This document is a WebAIM Short Form Task Group Instruction (TGI) for the USS Blue Ridge (LCC-19), specifically focused on the operational test for A/C Plant #6. The TGI is dated 29-AUG-2024 and has a unique identifier of 51426-3-301KTR. The document outlines specific tasks for multiple work groups, including contractor work, quality assurance (QA) work, support/field (S/F) work, and test work, all centered on conducting a tightness and operational test in accordance with the referenced technical procedure (TP 51426-3-301KTR).

The task instruction includes detailed information such as preparation details (prepared by Enomoto, Daisuke and approved by Higa, Riley), job summary ID 142A0003, and specific work instructions for different teams. The tasks involve accomplishing and documenting tightness and operational tests, with additional requirements for conducting vibration analysis. The document is marked FOUO (For Official Use Only) and is part of a larger ship repair and maintenance project for the USS Blue Ridge at the US Naval Ship Repair Facility and Japan Regional Maintenance Center.

View the file

Other files

File Type Posted
Exhibit (A) BLR_5C1_TYCOM1 CDRL_r.pdf PDF
TGI_3819P58101A01_c1v0.pdf PDF
TGI_3819P51406A01_c0v0.pdf PDF
TGI_3819P14212A01_c0v0.pdf PDF
TGI_3819P14211A01_c0v0.pdf PDF
TGI_3819P14206A01_c0v2.pdf PDF
TGI_3819P14203_T02_c0v0.pdf PDF
TGI_3819P13506T01_c0v0.pdf PDF
TGI_3819P12364A01_c0v0.pdf PDF
TGI_3819P12365A01_c0v1.pdf PDF
TGI_3819P12362A01_c0v0.pdf PDF
TGI_3819P12356_A01_c1v0.pdf PDF
TGI_3819P12342A01_c0v0.pdf PDF
TGI_3819P12344A01_c0v0.pdf PDF
TGI_3819P12323A01_c2v1.pdf PDF
TGI_3819P51404A01_c0v0.pdf PDF
TGI_3819P12357_A01_c0v0.pdf PDF
2.03 Solicitation N6264925RA0210001.pdf PDF
TGI_3819P59302T01_TGI_c0v0.pdf PDF
TGI_3819P58101A01_c1v0.pdf PDF
TGI_3819P51402A01_c1v1.pdf PDF
TGI_3819P14203_A01_c2v1.pdf PDF
TGI_3819P14203_T03_c0v0.pdf PDF
TGI_3819P14203_T02_c0v0.pdf PDF
TGI_3819P14206T01_c0v0.pdf PDF
TGI_3819P12362A01_c0v0.pdf PDF
TGI_3819P12355_A01_c1v0.pdf PDF
TGI_3819P12339A01_c2v1.pdf PDF
TGI_3819P12338A01_c0v0.pdf PDF
TGI_3819P12304A01_c0v0.pdf PDF
TGI_3819P12310A01_c3v1.pdf PDF
Attachment V Contract data.pdf PDF
Attachment II Price Proposal Form N6264925RA021.xlsx XLSX spreadsheet
Attachment VI Quality Assurance Surveillance Plan (QASP).pdf PDF
TGI_3819P14212A01_c0v0.pdf PDF
TGI_3819P14215A01_c0v0.pdf PDF
TGI_3819P51404A01_c0v0.pdf PDF
TGI_3819P14206T03_c0v0.pdf PDF
TGI_3819P12387A01_c0v1.pdf PDF
TGI_3819P14206A01_c0v2.pdf PDF
TGI_3819P12364A01_c0v0.pdf PDF
TGI_3819P13506A01_c0v0.pdf PDF
TGI_3819P12321A01_c1v1.pdf PDF
TGI_3819P12342A01_c0v0.pdf PDF
TGI_3819P12336A01_c0v0.pdf PDF
TGI_3819P12320A01_c0v0.pdf PDF
TGI_3819P12354A01.pdf PDF
TGI_3819P12305A01_c0v0.pdf PDF
Attachment IV RFI (fillable).pdf PDF
2.01 N6264925RA021 Solicitation.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

29-AUG-2024 0927

20.14.15.0.8998 (August 2024) ICN: 3819P14203 KeyOp: T04

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 51426-3-301KTR TT T 1 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 51426

CU PHASE TITLE: A/C PLANT #6 (T & OP) - KTR

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 2

ES01NPNW * ES01NPNX * ES01NPNY * ES01NPNZ * ES01NPP0 * ES01NPP1 * ES01NPFP * ES01NPFN * ES01NPFK *

ES01NPFF * ES01NPFG * ES01NPFH * ES01NPFJ * ES01NPFL * ES01NPFM * EA05L094

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

ENOMOTO, DAISUKE 246.2 3152437296 14-AUG-2024

APPROVED BY: CODE: PHONE: DATE:

HIGA, RILEY 246.2 3152432291 26-AUG-2024

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

EA05-L094 * ES01-NPFF * ES01-NPFG * ES01-NPFH * ES01-NPFJ * ES01-NPFK * ES01-NPFL * ES01-NPFM * ES01-NPFN *

ES01-NPFP * ES01-NPNW * ES01-NPNX * ES01-NPNY * ES01-NPNZ * ES01-NPP0

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA, TAKEHIDE U

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

142A0003

Operational test for A/C Plant #6 - KTR.

TGI Short Form

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

29-AUG-2024 0927

20.14.15.0.8998 (August 2024) (Continued) ICN: 3819P14203 KeyOp: T04

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 51426-3-301KTR TT T 1 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 51426

CU PHASE TITLE: A/C PLANT #6 (T & OP) - KTR

FOUO Pg 2 of 2

JCNs (Cont.):

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 TP 51426-3-301KTR AC PLANT #6 (T & OP) - KTR LAT Y

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

(V) Contractor work:

Accomplish/document the tightness & operational test in accordance with reference, TP 51426-3-301KTR.

22/KE PC N

(G) QA work:

Accomplish/document the tightness & operational test in accordance with reference, TP 51426-3-301KTR.

33/G1 QA N

(S) S/F work:

Accomplish/document the tightness & operational test in accordance with reference, TP 51426-3-301KTR.

/ EA05 N

Test work:

Conduct vibration analysis in accordance with reference, TP 51426-3-

301KTR.

46/J5 JN N

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 3819P14203 KEY OP: T04

ES01-NPP1

File details come from the government source that posted it. Updated .