- FY20 MCAF PAF180200 APR - JET FUEL STORAGE TANKS, ROYAL AUSTRALIAN AIR FORCE BASE TINDAL, AUSTRALIA
- Solicitation number
- N6274221R1300
About this file
This solicitation seeks construction services for two four (4) ML bulk fuel storage tanks and associated infrastructure at Royal Australian Air Force Base Tindal in Australia's Northern Territory. Services include design and construction of the tanks, two pump houses, a fuel truck fill stand, filter building, and all required utilities and site improvements. There are also three priced options for concrete vs. asphalt pavements, a crossover pit, and hydrant station. The Navy's Naval Facilities Engineering Command issued the solicitation, with a response due date of November 24, 2020 and anticipated award between $25-75 million. Pricing shall be provided for the base item and each option exclusive of Australian Goods and Services Tax. Subcontract reporting is required to the Australian Department of Defence to support tracking of local industry participation.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
19RXXX1
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
RFP NO. N62742-21-R-1300, WON 1606003, FY20 MCAF PAF180200 APR - JET FUEL STORAGE TANKS, ROYAL AUSTRALIAN AIR FORCE
(RAAF) BASE TINDAL, AUSTRALIA
Amendment No. 0004 is continued on Page 2.
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA 15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6274221R1300
X 9B. DATED (SEE ITEM 11)
24-Nov-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
CODE
NAVFAC PACIFIC
CONSTR CONTRACTS BRANCH (CODE ACQ33)
258 MAKALAPA DR STE 100
JBPHH HI 96860-3134
N62742 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODE CODE
EMAIL: TEL:
9-Feb-2021
N6274221R1300 Amendment No. 0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SOLICITATION, OFFER AND AWARD (SF1442) PRICE PROPOSAL SCHEDULE
Remove the Price Proposal Schedule (Amendment No. 0001), Page 3 of 4 and Page 4 of 4, in its entirety and replace with the attached revised Price Proposal Schedule (Amendment No. 0004), Page 3 of 4 and Page 4 of 4.
DOCUMENT 00800, SPECIAL CONTRACT REQUIREMENTS
Delete Document 00800 in its entirety and replace with the attached revised Document 00800 (Amendment No.
0004), which revises paragraph 1.5.
Add the attached subcontract reporting form at the end of Document 00800.
SOLICITATION, OFFER AND AWARD (SF 1442), CONTINUED
PRICE PROPOSAL SCHEDULE
FOR
RFP NO. N62742-21-R-1300
WON 1606003, FY20 MCAF PROJECT PAF180200 APR – JET FUEL
STORAGE TANKS, RAAF BASE TINDAL, AUSTRALIA
RFP N62742-21-R-1300
SF 1442 (Continued)
CONTRACT
LINE ITEM NO.
DESCRIPTION
QTY
UNIT OF
ISSUE
AMOUNT
BASE ITEM: The basis for CLIN 0001 is the price for all work complete in accordance with the drawings and specifications for WON 1606003 not including work specified in CLINs 0002 through 0004.
Lump Sum
OPTION ITEM NO. 1
The basis for pre-priced CLIN 0002 is the price for all work to construct concrete vs. asphalt pavements for the heavy-duty pavements, in accordance with the drawings and specifications but not including the work under any other CLIN.
OPTION ITEM NO. 2
The basis for pre-priced CLIN 0003 is the price for all work to construct the cross over pit for the fuel transfer lines, in accordance with the drawings and specifications but not including the work under any other CLIN.
OPTION ITEM NO. 3
The basis for pre-priced CLIN 0004 is the price for all work to construct the hydrant-hose checkout station, in accordance with the drawings and specifications but not including the work under any other CLIN.
Notes:
1. See Document 00202 for the Price Evaluation. The total of the proposed price for CLINs 0001 through 0004 will form the basis for the evaluation noted in Document 00202.
2. A firm-fixed-price is required for all line items. The following NAVFAC Language applies:
ALL OR NONE OFFERS - Offers are solicited on an “all or none” basis and FAR 52.215-1, INSTRUCTIONS TO OFFERORS-COMPETITIVE ACQUISITION in Document 00100, is hereby modified. Failure to submit offers for all line items listed shall be cause for rejection of the offer.
3. Multiple awards will not be made.
4. The magnitude of construction is between $25,000,000 and $75,000,000.
5. The provision at FAR 52.217-5, Evaluation of Options (JUL 1990), will apply as follows:
EVALUATION OF OPTIONS (JUL 1990)
Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the lump sum price of the options to the lump sum price of the basic requirement. Evaluation of the options will not obligate the Government to exercise the options.
SOLICITATION, OFFER AND AWARD (SF 1442), CONTINUED
PRICE PROPOSAL SCHEDULE
FOR
RFP NO. N62742-21-R-1300
WON 1606003, FY20 MCAF PROJECT PAF180200 APR – JET FUEL
STORAGE TANKS, RAAF BASE TINDAL, AUSTRALIA
SF 1442 (Continued)
(End of Provision)
6. Additionally, the clause at FAR 52.217-7, Option for Increased Quantity – Separately Priced Line Item (MAR 1989), will apply as follows:
OPTION FOR INCREASED QUANTITY -- SEPARATELY PRICED LINE ITEM (MAR 1989)
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the options at the time of award or by written notice to the Contractor within 365 calendar days from the date of contract award. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.
(End of Clause)
7. DFARS 252.247-7023, TRANSPORTATION OF SUPPLIES BY SEA. Within 30 days of each shipment, the Contractor is required to provide an electronic copy of the carrier’s bill of lading to the Contracting Officer and to MARAD via email. MARAD email: Cargo.MARAD@dot.gov (ATTN: MIL Team). In addition, the Contractor shall notify the Contracting Officer when oceanic shipments have been initiated within 3 working days of shipment.
8. The price of CLIN 0001, CLIN 0002, CLIN 0003, and CLIN 0004 shall be exclusive of the Australia Goods and Services Tax. Also, see paragraph 10, GST, of the Australian Requirements Schedule of Section 01 11 00, General Requirements.
FY20 MCAF PAF180200 APR – JET FUEL WON 1606003
STORAGE TANKS, ROYAL AUSTRALIAN
AIR FORCE BASE TINDAL, AUSTRALIA
DOCUMENT 00800 TABLE OF CONTENTS
DOCUMENT 00800
SPECIAL CONTRACT REQUIREMENTS
5/20
1.1 AUTHORITY
1.2 ORGANIZATIONAL CONFLICTS OF INTEREST
1.3 NOTICE OF BONDING REQUIREMENTS
1.4 NORTHERN TERRITORY OF AUSTRALIA CONSTRUCTION INDUSTRY LONG SERVICE LEAVE
AND BENEFITS ACT AS IN FORCE AT 23 APRIL 2015
1.5 UNITED STATES FORCE POSTURE INITIATIVES (USFPI) SUBCONTRACT REPORTING
-- End of Document --
DOCUMENT 00800
SPECIAL CONTRACT REQUIREMENTS
1/20
1.1 AUTHORITY
a. No person other than the Contracting Officer has authority to bind the Government with respect to this contract.
b. No action or omission of any government employee or representative other than the Contracting Officer shall increase or decrease the scope of this contract or shall otherwise modify the terms and conditions of this contract.
c. In no event shall any of the following be effective or binding on the Government or imputed to the Contracting Officer with respect to this contract:
(1) An understanding or agreement between the Contractor and anyone other than the Contracting Officer;
(2) A purported modification or change order issued by anyone other than the Contracting Officer;
(3) A promise by anyone other than the Contracting Officer to provide additional funding or make payments; or
(4) An order, direction, consent, or permission from anyone other than the Contracting Officer to:
(a) Incur costs in excess of a specified estimated cost, allotment of funds, or other ceiling; or
(b) Expend hours in excess of a specified level of effort.
1.2 ORGANIZATIONAL CONFLICTS OF INTEREST
Review of FAR Subpart 9.5, Organizational and Consultant Conflicts of Interest is encouraged. The intent is to identify and evaluate potential conflicts of interest prior to contract award. Generally, if the Contractor / affiliates /subcontractors under this contract prepares or assists in preparing a statement of work, specifications and plans, the Contractor and its affiliates and any subcontractors/subconsultants may be ineligible to bid or participate, in any capacity, in any contractual effort which is based on such statement of work or specifications and plans as a prime contractor, subcontractor, consultant or in any similar capacity. In addition, the Contractor and its affiliates and/or subcontractors under this contract are ineligible to bid or participate, in any capacity, in any contractual effort which is based upon a statement of work, specifications and plans which the Contractor and its affiliates and/or subcontractors previously prepared or assisted in preparing.
1.3 NOTICE OF BONDING REQUIREMENTS
Within 21 days after receipt of award, the offeror to whom the award is made shall furnish the bonds required by FAR Clause 52.228-15 Performance and Payment Bonds--Construction.
Offerors are hereby notified that the contract time for purposes of fixing the completion date, default, and liquidated damages will be as stated in FAR Clause 52.211-10 Commencement, Prosecution, and Completion of Work, regardless of when performance and payment bonds or deposits in lieu of surety are executed.
1.4 NORTHERN TERRITORY OF AUSTRALIA CONSTRUCTION INDUSTRY LONG SERVICE LEAVE
AND BENEFITS ACT AS IN FORCE AT 23 APRIL 2015
(a) Without limiting the Contractor's obligations under the Contract or otherwise at law or in equity, the Contractor shall comply with its obligations under the Long Service Leave Legislation.
DOCUMENT 00800
(b) If required by the Long Service Leave Legislation, the Contractor must pay any levy, charge, contribution or associated amount in respect of the work performed under this Contract.
(c) Any amount paid by the Contractor under paragraph (b) is deemed to be included in the Contract Price and the Contractor will have no Claim against the United States arising out of or in connection with its obligations under this paragraph or the Long Service Leave Legislation.
1.5 UNITED STATES FORCE POSTURE INITIATIVES (USFPI) SUBCONTRACT REPORTING
Within 180 calendar days after contract award, and every 180 calendar days thereafter, the Contractor shall furnish a report documenting the awards by the Contractor to subcontractors/suppliers for the performance of this contract. The report shall be in the form provided at the end of this Document. This information will be shared with the Australian Department of Defence, for purposes of Estate and Infrastructure Group reporting on local industry participation in construction projects on Australian Defence bases. The Australian Department of Defence may disclose this information to the public.
-- End of Document --
FY20 MCAF PAF180200 APR – JET FUEL STORAGE TANKS,
ROYAL AUSTRALIAN AIR FORCE BASE TINDAL, AUSTRALIA
WON 1606003
(a) (b) (c) (d) (e) (f) (g) (h) Total No. of
Subcontracts Required to
Complete Work
No. of Subcontracts Awarded to Date
Value (AUD) of Subcontracts
Awarded to Date
% of Subcontracts Awarded ((b) / (a))
No. of NT Subcontracts
Awarded to Date
Value (AUD) of NT Subcontracts
Awarded to Date
% of Subcontracts Awarded to NT firms
((e)/(b))
% Value (AUD) of NT Subcontracts Awarded ((f) / (c))
*Note: For purposes of this report, a Northern Territory (NT) firm is defined as: A business that has an office based in the NT that will be integral to project delivery.
ALL SUBCONTRACTS SUBCONTRACTS TO NORTHERN TERRITORY (NT) FIRMS*
RFP N62742-21-R-1300
Amendment No. 0004