of Materials Using a Radiant Heat

Energy Source.

7. E783-02(2010) - Field Measurement of Air Leakage Through Installed

Exterior Windows and Doors.

8. E1186-03(2009) - Air Leakage Site Detection in Building Envelopes and Air Barrier Systems.

9. E2178-13 - Air Permeance of Building Materials.

10. E2357-11 - Determining Air Leakage of Air Barrier Assemblies.

D. U.S. Environmental Protection Agency (EPA):

1. 40 CFR 59, Subpart D National Volatile Organic Compound Emission

Standards for Consumer and Commercial Products.

1.4 SUBMITTALS

A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.

1. Indicate size, configuration, and fabrication and installation details.

B. Manufacturer's Literature and Data:

1. Description of each product.

2. Installation instructions.

C. Sustainable Construction Submittals:

1. Low Pollutant-Emitting Materials:

a. Show volatile organic compound types and quantities.

D. Test reports:

1. Submit field inspection and test reports.

E. Certificates: Certify each product complies with specifications.

F. Qualifications: Substantiate qualifications comply with specifications.

1. Manufacturer.

2. Installer.

a. Certify installer approval by air barrier manufacturer.

Bancroft-AE Project No. 18-102 07 27 27-3 08-03-2020

1.5 QUALITY ASSURANCE

A. Coordinate work with adjacent and related work to provide continuous, unbroken, durable air barrier system.

B. Manufacturer Qualifications:

1. Regularly and presently manufactures specified products.

2. Manufactured specified products with satisfactory service on five similar installations for minimum five years.

C. Installer Qualifications:

1. Regularly and presently installs specified products.

2. Approved by manufacturer.

3. Applicators trained and certified by manufacturer of air barrier system.

4. Full time on-site field supervisor has completed three projects of similar scope within last year.

5. Field Supervisor: Holds Sealant, Waterproofing, and Restoration

Institute (SWRI) Wall Coating Validation Program Certificate, or similar qualification acceptable to Contracting Officer’s

Representative.

D. Testing Agency Qualifications:

1. Accredited by International Accreditation Service, Inc. or American

Association for Laboratory Accreditation.

2. Staff experienced in installation of specified system and qualified to perform observation and inspection specified and determine compliance with project requirements.

1.6 DELIVERY

A. Deliver products in manufacturer's original sealed packaging.

B. Mark packaging, legibly. Indicate manufacturer's name or brand, type, production run number, and manufacture date.

C. Before installation, return or dispose of products within distorted, damaged, or opened packaging.

Bancroft-AE Project No. 18-102 07 27 27-4 08-03-2020

1.7 STORAGE AND HANDLING

A. Store products indoors in dry, weathertight, conditioned facility.

B. Protect products from damage during handling and construction operations.

1.8 FIELD CONDITIONS

A. Environment:

1. Work Area Ambient Temperature Range: 4 to 32 degrees C (40 to

90 degrees F) continuously, beginning 48 hours before installation.

B. Surface Requirements: visibly dry, and complying with manufacturer's instructions.

1.9 WARRANTY

A. Construction Warranty: FAR clause 52.246-21, "Warranty of

Construction."

PART 2 - PRODUCTS

2.1 SYSTEM PERFORMANCE

A. Air-Barrier Assembly Air Leakage: Maximum 0.2 L/s/sq. m

(0.04 cfm/sq. ft.) of surface area at 75 Pa (1.57 psf) differential pressure when tested according to ASTM E2357.

B. Provide full system of compatible materials under conditions of service and application required. Compatibility based on testing by material manufacturer.

C. Perform as continuous vapor retarding air barrier and moisture drainage plane.

D. Transition to adjacent flashings and discharge water to building exterior.

E. Accommodate substrate movement and seal expansion and control joints, construction material transitions, opening transitions, penetrations, and perimeter conditions without moisture deterioration and air leakage exceeding performance requirements.

2.2 PRODUCTS - GENERAL

A. Provide air barrier system components from one manufacturer.

B. Sustainable Construction Requirements:

Bancroft-AE Project No. 18-102 07 27 27-5 08-03-2020

1. Low Pollutant-Emitting Materials: Comply with VOC limits specified in Section 01 81 13, SUSTAINABLE CONSTRUCTION REQUIREMENTS for the following products:

a. Non-Flooring Adhesives and Sealants.

2.3 AIR BARRIER

A. Fluid-Applied, Vapor-Retarding Membrane Air Barrier:

1. Elastomeric, modified bituminous or synthetic polymer membrane.

2. Air Permeance: ASTM E2178: 0.2 L/s/sq. m (0.04 cfm/sq. ft.) of surface area at 75 Pa (1.57 psf) differential pressure.

3. Vapor Permeance: ASTM E96/E96M: Maximum 5.8 ng/Pa/s/sq. m

(0.1 perms).

4. Elongation: Ultimate, ASTM D412, Die C: 500 percent, minimum.

5. Thickness: Minimum 1.0 mm (40 mils) dry film thickness, applied in single continuous coat.

6. Surface Burning Characteristics: When tested according to ASTM E84S.

a. Flame Spread Rating: 25 maximum.

b. Smoke Developed Rating: 450 maximum.

2.4 ACCESSORIES

A. Primer: Waterborne primer complying with VOC requirements, recommended air barrier manufacturer to suit application.

B. Counterflashing Sheet: Modified bituminous, minimum 1.0 mm (40 mils) thick, self-adhering composite sheet consisting of minimum 0.8 mm

(33 mils) of rubberized asphalt laminated to polyethylene film.

C. Substrate Patching Material: Manufacturer's standard trowel-grade filler material.

D. Sprayed Polyurethane Foam Sealant: Foamed-in-place, 24 to 32 kg/cu. m

(1.5 to 2.0 pcf) density, with maximum flame-spread index of 25 when tested according to ASTM E84.

E. Flexible Opening Transition: Cured low-modulus silicone extrusion with reinforcing ribs, sized to fit opening widths, designed for adhesion to or insertion into aluminum framing extrusions, and compatible with air barrier system materials and accessories.

Bancroft-AE Project No. 18-102 07 27 27-6 08-03-2020

F. Joint Sealant: ASTM C920, single-component, neutral-curing silicone;

Class 100/50 (low modulus), Grade NS, Use NT related to exposure, approved by membrane air barrier manufacturer for adhesion and compatibility with membrane air barrier and accessories.

PART 3 - EXECUTION

3.1 PREPARATION

A. Examine and verify substrate suitability for product installation.

B. Protect existing construction and completed work from damage.

C. Correct substrate deficiencies:

1. Remove projections and excess materials and fill voids with substrate patching material.

2. Remove contaminants capable of affecting subsequently installed product's performance.

D. Prepare and treat substrate joints and cracks according to ASTM C1193 and membrane air barrier manufacturer's instructions.

3.2 INSTALLATION - AIR BARRIER

A. Install products according to manufacturer's instructions and approved submittals drawings.

1. When manufacturer's instructions deviate from specifications, submit proposed resolution for Contracting Officer's Representative consideration.

B. Apply primer.

C. Install transition strips and accessory materials.

D. Seal air barrier to adjacent components of building air barrier system.

E. Install flexible opening transition at each opening perimeter. Extend transition onto each substrate minimum 75 mm (3 inches).

1. Fill gaps at perimeter of openings with foam sealant.

F. At penetrations, seal transition strips around penetrating objects with termination mastic.

1. Fill gaps at perimeter of penetrations with sprayed polyurethane foam sealant.

G. At top of through-wall flashings, seal with continuous transition strip of manufacturer's recommended material to suit application.

Bancroft-AE Project No. 18-102 07 27 27-7 08-03-2020

H. Apply air barrier in full contact with substrate to produce continuous seal with transitions.

I. Apply fluid membrane in thickness recommended by manufacturer, and minimum specified thickness.

J. Leave air barrier exposed until tested and inspected and tested by

Contracting Officer’s Representative.

3.3 FIELD QUALITY CONTROL

A. Field Inspections and Tests: Performed by testing laboratory specified in Section 01 45 29, TESTING LABORATORY SERVICES.

1. Perform inspections and tests before concealing air barrier with subsequent work.

B. Inspections:

1. Compatibility of materials within air barrier system and adjacent materials.

2. Suitability of substrate and support for air barrier.

3. Suitability of conditions under which air barrier is applied.

4. Adequacy of substrate priming.

5. Application and treatment of joints and edges of transition strips, flexible opening transitions, and accessory materials.

6. Continuity and gap-free installation of air barrier, transition strips, and accessory materials.

C. Inspection and Test Frequency: Determined by installed air barrier surface area.

1. Up to 900 sq. m (10,000 sq. ft.): One inspection.

2. 901 - 3,300 sq. m (10,001 - 35,000 sq. ft.): Two inspections.

D. Submit inspection and test reports to Contracting Officer’s

Representative within seven calendar days of completing inspection and test.

E. Defective Work:

1. Correct deficiencies, make necessary repairs, and retest as required to demonstrate compliance with specified requirements.

3.4 CLEANING

A. Remove masking materials.

Bancroft-AE Project No. 18-102 07 27 27-8 08-03-2020

B. Clean spills and overspray using cleaning agents recommended by manufacturers of affected construction.

3.5 PROTECTION

A. Protect air barrier from construction operations.

B. Protect air barrier from exposure to UV light exposure exceeding manufacturer's recommendation.

C. Replace overexposed materials and retest.

- - E N D - -

File details come from the government source that posted it. Updated .