FY20 MCAF PAF180200 APR - JET FUEL STORAGE TANKS, ROYAL AUSTRALIAN AIR FORCE BASE TINDAL, AUSTRALIA
Solicitation number
N6274221R1300
Issued by

About this file

This document contains questions and answers related to solicitation number N6274221R1300 for construction of jet fuel storage tanks and support infrastructure at Royal Australian Air Force Base Tindal in Australia. The solicitation seeks design and construction of two 25,000-barrel cut-and-cover bulk fuel tanks, along with associated pump houses, fuel transfer facilities, utilities, and site improvements. Three optional line items are included for alternative pavement types, a crossover pit, and hydrant-hose checkout station. Questions cover topics such as reinforcing details, water availability and quality, project schedule coordination, site conditions and responsibilities. Responses are deferred pending further review.

View the file

Other files

File Type Posted
21R1300_Notice12-Issued.pdf PDF
21R1300_Amd8-Issued.pdf PDF
AMD0008_Attachments.pdf PDF
21R1300_Notice11-Issued.pdf PDF
21R1300_Amd7-Issued.pdf PDF
21R1300_Notice10-Issued.pdf PDF
21R1300_Amd6-Issued.pdf PDF
AMD0005_Dwgs_Attachments.pdf PDF
21R1300_Amd5-Issued.pdf PDF
21R1300_Notice9-Issued.pdf PDF
21R1300_Amd4-Issued.pdf PDF
21R1300_Notice7-Issued.pdf PDF
20R1300_Amend0003-Issued.pdf PDF
20R1300_AMD0003_Attachments.pdf PDF
21R1300_Notice6-Issued.pdf PDF
21R1300_Amend0002-Issued.pdf PDF
AMD002section01 50 00.pdf PDF
21R1300_Notice5-Issued.pdf PDF
AMD2_Dwg17254307_E-413_Rev2_SIGN.pdf PDF
21R1300_Amd1_Attachments.zip ZIP file
21R1300_Notice4-Issued.pdf PDF
AMD 001 Drawings_SIGNED.pdf PDF
PAF180200_JA_Romteck_FireAlarmTransmitter-Redacted.pdf PDF
21R1300_Amend0001-Issued.pdf PDF
21R1300_Notice3_Issued.pdf PDF
21R1300_Notice2-Issued.pdf PDF
PAF180200_Proj_Site_Photos.pdf PDF
21R1300_Notice1-Issued.pdf PDF
2-PAF180200-Specs_SIGNED.pdf PDF
4-PAF180200-Drawings2_SIGNED.pdf PDF
3-PAF180200-Drawings1_SIGNED.pdf PDF
1-RFPN6274221R1300_Issued.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE NAVY

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND, PACIFIC

258 MAKALAPA DR., STE. 100

JBPHH, HI 96860-3134

RFP N62742-21-R-1300

Notice No. 8

9 February 2021

PRE-PROPOSAL QUESTIONS & ANSWERS

RFP N62742-21-R-1300

WON 1606003, FY20 MCAF PROJECT

PAF180200 APR JET FUEL STORAGE TANKS,

ROYAL AUSTRALIAN AIR FORCE (RAAF) BASE TINDAL,

AUSTRALIA

NOTE: The following questions and answers are provided for INFORMATION ONLY. The RFP remains unchanged unless it is amended in writing on a Standard Form 30.

83. On Drawings C-302 to C-304 you show a symbol for reinforced slab. We do not see any detail of this reinforcing on the drawings.

ANSWER: Response deferred.

84. In specification Section 01 50 00, Paragraph 3.3.3, it states: “Current assessment of the output of the water treatment is that it meets the requirements for uncontaminated freshwater but does not meet the requirements for potable water and may possibly be used for tank hydrostatic testing and/or dust suppression, but not for the production of concrete. Section 33

56 21.17 SINGLE WALL ABOVEGROUND FIXED ROOF STEEL POLSTORAGE

TANK defines the water quality standard required for hydrotesting.” Unless told otherwise, we are going to assume that water supplied from the Water Treatment Plant will meet the requirements for project dust control and hydro testing water for the single-wall above ground fixed roof steel POL storage tank in Section 33 56 21.17.

85. On Drawing C-101, note 4, the last sentence states: “Refer to RAAF Base Works Managing Contractor for scheduling of nearby and surrounding Projects.” Could you provide us a copy of this information or direct us to where this is located? We would like to know the award and completion dates of contracts WE07 and WE05.

86. Please provide the days of the week and the hours of the day that water may be taken from the Water Treatment Plant. Our work schedule may require 7 days per week as a normal shift, and if water is not available this may alter the construction schedule of the project.

87. Detail A4 of Drawing C-608 indicates to place HDPE Liner in 50 thick compacted sand layer for all Rigid Pavement; however, there is no HDPE Liner for Rigid Pavement as per Detail C2 of C-604. Please advise if Contractor has to place HDPE Liner in 50 thick compacted sand layer for all Rigid Pavement.

ANSWER: Response deferred.

88. The RFP and our bid assume that there will be unrestricted travel to the job site due to the Covid-19 pandemic. Please verify that Covid-19 travel bans at the time the project starts will be considered a changed condition with appropriate time extension for allowance of key expat personnel to access the country.

ANSWER: Document 00700, paragraph 1.101, FAR 52.249-10, DEFAULT (FIXED-PRICE CONSTRUCTION), would apply in this situation.

89. Please confirm prime contractors are not to include any costs associated with the Australian GST in our price for this proposal.

ANSWER: Confirmed. See paragraph 10, GST, of the Australian Requirements Schedule of the RFP and the revised Price Proposal Schedule in Amendment No. 0004.

90. Per Drawing A-331 (Detail C3) and Drawing C-208 (Detail A), please provide details for the raised island slabs. Please provide the thickness of the slabs and reinforcing needed.

ANSWER: Response deferred.

91. The overall gantry dimensions for the gantry shown on C-208 vary slightly on Drawings S- 208 and C-604. Please confirm which set of dimensions are correct.

ANSWER: Response deferred.

92. We note that Drawing C-101 indicates over 620 meters of fence line demolition. Please confirm that this work is to be performed under this contract (not part of WE07).

ANSWER: Response deferred.

93. Please confirm that the Site Surveillance System (C-101 demolition scope) will be removed by others prior to commencement of this contract.

ANSWER: Response deferred.

94. Drawing C-101 shows what appears to be an unimproved road shown for removal following along the fence. Please confirm the removal of the road will be performed as part of WE07 (not part of this contract).

95. Please confirm that the new fence line and bike path in Drawing C-101 is expected to be completed prior to the start of work and that entire scope will therefore be a part of WE07 (not part of this contract).

96. May a water bore be drilled and a tank farm established to harness construction water on

Tindal RAAF base adjacent to the construction footprint (outside the construction footprint)?

97. Can the Artesian Basin water be used for dust suppression and compaction purposes in case the water supply from the RAAF Water Treatment Plant becomes available for construction purposes?

98. Can the Government can supply all of the available water test reports and data indicating water quality on the Tindal RAAF Base?

99. Section 01 14 00, Paragraph 1.4.3.2, Security Escort, describes the necessity of this observation during construction. To determine contractor costs, we require additional definition of this requirement.

a. What is the timeline for the contractor personnel to receive the training and authorization?

b. Is there a fee involved to obtain the escort authorization?

c. Can the contractor personnel have collateral duties as a member of the crew?

d. Is there a limit in the size of a crew a single escort is responsible for?

100. Regarding the Rolling Pit Cover steel manufacturing identified on Drawing M-207, Details

A1 and C1, the aluminum steel frame size of 100 x 75 x 8mm RHS and Aluminum Cover Material 6016 T6 6mm are not available for procurement in Australia. Will an alternate material frame size and aluminum cover type that is available in Australia be allowed? It is recommended from a local manufacturer that these sizes/types are available:

a. AUS available FRAME material: “Anything in a 75mm RHS does not go above 6mm in thickness. 102 x 76 RHS but 6mm wall thickness is as high as it goes. Would have to go with maybe 100 x 100 x 9mm RHS as that is all that is near material thickness. If 100 x 100 x 9 is to be used then bolt lengths etc. would have to be changed and engineer approved.”

b. AUS available Aluminum plate type: “Aluminum cover material in 6mm is available in 5005 H34 or 5083 H116 and comes in common sheet sizes.”

101. Unexploded Ordnances

Section 31 11 00 – Clause 3.1.1.4 States - ‘The works area has previously been cleared of unexploded ordinances.

Section 01 35 13.01 of General Requirements P 2.1.4 (Item ‘n’) Handover Takeover (HOTO) Phase States – ‘Provided the following HOTO submittals 14 calendar days before Beneficial Occupancy Date (BOD)’ – ‘Unexploded Ordnance (UXO) certifications with maps and GPS points of boundaries clearance (plus to the required depth)

Can you please clarify that UXO will be cleared prior to site possession and a UXO Certification will be provided to the Contractor for inclusion in the HOTO Phase documentation?