TGI_3819P51405A01_c0v0.pdf
PDF 162 KB Posted
- Attached to
- USS BLUE RIDGE (LCC-19) 5C1 DSRA TYCOM 1
- Solicitation number
- N6264925RA021
About this file
This document is a Task Group Instruction (TGI) for mechanical cleaning of the No. 5 Air Conditioning (A/C) Plant Condenser on the USS BLUE RIDGE (LCC-19), part of a larger ship repair and maintenance project. The specific task involves detailed procedures for removing and reinstalling condenser water heads, performing borescope inspections of 332 condenser tubes, conducting leak checks, hydrostatic testing, and ensuring cleanliness levels for both refrigerant and seawater sides of the condenser system.
The TGI provides comprehensive technical instructions, including requirements for materials like nitrogen for leak checks, lubricating oil, tube inserts, O-rings, zinc anodes, and gaskets. The work is to be performed at Pump Room No. 2 and Air Conditioning Machinery Room No. 2, with specific technical specifications such as using HFC-236fa refrigerant, conducting tests at 270 PSIG with clean fresh water, and applying adhesives conforming to specific standards. The work is scheduled to occur between January 12, 2026, and May 15, 2027, as part of the USS BLUE RIDGE's Docking-Selected Restricted Availability (DSRA) maintenance period at the Naval Ship Repair Facility and Japan Regional Maintenance Center.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
FOUO: Public availability to be determined under 5 USC 552
TASK GROUP INSTRUCTION
AIM REV 20.11.4.0 (OCTOBER 2020)
TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:
NO.: #5 AC PLANT COND AY A 0 0
SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE:
F/O - ACCOMPLISH MECHANICAL CLEANING OF NO. 5 A/C PLANT CONDENSER
PREPARING ACTIVITY:
PREPARED BY: CODE PHONE DATE
REIYA KIMURA 234. 315-243-5507 20-MAY-2024
APPROVED BY: CODE PHONE DATE
HIDEO HARADA 234. 315-243-5176 20-MAY-2024
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
REASON FOR WORK/NEED FOR CHANGE:
CHANGE INSTRUCTIONS:
SPECIAL REQUIREMENTS:
CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL II (REFRIGERANT SIDE) AND III (SEAWATER SIDE).
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
ACCEPTANCE OF COMPLETED WORK
PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:
REQUIRED:☐YES ☒NO
RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
TGI NO.: #5 AC PLANT COND AY A 0
FOUO
SHIP: LCC-19 CHG/VER: 0/0
LIST OF EFFECTIVE PAGES
SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.
1-5 J1 M1-3
QA28(1)
1. SCOPE/PURPOSE
1.1 Title: No. 5 Air Conditioning (A/C) Plant Condenser Mechanical Cleaning; accomplish
1.2 Location of Work:
1.2.1 Pump Room No. 2 and Air Conditioning Machinery Room No. 2 (7-109-2-E)
1.3 Identification:
1.3.1 Quantity (One EA), No. 5 Air Conditioning (A/C) Plant
Mfr: York International Corporation Mfr Id: 476-97532-000 Plant Capacity: 250-Ton System Refrigerant Charge: HFC-236fa (600 LB) Oil Charge: 37 Quarter of POE 46 Oil
APL: 32A030076
1.3.1.1 Quantity (One EA), Condenser
Mfr: York International Corporation Mfr ID: 376-67967 Number of Tube: 332 Tube Size: 3/4 Inch OD x 0.049 THK X 126 Inch LG Tube Material: 70-30 CNA Weight of Water head Inlet Outlet Head: 338 LBS Weight of Water head Return Head: 266 LBS
CAGE: 66935
APL: 043020362
1.4 Security Classification: None.
1.5 Initial Condition:
1.5.1 Potential Asbestos Hazard
1.6 Contractor work start date:
1.7 Contractor work completion date:
2. REFERENCES:
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N
1/12/2026
5/15/2027
FOUO
SHIP: LCC-19 CHG/VER: 0/0
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
3 TM S9514-
EL-MMA-010
AIR CONDITIONING PLANT, HFC-
236fa, 250-TON CAPACITY, LCC-
19 CLASS
5 N
4 TM S9086-
HY-STM-
010/CH-254
Condensers Heat Exchangers And Air Ejectors
7 N
5 TM S9AA0-
AB-GOS-
010/GSO
General Specifications for Overhaul of Surface Ships (GSO)
11 N
6 TM S9086-
RK-STM-
010/CH-505
Piping Systems 6 N
7 TM S9086-
RJ-STM-
010/CH-504
PRESS., TEMP. and Other Mechanical and Electromechanical Measuring Instruments
7 N
3. APPENDICES:
3.1. Appendix “J” TGI Job Summary Information Sheet
3.2. Appendix "M" TGI Material List
3.3. Appendix “D” Deficiency Form
4. GENERAL REQUIREMENTS:
4.1. Not Applicable
5. PROCEDURE:
5.1 Remove refrigerant HFC-236fa from the refrigerant system of A/C plant listed in 1.3.1 in accordance with Paragraph 6-4.2 of 2.3.
5.1.1 Remove and dispose lubrication oil from the lubricating system in accordance with Paragraph 6-4.3 of 2.3.
5.1.2 Evacuate the refrigerant system in accordance with Paragraph 6-5.1 of 2.3.
5.1.3 Ensure that the density of refrigerant is below 500 ppm at leak detector. If not, vacuum the refrigerant system until the leak detector reads 500 ppm or below.
5.2 Remove each condenser water head from the condenser listed in 1.3.1.1 in accordance with 2.3.
5.2.1 Restore each piping flange mating surface exposed by disassembly of piping system. Repair by removing each high spot, burr, abrasion, and foreign matter, where removal can be accomplished by a hand tool. Take precautions to maintain phonographic finish on each flange that has it.
5.2.2 Restore each mating surface exposed by condenser water head removal. Repair by removing each high spot, burr, abrasion, and foreign matter, where removal can be accomplished by hand tool.
5.2.3 Accomplish a visual inspection of each piping flange connection, condenser water head, and tube insert in accordance with 2.3. Allowable warpage, cracking, elongated/distorted bolt hole, missing thread, leakage path, and excessive corrosion: None.
5.2.3.1 Submit one legible copy, in hard copy or approved transferrable media, of a report listing results of the requirements of 5.2.3 to the SUPERVISOR.
FOUO
SHIP: LCC-19 CHG/VER: 0/0
5.3 Accomplish the mechanical cleaning of the seawater side of the condenser listed in 1.3.1.1 in accordance with paragraph 254-6.2 of 2.4, using 2.3 for guidance.
5.3.1 Remove each existing tube insert from the inlet end of the tubes.
5.3.2 Ensure General Cleaning must be Level III for seawater side in accordance with Section 505j2 of 2.5.
5.4 Accomplish a borescope inspection of each internal surface on a total of 332 tubes (100 percent) for the condenser listed in 1.3.1.1 in accordance with Paragraph 254-2.6.4.3 of 2.4. Allowable marine growth, scale, and mineral deposit: None.
(V) "BORESCOPE INSPECTION"
5.5 Accomplish a leak check of the refrigerant system of A/C plant listed in 1.3.1 in accordance with Paragraph 6-5.1 of 2.3.
5.6 Install each condenser water head to the condenser listed in 1.3.1.1 in accordance with 2.3.
5.6.1 Remove existing, fit and install each new zinc anode to each water head.
5.6.2 Remove existing and install each new gasket and O-ring. Material must conform to each specification in Figure 7-14 of 2.3.
5.6.3 Install each new tube insert to the inlet end of the tubes.
5.6.3.1 Apply adhesive conforming to MMM-A-189, Class 2, on each tube insert.
5.6.4 Torque each fastener in accordance with 2.3.
5.6.4.1 Submit one legible copy, in hard copy or approved transferrable media, of a report listing results of the requirements of 5.6.4 to the SUPERVISOR.
5.7 Accomplish testing of the condenser listed in 1.3.1.1 in accordance with 2.6.
5.7.1 Each master and backup test gage must conform to gage range and graduation shown on Table 504-6-1 of
2.7. The backup gage must be cross-checked to the master hydrostatic test gage up to the maximum test pressure just prior to start of testing. Master and backup gages must track within 2 percent of each other.
5.7.2 Accomplish a shop hydrostatic test for tube side of the condenser for evidence of external leakage and/or deformation. Allowable external leakage and/or deformation: None.
(V)(G) “VISUAL INSPECTION - SHOP HYDROSTATIC TEST”
5.7.3 Install each vent/drain piping to water heads prior to beginning hydrostatic test.
5.7.4 The tube side test pressure is 270 PSIG.
5.7.5 The test medium is clean fresh water.
5.7.6 Document shop hydrostatic test results on QA Form 28, Enclosure-01-1.
5.7.7 Ensure General Cleaning must be Level III for seawater side in accordance with Section 505j2 of 2.5.
5.7.8 Install new label plate on the condenser engraving the hydrostatic test pressure and date tested.
5.8 Restore the refrigerant system of each A/C plant listed in 1.3.1 to the operating condition, using 2.3 for guidance.
FOUO
SHIP: LCC-19 CHG/VER: 0/0
5.8.1 Evacuate and dehydrate the refrigerant system in accordance with Paragraph 6-5.1 of 2.3.
5.8.2 Accomplish a vacuum hold check of the refrigerant system in accordance with Paragraph 6-5.1 of 2.3.
(V)(G) "VACUUM HOLD CHECK"
5.8.3 Charge the lubricant system with new lubricating oil (POE 46) in accordance with Paragraph 6-5.4 of 2.3.
5.9 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surface.
5.10 Notes:
5.10.1 Planner: Code 234 R. Kimura, 243-5507
Planner: Code 232 T. Funaki, 243-2494 Planner: Code 233 S. Ogawa, 090-6170-8579
5.10.2 Work Integration Manager (WIM): C333 T. Yaginuma, 080-5419-0598
5.10.3 This TGI meets the intent of LCC CSWT File No. 514-002.
5.10.4 JCN EA05-ZAG2 is related to this TGI.
5.11 Government Furnished Material (GFM):
5.11.1 SRF-JRMC will provide GFM listed in Appendix “M”.
5.12 SRF-JRMC will provide following Service Work (TGI).
5.12.1 [C740] Crane and rigging service.
5.12.2 [X99E] Utility service, electrical.
5.12.3 [X99M] Utility service, except electrical.
5.12.4 [C106.1] Safety inspection for SRF-JRMC employees.
5.12.5 [C106.2] Gas free inspection for SRF-JRMC employees.
5.12.6 [C133] QA inspection for (G) symbols.
FOUO
J-1
SHIP: LCC-19 CHG/VER: 0/0
APPENDIX "J"
TGI JOB SUMMARY INFORMATION SHEET
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
#5 AC PLANT COND AY A 0 0
CU PHASE TITLE:
F/O - ACCOMPLISH MECHANICAL CLEANING OF NO. 5 A/C PLANT CONDENSER
PRIMARY COMPONENT:
COMPONENT UNIT LIST (FOR ASSEMBLIES):
#5 AC PLANT AE #5 AC COND/CHILLER CN
ATTACHMENT LIST:
1. ENCLOUSRE-01 (3819P51405A01-QA28.docx) saved on 18-MAY-2024 0000.
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA ,TAKEHIDE
JO: KO: TOTAL MAN HRS: PLANNING ACCEPTANCE:
3819P51405 A01
TOTAL MAT’L COST TOTAL DURATION:
CU PHASE DESCRIPTION:
The purpose of this TGI is to accomplish mechanical cleaning of No. 5 Air Conditioning (A/C) Plant Condenser.
Location of Work:
Pump Room No. 2 and Air Conditioning Machinery Room No. 2 (7-109-2-E)
TASK NAME
SHOP TSD/WC TS CREW# MHRS
HIGH RAD
HOURS
RC
GRID#
5.1 OMCH HRs 22 KE PC
5.2 BLRM HRs, INSL HRs, ELEC HRs, PFTR HRs 22 KE PC
5.3 BLRM HRs 22 KE PC
5.4 BLRM HRs 22 KE PC
5.5 OMCH HRs 22 KE PC
5.6 BLRM HRs 22 KE PC
5.7 BLRM HRs, INSL HRs, ELEC HRs, PFTR HRs 22 KE PC
5.8 OMCH HRs 22 KE PC
5.9 PNTR HRs, QA HRs 22 KE PC
Boiler Work CFM for marine chemist cost, asbestos sampler and analysis cost, covering material, paint, label plate material and other consumable material (MISC).
22 MQ CS
Machinery Work CFM for rag wiping, tape duct, flux bag plastic and misc.
22 MQ CS
Process Funding Document 10 CT OM
FOUO
M-1
SHIP: LCC-19 CHG/VER: 0/0
APPENDIX “M”
TGI MATERIAL LIST
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
#5 AC PLANT COND AY A 0 0
CU PHASE TITLE:
F/O - ACCOMPLISH MECHANICAL CLEANING OF NO. 5 A/C PLANT CONDENSER
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV
1 S9514-EL-MMA-010
JOB ORDER: KEY OP:
3819P51405 A01
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
200 M NITROGEN, FOR KTR
FOR LEAK CHECK FOR A/C
PLANT
POC: C232 T.FUNAKI
243-2494
9B 6830 007586475 NA 4 Y 41325012 12/CY
201 M LEAK DET, FOR KTR
FOR LEAK CHECK FOR A/C
PLANT
POC: C232 T.FUNAKI
243-2494
9B 6850 001862963 NA 4 Y 41325026 10/BT
202 M LUBRICAT, FOR KTR
FOR COMPRESSOR
LUBRICATING OIL POE-46
POC: C232 T.FUNAKI
243-2494
9B 9150 014439390 NA 4 Y 41325006 10/GL
300 M SEALER,CHEMICAL, ORDERED
FOR CONTRACTOR
ORIG: CODE 233, S. OGAWA
090-6170-8579
9B 6850 011329623 NA 4 Y 41135160 1/CN
NOTES:
FOUO
M-2
SHIP: LCC-19 CHG/VER: 0/0
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
301 M LUBRICANT,THREAD,
ORDERED FOR CONTRACTOR
ORIG: CODE 233, S. OGAWA
090-6170-8579
9B 9150 015976309 NA 4 Y 41135163 1/CN
400 1 M O-RING, C234 R.KIMURA, 243-
ORDER FOR KTR
SEAL, O-RING,
S9514-EL-MMA-010, FIG 7-14-2
9B 5331 002518839 NA 4 N 41295268 10/EA
401 1 M INSERT,TUBE FITTING, C234
R.KIMURA, 243-5507
ORDER FOR KTR
MATERIAL: INSERT, TUBE
FITTING
S9514-EL-MMA-010,FIG 7-1-77
9B 4730 011819598 NA 4 N 41295220
350/EA
402 1 M O-RING, ORG: C234 R.KIMURA,
243-5507
ORDER FOR KTR
O-RING
S9514-EL-MMA-010, FIG 7-14-4
9B 5331 006413763 NA 4 N 41295269 10/EA
403 M ANODE,CORROSION PRE,
C234 R.KIMURA, 243-5507
ORDER FOR KTR
MATERIAL:
ANODE,CORROSION,
PREVENTIVE
SIZE: 0.840" OD X 72" LG
9B 5342 008136055 NA 4 N 41295270 1/EA
404 M GASKET, RUBBER GASKET,
SIZE: 3FT X 4FT X 1/8"THK,
SPEC: ASTM 2000D, M2-AA603-
A13-B13-EA14,
DWG: 804-5284201-S12,
CERTIFICATION SHEET
REQUIRED,
DO NOT CROSS TO NSN: 5330-
01-490-5044 (QDR SUBMITTED)
ORDERED FOR KTR
ORG: C234 R.KIMURA, 243-
9B 5330 LL4598269 NA 4 N 41347437 2/SH
405 1 M GASKET, ORG: C234
R.KIMURA, 243-5507
ORDER FOR KTR
MATERIAL: GASKET RUBBER,
NOMEN: S9514-EL-MMA-010,
FIG 7-14-15
9B 5330 010425984 NA 4 N 41295271 1/EA
406 1 M SEAL,NONMETALLIC ST, ORG:
C234 R.KIMURA, 243-5507
ORDER FOR KTR
MATERIAL: GASKET RUBBER,
NOMEN: S9514-EL-MMA-010,
FIG 7-14-14
9B 5330 010422696 NA 4 N 41295196 1/SP
407 M ADHESIVE, ADHESIVE FOR
RUBBER
ORIG: C234 R.KIMURA, 243-
ORDERED FOR KTR
9B 8040 008419773 NA 4 Y 41295203 2/PT
408 M ADHESIVE, ADHESIVE FOR
CLOTH,
ORDERED FOR KTR
ORIG: C234 R.KIMURA, 243-
9B 8040 002738708 NA 4 Y 41295272 1/GL
FOUO
M-3
SHIP: LCC-19 CHG/VER: 0/0
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
409 M INSULATI, INSULATION, PIPE,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013,
FOR 5" IPS,
SIZE: 5-1/2" ID X 3/4" THK X 6
FT LG,
UI: EA/6 FT(ONE CONTINUOUS
LENGTH REQUIRED),
MATL: NON-HALOGEN,
2EA/BOX. *MUST BE ORDERED
IN MULTIPLES OF 2EA*
ORIG: C234, R.KIMURA, 243-
ORDERED FOR KTR
9B 5640 LL9607849 NA 4 N 41327433 2/EA
410 M INSULATI, INSULATION, PIPE,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013,
FOR SIZE: 6" IPS,
SIZE: 6-5/8" ID X 3/4" THK X 6FT
LG,
UI: EA/6 FT(ONE CONTINUOUS
LENGTH REQUIRED),
MATL: NON-HALOGEN,
2EA/BOX. *MUST BE ORDERED
IN MULTIPLES OF 2EA*
ORIG: C234, R.KIMURA, 243-
ORDERED FOR KTR
9B 5970 LL9607850 NA 4 N 41327437 2/EA
411 M INSULATION SHEET,
INSULATION, FLAT SHEET,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013, FOR SIZE: 36”W X
48”L X 3/4” THK, MATL: NON-
HALOGEN,
**GSA ADVANTAGE
AVAILABLE**
8SH/BOX.
ORDERED FOR KTR
ORIG: C234 R.KIMURA, 243-
9B 5640 LL9607854 NA 4 N 41327451 2/SH
412 M ADHESIVE, ADHESIVE FOR
TUBE INSERT
ORIG: C-234 R.KIMURA, 243-
ORDERED FOR KTR
9Q 8040 005437170 NA 4 Y 41295273 2/PT
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR APPENDIX "D"
DEFICIENCY FORM
☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One)
2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
LCC-19 #5 AC PLANT COND AY A 0
4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:
3819P51405 A01
7. DESCRIPTION:
8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
9. CORRECTIVE ACTION:
10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
FOR NON-NUCLEAR USE ONLY
11. RFD/RFW REQ’D ☐ LAR REQ'D ☐
ILS MOD REQ’D ☐
SRD/PLAN REV REQ'D ☐
DWG NO.: _____________________ S/A NO.: ___________________
12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:
SATISFACTORY:
13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
YES ☐ NO ☐
14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE:
15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
_________:YES ☐ NO ☐
16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE (DR ONLY)
DL’s ISSUED
(DR ONLY)
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
LCC-19 #5 AC PLANT COND AY A 0
COMUSFLTFORCOMINST 4790.3 REV D CHG 3
07 Nov 2023
SHOP TEST RECORD Page 1 of 1
QA FORM 28 Planning must fill in blocks identified by a prior to issuing
1. SHIP HULL NO. 2. JCN 3. LWC/SHOP 4. CWP/REC SER NO. 5. SYSTEM/COMPONENT/ROTATABLE POOL SER NO.
USS BLUE RIDGE LCC19 EA05-ZAG2 KTR N/A No. 5 Air Conditioning Plant Condenser
6. REFERENCES: TEST REF (E.G., MS, TECH MAN) & OTHER REFS (E.G., VLV DWG) 7. TEST GAGE RANGE /INSTRUMENT USED SERIAL NO. CAL DUE DATE 8. RELIEF VLV SET POINT
A. TM S9514-EL-MMA-010 Rev. 5
B.
C.
D.
9. TEST REQUIREMENTS & RESULTS
TEST TYPE KEY H = STRENGTH AND POROSITY/ELEVATED PRESSURE TEST J = MECHANICAL JOINT TIGHTNESS ST = SEAT TIGHTNESS OP = OPERATIONAL O = OTHER
(SPECIFY): ______________________
TE
ST
T Y
PE
(S
EE
K
EY
) PARAGRAPH
DESCRIBING
VALVE POSITION
AND POINT OF
ENTRY
REF
LTR
GAGE
USED
(LTR
FROM
BLK 7)
REQUIRED
MEDIUM
MEDIUM
USED
REQUIRED
PRESSURE
ACTUAL
PRESSURE
MINIMUM
DURATION
ACTUAL
DURATION
ALLOWED
LEAKAGE
ACTUAL
LEAKAGE SAT/UNSAT SIGNATURE, BADGE NO. & DATE
H 5.7 A Clean Fresh Water
270 PSIG 30 minutes None
10. REMARKS. (CRAFTSMAN/QAI SUBMIT A DF TO RESOLVE UNSAT DATA)
11. QA INSPECTOR/SHOP SUPERVISOR SIGNATURE/BADGE NO. (RECORD
REVIEWED FOR FINAL ACCEPTANCE)
DATE 12. QAS SIGNATURE/BADGE NO. (RECORD HAS BEEN REVIEWED FOR
COMPLETENESS)
DATE
3819P51405A01 ENCLOSURE-01-1 TOTAL 1