This document is a Task Group Instruction (TGI) for cleaning, inspecting, repairing, and preserving the Distillate Fuel or Ballast tank (9-8-0-F) on the USS Blue Ridge (LCC-19). The work is scheduled to begin on 7/21/2026 and complete by 10/21/2027, with a total scope of 7,000 square feet of interior tank surface. Key requirements include commercial blast cleaning, visual inspection for coating and structural integrity, and comprehensive repair work involving welding, plate replacement, and surface preparation.

The task involves multiple technical specifications, including Level III general cleaning, manhole cover installation, and surface preparation to SSPC-SP 6 standards. Specific repair tasks include welding one linear foot of deteriorated welds, base metal weld buildup of 60 square inches, removal and replacement of 10 square feet of deteriorated plate, and 4 linear feet of defective stiffener. The work affects a fire zone boundary, requiring a non-flammable closure, and involves potential lead hazard considerations. The estimated labor is 4,983 man-hours, with various specialized tasks performed by different trades including laborers, painters, welders, and quality assurance personnel.

View the file

Other files

File Type Posted
TGI_3819P59302A01_c1v1.pdf PDF
TGI_3819P14213A01_c0v0.pdf PDF
TGI_3819P14203_T04_c0v0.pdf PDF
TGI_3819P14206T01_c0v0.pdf PDF
TGI_3819P14206T02_c0v0.pdf PDF
TGI_3819P12393_A01_c0v0.pdf PDF
TGI_3819P12357_T01_c0v0.pdf PDF
TGI_3819P12341A01_c0v0.pdf PDF
TGI_3819P12340A01_c1v0.pdf PDF
TGI_3819P12336A01_c0v0.pdf PDF
TGI_3819P12312A01_c0v0.pdf PDF
TGI_3819P12305A01_c0v0.pdf PDF
TGI_3819P58101A01_c1v0.pdf PDF
TGI_3819P51406A01_c0v0.pdf PDF
TGI_3819P14212A01_c0v0.pdf PDF
TGI_3819P14211A01_c0v0.pdf PDF
TGI_3819P14206A01_c0v2.pdf PDF
2.03 Solicitation N6264925RA0210001.pdf PDF
TGI_3819P14212A01_c0v0.pdf PDF
TGI_3819P14215A01_c0v0.pdf PDF
TGI_3819P51404A01_c0v0.pdf PDF
TGI_3819P14206T03_c0v0.pdf PDF
TGI_3819P12387A01_c0v1.pdf PDF
TGI_3819P14206A01_c0v2.pdf PDF
TGI_3819P12364A01_c0v0.pdf PDF
TGI_3819P13506A01_c0v0.pdf PDF
TGI_3819P14203_T04_c0v0.pdf PDF
TGI_3819P12321A01_c1v1.pdf PDF
TGI_3819P12342A01_c0v0.pdf PDF
TGI_3819P12336A01_c0v0.pdf PDF
TGI_3819P12320A01_c0v0.pdf PDF
TGI_3819P12354A01.pdf PDF
TGI_3819P12305A01_c0v0.pdf PDF
Attachment IV RFI (fillable).pdf PDF
TGI_3819P59302T01_TGI_c0v0.pdf PDF
TGI_3819P58101A01_c1v0.pdf PDF
TGI_3819P51402A01_c1v1.pdf PDF
TGI_3819P14203_A01_c2v1.pdf PDF
TGI_3819P14203_T03_c0v0.pdf PDF
TGI_3819P14203_T02_c0v0.pdf PDF
TGI_3819P14206T01_c0v0.pdf PDF
TGI_3819P12362A01_c0v0.pdf PDF
TGI_3819P12355_A01_c1v0.pdf PDF
TGI_3819P12339A01_c2v1.pdf PDF
TGI_3819P12338A01_c0v0.pdf PDF
TGI_3819P12304A01_c0v0.pdf PDF
TGI_3819P12310A01_c3v1.pdf PDF
Attachment V Contract data.pdf PDF
Attachment II Price Proposal Form N6264925RA021.xlsx XLSX spreadsheet
2.01 N6264925RA021 Solicitation.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

FOUO: Public availability to be determined under 5 USC 552

TASK GROUP INSTRUCTION

AIM REV 20.11.4.0 (OCTOBER 2020)

TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:

NO.: FO/BLST 9-8-0-F AY A 0 4

SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE:

F/O - CLEAN, INSPECT, REPAIR, AND PRESERVE DSTLT FUEL OR BALLAST (9-8-0-F)

PREPARING ACTIVITY:

PREPARED BY: CODE PHONE DATE

AKIRA SUZUKI 231B. 315-243-0968 25-MAR-2024

APPROVED BY: CODE PHONE DATE

RYOUTA TAKAGI 231B 315-243-4502 25-MAR-2024

CONCURRED BY: CODE PHONE DATE

CONCURRED BY: CODE PHONE DATE

CONCURRED BY: CODE PHONE DATE

CONCURRED BY: CODE PHONE DATE

REASON FOR WORK/NEED FOR CHANGE:

Incorrect manhole number on 1.3.2 and 1.3.3

CHANGE INSTRUCTIONS:

CH1: Correct 2.12. (3/25/2024) CH2: Correct date of prepared and approved. (3/25/2024) CH3: Update TGI. (8/20/2024) CH4: Correct manhole number on 1.3.2 and 1.3.3. (8/7/2025)

SPECIAL REQUIREMENTS:

SURFMEPP

This work Affects a fire zone boundary. Fabrication and/or staging of a non-flammable closure is required.

CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL III

WORK CERTIFICATION SIGNATURES

COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:

ACCEPTANCE OF COMPLETED WORK

PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:

REQUIRED:☐YES ☒NO

RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:

TGI NO.: FO/BLST 9-8-0-F AY A 0

FOUO

SHIP: LCC-19 CHG/VER: 4/1

LIST OF EFFECTIVE PAGES

SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.

1-5 J 1-2 M-1

1. SCOPE/PURPOSE

1.1 Title: Distillate Fuel or Ballast (9-8-0-F); clean, inspect, repair, and preserve

1.2 Location of Work:

1.2.1 Distillate Fuel or Ballast (9-8-0-F)

1.2.2 Hazmat/Flammable Storeroom B (7-12-0-K)

1.3 Identification:

1.3.1 Quantity (One EA), Distillate Fuel or Ballast

Tank No.: 9-8-0-F Capacity: 41,227 Gallons

1.3.2 Quantity (2 EA), Manhole Cover Plate(s) for 9-8-0-F

Manhole No(s).: 7-12-2 and 7-17-1 Size: 15 Inches x 23 Inches Material: Steel

1.3.3 Quantity (2 EA), Bolting Ring for Manhole Cover Plate(s) for 9-8-0-F

Manhole No(s).: 7-12-2 and 7-17-1 Material: Steel

1.3.4 Quantity (7,000 SF), Entire Interior Surface of Distillate Fuel or Ballast (9-8-0-F)

Remarks: The area includes tank side of manhole cover pate(s) and bolting ring

1.4 Security Classification: None.

1.5 Initial Condition:

1.5.1 Potential Lead Hazard

1.5.2 Critical Coated Area: CCNY-LCC19-026-25 for the area listed in 1.3.4

1.6 Contractor work start date: 7/21/2026

1.7 Contractor work completion date: 10/21/2027

2. REFERENCES:

FOUO

SHIP: LCC-19 CHG/VER: 4/1

REF.

NO.

DOCUMENT

/DRAWING

NUMBER

DOCUMENT/DRAWING TITLE REV CHG

NO.

COPY

REQ’D

(Y/N)

SOURCE

DOC

(Y/N)

PARA SEC PG CHP

1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N

3 TM S9086-

CJ-STM-

010/CH-075

Fasteners 7 N

4 TM

SYSTEMS &

SPECIFICAT

IONS

SSPC Painting Manual Volume 2 - N

5 DWG 100-

2491001

Shell Plating & Stringer - Fr51-1/2 Ctr to 4th Dk

H Y AL

L

6 DWG 101-

2491011

CVK & SHELL LONG FR8-51-1/2 E Y AL

7 DWG 101-

2491013

Floors FR 8-98 S Y SE E N

OT

E

8 DWG 102-

2491030

INNER BOTTOM PLTG FR8-1/2 -

51-1/2

G Y AL

9 DWG 103-

2491032

2ND PLTF PLATING FR 8-52 G Y AL

10 DWG 114-

2491153

TRNSV BHD FR 8, 12 & 14 F Y AL

11 DWG 114-

2491154

TRANSV BHD FR 18 & 30 G Y AL

12 TM T-9630-

AB-MMD-

Corrosion Control Assessment and Maintenance Manual (CCAMM)

3 N

13 TM NAVSEA

4790/14

Tank and Void Structural and Coating Condition Survey (MRC G1N5)

- N

3. APPENDICES:

3.1. Appendix “J” TGI Job Summary Information Sheet

3.2. Appendix "M" TGI Material List

3.3. Appendix “D” Deficiency Form

4. GENERAL REQUIREMENTS:

4.1 Not Applicable.

5. PROCEDURE:

5.1 Accomplish the requirements of 099-902YO of 2.2 for each tank listed in 1.3.1.

5.1.1 Accomplish the requirements of 009-107 of 2.1.

5.1.1.1 Ensure General Cleaning must be Level III.

5.1.2 Accomplish installation of each manhole cover for each tank listed in 1.3.1 in accordance with Figure 075-4-1 of 2.3.

5.2 Commercial blast clean each tank listed 1.3.1. Accomplish each requirement of Surface Preparation Specification SSPC-SP 6 of 2.4.

FOUO

SHIP: LCC-19 CHG/VER: 4/1

5.3 Accomplish a visual inspection of each tank listed in 1.3.1 for existing preservation coating, structural integrity, deterioration, pitting, each crack, and area of damage or distortion, including each sounding tube, tank vent, overflow, piping, each structural member, and manhole cover, using 2.5 through 2.11 for guidance.

5.3.1 Submit one legible copy, in hard copy or approved transferrable media, of a report listing results of the requirements of 5.3 to the SUPERVISOR.

5.4 Repair each tank listed in 1.3.1, based on the CCIMS assessment report as designated by the SUPERVISOR, using 2.5 through 2.11 for guidance. See 5.9.5 through 5.9.7.

5.4.1 Vee-out and weld a total of one linear foot of each deteriorated and damaged weld. Each area of repair must include deck, bulkhead, shell plating, and overhead.

5.4.2 Chip and grind each surface flush in way of each repair.

5.4.3 Base metal weld buildup a total of 60 square inches of each plate defect in the tank.

5.4.3.1 For bidding purposes the base metal weld buildup must be one quarter inch thick.

5.4.3.2 Surface must be ground to sound metal prior to base metal weld buildup.

5.4.3.3 Fill each local pit and groove with weld material prior to application of each principal build up layer.

5.4.3.4 Grind each surface of completed base weld metal buildup smooth if greater than 1/8 inch above plate surface.

5.4.4 Remove existing, fabricate, and install new a total of 10 square feet of deteriorated plate.

5.4.5 Remove existing, fabricate, and install new a total of 4 linear feet of defective stiffener.

5.4.6 Accomplish the requirements of 009-12 of 2.1, including Table 2, Columns A, Lines One through 7.

5.4.6.1 Accomplish nondestructive testing in accordance with Line 11.

5.4.7 Accomplish the requirements of 009-25 of 2.1 for an air hose, water hose, or vacuum box test of each new insert weld seam. Allowable leakage: None.

5.5 Accomplish the requirements of 009-32 of 2.1, including Table 3, Line(s) 25, for storeroom side surface of each cover plate listed in 1.3.2.

5.6 Accomplish the requirements of 009-32 of 2.1, for storeroom side surface of each bolting ring listed in 1.3.3.

5.7 Accomplish the requirements of 009-32 of 2.1, including Table 4, Line(s) 11, for each area listed in 1.3.4.

5.7.1 Submit new coating data applied to the SUPERVISOR in accordance with 2.12 and 2.13.

5.8 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.

5.9 Notes:

5.9.1 Planner: Code 231B A. Suzuki, 243-0968

5.9.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598

5.9.3 2.13 is available on P:\C200\C225\Enclosures\C231\Tank and Void Structural and Coating Condition Survey

(MRC G1N5).

FOUO

SHIP: LCC-19 CHG/VER: 4/1

5.9.4 This TGI meets the intent of DDG CSWT File Nos. 123-111, 123-133, and 123-142.

5.9.5 CCIMS assessment of each tank listed in 1.3.1 will be accomplished by SRF-JRMC (TGI No. 3819P12310I01), and the Project team will provide the assessment report with engineering evaluation under DL process for front loading structure repair.

5.9.6 Removal and installation of interferences, and gas free operation, preservation of boundary spaces relating to front loading structure repair are not included in this TGI. They will be covered by a DL in the future based on Contractor submitted condition report.

5.9.7 Materials for structure members relating to front loading repair will be provided in the future as a DL based on Contractor submitted condition report.

5.9.8 Work per this instruction involves cutting an access (or removal of a door) through a fire zone bulkhead, through the hull of the ship above the turn of the bilge, through ventilation components (ducting, plenums, etc.), or through any air-tight, fume-tight or watertight bulkheads normally used to control air flow in the event of a shipboard fire. A nonflammable closure is required in accordance with COMNAVSEASYSCOM MSG R 261400Z JUL 12. The closure, if not continuously in use, shall be staged near the access, readily visible and accessible, so that any emergency responder can install the closure to affect proper air flow onboard the ship.

5.9.9 WPC will copy the following pages in reference.

Ref. 2.7: Pages 4, 5, 6, 7, 28, 29, 30

5.9.10 JCNs EM04-ZAC8, EM04-ZAE0, and ER04-ZAN8 are related to this TGI.

5.10 Government Furnished Material (GFM): None.

5.11 SRF-JRMC will provide the following service work: (TGI No. 3819P12310S02)

5.11.1 [C740] Crane and crane rigging service.

5.11.2 [X99E] Utility service, electrical.

5.11.3 [X99M] Utility service, including water supply, steam supply, and low pressure air supply except onboard blasting work.

5.11.4 [C106.1] Safety inspection for SRF-JRMC employees.

5.11.5 [C106.2] Gas free inspection for SRF-JRMC employees.

5.11.6 [C133] QA inspection for (G) symbol(s) and review coating application data.

5.11.7 [C135] QA inspection for (G) symbol(s).

5.11.8 [C250] Technical support.

FOUO

J-1

SHIP: LCC-19 CHG/VER: 4/1

APPENDIX "J"

TGI JOB SUMMARY INFORMATION SHEET

SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH

VERSION:

CASREP

CAT:

FO/BLST 9-8-0-F AY A 0 1

CU PHASE TITLE:

F/O - CLEAN, INSPECT, REPAIR, AND PRESERVE DSTLT FUEL OR BALLAST (9-8-0-F)

PRIMARY COMPONENT:

COMPONENT UNIT LIST (FOR ASSEMBLIES):

MANHOLE 7-12-2 HA MANHOLE 7-17-1 HA FO/BLST 9-8-0-F TK

ATTACHMENT LIST:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

TAKAHASHI ,YASUHIKO

JO: KO: TOTAL MAN HRS: TOTAL MAT’L COST TOTAL DURATION: PLANNING ACCEPTANCE:

3819P12310 A01 4983 $0.00 1

CU PHASE DESCRIPTION:

The purpose of this TGI is to clean, inspect, repair, and preserve Distillate Fuel or Ballast (9-8-0-F).

Location of Work:

Distillate Fuel or Ballast (9-8-0-F) Hazmat/Flammable Storeroom B (7-12-0-K)

TASK NAME

SHOP TSD/WC TS CREW# MHRS

HIGH RAD

HOURS

RC

GRID#

5.1 LBR 360HRs 22 KE PC 1 360 0

5.2 PNTR 1,424HRs, RGRS 48HRs, QA 2HRs 22 KE PC 1 1474 0

5.3 SFTR 24HRs, PNTR 24 HRs 22 KE PC 1 48 0

5.4 SFTR 480HRs, WELD 270HRs, CARP 16HRs, RGRS

48HRs, QA 2HRs

22 KE PC 1 816 0

5.5 PNTR 6HRs, QA 10HRs 22 KE PC 1 16 0

5.6 PNTR 6HRs, RGRS 24 HRs, QA 10HRs 22 KE PC 1 40 0

5.7 PNTR 2,142HRs, RGRS 48HRs, ELEC 16HRs, QA 10HRs 22 KE PC 1 2216 0

5.8 PNTR 10HRs, QA 2HRs 22 KE PC 1 12 0

Dewatering and Cleaning Work CFM: $5,321.54 for marine chemist, gaskets, fasteners, tank watch cost, and misc such as other consumable.

22 MQ CS 0 0 0

Structural Work CFM: $7,985.64 for MT inspection cost, fire watch cost, tank watch cost, air compressor rental cost and fuel oil cost for air hose test, and misc such as gases, electrode, temporary closure, covering material and other consumable.

22 MQ CS 0 0 0

Preservation Work CFM: $238,644.76 for all paints, thinner, grits, grits disposal cost, tank watch cost, air compressor, dryer, fuel oil, air conditioning, and misc such as covering material and other consumable.

22 MQ CS 0 0 0

FOUO

J-2

SHIP: LCC-19 CHG/VER: 4/1

TASK NAME

SHOP TSD/WC TS CREW# MHRS

HIGH RAD

HOURS

RC

GRID#

Process Funding Document. 10 CT OM 1 1 0

Version-1: correct reference No. 12. C231B R. Takagi, 03/25/2024 -/Y/N

V-01 0 0 0

FOUO

M-1

SHIP: LCC-19 CHG/VER: 4/1

APPENDIX “M”

TGI MATERIAL LIST

SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH

VERSION:

CASREP

CAT:

FO/BLST 9-8-0-F AY A 0 1

CU PHASE TITLE:

F/O - CLEAN, INSPECT, REPAIR, AND PRESERVE DSTLT FUEL OR BALLAST (9-8-0-F)

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING

NUMBER

DOCUMENT/DRAWING TITLE REV

JOB ORDER: KEY OP:

3819P12310 A01

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

NOTES:

FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____

☐ NUCLEAR APPENDIX "D"

DEFICIENCY FORM

☐ NON-NUCLEAR

1. SHIP/HULL NO.: 2a. DL or DR No.

(Circle One)

2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:

LCC-19 FO/BLST 9-8-0-F AY A 0

4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:

3819P12310 A01

7. DESCRIPTION:

8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:

9. CORRECTIVE ACTION:

10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:

FOR NON-NUCLEAR USE ONLY

11. RFD/RFW REQ’D ☐ LAR REQ'D ☐

ILS MOD REQ’D ☐

SRD/PLAN REV REQ'D ☐

DWG NO.: _____________________ S/A NO.: ___________________

12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:

SATISFACTORY:

13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

YES ☐ NO ☐

14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

COMPLETE:

15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

_________:YES ☐ NO ☐

16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

COMPLETE (DR ONLY)

DL’s ISSUED

(DR ONLY)

FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____

☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR

1. SHIP/HULL NO.: 2a. DL or DR No.

(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:

LCC-19 FO/BLST 9-8-0-F AY A 0