TGI_3819P12388A01_c1v1.pdf

PDF 373 KB Posted

Attached to
USS BLUE RIDGE (LCC-19) 5C1 DSRA TYCOM 1
Solicitation number
N6264925RA021
Issued by

About this file

This document is a Task Group Instruction (TGI) for repair work on the USS BLUE RIDGE (LCC-19), specifically addressing corrosion repair of structural members in the 9-44-0-Q compartment on the starboard side. The TGI details the repair of two specific structural components: a bulkhead plating on Transverse Bulkhead Frame 44 and a Transverse Oiltight Floor Frame 45, both made of OS, MIL-S-22698 GR-A plate material.

The work is scheduled for contractor execution from January 12, 2026, to May 15, 2027, with specific requirements including build-up welding of corroded areas, personnel safety protocols, and surface treatment. The repair locations are in multiple compartments including the Underwater Log and Fathometer Trunk, Distillate Fuel or Ballast area, and Pump Room No. One. Supporting services will be provided by SRF-JRMC, including crane and rigging services, utility services, safety inspections, and quality assurance inspections. The TGI is part of a larger ship repair and maintenance project for the USS BLUE RIDGE at Commander, Fleet Activities Yokosuka Naval Base.

View the file

Other files

File Type Posted
TGI_3819P59302A01_c1v1.pdf PDF
TGI_3819P14213A01_c0v0.pdf PDF
TGI_3819P14203_T04_c0v0.pdf PDF
TGI_3819P14206T01_c0v0.pdf PDF
TGI_3819P14206T02_c0v0.pdf PDF
TGI_3819P12393_A01_c0v0.pdf PDF
TGI_3819P12357_T01_c0v0.pdf PDF
TGI_3819P12341A01_c0v0.pdf PDF
TGI_3819P12340A01_c1v0.pdf PDF
TGI_3819P12336A01_c0v0.pdf PDF
TGI_3819P12312A01_c0v0.pdf PDF
TGI_3819P12305A01_c0v0.pdf PDF
TGI_3819P58101A01_c1v0.pdf PDF
TGI_3819P51406A01_c0v0.pdf PDF
TGI_3819P14212A01_c0v0.pdf PDF
TGI_3819P14211A01_c0v0.pdf PDF
TGI_3819P14206A01_c0v2.pdf PDF
2.03 Solicitation N6264925RA0210001.pdf PDF
TGI_3819P14212A01_c0v0.pdf PDF
TGI_3819P14215A01_c0v0.pdf PDF
TGI_3819P51404A01_c0v0.pdf PDF
TGI_3819P14206T03_c0v0.pdf PDF
TGI_3819P12387A01_c0v1.pdf PDF
TGI_3819P14206A01_c0v2.pdf PDF
TGI_3819P12364A01_c0v0.pdf PDF
TGI_3819P13506A01_c0v0.pdf PDF
TGI_3819P14203_T04_c0v0.pdf PDF
TGI_3819P12321A01_c1v1.pdf PDF
TGI_3819P12342A01_c0v0.pdf PDF
TGI_3819P12336A01_c0v0.pdf PDF
TGI_3819P12320A01_c0v0.pdf PDF
TGI_3819P12354A01.pdf PDF
TGI_3819P12305A01_c0v0.pdf PDF
Attachment IV RFI (fillable).pdf PDF
TGI_3819P59302T01_TGI_c0v0.pdf PDF
TGI_3819P58101A01_c1v0.pdf PDF
TGI_3819P51402A01_c1v1.pdf PDF
TGI_3819P14203_A01_c2v1.pdf PDF
TGI_3819P14203_T03_c0v0.pdf PDF
TGI_3819P14203_T02_c0v0.pdf PDF
TGI_3819P14206T01_c0v0.pdf PDF
TGI_3819P12362A01_c0v0.pdf PDF
TGI_3819P12355_A01_c1v0.pdf PDF
TGI_3819P12339A01_c2v1.pdf PDF
TGI_3819P12338A01_c0v0.pdf PDF
TGI_3819P12304A01_c0v0.pdf PDF
TGI_3819P12310A01_c3v1.pdf PDF
Attachment V Contract data.pdf PDF
Attachment II Price Proposal Form N6264925RA021.xlsx XLSX spreadsheet
2.01 N6264925RA021 Solicitation.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

21-AUG-2024 1628

20.14.15.0.8993 (August 2024) ICN: 3819P12388 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: TRUNK 9-44-0-Q MS A 0 1/1

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 12321

CU PHASE TITLE: *F/O - REPAIR CORRODED AREA ON STRUCTURAL MEMBER IN 9-44-0-Q, STBD

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 4

ES01NPHA * ES01NPHB

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

SAITO, CHIKANAO 231B 3152435840 29-MAR-2024

APPROVED BY: CODE: PHONE: DATE:

TAKAGI, RYOUTA 231B 3152434502 30-MAR-2024

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

ES01-NPHA * ES01-NPHB

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA, TAKEHIDE 9-44-0-Q C

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

123A2188

1. SCOPE/PURPOSE:

1.1 Title: Corroded Area on Structural Member in 9-44-0-Q, Starboard (Stbd); repair

1.2 Location of Work:

1.2.1 Underwater Log and Fathometer Trunk (9-44-0-Q)

1.2.2 Distillate Fuel or Ballast (9-40-0-F)

1.2.3 Pump Room No. One (8-40-0-E)

1.3 Identification:

1.3.1 (One Lot), Structural Member in 9-44-0-Q, Stbd

1.3.1.1 Quantity (One Lot), Bulkhead Plating, Transverse Bulkhead Frame 44

TGI Short Form

21-AUG-2024 1628

20.14.15.0.8993 (August 2024) (Continued) ICN: 3819P12388 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: TRUNK 9-44-0-Q MS A 0 1/1

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 12321

CU PHASE TITLE: *F/O - REPAIR CORRODED AREA ON STRUCTURAL MEMBER IN 9-44-0-Q, STBD

FOUO Pg 2 of 4

CU PHASE DESCRIPTION (Cont.)

Base Material: OS, MIL-S-22698 GR-A, 15.3 LBs Plate Remarks: See Sketch Enclosure-01 for location detail

JCN: ES01-NPHA

1.3.1.2 Quantity (One Lot), Transverse Oiltight Floor Frame 45

Base Material: OS, MIL-S-22698 GR-A, 20.4 LBs Plate Remarks: See Sketch Enclosure-01 for location detail

JCN: ES01-NPHB

1.4 Security Classification: None.

1.5 Initial Condition:

1.5.1 Potential Lead Hazard

1.6 Contractor work start date: 1/12/2026

1.7 Contractor work completion date: 5/15/2027

2. PROCEDURE:

2.1 Accomplish build up weld of corroded areas on each existing structural member listed in 1.3.1, using Ref. No. 3 and Ref.

No. 4 for guidance.

2.1.1 Accomplish the requirements of 009-12 of Ref. No. One, including Table 2, Column(s) A, Lines One through 7.

2.2 Confirm that all personnel have exited the space prior to closure of each space listed in 1.2.1. Designate one person to account for all personnel who may have entered the space.

2.3 Accomplish the requirements of 009-32 of Ref. No. One for each new and disturbed surface.

2.4 Notes:

2.4.1 Planner: Code 231B C. Saito, 243-5840

Engineer: Code 250 K. Ishiwata, 243-0092

2.4.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598

2.4.3 This TGI clears DFS LCC-19-1011-2024 in its entirety.

2.4.4 Opening, initial cleaning, closing of each space listed in 1.2.2 will be covered by TGI No. 3819P12316A01 (KTR TGI).

2.4.5 JCNs ES01-NPHA and ES01-NPHB are related to this TGI.

2.5 Government Furnished Material (GFM): None.

2.6 SRF-JRMC will provide the following service work: (TGI No. 3819P12388S03).

21-AUG-2024 1628

20.14.15.0.8993 (August 2024) (Continued) ICN: 3819P12388 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: TRUNK 9-44-0-Q MS A 0 1/1

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 12321

CU PHASE TITLE: *F/O - REPAIR CORRODED AREA ON STRUCTURAL MEMBER IN 9-44-0-Q, STBD

FOUO Pg 3 of 4

CU PHASE DESCRIPTION (Cont.)

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

2.6.1 [C740] Crane and crane rigging service.

2.6.2 [X99E] Utility service, electrical.

2.6.3 [X99M] Utilities service, including low pressure air supply, water supply, and steam supply.

2.6.4 [C106.1] Safety inspection for SRF-JRMC employees.

2.6.5 [C106.2] Gas free inspection for SRF-JRMC employees.

2.6.6 [C133] QA Inspection for (G) symbol(s).

21-AUG-2024 1628

20.14.15.0.8993 (August 2024) (Continued) ICN: 3819P12388 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: TRUNK 9-44-0-Q MS A 0 1/1

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 12321

CU PHASE TITLE: *F/O - REPAIR CORRODED AREA ON STRUCTURAL MEMBER IN 9-44-0-Q, STBD

FOUO Pg 4 of 4

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N 3 DWG 114-2491155 TRANSV BHD FR 40, Pump

RM BHD and Trunk BHD FR 44-45

K Y ALL

4 DWG 101-2491013 Floors FR 8-98 S Y 13

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

2.1 WELD HRs, PNTR HRs, QA HRs 22/KE PC N

2.2 SFTR HRs 22/KE PC N

2.3 PNTR HRs, QA HRs 22/KE PC N

Structural Work CFM for all paints, thinner, lead sampling and analysis cost, marine chemist, firewatch cost, tank watch cost, and misc such as electrode, gases, covering material, and other consumable.

22/MQ CS N

Process Funding Document 10/CT OM

Version-01: add Paragraphs 2.2 and 2.4.3, and Task #2. C231B R.

Takagi, 03/30/2024. -/-/N

/ V-01

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

ATTACHMENT LIST

TITLE FILE NAME SAVED DATE

ENCLOSURE-01 3819P12388A01-Sketch.pdf 29-MAR-2024 0000

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 3819P12388 KEY OP: A01

LOCATION MAP OF CORRODED AREA IN 9-44-0-Q

SHEET 1 OF 23819P12388A01

SKETCH

ENCLOSURE-01

B

A

PLAN 1-A

9-44-0-Q, STBD

FWD

FR44FR45

INNER BOTTOM

KEY PLAN

7-40-0-E

FR48 FR40

SHEET 2 OF 23819P12388A01

SKETCH

ENCLOSURE-01

DET BHD FR44

CORRODED AREA

LISTED IN 1.3.1.1

SECT 2-A

TRANSV BHD FR44

LKG FWD

DET OT FL FR45

CORRODED AREA

LISTED IN 1.3.1.2

INNER BOTTOM

INNER BOTTOM

SECT 2-B

TRANSV OT FL FR45

LKG AFT

CL

CL

APPROX: 4 SQIN

8”

36”

SHELL

2ND PLATF

STBD LONG BHD

APPROX: 51 SQIN