TGI_3819P14203_T04_c0v0.pdf
PDF 26 KB Posted
- Attached to
- USS BLUE RIDGE (LCC-19) 5C1 DSRA TYCOM 1
- Solicitation number
- N6264925RA021
About this file
This document is a WebAIM Short Form Task Group Instruction for the USS Blue Ridge, dated 29-AUG-2024, with the Task Group Instruction (TGI) number 51426-3-301KTR. The document details an operational test for Air Conditioning (A/C) Plant #6, specifically a tightness and operational test. The tasks involve contractor work, quality assurance (QA) work, support/function (S/F) work, and test work, including conducting a vibration analysis in accordance with the referenced technical procedure TP 51426-3-301KTR. The document is marked FOUO (For Official Use Only) and involves personnel from different departments, including Enomoto Daisuke (prepared by), Higa Riley (approved), and Yaginuma Takehide (zone manager), with various work codes and contact numbers provided.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
29-AUG-2024 0927
20.14.15.0.8998 (August 2024) ICN: 3819P14203 KeyOp: T04
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 51426-3-301KTR TT T 1 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 51426
CU PHASE TITLE: A/C PLANT #6 (T & OP) - KTR
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 2
ES01NPNW * ES01NPNX * ES01NPNY * ES01NPNZ * ES01NPP0 * ES01NPP1 * ES01NPFP * ES01NPFN * ES01NPFK *
ES01NPFF * ES01NPFG * ES01NPFH * ES01NPFJ * ES01NPFL * ES01NPFM * EA05L094
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
ENOMOTO, DAISUKE 246.2 3152437296 14-AUG-2024
APPROVED BY: CODE: PHONE: DATE:
HIGA, RILEY 246.2 3152432291 26-AUG-2024
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
EA05-L094 * ES01-NPFF * ES01-NPFG * ES01-NPFH * ES01-NPFJ * ES01-NPFK * ES01-NPFL * ES01-NPFM * ES01-NPFN *
ES01-NPFP * ES01-NPNW * ES01-NPNX * ES01-NPNY * ES01-NPNZ * ES01-NPP0
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
142A0003
Operational test for A/C Plant #6 - KTR.
TGI Short Form
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
29-AUG-2024 0927
20.14.15.0.8998 (August 2024) (Continued) ICN: 3819P14203 KeyOp: T04
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 51426-3-301KTR TT T 1 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 51426
CU PHASE TITLE: A/C PLANT #6 (T & OP) - KTR
FOUO Pg 2 of 2
JCNs (Cont.):
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 TP 51426-3-301KTR AC PLANT #6 (T & OP) - KTR LAT Y
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
(V) Contractor work:
Accomplish/document the tightness & operational test in accordance with reference, TP 51426-3-301KTR.
22/KE PC N
(G) QA work:
Accomplish/document the tightness & operational test in accordance with reference, TP 51426-3-301KTR.
33/G1 QA N
(S) S/F work:
Accomplish/document the tightness & operational test in accordance with reference, TP 51426-3-301KTR.
/ EA05 N
Test work:
Conduct vibration analysis in accordance with reference, TP 51426-3-
301KTR.
46/J5 JN N
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 3819P14203 KEY OP: T04
ES01-NPP1
File details come from the government source that posted it. Updated .