This Task Group Instruction (TGI) details a specific ship repair task for the USS Blue Ridge (LCC-19) involving the replacement of air escape piping for the clean salt water ballast system. The work is part of a larger ship maintenance project scheduled for January 12, 2026 to May 15, 2027, and focuses on replacing approximately 5 feet of 6-inch Schedule 40 carbon steel piping located in the Clean Salt Water Ballast, Anti-Roll Tank, and Third Deck Weather areas.
The task requires specific technical procedures, including removing existing piping, installing new piping, performing elevated non-destructive testing (ENDT) on weld joints, and conducting an unobstructed air flow test. The Naval Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC) will provide government-furnished material, crane and rigging services, utility services, and quality assurance inspections. The material list includes specific components such as steel pipe couplings, backing rings, and piping, with detailed specifications for each item.
View the file
Other files
Show 40 more
Latest 50 of 127 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
29-AUG-2024 0937
20.14.15.0.8998 (August 2024) ICN: 3819P12393 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: A/E 9-52-2-W AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE: *F/O - REPLACE AIR ESCAPE PIPING FOR CLEAN SALT WATER BALLAST
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 5
ER013250
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
SHIBANO, TAKAHIRO 234 3152433583 21-AUG-2024
APPROVED BY: CODE: PHONE: DATE:
SHINMEI, HIDEKUNI 234 3152432371 21-AUG-2024
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
ER01-3250
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
123A1693
1. SCOPE/PURPOSE:
1.1 Title: Air Escape Piping for Clean Salt Water Ballast; replace
1.2 Location of Work:
1.2.1 Clean Salt Water Ballast (9-52-2-W)
1.2.2 Anti-Roll Tank (7-52-01-W)
1.2.3 Third Deck Weather, Frames between 50 and 60, Port
1.3 Identification:
1.3.1 Quantity (Approx. 5 FT), Air Escape Piping for Clean Salt Water Ballast Size: 6 Inch IPS (6.625 Inch OD X 0.280 Inch WT), Sch 40 Material: Carbon Steel
TGI Short Form
29-AUG-2024 0937
20.14.15.0.8998 (August 2024) (Continued) ICN: 3819P12393 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: A/E 9-52-2-W AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE: *F/O - REPLACE AIR ESCAPE PIPING FOR CLEAN SALT WATER BALLAST
FOUO Pg 2 of 5
CU PHASE DESCRIPTION (Cont.)
Specification: ASTM A106, GRADE B Remarks: See Sheet One (PLAN 2nd PLATF) of Ref. No. 3 and Sheet One (Zone 3-B) of Ref. No. 4 for detail
1.4 Security Classification: None.
1.5 Initial Condition:
1.5.1 Potential Lead Hazard.
1.6 Contractor work start date: 1/12/2026
1.7 Contractor work completion date: 5/15/2027
2. PROCEDURE:
2.1 Remove existing and install new each air escape piping listed in 1.3.1, using Ref. No. 3 and Ref. No. 4 for guidance.
2.1.1 Accomplish the requirements of 009-12 of Ref. No. One, including Table One, Column(s) A, Lines One through 10.
2.1.2 Accomplish following elevated non-destructive testing (ENDT) inspection for Class P-2 air escape piping listed in 1.3.1.
2.1.2.1 Accomplish liquid penetrant test on final layer of each Class P-2 onboard weld joint in accordance with Paragraph 4.3.a of Ref. No. 5. The accept or reject criteria must be in accordance with Paragraph 4.3.a of Ref. No. 5.
(l)(G) "ELEVATED NDT INSPECTION"
2.1.2.2 The area of ENDT is shown on Enclosure-01.
2.1.3 Accomplish an unobstructed air flow test for air escape piping listed in 1.3.1 with pressure source at not greater than 100 PSIG to ensure free flow capability and to ensure removal of blanks, using compressed air in accordance with Paragraph 506h of Ref. No. 6. Allowable obstruction: None.
(V)(G) “UNOBSTRUCTED AIR FLOW TEST”
2.2 Accomplish the requirements of 009-32 of Ref. No. One for each new and disturbed surface.
2.3 Notes:
2.3.1 Planner: Code 234 T. Shibano, 243-3583
2.3.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
2.3.3 Opening, initial cleaning, and closing of each space listed in 1.2.1 have been covered by TGI No(s). 3819P12340A01
(KTR TGI).
2.3.4 Opening, initial cleaning, and closing of each space listed in 1.2.2 have been covered by TGI No(s). 3819P12335A01
(KTR TGI).
2.3.5 JCN ER01-3250 is related to this TGI.
29-AUG-2024 0937
20.14.15.0.8998 (August 2024) (Continued) ICN: 3819P12393 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: A/E 9-52-2-W AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE: *F/O - REPLACE AIR ESCAPE PIPING FOR CLEAN SALT WATER BALLAST
FOUO Pg 3 of 5
CU PHASE DESCRIPTION (Cont.)
2.4 Government Furnished Material (GFM):
2.4.1 SRF-JRMC will provide GFM listed in Material List.
2.5 SRF-JRMC will provide the following Service Work: (TGI No. 3819P12393S02).
2.5.1 [C740] Crane and crane rigging service.
2.5.2 [X99E] Utility Service, electrical.
2.5.3 [X99M] Utility Service, including low pressure air supply, water supply, and steam supply.
2.5.4 [C106.1] Safety inspection for SRF-JRMC employees.
2.5.5 [C106.2] Gas free inspection for SRF-JRMC employees.
2.5.6 [C133] QA inspection for (G) symbols.
29-AUG-2024 0937
20.14.15.0.8998 (August 2024) (Continued) ICN: 3819P12393 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: A/E 9-52-2-W AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE: *F/O - REPLACE AIR ESCAPE PIPING FOR CLEAN SALT WATER BALLAST
FOUO Pg 4 of 5
OTHER SPECIAL REQUIREMENTS:
CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL III
CLASS P-2 PIPING
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N
3 DWG 511-2492425 FO & CLEAN SW BALL OVFL
SNDG TUBES & AIR
ESCAPES FR 52-76, PLAN
G Y ALL
4 DWG 551-2492789 FO & CLEAN SW BALL OVFL
SNDG TUBES & AIR ESCPES
FR 52-76-SECT
H Y ALL
5 PDD 505-ELM-
210146
TEST GUIDANCE FOR REQD
ELEVATED NDT OF
INACCESSIBLE WELDING
JOINT ON PIPING SYS
- Y ALL
6 TM S9AA0-AB-GOS-
010/GSO 2016
General Specifications for Overhaul of Surface Ships GSO 2016 Edition
11 N
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
2.1 PFTR HRs, WELD HRs, PNTR HRs, RGRS HRs, QA HRs 22/KE PC N
2.2 PNTR HRs, QA HRs 22/KE PC N
Piping Work CFM fire watch cost, tank watch cost, welding rod, paint, MISC such as saw blades, painting material, covering materail, tape, plastic bag/sheet and etc.
22/MQ CS N
Process Funding Document. 10/CT OM N
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 3819P12393 KEY OP: A01
29-AUG-2024 0937
20.14.15.0.8998 (August 2024) (Continued) ICN: 3819P12393 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: A/E 9-52-2-W AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE: *F/O - REPLACE AIR ESCAPE PIPING FOR CLEAN SALT WATER BALLAST
FOUO Pg 5 of 5
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
001 M COUPLING, SLEEVE,
COUPLING, SLEEVE TYPE FOR
STEEL PIPE SCH 40, 6" IPS,
7.420"OD X 6.720"ID X
0.350"THK X 2"LG, STEEL, MIL-
S-22698 GR-A, BIW DWG#:
8100-2400-0019 SHEET 4,
CAT#: 13227-128.
ORDERED FOR KTR, ORG:
C234,T. SHIBANO, TEL: 243-
9B 4730 LL9308454 NA 4 N 42407466 4/EA
002 M BACKING RING, BACKING
RING, SIZE: 6"IPS, RING
WIDTH 1", CARBON STEEL,
TYPE "CCC", SCH 40
ORDERED FOR KTR, ORG:
C234,T. SHIBANO, TEL: 243-
9B 4730 LL4558811 NA 4 N 42207516 2/EA
003 M PIPE,METALLIC, PIPE, C-
STEEL, 6"IPS, SCH40
PROVIDE ONE CONTINUEOUS
LENGTH 10 FT. DO NOT
PROVIDE SEPARATELY.
ORDERED FOR KTR, ORG:
C234,T. SHIBANO, TEL: 243-
9B 4710 010142591 NA 4 N 42405216 10/FT
ATTACHMENT LIST
TITLE FILE NAME SAVED DATE
ENCLOSURE-01 3819P12393A01-Sketch.pdf 19-AUG-2024 0000
Takahiro.Shibano.ja Text Box
SKETCH
Takahiro.Shibano.ja_1 Line
Takahiro.Shibano.ja_2 Text Box
ENCLOSURE-01
Takahiro.Shibano.ja_3 Text Box
SHEET 1 OF 1
Takahiro.Shibano.ja_4 Text Box 3819P12393A01
Takahiro.Shibano.ja_5 Rectangle
Takahiro.Shibano.ja_6 Text Box ENDT area
Takahiro.Shibano.ja_7 Line
File details come from the government source that posted it. Updated .