21R1300_Notice11-Issued.pdf

PDF 676 KB Posted

Attached to
FY20 MCAF PAF180200 APR - JET FUEL STORAGE TANKS, ROYAL AUSTRALIAN AIR FORCE BASE TINDAL, AUSTRALIA
Solicitation number
N6274221R1300
Issued by

About this file

This document contains questions and answers regarding solicitation number N6274221R1300 for construction of two four million barrel cut'n'cover bulk fuel tanks, support infrastructure including two pump houses and a filter building, and all required utilities and site work at Royal Australian Air Force Base Tindal in Australia. Key details include allowing ultrasonic weld examination in place of radiography, accepting accreditation by the National Association of Testing Authorities of Australia in lieu of ASTM E329 for testing agencies, revising surge protector requirements in section 28 31 63.00 20 to allow for Australian models, and not permitting a change from precast panels to blockwork in filter building and pump vault structures as specified.

View the file

Other files

File Type Posted
21R1300_Notice12-Issued.pdf PDF
21R1300_Amd8-Issued.pdf PDF
AMD0008_Attachments.pdf PDF
21R1300_Amd7-Issued.pdf PDF
21R1300_Notice10-Issued.pdf PDF
21R1300_Amd6-Issued.pdf PDF
AMD0005_Dwgs_Attachments.pdf PDF
21R1300_Amd5-Issued.pdf PDF
21R1300_Notice9-Issued.pdf PDF
21R1300_Notice8-Issued.pdf PDF
21R1300_Amd4-Issued.pdf PDF
21R1300_Notice7-Issued.pdf PDF
20R1300_Amend0003-Issued.pdf PDF
20R1300_AMD0003_Attachments.pdf PDF
21R1300_Notice6-Issued.pdf PDF
21R1300_Amend0002-Issued.pdf PDF
AMD002section01 50 00.pdf PDF
21R1300_Notice5-Issued.pdf PDF
AMD2_Dwg17254307_E-413_Rev2_SIGN.pdf PDF
21R1300_Amd1_Attachments.zip ZIP file
21R1300_Notice4-Issued.pdf PDF
AMD 001 Drawings_SIGNED.pdf PDF
PAF180200_JA_Romteck_FireAlarmTransmitter-Redacted.pdf PDF
21R1300_Amend0001-Issued.pdf PDF
21R1300_Notice3_Issued.pdf PDF
21R1300_Notice2-Issued.pdf PDF
PAF180200_Proj_Site_Photos.pdf PDF
21R1300_Notice1-Issued.pdf PDF
2-PAF180200-Specs_SIGNED.pdf PDF
4-PAF180200-Drawings2_SIGNED.pdf PDF
3-PAF180200-Drawings1_SIGNED.pdf PDF
1-RFPN6274221R1300_Issued.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE NAVY

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND, PACIFIC

258 MAKALAPA DR., STE. 100

JBPHH, HI 96860-3134

RFP N62742-21-R-1300

Notice No. 11

24 February 2021

PRE-PROPOSAL QUESTIONS & ANSWERS

RFP N62742-21-R-1300

WON 1606003, FY20 MCAF PROJECT

PAF180200 APR JET FUEL STORAGE TANKS,

ROYAL AUSTRALIAN AIR FORCE (RAAF) BASE TINDAL,

AUSTRALIA

NOTE: The following questions and answers are provided for INFORMATION ONLY. The RFP remains unchanged unless it is amended in writing on a Standard Form 30.

RESPONSES DEFERRED FROM NOTICE NO. 10 DATED FEBRUARY 18, 2021:

102. Section 33 56 21.17, SINGLE WALL ABOVEGROUND FIXED ROOF STEEL POL

STORAGE TANK, Paragraph 3.5.2 requires inspection of butt welds with complete penetration and complete fusion by the radiographic method. Alternatively, using Time-of- Flight Diffraction (TOFD) or Phased Array Ultrasonic Testing (PAUT) instead of radiograph method will reduce the project schedule. Please advise if TOFD or PAUT is acceptable in place of the radiograph method.

ANSWER: Ultrasonic weld examination will be allowed. See Amendment No. 0008.

103. Section 33 56 21.17, SINGLE WALL ABOVEGROUND FIXED ROOF STEEL POL

STORAGE TANK, Paragraph 1.8.6.2 requires that the testing agency, testing laboratory, technical consultant, or contractor's approved quality assurance organization must meet the requirements of ASTM E329. In Australia, The National Association of Testing Authorities (NATA) is Australia’s national accreditation body for the accreditation of laboratories, inspection bodies, calibration services, producers of certified reference materials, and proficiency testing scheme providers throughout Australia. Is it acceptable as an alternative for the Government to confirm testing agency, testing laboratory, technical consultant, or contractor's approved quality assurance organization to allow the credentials of NATA in lieu of ASTM E329?

ANSWER: NATA accreditation is acceptable. See Amendment No. 0008.

RFP N62742-21-R-1300

104. Regarding Section 28 31 63.00 20, an Australian electrical subcontractor has advised that local surge protectors are different than specified, but expected to work with their equipment and intent of the contract. However, they do not align with the specification. We exceed the current requirements but do not meet the voltage Vp specified. We understand this is a minor change and can wait to submit a variance post award. For bidding purposes are the recommended surge arrestors acceptable?

Specification requirement:

10/1000uS they want Vp1500V Ipk 60A and 8/20uS they want Vp 1000V Ipk 500A.

AUS Recommended Surge Protectors At 8/20uS :

UTB30SP can do Vp 40V Ipk 20KA; UTB110SP can do Vp 220V Ipk 20KA; DSD120-15- 24 can do Vp 30V Ipk 20KA

ANSWER: Australian surge protectors as indicated in Question 104 are not acceptable.

However, the requirements indicated in Paragraph 2.1.3 have been revised. See Amendment No. 0008.

105. Section 28 31 63.00 20, ANALOG/ADDRESSABLE INTERIOR FIRE ALARM

SYSTEM, Paragraph 2.1.3.a states that the cables "shall have surge protection circuits installed at each end." This is not typical, which would double the number of surge protectors. Please confirm whether surge arrestors are required at each end of each circuit.

ANSWER: Confirmed.

106. Section 28 31 63.00 20, ANALOG/ADDRESSABLE INTERIOR FIRE ALARM, Paragraph 2.1.3.b requests "Additional triple electrode gas surge protectors...". An Australian electrical subcontractor has advised they cannot source this product. Will a recommended manufacturer be provided for the contractors to contact? Or, is an alternate specification available that can be considered as an equal to this requirement? If an alternate is acceptable, please provide the revised requirement for the contractors to use as a basis of bid.

ANSWER: Section 28 31 63.00 20 Paragraph 2.1.3 has been revised to delete the requirement for triple electrode gas surge protectors. However, surge protectors are still required. See Amendment No. 0008.

107. Detail B5 on Drawing A-511 shows the use of Precast 150mm Panels. These panels are located at both the Filter Building and the Pump Vault structures. On a previous project we used blockwork in these locations. The preliminary pricing we are receiving has the cost for the precast panels substantially higher (approximately four times the cost) than conventional blockwork. Please consider the allowance to use blockwork at these locations.

ANSWER: Comply with RFP requirements.