This document is a Task Group Instruction (TGI) for the USS Blue Ridge (LCC-19) detailing a specific maintenance task to replace the peel and stick nonskid system in the 7-72-2-L passage. The work involves replacing approximately 13 square feet of second platform deck plating, including vertical surfaces up to 6 inches from the deck, located between frames 72 and 74 on the port side. The work is part of a larger ship repair and maintenance project scheduled for January 12, 2026 to May 15, 2027.
The TGI specifies technical requirements for the nonskid deck covering, which must conform to MIL-PRF-24667, Type XI, Composition PS. The Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC) will provide supporting services including crane and rigging, utility services, safety inspections, and quality assurance. The document notes a potential lead hazard and is part of the larger USS Blue Ridge maintenance availability, with a job number of ES01-NPJB and a planning acceptance process involving multiple personnel from Code 231B and Code 333.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
20-AUG-2024 1015
20.14.12.0.8874 (April 2024) ICN: 3819P14215 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 7-72-2-L DC A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 64511
CU PHASE TITLE: *F/O - REPLACE PEEL AND STICK NONSKID SYSTEM IN 7-72-2-L
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 3
ES01NPJB
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
HAGA, MASAMICHI 231B 3152432513 06-APR-2024
APPROVED BY: CODE: PHONE: DATE:
NAKANO, SEIICHI 231B 3152434519 06-APR-2024
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
ES01-NPJB
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE 7-72-2-L 7 U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
142A0015
1 SCOPE/PURPOSE:
1.1 Title: Peel and Stick Nonskid System in 7-72-2-L; replace
1.2 Location of Work:
1.2.1 Passage (7-72-2-L)
1.3 Identification:
1.3.1 Quantity (13 SF), Second Platform Deck Plating in 7-72-2-L, Frames between 72 and 74, including vertical surface up to height of 6 inches from deck in and around peel and stick deck covering area, Port
Remarks: See Sketch Enclosure-01 for location detail
1.4 Security Classification: None.
TGI Short Form
20-AUG-2024 1015
20.14.12.0.8874 (April 2024) (Continued) ICN: 3819P14215 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 7-72-2-L DC A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 64511
CU PHASE TITLE: *F/O - REPLACE PEEL AND STICK NONSKID SYSTEM IN 7-72-2-L
FOUO Pg 2 of 3
CU PHASE DESCRIPTION (Cont.)
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1.5 Initial Condition:
1.5.1 Potential Lead Hazard.
1.6 Contractor work start date: 1/12/2026
1.7 Contractor work completion date: 5/15/2027
2. PROCEDURE:
2.1 Accomplish the requirements of 009-32 of Ref. No. One, including Table 2, Line(s) 25, for each area listed in 1.3.1.
2.1.1 Accomplish the requirements of 009-26 of Ref No. One, including Attachment G, for installation of new peel and stick nonskid deck covering. Application of peel and stick nonskid deck covering must conform to MIL-PRF-24667, Type XI, Composition PS.
2.2 Notes:
2.2.1 Planner: Code 231B M. Haga, 243-2513
2.2.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
2.2.3 JCN ES01-NPJB is related to this TGI.
2.3 Government Furnished Material (GFM): None.
2.4 SRF-JRMC will provide the following service work: (TGI No. 3819P14215S02)
2.4.1 [C740] Crane and crane rigging service.
2.4.2 [X99E] Utility service, electrical.
2.4.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.
2.4.4 [C106.1] Safety inspection for SRF-JRMC employees.
2.4.5 [C106.2] Gas free inspection for SRF-JRMC employees.
2.4.6 [C133] QA inspection for (G) symbol(s).
20-AUG-2024 1015
20.14.12.0.8874 (April 2024) (Continued) ICN: 3819P14215 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 7-72-2-L DC A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 64511
CU PHASE TITLE: *F/O - REPLACE PEEL AND STICK NONSKID SYSTEM IN 7-72-2-L
FOUO Pg 3 of 3
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
2.1 PNTR HRs, CARP HRs, QA HRs 22/KE PC N
CFM for all paints, peel and stick nonskid, thinner, sampler/analyze lead, and misc such as covering materials, and other consumables.
22/MQ CS N
Process Funding Document. 10/CT OM N
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
ATTACHMENT LIST
TITLE FILE NAME SAVED DATE
ENCLOSURE-01 3819P14215A01-Sketch.pdf 07-MAR-2024 0000
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 3819P14215 KEY OP: A01
Sketch
3819P14215A01 ENCLOSURE-01 Sheet 1 of 2
DETAIL 2-A
Sketch
3819P14215A01 ENCLOSURE-01 Sheet 2 of 2
DETAIL PLAN VIEW 2-A
PASSAGE 7-72-2-L
8”
24”
20”
FR 72 BHD 73.5
24”
FR 73