This document is a Task Group Instruction (TGI) for cleaning, inspecting, repairing, and preserving the clean salt water ballast system on the USS BLUE RIDGE (LCC-19). The specific work involves a comprehensive maintenance procedure for the ballast tank No. 9-40-2-W, with a total capacity of 27,158 gallons. The work includes visual inspection of existing preservation coating, marking corroded or damaged areas, general cleaning to Level III standards, manhole cover installation, and extensive repair work such as welding deteriorated welds, repairing plate defects, and replacing up to 10 square feet of deteriorated plate and 4 linear feet of defective stiffener.
The task is part of a larger ship repair and maintenance project, with a contractor work start date of 1/12/2026 and completion date of 5/15/2027. Special requirements include working around a fire zone boundary and fabricating a non-flammable closure. The work will be conducted in the Clean Salt Water Ballast tank and Air Conditioning Machinery Room, with specific technical requirements for surface preparation, welding, non-destructive testing, and preservation. The instruction is marked FOUO (For Official Use Only) and includes detailed procedural steps, material references, and appendices for job summary and material listing.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
FOUO: Public availability to be determined under 5 USC 552
TASK GROUP INSTRUCTION
AIM REV 20.11.4.0 (OCTOBER 2020)
TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:
NO.: BLST 9-40-2-W AY A 0 0
SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE:
F/O - CLEAN, INSPECT, REPAIR, AND PRESERVE CLEAN SALT WATER BALLAST (9-40-2-W)
PREPARING ACTIVITY:
PREPARED BY: CODE PHONE DATE
RIKAKO TAKAGI 231B. 315-243-9982 22-DEC-2023
APPROVED BY: CODE PHONE DATE
RYOUTA TAKAGI 231B 315-243-4502 22-DEC-2023
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
REASON FOR WORK/NEED FOR CHANGE:
CHANGE INSTRUCTIONS:
SPECIAL REQUIREMENTS:
SURFMEPP
This work Affects a fire zone boundary. Fabrication and/or staging of a non-flammable closure is required.
CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL III
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
ACCEPTANCE OF COMPLETED WORK
PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:
REQUIRED:☐YES ☒NO
RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
TGI NO.: BLST 9-40-2-W AY A 0
FOUO
SHIP: LCC-19 CHG/VER: 0/0
LIST OF EFFECTIVE PAGES
SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.
1-5 J-1 M-1
1. SCOPE/PURPOSE
1.1 Title: Clean Salt Water Ballast (9-40-2-W); clean, inspect, repair, and preserve
1.2 Location of Work:
1.2.1 Clean Salt Water Ballast (9-40-2-W)
1.2.2 Air Conditioning Machinery Room No. One and Refrigeration Machinery Room (7-40-0-E)
1.3 Identification:
1.3.1 Quantity (One EA), Clean Salt Water Ballast
Tank No.: 9-40-2-W Capacity: 27,158 Gallons
1.3.2 Quantity (2 EA), Manhole Cover Plate for 9-40-2-W
Manhole No(s).: 7-40-2 Size: 15 Inches x 23 Inches Manhole No(s).: 7-47-4 Size: 15 Inches x 23 Inches Material: Steel
1.3.3 Quantity (2 EA), Bolting Ring of Manhole for 9-40-2-W
Manhole No(s).: 7-40-2 and 7-47-4 Material: Steel
1.4 Security Classification: None.
1.5 Initial Condition:
1.5.1 Potential Lead Hazard.
1.6 Contractor work start date:
1.7 Contractor work completion date:
2. REFERENCES:
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N
3 TM S9086-
CJ-STM-
010/CH-075
Fasteners 7 N
1/12/2026
5/15/2027
FOUO
SHIP: LCC-19 CHG/VER: 0/0
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
4 DWG 100-
2491001
Shell Plating & Stringer - Fr51-1/2 Ctr to 4th Dk
H Y AL
L
5 DWG 101-
2491020
WEBS FR 42, 44, 46, 48 & 50 J Y AL
6 DWG 103-
2491032
2ND PLTF PLATING FR 8-52 G Y AL
7 DWG 114-
2491155
TRANSV BHD FR 40, Pump RM BHD and Trunk BHD FR 44-45
K Y AL
8 DWG 114-
2491161
DEEP TANK BHD FR 24, 48, 56, &
LONG BHD BEL 2ND PLATF FR
30-76
F Y AL
9 DWG 102-
2491030
INNER BOTTOM PLTG FR8-1/2 -
51-1/2
G Y AL
10 DWG 114-
2491156
AGC19 TRANSV BHD FR 52 & 64 G Y AL
3. APPENDICES:
3.1. Appendix “J” TGI Job Summary Information Sheet
3.2. Appendix "M" TGI Material List
3.3. Appendix “D” Deficiency Form
4. GENERAL REQUIREMENTS:
4.1 Not Applicable.
5. PROCEDURE:
5.1 Accomplish the requirements of 099-902YO of 2.2 for each tank listed in 1.3.1.
5.1.1 Accomplish a visual inspection of each tank listed in 1.3.1 for existing preservation coating.
5.1.1.1 Mark each corroded, damaged and/or deteriorated coating area in each tank.
5.1.1.2 Submit one legible copy, in hard copy or approved transferrable media, of a report with a sketch listing results of the requirements of 5.1.1.1 to the SUPERVISOR.
5.1.2 Accomplish the requirements of 009-107 of 2.1.
5.1.2.1 Ensure General Cleaning must be Level III.
5.1.3 Accomplish installation of each manhole cover for each tank listed in 1.3.1 in accordance with Figure 075-4-1 of 2.3.
5.2 Repair each tank listed in 1.3.1, based on the CCIMS assessment report as designated by the SUPERVISOR, using 2.4 through 2.10 for guidance. See 5.7.4 through 5.7.6.
5.2.1 Vee-out and weld a total of one linear foot of each deteriorated and damaged weld. Each area of repair must include deck, bulkhead, shell plating, and overhead.
5.2.2 Chip and grind each surface flush in way of each repair.
5.2.3 Base metal weld buildup a total of 60 square inches of each plate defect in the tank.
FOUO
SHIP: LCC-19 CHG/VER: 0/0
5.2.3.1 For bidding purposes the base metal weld buildup must be one quarter inch thick.
5.2.3.2 Surface must be ground to sound metal prior to base metal weld buildup.
5.2.3.3 Fill each local pit and groove with weld material prior to application of each principal buildup layer.
5.2.3.4 Grind each surface of completed base weld metal buildup smooth if greater than 1/8 inch above plate surface.
5.2.4 Remove existing, fabricate and install new a total of 10 square feet of deteriorated plate.
5.2.5 Remove existing, fabricate and install new a total of 4 linear feet of defective stiffener.
5.2.6 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.2.6.1 Accomplish nondestructive testing in accordance with Line 11.
5.2.7 Accomplish the requirements of 009-25 of 2.1 for an air hose, water hose, or vacuum box test of each new insert weld seam. Allowable leakage: None.
5.3 Accomplish the requirements of 009-32 of 2.1 including Table 4, Line(s) 17, for tank side surface, and Table 3, Line(s) 12, for machinery space side surface of each cover plate listed in 1.3.2.
5.4 Accomplish the requirements of 009-32 of 2.1 for each bolting ring listed in 1.3.3.
5.5 Accomplish the requirements of 009-32 of 2.1, including Table 4, Line(s) 17, for a total of 420 square feet of defective painted surfaces, for each tank listed in 1.3.1, as designated by the SUPERVISOR.
5.5.1 The preservation area must not exceed 10 square feet per one area.
5.6 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.7 Notes:
5.7.1 Planner: Code 231B R. Takagi, 243-9982
5.7.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
5.7.3 This TGI meets the intent of DDG CSWT File Nos. 123-133, 123-142, and 123-143.
5.7.4 CCIMS assessment of each tank listed in 1.3.1 will be accomplished by SRF-JRMC (TGI No. 3819P12337I01), and the Project team will provide the assessment report with engineering evaluation under DL process for front loading structure repair.
5.7.5 Removal and installation of interferences, and gas free operation, preservation of boundary spaces relating to front loading structure repair are not included in this TGI. They will be covered by a DL in the future based on Contractor submitted condition report.
5.7.6 Materials for structure members relating to front loading repair will be provided in the future as a DL based on Contractor submitted condition report.
5.7.7 Work per this instruction involves cutting an access (or removal of a door) through a fire zone bulkhead, through the hull of the ship above the turn of the bilge, through ventilation components (ducting, plenums, etc.), or through any air-tight, fume-tight or watertight bulkheads normally used to control air flow in the event of a shipboard fire. A nonflammable closure is required in accordance with COMNAVSEASYSCOM MSG R 261400Z JUL 12. The
FOUO
SHIP: LCC-19 CHG/VER: 0/0
closure, if not continuously in use, shall be staged near the access, readily visible and accessible, so that any emergency responder can install the closure to affect proper air flow onboard the ship.
5.7.8 JCNs ER01-ZAW6, ER01-ZAK9, and ER01-ZAX4 are related to this TGI.
5.8 Government Furnished Material (GFM): None.
5.9 SRF-JRMC will provide the following service work: (TGI No. 3819P12337S02).
5.9.1 [C740] Crane and crane rigging service.
5.9.2 [X99E] Utility service, electrical.
5.9.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.
5.9.4 [C106.1] Safety inspection for SRF-JRMC employees.
5.9.5 [C106.2] Gas free inspection for SRF-JRMC employees.
5.9.6 [C133] QA inspection for (G) symbol(s).
5.9.7 [C135] QA inspection for (G) symbol(s).
5.9.8 [C250] Technical support.
FOUO
J-1
SHIP: LCC-19 CHG/VER: 0/0
APPENDIX "J"
TGI JOB SUMMARY INFORMATION SHEET
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
BLST 9-40-2-W AY A 0 0
CU PHASE TITLE:
F/O - CLEAN, INSPECT, REPAIR, AND PRESERVE CLEAN SALT WATER BALLAST (9-40-2-W)
PRIMARY COMPONENT:
COMPONENT UNIT LIST (FOR ASSEMBLIES):
BLST 9-40-2-W TK MANHOLE 7-47-4 HA MANHOLE 7-40-2 HA
ATTACHMENT LIST:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA ,TAKEHIDE
JO: KO: TOTAL MAN HRS: PLANNING ACCEPTANCE:
3819P12337 A01
TOTAL MAT’L COST TOTAL DURATION:
CU PHASE DESCRIPTION:
The purpose of this TGI is to clean, inspect, repair, and preserve clean salt water ballast (9-40-2-W).
Location of Work:
Clean Salt Water Ballast (9-40-2-W) Air Conditioning Machinery Room No. One and Refrigeration Machinery Room (7-40-0-E)
TASK NAME
SHOP TSD/WC TS CREW# MHRS
HIGH RAD
HOURS
RC
GRID#
5.1 LBR HRs, PNTR HRs 22 KE PC
5.2 SFTR HRs, WELD HRs, CARP HRs, PNTR HRs, QA HRs 22 KE PC
5.3 PNTR HRs, QA HRs 22 KE PC
5.4 PNTR HRs, RGRS HRs, QA HRs 22 KE PC
5.5 PNTR HRs, QA HRs 22 KE PC
5.6 PNTR HRs, QA HRs 22 KE PC
Dewatering and Cleaning Work CFM marine chemist, gaskets, fasteners, tank watch cost, and MISC.
22 MQ CS
Structural Work CFM for fire watch and tank watch cost, MT inspection cost, lead sampling/analysis cost, air compressor rental cost and fuel oil cost for air hose test, and MISC such as electrode, gases, temporary closure and covering material, and other consumable.
22 MQ CS
Preservation Work CFM for all paints, thinner, grit including waste disposal cost, tank watch cost, and MISC such as covering material and other consumable.
22 MQ CS
Process Funding Document 10 CT OM
FOUO
M-1
SHIP: LCC-19 CHG/VER: 0/0
APPENDIX “M”
TGI MATERIAL LIST
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
BLST 9-40-2-W AY A 0 0
CU PHASE TITLE:
F/O - CLEAN, INSPECT, REPAIR, AND PRESERVE CLEAN SALT WATER BALLAST (9-40-2-W)
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV
JOB ORDER: KEY OP:
3819P12337 A01
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
NOTES:
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR APPENDIX "D"
DEFICIENCY FORM
☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One)
2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
LCC-19 BLST 9-40-2-W AY A 0
4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:
3819P12337 A01
7. DESCRIPTION:
8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
9. CORRECTIVE ACTION:
10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
FOR NON-NUCLEAR USE ONLY
11. RFD/RFW REQ’D ☐ LAR REQ'D ☐
ILS MOD REQ’D ☐
SRD/PLAN REV REQ'D ☐
DWG NO.: _____________________ S/A NO.: ___________________
12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:
SATISFACTORY:
13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
YES ☐ NO ☐
14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE:
15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
_________:YES ☐ NO ☐
16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE (DR ONLY)
DL’s ISSUED
(DR ONLY)
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
LCC-19 BLST 9-40-2-W AY A 0
File details come from the government source that posted it. Updated .