This document is a Task Group Instruction (TGI) for the USS BLUE RIDGE (LCC-19), specifically focused on cleaning, inspecting, repairing, and preserving the Distillate Fuel Overflow or Ballast tank (9-64-0-F). The TGI provides detailed instructions for maintenance work to be performed, including visual inspections, general cleaning at Level III, manhole cover installations, welding repairs, and preservation of various tank and compartment spaces. The work involves removing unused heating coil piping, repairing structural members, and addressing potential lead and asbestos hazards.
The task is part of a larger ship repair and maintenance project scheduled from January 12, 2026, to May 15, 2027, at Commander, Fleet Activities Yokosuka Naval Base. The instruction includes specific technical requirements such as vee-out and weld repairs, base metal weld buildup, plate replacements, and non-destructive testing. The work will be conducted across multiple spaces including salt water ballast tanks, potable water tanks, and various storerooms, with careful attention to fire zone boundaries and requiring non-flammable closures during the repair process.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
FOUO: Public availability to be determined under 5 USC 552
TASK GROUP INSTRUCTION
AIM REV 20.11.4.0 (OCTOBER 2020)
TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:
NO.: TK/MS 9-64-0-F AY A 0 2
SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE:
F/O - CLEAN, INSPECT, REPAIR, AND PRESERVE DSTLT FUEL OVFL OR BLST (9-64-0-F)
PREPARING ACTIVITY:
PREPARED BY: CODE PHONE DATE
TATSUYA OOSERA 231B 315-243-9935 20-DEC-2023
APPROVED BY: CODE PHONE DATE
RYOUTA TAKAGI 231B 315-243-4502 20-DEC-2023
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
REASON FOR WORK/NEED FOR CHANGE:
Reference No. 13 and Enclosure-01 are incorrect.
CHANGE INSTRUCTIONS:
CH1: Revise location name for 9-64-0-F. (12/23/2023) CH2: Revise reference No. 13 and Enclosure-01. (08/19/2024)
SPECIAL REQUIREMENTS:
SURFMEPP
CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL III
This work affects a fire zone boundary. Fabrication and/or staging of a non-flammable closure is required.
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
ACCEPTANCE OF COMPLETED WORK
PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:
REQUIRED:☐YES ☒NO
RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
TGI NO.: TK/MS 9-64-0-F AY A 0
FOUO
SHIP: LCC-19 CHG/VER: 2/3
LIST OF EFFECTIVE PAGES
SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.
1-7 Sketch (1)
J1-2 M-1 Sketch (1)
1. SCOPE/PURPOSE
1.1 Title: Distillate Fuel Overflow or Ballast (9-64-0-F); clean, inspect, repair, and preserve
1.2 Location of Work:
1.2.1 Distillate Fuel Overflow or Ballast (9-64-0-F)
1.2.2 Clean Salt Water Ballast (9-56-0-F)
1.2.3 Clean Salt Water Ballast (9-52-1-W)
1.2.4 Clean Salt Water Ballast (9-52-2-W)
1.2.5 Clean Salt Water Ballast (9-64-1-W)
1.2.6 Clean Salt Water Ballast (9-64-2-W)
1.2.7 Potable Water Tank (9-74-0-W)
1.2.8 Void (7-52-0-V)
1.2.9 Ship Store Storeroom (7-58-0-A)
1.2.10 Dry Provisions Storeroom (7-64-0-A)
1.2.11 Air Conditioning Machinery Room No. 3 (7-64-2-E)
1.2.12 Dry Provisions Storeroom (7-68-0-A)
1.2.13 Small Arms Magazine (7-69-2-M)
1.2.14 Passage (7-72-2-L)
1.3 Identification:
1.3.1 Quantity (One EA), Distillate Fuel Overflow or Ballast
Tank No. : 9-64-0-F Capacity: 142,245 Gallons
1.3.2 Quantity (2 EA), Manhole Cover Plate for 9-64-0-F
Manhole No(s). : 7-65-1 Size: 15 Inches x 23 Inches Manhole No(s). : 7-75-2 Size: 15 Inches x 23 Inches Material: Steel
FOUO
SHIP: LCC-19 CHG/VER: 2/3
1.3.3 Quantity (2 EA), Bolting Ring of Manhole for 9-64-0-F
Manhole No(s). : 7-65-1 and 7-75-2 Material: Steel
1.3.4 Quantity (One EA), Stud on Web Frame 68 in 9-64-0-F, between Longitudinal Nos. 2P and 3P, Port Material: Steel Remarks: See Sketch Enclosure-01 for location detail
1.3.5 Quantity (12 AY), Unused Obsolete Heating Coil Piping including Penetration Sleeve Size: 1/2 Inch IPS and 1-1/2 Inch IPS Material: Carbon-Steel Remarks: See Sheet 2 (Plan 12-B) of 2.14, Sheet One of 2.15 and Sketch Enclosure-02 for details.
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N
3 TM S9086-
CJ-STM-
010/CH-075
Fasteners 7 N
4 DWG 101-
2491013
Floors FR 8-98 S Y SE E N
OT
E
5 DWG 100-
2491003
SHELL PLTG & STGR FRAME 51
1/2 -102 1/4 CL TO 4 TH DECK
G Y AL
L
6 DWG 101-
2491012
CVK & Shell Long AFT FR 51 1/2 L Y AL L
7 DWG 101-
2491022
WEBS FR 66, 68, 70, 72, & 74 K Y AL
L
1.3.6 Quantity (One Lot), Structural Member in 9-64-0-F
Remarks: See Sketch Enclosure-02 for location detail
1.3.6.1 Quantity (One Lot), Longitudinal Bulkhead, Frames between 66 and 73, Port and Starboard (Stbd) Base Material: OS, MIL-S-22698 GR-A, 17.85 LBs Plate
1.3.6.2 Quantity (One EA), Transverse Bulkhead Frame 64, between Longitudinals No. 9P and No. 9S, Port and Stbd Base Material: OS, MIL-S-22698 GR-A, 17.85 LBs Plate
1.4 Security Classification:
1.4.1 Spaces - 1.2.13
1.5 Initial Condition:
1.5.1 Potential Lead Hazard.
1.5.2 Potential Asbestos Hazard.
1.6 Contractor work start date: 1/12/2026
1.7 Contractor work completion date: 5/15/2027
2. REFERENCES:
FOUO
SHIP: LCC-19 CHG/VER: 2/3
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
8 DWG 102-
2491031
Inner Bottom PLTG FR 51 1/2 - 98 K Y AL L
9 DWG 103-
2491033
2 PLATF FR 52-98 J Y AL
L
10 DWG 114-
2491156
AGC19 TRANSV BHD FR 52 & 64 G Y AL
L
11 DWG 114-
2491157
TRANSV BHD FR 76 & 86 N Y AL
L
12 DWG 114-
2491161
DEEP TANK BHD FR 24, 48, 56, &
LONG BHD BEL 2ND PLATF FR
30-76
F Y AL
L
13 DWG 114-
2491166
MISC STRUCT BHD BELOW 1ST
PLATF FWD FR98
R Y 3,4
14 DWG 512-
6550071
LCC19-1071D DEACTIVATED
HEATING COILS REMOVAL
- Y AL
L
15 DWG 511-
2492437
FO JP5 BALL STR LDS FR52 76 D Y AL
L
3. APPENDICES:
3.1 Appendix “J” TGI Job Summary Information Sheet
3.2 Appendix "M" TGI Material List
3.3 Appendix “D” Deficiency Form
4. GENERAL REQUIREMENTS:
4.1 Not Applicable.
5. PROCEDURE:
5.1 Accomplish the requirements of 099-902YO of 2.2 for each tank listed in 1.3.1.
5.1.1 Accomplish a visual inspection of each tank listed in 1.3.1 for existing preservation coating.
5.1.1.1 Mark each corroded, damaged and/or deteriorated coating area in each tank.
5.1.1.2 Submit one legible copy, in hard copy or approved transferrable media, of a report with a sketch listing results of the requirements of 5.1.1.1 to the SUPERVISOR.
5.1.2 Accomplish the requirements of 009-107 of 2.1.
5.1.2.1 Ensure General Cleaning must be Level III.
5.1.3 Accomplish installation of each manhole cover for each tank listed in 1.3.1 in accordance with Figure 075-4-1 of 2.3.
5.2 Weld fill, drill, and tap a total of 10 each stripped manhole cover bolting ring holes for each tank listed in 1.3.1 as designated by the SUPERVISOR. See 5.11.5.
5.2.1 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column A, Lines One through 7.
5.3 Repair each tank listed in 1.3.1, based on the CCIMS assessment report as designated by the SUPERVISOR, using 2.4 through 2.13 for guidance. See 5.11.4 through 5.11.6.
FOUO
SHIP: LCC-19 CHG/VER: 2/3
5.3.1 Vee-out and weld a total of one linear foot of each deteriorated and damaged weld. Each area of repair must include deck, bulkhead, shell plating, and overhead.
5.3.2 Chip and grind each surface flush in way of each repair.
5.3.3 Base metal weld buildup a total of 60 square inches of each plate defect in the tank.
5.3.3.1 For bidding purposes the base metal weld buildup must be one quarter inch thick.
5.3.3.2 Surface must be ground to sound metal prior to base metal weld buildup.
5.3.3.3 Fill each local pit and groove with weld material prior to application of each principal build up layer.
5.3.3.4 Grind each surface of completed base weld metal buildup smooth if greater than 1/8 inch above plate surface.
5.3.4 Remove existing, fabricate, and install new a total of 10 square feet of deteriorated plate.
5.3.5 Remove existing, fabricate, and install new a total of 4 linear feet of defective stiffener.
5.3.6 Accomplish the requirements of 009-12 of 2.1, including Table 2, Columns A, Lines One through 7.
5.3.6.1 Accomplish nondestructive testing in accordance with Line 11.
5.3.7 Accomplish the requirements of 009-25 of 2.1 for an air hose, water hose, or vacuum box test of each new insert weld seam. Allowable leakage: None.
5.4 Accomplish the requirements of 009-32 of 2.1, including Table 4, Line(s) 11, for tank side surface, and Table 3, Line(s) 25, for interior compartment side surface of each cover plate listed in 1.3.2.
5.5 Accomplish the requirements of 009-32 of 2.1 for each bolting ring listed in 1.3.3.
5.6 Accomplish the requirements of 009-32 of 2.1, including Table 4, Line(s) 11, for a total of 1,726 square feet of defective painted surfaces, for each tank listed in 1.3.1, as designated by the SUPERVISOR.
5.6.1 The preservation area must not exceed 10 square feet per one area.
5.7 Remove unused each existing stud listed in 1.3.4, using 2.7 for guidance.
5.8 Remove each existing unused obsolete heating coil piping listed in 1.3.5, using 2.14, 2.15 and Enclosure-02 for guidance.
5.9 Accomplish build up weld of remaining holes on each structural member listed in 1.3.6 caused by the removal each unused obsolete heating coil piping listed in 1.3.5, using 2.10 and 2.12 for guidance.
5.9.1 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column A, Lines One through 7.
5.9.2 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of each structural member. Allowable leakage: None.
5.10 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.11 Notes:
5.11.1 Planner: Code 231B T. Oosera, 243-9935
FOUO
SHIP: LCC-19 CHG/VER: 2/3
Planner: Code 234 A. Onose, 243-0093 Engineer: Code 250 S. Yokota, 243-5969
5.11.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
5.11.3 This TGI meets the intent of DDG CSWT File Nos. 123-133, 123-142, and 123-143.
5.11.4 CCIMS assessment of each tank listed in 1.3.1 will be accomplished by SRF-JRMC (TGI No.
3819P12318I01), and the Project team will provide the assessment report with engineering evaluation under DL process for front loading structure repair.
5.11.5 Removal and installation of interferences, and gas free operation, preservation of boundary spaces relating to front loading structure repair are not included in this TGI. They will be covered by a DL in the future based on Contractor submitted condition report.
5.11.6 Materials for structure members relating to front loading repair will be provided in the future as a DL based on Contractor submitted condition report.
5.11.7 Opening, initial cleaning, and closing of each space listed in 1.2.2 through 1.2.8 will be covered by the following TGI No(s).
Clean Salt Water Ballast (9-56-0-F): 3819P12317A01 (KTR TGI) Clean Salt Water Ballast (9-52-1-W): 3819P12339A01 (KTR TGI) Clean Salt Water Ballast (9-52-2-W): 3819P12340A01 (KTR TGI) Clean Salt Water Ballast (9-64-1-W): 3819P12341A01 (KTR TGI) Clean Salt Water Ballast (9-64-2-W): 3819P12342A01 (KTR TGI) Potable Water Tank (9-74-0-W): 3819P12323A01 (KTR TGI) Void (7-52-0-V): 3819P12365A01 (KTR TGI)
5.11.8 Work per this instruction involves cutting an access (or removal of a door) through a fire zone bulkhead, through the hull of the ship above the turn of the bilge, through ventilation components (ducting, plenums, etc.), or through any air-tight, fume-tight or watertight bulkheads normally used to control air flow in the event of a shipboard fire. A nonflammable closure is required in accordance with COMNAVSEASYSCOM MSG R 261400Z JUL 12. The closure, if not continuously in use, shall be staged near the access, readily visible and accessible, so that any emergency responder can install the closure to affect proper air flow onboard the ship.
5.11.9 WPC will copy the following pages in reference.
REF. 2.4: Pages One, and 17 through 20
5.11.10 JCNs EM04-ZAD5, EM04-ZAD7, ER01-ZAN3, ES01-NPA9, and ES01-NPAA are related to this TGI.
5.12 Government Furnished Material (GFM):
5.12.1 SRF-JRMC will provide GFM listed in Appendix “M”.
5.13 SRF-JRMC will provide the following service work: (TGI No. 3819P12318S02).
5.13.1 [C740] Crane and crane rigging service.
5.13.2 [X99E] Utility service, electrical.
5.13.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.
5.13.4 [C106.1] Safety inspection for SRF-JRMC employees.
FOUO
SHIP: LCC-19 CHG/VER: 2/3
5.13.5 [C106.2] Gas free inspection for SRF-JRMC employees.
5.13.6 [C133] QA inspection for (G) symbol(s).
5.13.7 [C135] QA inspection for (G) symbol(s).
5.13.8 [C250] Technical support.
FOUO
J-1
SHIP: LCC-19 CHG/VER: 2/3
APPENDIX "J"
TGI JOB SUMMARY INFORMATION SHEET
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
TK/MS 9-64-0-F AY A 0 3
CU PHASE TITLE:
F/O - CLEAN, INSPECT, REPAIR, AND PRESERVE DSTLT FUEL OVFL OR BLST (9-64-0-F)
PRIMARY COMPONENT:
COMPONENT UNIT LIST (FOR ASSEMBLIES):
MANHOLE 7-75-2 HA MANHOLE 7-65-1 HA FO/BLST 9-64-0-F TK
ATTACHMENT LIST:
1. ENCLOSURE-01 (3819P12318A01-Sketch-01.pdf) saved on 19-AUG-2024 0000.
2. ENCLOSURE-02 (3819P12318A01-Sketch-02.pdf) saved on 19-DEC-2023 0000.
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA ,TAKEHIDE
JO: KO: TOTAL MAN HRS: PLANNING ACCEPTANCE:
3819P12318 A01
TOTAL MAT’L COST TOTAL DURATION:
CU PHASE DESCRIPTION:
The purpose of this TGI is to clean, inspect, repair, and preserve distillate fuel overflow or ballast (9-64-0-F).
Location of Work:
Distillate Fuel Overflow or Ballast (9-64-0-F) Clean Salt Water Ballast (9-56-0-F) Clean Salt Water Ballast (9-52-1-W) Clean Salt Water Ballast (9-52-2-W) Clean Salt Water Ballast (9-64-1-W) Clean Salt Water Ballast (9-64-2-W) Potable Water Tank (9-74-0-W) Void (7-52-0-V) Ship Store Storeroom (7-58-0-A) Dry Provisions Storeroom (7-64-0-A) Air Conditioning Machinery Room No. 3 (7-64-2-E) Dry Provisions Storeroom (7-68-0-A) Small Arms Magazine (7-69-2-M) Passage (7-72-2-L)
TASK NAME
SHOP TSD/WC TS CREW# MHRS
HIGH RAD
HOURS
RC
GRID#
5.1 LBR HRs, PNTR HRs 22 KE PC
5.2 SFTR HRs, WELD HRs, PNTR HRs, QA HRs 22 KE PC
5.3 SFTR HRs, WELD HRs, PNTR HRs, CARP HRs, QA HRs 22 KE PC
5.4 PNTR HRs, QA HRs 22 KE PC
5.5 PNTR HRs, QA HRs, RGRS HRs 22 KE PC
5.6 PNTR HRs, QA HRs 22 KE PC
FOUO
J-2
SHIP: LCC-19 CHG/VER: 2/3
TASK NAME
SHOP TSD/WC TS CREW# MHRS
HIGH RAD
HOURS
RC
GRID#
5.7 SFTR HRs, SMTL HRs, INSL HRs, RGRS HRs 22 KE PC
5.8 PFTR HRs, WELD HRs, RGRS HRs 22 KE PC
5.9 WELD HRs, PNTR HRs, QA HRs 22 KE PC
5.10 PNTR HRs, QA HRs 22 KE PC
Dewatering and Cleaning Work CFM marine chemist, gaskets, fasteners, tank watch cost, and MISC.
22 MQ CS
Structural Work CFM for fire watch and tank watch cost, MT inspection cost, lead sampling/analysis cost, asbestos sampler and analysis cost for compartment insulation, air compressor rental cost and fuel oil cost for air hose test, and MISC such as electrode, gases, temporary closure and covering material, and other consumable.
22 MQ CS
Preservation Work CFM for all paints, thinner, grit including waste disposal cost, tank watch cost, and MISC such as covering material and other consumable.
22 MQ CS
Piping Work CFM for fire watch tank watch cost, electrode, gases, marine chemist and misc.
22 MQ CS
Process Funding Document. 10 CT OM
Version-1: revise location name for 9-64-0-F. C231B R. Takagi, 12/23/2023, -/-/N
V-01
Version-2: revise reference No. 13. C231B S. Yamaoka, 8/19/2024, Y/Y/N
V-02
Version-3: revise Enclosure-01. C231B S. Yamaoka, 8/19/2024, Y/Y/N
V-03
FOUO
M-1
SHIP: LCC-19 CHG/VER: 2/3
APPENDIX “M”
TGI MATERIAL LIST
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
TK/MS 9-64-0-F AY A 0 3
CU PHASE TITLE:
F/O - CLEAN, INSPECT, REPAIR, AND PRESERVE DSTLT FUEL OVFL OR BLST (9-64-0-F)
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV
JOB ORDER: KEY OP:
3819P12318 A01
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
001 M INSULATI, ORDERED FOR KTR
ORIG: C231B, T. OOSERA 243-
9Q 5640 008096312 NA 4 N 40045007 1/EA
002 M TAPE,TEX, ORDERED FOR
KTR
ORIG: C231B, T. OOSERA 243-
9B 8315 002671632 NA 4 N 40045002 1/RO
003 M ADHESIVE, ORDERED FOR
KTR
ORIG: C231B, T. OOSERA 243-
9B 8040 002738708 NA 4 Y 40045009 1/GL
NOTES:
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR APPENDIX "D"
DEFICIENCY FORM
☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One)
2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
LCC-19 TK/MS 9-64-0-F AY A 0
4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:
3819P12318 A01
7. DESCRIPTION:
8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
9. CORRECTIVE ACTION:
10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
FOR NON-NUCLEAR USE ONLY
11. RFD/RFW REQ’D ☐ LAR REQ'D ☐
ILS MOD REQ’D ☐
SRD/PLAN REV REQ'D ☐
DWG NO.: _____________________ S/A NO.: ___________________
12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:
SATISFACTORY:
13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
YES ☐ NO ☐
14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE:
15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
_________:YES ☐ NO ☐
16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE (DR ONLY)
DL’s ISSUED
(DR ONLY)
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
LCC-19 TK/MS 9-64-0-F AY A 0
LOCATION DETAIL OF UNUSED STUD IN 9-64-0-F
PLAN VIEW 1-A
2ND PLATF FR 64 - 74 PORT & STBD
OPP SIDE (LKG DOWN)
SECT 1-B
SECT 1-B
ENCLOSURE-01
WEB FR 68
LKG AFT
3819P12318A01
SKETCH
SHEET 1 OF 1
01234567089-