A012 54218106_Drawings_FinalCD_013120.pdf
PDF 2 MB Posted
- Attached to
- Z2DA--Renovate Building 4 A + B Floors Outpatient Mental Health Clinic, Project No. 542-18-106
- Solicitation number
- 36C24420B0003
About this file
This solicitation package is for a construction project to renovate an outpatient mental health clinic at a Department of Veterans Affairs medical center. The project involves demolishing and renovating approximately 28,000 square feet on the first and second floors as well as 3,000 square feet in the basement to construct new outpatient mental health clinics. The scope of work includes renovating the basement wing and first and second floors along with supporting work in the basement and attic. Exterior improvements such as a new elevator and shaft are part of the project. Bids are due on a date to be specified in the solicitation for a firm fixed price construction contract valued between $10-20 million. The contract is set aside exclusively for verified Service-Disabled Veteran-Owned Small Businesses and has a maximum completion time of 588 calendar days from notice to proceed.
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F E
C F
E C
FEC
FEC
F E
C F
E C
F E
C
1 2 3 4 5
6 7
8 9 10 11 12
AA
BB
CC
D.2D.2
E.2E.2
E.8
E.8
F.8F.8
HH
II
JJ
DD
EE
F
F
GG
6.86.2
G.5G.5
C.2
ROOF
ROOF
ROOF
DN
DN
UP
CONSULT
WOMENS
WAITING
ELEC
TOILET
TOILET
NEURO
PSYCH/
TESTING
NEURO
PSYCH/
TESTING
NEURO
PSYCH/
TESTING
NEURO
PSYCH/
TESTING
NEURO
PSYCH/
TESTING
NEURO
PSYCH/
TESTING
NEURO
PSYCH/
TESTING
NEURO
PSYCH/
TESTING
STORAGE
206A
STORAGE
210A
STORAGE
213A
STORAGE
213B
GROUP
THERAPY
EAST STAIR
214A
NURSE/
TRIAGE
215A
CHECK-IN
CLERKS
TOILETS
TOILETS
STAFF ROOM
VJO / TCM /
TBI
SUD CONSULT
OFFICE
SUD CONSULT
OFFICE
TOILET
TOILET
BIO-FEEDBACK
TREATMENT
BIO-FEEDBACK
DR. PEKALA
BIO-FEEDBACK
DANIELLE
BIO-FEEDBACK
OFFICE
STORAGE
226B
WEST STAIR
219A
SUD CONSULT
OFFICE
SUD CONSULT
OFFICE
SUD CONSULT
OFFICE
SUD CONSULT
OFFICE
SUD CONSULT
OFFICE
IT
ELEC
SUD CONSULT
OFFICE
SUD CONSULT
OFFICE
SUD CONSULT
OFFICE
HOTEL
CONSULT
HOTEL
CONSULT
STORAGE
230A
EAST
CORRIDOR
200E
CENTER
CORRIDOR
200C
WEST
CORRIDOR
200W
C.1
A440
CONFERENCE
WAITING/
BREAK-OUT
200A
A440
W01W01 W01
0 13
BIO-FEEDBACK
INTAKE
226A
BIO-FEEDBACK
WAITING
HAC
219B
A. REFER TO GI002 “CONSTRUCTION PERIOD SCHEDULING OF WORK – GENERAL NOTES”
REGARDING THE VA’S DISCRETION IN SELECTING WORK TO BE DONE AFTERHOURS/OFF-
HOURS.
B. REFER TO GI002 “CONSTRUCTION PERIOD SCHEDULING OF WORK – ADDITIONAL NOTES FOR
STERILE PROCESSING SERVICE (SPS)” REGARDING WORK IN, ADJACENT TO, OR THAT MAY
AFFECT SPS.
C. GENERAL ARRANGEMENT AND OVERALL PLANS ARE INTENDED TO GIVE AN OVERVIEW OF
WORK. REFER TO CORRESPONDING DRAWINGS ACROSS ALL DISCIPLINES FOR FULL EXTENT
OF WORK.
EXISTING CONSTRUCTION
TO REMAIN
NEW PARTITION WALL
AREA NOT IN CONTRACT
MATCHLINE
FIRE EXTINGUISHER
CABINET - REFER TO
DETAIL 1/A515
SURFACE MOUNTED FIRE
EXTINGUISHER CABINET
REFER TO DETAIL 2/A515
2 HOUR FIRE &
SMOKE
SEPARATION
1 HOUR FIRE &
SMOKE
SEPARATION
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
31 JAN 2020
GENERAL ARRANGEMENT
PLAN - SECOND FLOOR
RENOVATE BUILDING 4A&B FLOORS
OUTPATIENT MENTAL HEALTH CLINIC
VA Medical Center, Coatesville PA
RFR ARCH
542-18-106
A012
FINAL CONSTRUCTION
DOCUMENTS SUBMISSION
1/8" = 1'-0"
GENERAL ARRANGEMENT PLAN - SECOND FLOOR
PLAN GENERAL NOTES
PLAN LEGEND
0 4' 8' 16'
Revisions: Date:
FINAL CONCEPT DOCUMENTS SUBMISSION 15 JAN 2019
50% CONSTRUCTION DOCUMENTS SUBMISSION 16 APR 2019
MOD - 50% CONSTRUCTION DOCUMENTS SUBMISSION 21 JUN 2019
100% CONSTRUCTION DOCUMENTS SUBMISSION 3 JAN 2020
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 31 JAN 2020
File details come from the government source that posted it. Updated .