TGI_3819P12393_A01_c0v0.pdf

PDF 237 KB Posted

Attached to
USS BLUE RIDGE (LCC-19) 5C1 DSRA TYCOM 1
Solicitation number
N6264925RA021
Issued by

About this file

This Task Group Instruction (TGI) details a specific ship repair task for the USS Blue Ridge (LCC-19) involving the replacement of air escape piping for the clean salt water ballast system. The work is part of a larger ship maintenance project scheduled for January 12, 2026 to May 15, 2027, and focuses on replacing approximately 5 feet of 6-inch Schedule 40 carbon steel piping located in the Clean Salt Water Ballast, Anti-Roll Tank, and Third Deck Weather areas.

The task requires specific technical procedures, including removing existing piping, installing new piping, performing elevated non-destructive testing (ENDT) on weld joints, and conducting an unobstructed air flow test. The Naval Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC) will provide government-furnished material, crane and rigging services, utility services, and quality assurance inspections. The material list includes specific components such as steel pipe couplings, backing rings, and piping, with detailed specifications for each item.

View the file

Other files

File Type Posted
N6264925RA0210004.pdf PDF
Exhibit (A) BLR_5C1_TYCOM1 CDRL_r.pdf PDF
TGI_3819P12341A01_c0v0.pdf PDF
TGI_3819P59302A01_c1v1.pdf PDF
TGI_3819P12357_T01_c0v0.pdf PDF
TGI_3819P14206A01_c0v2.pdf PDF
TGI_3819P12362A01_c0v0.pdf PDF
TGI_3819P14211A01_c0v0.pdf PDF
TGI_3819P12311A01_c0v0.pdf PDF
TGI_3819P12354A01_c2v2.pdf PDF
TGI_3819P14203_T04_c0v0.pdf PDF
TGI_3819P12310A01_c4v1.pdf PDF
TGI_3819P51404A01_c0v0.pdf PDF
TGI_3819P12357_A01_c0v0.pdf PDF
TGI_3819P12321A01_c1v1.pdf PDF
TGI_3819P12338A01_c0v0.pdf PDF
BLR_5C1_TYCOM1 CDRL.pdf PDF
TGI_3819P12337A01_c0v0.pdf PDF
TGI_3819P14215A01_c0v0.pdf PDF
TGI_3819P12304A01_c0v0.pdf PDF
TGI_3819P12355_A01_c1v0.pdf PDF
TGI_3819P12318A01_c2v3.pdf PDF
TGI_3819P14203_A01_c2v1.pdf PDF
TGI_3819P12388A01_c1v1.pdf PDF
TGI_3819P12393_A01_c0v0.pdf PDF
TGI_3819P12317A01_c0v0.pdf PDF
N6264925RA0210003.pdf PDF
TGI_3819P51405A01_c0v0.pdf PDF
TGI_3819P14210A01_c0v2.pdf PDF
TGI_3819P14206T03_c0v0.pdf PDF
TGI_3819P51402A01_c1v1.pdf PDF
TGI_3819P14214A01_c0v0.pdf PDF
TGI_3819P12336A01_c0v0.pdf PDF
TGI_3819P59302T01_c0v0.pdf PDF
TGI_3819P13506A01_c0v0.pdf PDF
TGI_3819P12387A01_c0v1.pdf PDF
TGI_3819P12305A01_c0v0.pdf PDF
TGI_3819P14206T01_c0v0.pdf PDF
TGI_3819P14213A01_c0v0.pdf PDF
TGI_3819P12316A01_c5v3.pdf PDF
TGI_3819P12340A01_c1v0.pdf PDF
TGI_3819P12312A01_c0v0.pdf PDF
TGI_3819P14203_T01_c0v0.pdf PDF
TGI_3819P14203_T03_c0v0.pdf PDF
TGI_3819P51401A01_c1v2.pdf PDF
TGI_3819P14206T02_c0v0.pdf PDF
TGI_3819P12339A01_c3v2.pdf PDF
TGI_3819P12320A01_c0v0.pdf PDF
TGI_3819P16729A02_c0v1.pdf PDF
TGI_3819P12335A01_c1v0.pdf PDF
Show 40 more

Latest 50 of 127 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

29-AUG-2024 0937

20.14.15.0.8998 (August 2024) ICN: 3819P12393 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: A/E 9-52-2-W AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: *F/O - REPLACE AIR ESCAPE PIPING FOR CLEAN SALT WATER BALLAST

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 5

ER013250

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

SHIBANO, TAKAHIRO 234 3152433583 21-AUG-2024

APPROVED BY: CODE: PHONE: DATE:

SHINMEI, HIDEKUNI 234 3152432371 21-AUG-2024

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

ER01-3250

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA, TAKEHIDE

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

123A1693

1. SCOPE/PURPOSE:

1.1 Title: Air Escape Piping for Clean Salt Water Ballast; replace

1.2 Location of Work:

1.2.1 Clean Salt Water Ballast (9-52-2-W)

1.2.2 Anti-Roll Tank (7-52-01-W)

1.2.3 Third Deck Weather, Frames between 50 and 60, Port

1.3 Identification:

1.3.1 Quantity (Approx. 5 FT), Air Escape Piping for Clean Salt Water Ballast Size: 6 Inch IPS (6.625 Inch OD X 0.280 Inch WT), Sch 40 Material: Carbon Steel

TGI Short Form

29-AUG-2024 0937

20.14.15.0.8998 (August 2024) (Continued) ICN: 3819P12393 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: A/E 9-52-2-W AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: *F/O - REPLACE AIR ESCAPE PIPING FOR CLEAN SALT WATER BALLAST

FOUO Pg 2 of 5

CU PHASE DESCRIPTION (Cont.)

Specification: ASTM A106, GRADE B Remarks: See Sheet One (PLAN 2nd PLATF) of Ref. No. 3 and Sheet One (Zone 3-B) of Ref. No. 4 for detail

1.4 Security Classification: None.

1.5 Initial Condition:

1.5.1 Potential Lead Hazard.

1.6 Contractor work start date: 1/12/2026

1.7 Contractor work completion date: 5/15/2027

2. PROCEDURE:

2.1 Remove existing and install new each air escape piping listed in 1.3.1, using Ref. No. 3 and Ref. No. 4 for guidance.

2.1.1 Accomplish the requirements of 009-12 of Ref. No. One, including Table One, Column(s) A, Lines One through 10.

2.1.2 Accomplish following elevated non-destructive testing (ENDT) inspection for Class P-2 air escape piping listed in 1.3.1.

2.1.2.1 Accomplish liquid penetrant test on final layer of each Class P-2 onboard weld joint in accordance with Paragraph 4.3.a of Ref. No. 5. The accept or reject criteria must be in accordance with Paragraph 4.3.a of Ref. No. 5.

(l)(G) "ELEVATED NDT INSPECTION"

2.1.2.2 The area of ENDT is shown on Enclosure-01.

2.1.3 Accomplish an unobstructed air flow test for air escape piping listed in 1.3.1 with pressure source at not greater than 100 PSIG to ensure free flow capability and to ensure removal of blanks, using compressed air in accordance with Paragraph 506h of Ref. No. 6. Allowable obstruction: None.

(V)(G) “UNOBSTRUCTED AIR FLOW TEST”

2.2 Accomplish the requirements of 009-32 of Ref. No. One for each new and disturbed surface.

2.3 Notes:

2.3.1 Planner: Code 234 T. Shibano, 243-3583

2.3.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598

2.3.3 Opening, initial cleaning, and closing of each space listed in 1.2.1 have been covered by TGI No(s). 3819P12340A01

(KTR TGI).

2.3.4 Opening, initial cleaning, and closing of each space listed in 1.2.2 have been covered by TGI No(s). 3819P12335A01

(KTR TGI).

2.3.5 JCN ER01-3250 is related to this TGI.

29-AUG-2024 0937

20.14.15.0.8998 (August 2024) (Continued) ICN: 3819P12393 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: A/E 9-52-2-W AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: *F/O - REPLACE AIR ESCAPE PIPING FOR CLEAN SALT WATER BALLAST

FOUO Pg 3 of 5

CU PHASE DESCRIPTION (Cont.)

2.4 Government Furnished Material (GFM):

2.4.1 SRF-JRMC will provide GFM listed in Material List.

2.5 SRF-JRMC will provide the following Service Work: (TGI No. 3819P12393S02).

2.5.1 [C740] Crane and crane rigging service.

2.5.2 [X99E] Utility Service, electrical.

2.5.3 [X99M] Utility Service, including low pressure air supply, water supply, and steam supply.

2.5.4 [C106.1] Safety inspection for SRF-JRMC employees.

2.5.5 [C106.2] Gas free inspection for SRF-JRMC employees.

2.5.6 [C133] QA inspection for (G) symbols.

29-AUG-2024 0937

20.14.15.0.8998 (August 2024) (Continued) ICN: 3819P12393 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: A/E 9-52-2-W AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: *F/O - REPLACE AIR ESCAPE PIPING FOR CLEAN SALT WATER BALLAST

FOUO Pg 4 of 5

OTHER SPECIAL REQUIREMENTS:

CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL III

CLASS P-2 PIPING

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N

3 DWG 511-2492425 FO & CLEAN SW BALL OVFL

SNDG TUBES & AIR

ESCAPES FR 52-76, PLAN

G Y ALL

4 DWG 551-2492789 FO & CLEAN SW BALL OVFL

SNDG TUBES & AIR ESCPES

FR 52-76-SECT

H Y ALL

5 PDD 505-ELM-

210146

TEST GUIDANCE FOR REQD

ELEVATED NDT OF

INACCESSIBLE WELDING

JOINT ON PIPING SYS

- Y ALL

6 TM S9AA0-AB-GOS-

010/GSO 2016

General Specifications for Overhaul of Surface Ships GSO 2016 Edition

11 N

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

2.1 PFTR HRs, WELD HRs, PNTR HRs, RGRS HRs, QA HRs 22/KE PC N

2.2 PNTR HRs, QA HRs 22/KE PC N

Piping Work CFM fire watch cost, tank watch cost, welding rod, paint, MISC such as saw blades, painting material, covering materail, tape, plastic bag/sheet and etc.

22/MQ CS N

Process Funding Document. 10/CT OM N

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 3819P12393 KEY OP: A01

29-AUG-2024 0937

20.14.15.0.8998 (August 2024) (Continued) ICN: 3819P12393 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: A/E 9-52-2-W AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: *F/O - REPLACE AIR ESCAPE PIPING FOR CLEAN SALT WATER BALLAST

FOUO Pg 5 of 5

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

001 M COUPLING, SLEEVE,

COUPLING, SLEEVE TYPE FOR

STEEL PIPE SCH 40, 6" IPS,

7.420"OD X 6.720"ID X

0.350"THK X 2"LG, STEEL, MIL-

S-22698 GR-A, BIW DWG#:

8100-2400-0019 SHEET 4,

CAT#: 13227-128.

ORDERED FOR KTR, ORG:

C234,T. SHIBANO, TEL: 243-

9B 4730 LL9308454 NA 4 N 42407466 4/EA

002 M BACKING RING, BACKING

RING, SIZE: 6"IPS, RING

WIDTH 1", CARBON STEEL,

TYPE "CCC", SCH 40

ORDERED FOR KTR, ORG:

C234,T. SHIBANO, TEL: 243-

9B 4730 LL4558811 NA 4 N 42207516 2/EA

003 M PIPE,METALLIC, PIPE, C-

STEEL, 6"IPS, SCH40

PROVIDE ONE CONTINUEOUS

LENGTH 10 FT. DO NOT

PROVIDE SEPARATELY.

ORDERED FOR KTR, ORG:

C234,T. SHIBANO, TEL: 243-

9B 4710 010142591 NA 4 N 42405216 10/FT

ATTACHMENT LIST

TITLE FILE NAME SAVED DATE

ENCLOSURE-01 3819P12393A01-Sketch.pdf 19-AUG-2024 0000

Takahiro.Shibano.ja Text Box

SKETCH

Takahiro.Shibano.ja_1 Line

Takahiro.Shibano.ja_2 Text Box

ENCLOSURE-01

Takahiro.Shibano.ja_3 Text Box

SHEET 1 OF 1

Takahiro.Shibano.ja_4 Text Box 3819P12393A01

Takahiro.Shibano.ja_5 Rectangle

Takahiro.Shibano.ja_6 Text Box ENDT area

Takahiro.Shibano.ja_7 Line