This document is a WebAIM Short Form Task Group Instruction (TGI) for preservation of deck plating on the USS Blue Ridge, specifically in the SD Storeroom (7-18-0-A). The task involves preserving 36 square feet of deck plating located between frames 29 and 30 on the starboard side. The contractor work is scheduled to start on 7/21/2026 and complete by 10/21/2027.
The document includes detailed procedural requirements, noting a potential lead hazard and specifying that SRF-JRMC will provide supporting services including crane and rigging, utility services (electrical, air, water, steam), and safety and quality assurance inspections. The task involves painter and quality assurance hours, with requirements for confirming materials like paints, thinners, and lead sampling supplies. A sketch (Enclosure-01) is attached showing the precise location of the preservation area within the ship's storeroom.
View the file
Other files
Show 40 more
Latest 50 of 127 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
20-AUG-2024 0948
20.14.12.0.8874 (April 2024) ICN: 3819P14213 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 7-18-0-A MS A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 13011
CU PHASE TITLE: *F/O - PRESERVE DECK PLATING IN 7-18-0-A
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 3
ES01NPG9
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
NAKANO, SEIICHI 231B 3152434519 18-APR-2024
APPROVED BY: CODE: PHONE: DATE:
TAKAGI, RYOUTA 231B 3152434502 18-APR-2024
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
ES01-NPG9
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE 7-18-0-A 7 U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
142A0013
1 SCOPE/PURPOSE:
1.1 Title: Deck Plating in 7-18-0-A; preserve
1.2 Location of Work:
1.2.1 SD Storeroom (7-18-0-A)
1.3 Identification:
1.3.1 Quantity (36 SF), Deck Plating in 7-18-0-A, Frames between 29 and 30, Starboard
Remarks: See Sketch Enclosure-01 for location detail.
1.4 Security Classification: None.
1.5 Initial Condition:
TGI Short Form
20-AUG-2024 0948
20.14.12.0.8874 (April 2024) (Continued) ICN: 3819P14213 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 7-18-0-A MS A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 13011
CU PHASE TITLE: *F/O - PRESERVE DECK PLATING IN 7-18-0-A
FOUO Pg 2 of 3
CU PHASE DESCRIPTION (Cont.)
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1.5.1 Potential Lead Hazard.
1.6 Contractor work start date: 7/21/2026
1.7 Contractor work completion date: 10/21/2027
2. PROCEDURE:
2.1 Accomplish the requirements of 009-32 of Ref. No. One, including Table 3, Line(s) 6, for each area listed in 1.3.1.
2.2 Notes:
2.2.1 Planner: Code 231B S. Nakano, 243-4519
2.2.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
2.2.3 JCN ES01-NPG9 is related to this TGI.
2.3 Government Furnished Material (GFM): None.
2.4 SRF-JRMC will provide the following service work: (TGI No. 3819P14213S02)
2.4.1 [C740] Crane and crane rigging service.
2.4.2 [X99E] Utility service, electrical.
2.4.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.
2.4.4 [C106.1] Safety inspection for SRF-JRMC employees.
2.4.5 [C106.2] Gas free inspection for SRF-JRMC employees.
2.4.6 [C133] QA inspection for (G) symbol(s).
20-AUG-2024 0948
20.14.12.0.8874 (April 2024) (Continued) ICN: 3819P14213 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 7-18-0-A MS A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 13011
CU PHASE TITLE: *F/O - PRESERVE DECK PLATING IN 7-18-0-A
FOUO Pg 3 of 3
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
2.1 PNTR HRs, QA HRs 22/KE PC N
CFM for all paints, thinner, sampler/analyze lead, and MISC such as covering material and other consumable.
22/MQ CS N
Process Funding Document. 10/CT OM N
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
ATTACHMENT LIST
TITLE FILE NAME SAVED DATE
ENCLOSURE-01 3819P14213A01-Sketch.pdf 18-APR-2024 0000
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 3819P14213 KEY OP: A01
3819P14213A01 SHEET 1 OF 1SKETCH
ENCLOSURE‐01
30 29
9’
4’
PLAN VIEW
SD Storeroom (7‐18‐0‐A)
Preservation Area
FWD