About this file

This document is a WebAIM Short Form Task Group Instruction (TGI) for preservation of deck plating on the USS Blue Ridge, specifically in the SD Storeroom (7-18-0-A). The task involves preserving 36 square feet of deck plating located between frames 29 and 30 on the starboard side. The contractor work is scheduled to start on 7/21/2026 and complete by 10/21/2027.

The document includes detailed procedural requirements, noting a potential lead hazard and specifying that SRF-JRMC will provide supporting services including crane and rigging, utility services (electrical, air, water, steam), and safety and quality assurance inspections. The task involves painter and quality assurance hours, with requirements for confirming materials like paints, thinners, and lead sampling supplies. A sketch (Enclosure-01) is attached showing the precise location of the preservation area within the ship's storeroom.

View the file

Other files

File Type Posted
N6264925RA0210004.pdf PDF
Exhibit (A) BLR_5C1_TYCOM1 CDRL_r.pdf PDF
TGI_3819P12341A01_c0v0.pdf PDF
TGI_3819P59302A01_c1v1.pdf PDF
TGI_3819P12357_T01_c0v0.pdf PDF
TGI_3819P14206A01_c0v2.pdf PDF
TGI_3819P12362A01_c0v0.pdf PDF
TGI_3819P14211A01_c0v0.pdf PDF
TGI_3819P12311A01_c0v0.pdf PDF
TGI_3819P12354A01_c2v2.pdf PDF
TGI_3819P14203_T04_c0v0.pdf PDF
TGI_3819P12310A01_c4v1.pdf PDF
TGI_3819P51404A01_c0v0.pdf PDF
TGI_3819P12357_A01_c0v0.pdf PDF
TGI_3819P12321A01_c1v1.pdf PDF
TGI_3819P12338A01_c0v0.pdf PDF
BLR_5C1_TYCOM1 CDRL.pdf PDF
TGI_3819P12337A01_c0v0.pdf PDF
TGI_3819P14215A01_c0v0.pdf PDF
TGI_3819P12304A01_c0v0.pdf PDF
TGI_3819P12355_A01_c1v0.pdf PDF
TGI_3819P12318A01_c2v3.pdf PDF
TGI_3819P14203_A01_c2v1.pdf PDF
TGI_3819P12388A01_c1v1.pdf PDF
TGI_3819P12393_A01_c0v0.pdf PDF
TGI_3819P12317A01_c0v0.pdf PDF
N6264925RA0210003.pdf PDF
TGI_3819P51405A01_c0v0.pdf PDF
TGI_3819P14210A01_c0v2.pdf PDF
TGI_3819P14206T03_c0v0.pdf PDF
TGI_3819P51402A01_c1v1.pdf PDF
TGI_3819P14214A01_c0v0.pdf PDF
TGI_3819P12336A01_c0v0.pdf PDF
TGI_3819P59302T01_c0v0.pdf PDF
TGI_3819P13506A01_c0v0.pdf PDF
TGI_3819P12387A01_c0v1.pdf PDF
TGI_3819P12305A01_c0v0.pdf PDF
TGI_3819P14206T01_c0v0.pdf PDF
TGI_3819P12316A01_c5v3.pdf PDF
TGI_3819P12340A01_c1v0.pdf PDF
TGI_3819P12312A01_c0v0.pdf PDF
TGI_3819P14203_T01_c0v0.pdf PDF
TGI_3819P14203_T03_c0v0.pdf PDF
TGI_3819P51401A01_c1v2.pdf PDF
TGI_3819P14206T02_c0v0.pdf PDF
TGI_3819P12339A01_c3v2.pdf PDF
TGI_3819P12320A01_c0v0.pdf PDF
TGI_3819P16729A02_c0v1.pdf PDF
TGI_3819P12335A01_c1v0.pdf PDF
TGI_3819P14212A01_c0v0.pdf PDF
Show 40 more

Latest 50 of 127 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

20-AUG-2024 0948

20.14.12.0.8874 (April 2024) ICN: 3819P14213 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 7-18-0-A MS A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 13011

CU PHASE TITLE: *F/O - PRESERVE DECK PLATING IN 7-18-0-A

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 3

ES01NPG9

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

NAKANO, SEIICHI 231B 3152434519 18-APR-2024

APPROVED BY: CODE: PHONE: DATE:

TAKAGI, RYOUTA 231B 3152434502 18-APR-2024

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

ES01-NPG9

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA, TAKEHIDE 7-18-0-A 7 U

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

142A0013

1 SCOPE/PURPOSE:

1.1 Title: Deck Plating in 7-18-0-A; preserve

1.2 Location of Work:

1.2.1 SD Storeroom (7-18-0-A)

1.3 Identification:

1.3.1 Quantity (36 SF), Deck Plating in 7-18-0-A, Frames between 29 and 30, Starboard

Remarks: See Sketch Enclosure-01 for location detail.

1.4 Security Classification: None.

1.5 Initial Condition:

TGI Short Form

20-AUG-2024 0948

20.14.12.0.8874 (April 2024) (Continued) ICN: 3819P14213 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 7-18-0-A MS A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 13011

CU PHASE TITLE: *F/O - PRESERVE DECK PLATING IN 7-18-0-A

FOUO Pg 2 of 3

CU PHASE DESCRIPTION (Cont.)

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1.5.1 Potential Lead Hazard.

1.6 Contractor work start date: 7/21/2026

1.7 Contractor work completion date: 10/21/2027

2. PROCEDURE:

2.1 Accomplish the requirements of 009-32 of Ref. No. One, including Table 3, Line(s) 6, for each area listed in 1.3.1.

2.2 Notes:

2.2.1 Planner: Code 231B S. Nakano, 243-4519

2.2.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598

2.2.3 JCN ES01-NPG9 is related to this TGI.

2.3 Government Furnished Material (GFM): None.

2.4 SRF-JRMC will provide the following service work: (TGI No. 3819P14213S02)

2.4.1 [C740] Crane and crane rigging service.

2.4.2 [X99E] Utility service, electrical.

2.4.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.

2.4.4 [C106.1] Safety inspection for SRF-JRMC employees.

2.4.5 [C106.2] Gas free inspection for SRF-JRMC employees.

2.4.6 [C133] QA inspection for (G) symbol(s).

20-AUG-2024 0948

20.14.12.0.8874 (April 2024) (Continued) ICN: 3819P14213 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 7-18-0-A MS A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 13011

CU PHASE TITLE: *F/O - PRESERVE DECK PLATING IN 7-18-0-A

FOUO Pg 3 of 3

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

2.1 PNTR HRs, QA HRs 22/KE PC N

CFM for all paints, thinner, sampler/analyze lead, and MISC such as covering material and other consumable.

22/MQ CS N

Process Funding Document. 10/CT OM N

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

ATTACHMENT LIST

TITLE FILE NAME SAVED DATE

ENCLOSURE-01 3819P14213A01-Sketch.pdf 18-APR-2024 0000

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 3819P14213 KEY OP: A01

3819P14213A01 SHEET 1 OF 1SKETCH

ENCLOSURE‐01

30 29

9’

4’

PLAN VIEW

SD Storeroom (7‐18‐0‐A)

Preservation Area

FWD