CDRL A007 SITUATION SUMMARY REPORT H-53 v2.pdf

PDF 106 KB Posted

Attached to
H-53E Aircraft Maintenance and Repair Services
Solicitation number
N6264920R0003
Issued by

About this file

This document is a Contract Data Requirements List (CDRL) outlining reporting requirements for a contractor providing H-53E aircraft maintenance and repair services. The contractor must submit weekly Situation Summary Reports and RESET Production Reports in Microsoft Excel format to advise stakeholders on aircraft status. The initial reports are due with the contractor's response to the Government's Induction Package for each aircraft. Updated reports are required weekly and within five days of completing evaluation and inspection phases to include all known information and plans. The reports must be sent to the Fleet Readiness Center Western Pacific via email. The Government has five days to review and accept or reject each submission.

View the file

Other files

File Type Posted
N6264920R0003 AMD 0004.docx DOCX document
N6264920R0003 AMD 0004 CONFORMED.docx DOCX document
ANSWERS H-53E_Q_AND_A_23MAR2020.xlsx XLSX spreadsheet
N6264920R0003_AMD_0003.pdf PDF
N6264920R0003 AMD 0002.pdf PDF
CDRL C002 PRESENTATION DOCUMENTATION H-53 v2.pdf PDF
Q and A N6264920R0003 AMD 0002.pdf PDF
N6264920R0003 AMD 0002 CONFORMED.docx DOCX document
H-53E Att 01 Performance Work Statement (PWS) (2020-01-21).docx DOCX document
N6264920R0003 MOD 0001.docx DOCX document
CDRL A002 TECHNICAL DIRECTIVES REPORT H-53 v1.pdf PDF
N6264920R0003 MOD 0001 Conformed.docx DOCX document
CDRL C002 PRESENTATION DOCUMENTATION H-53 v1.pdf PDF
CDRL D002 TRANSITION STATUS REPORT H-53 v1.pdf PDF
CDRL A003 TDC KIT RECEIPT AND REPORTING OF KIT DISCREPANCY REPORT H-53 v1.pdf PDF
CDRL A010 MAINTENANCE HISTORY SUMMARY REPORT H-53 v1.pdf PDF
H-53E Att 06 LMR Process at Contractor Facilities (2020-01-09).docx DOCX document
CDRL G001 MONTHLY MATERIAL EXPENSE REPORT H-53 v1.pdf PDF
CDRL B004 RECEIPT REPORT H-53 v1.pdf PDF
CDRL D004 CONTRACTOR TRAINING PLAN H-53 v1.pdf PDF
CDRL F001 INTEGRATED MASTER SCHEDULE H-53 v1.pdf PDF
N6264920R0003 H-53 RFP.docx DOCX document
H-53E Att 10 GFP List (2020-01-09).xlsx XLSX spreadsheet
CDRL B003 AIRCRAFT AWAITING PARTS (AWP) REPORT H-53 v1.pdf PDF
CDRL B012 COST PER BUNO REPORT H-53 v1.pdf PDF
CDRL B005 SUPPLY EFFECTIVENESS REPORT H-53 v1.pdf PDF
CDRL B008 SUPPORT EQUIPMENT (SE) MAINTENANCE HISTORY REPORT H-53 v1.pdf PDF
CDRL L001 TECHNICAL DATA INVENTORY LIST H-53 v1.pdf PDF
H-53E Att 09 Fac and AF Req (2020-01-09).docx DOCX document
H-53E Att 08 PEMA Specs (2020-01-09).docx DOCX document
H-53E_Att_14_Price_Summary_Spreadsheet_(2020-01-09).xlsx XLSX spreadsheet
H-53E Att 12 H-53E PMID Induction Schedule (2020-01-29).xlsx XLSX spreadsheet
CDRL D001 PHASE-IN TRANSITION PLAN H-53 v1.pdf PDF
CDRL C001 MEETING MINUTES H-53 v1.pdf PDF
H-53E_Att_13_Past_Performance_Questionnaire_(2020-01-09).docx DOCX document
CDRL A008 EXAMINATION & EVALUATION (E&E) DISCREPANCY REPORT H-53 v1.pdf PDF
CDRL B011 SUPPORT EQUIPMENT (SE) MAINTENANCE AND CALIBRATION REPORT H-53 v1.pdf PDF
H-53E Att 07 TEI Process at Contarctor Facilities (2020-01-09).docx DOCX document
H-53E Att 02 Gov Relationships&Resp (2020-01-09).docx DOCX document
CDRL B013 PARTS REQUIRED REPORT (PRR) H-53 v1.pdf PDF
H-53E Att 03 QASP (2020-01-09).docx DOCX document
CDRL A006 SCHEDULED REMOVAL CARDS H-53 v1.pdf PDF
CDRL B010 ANNUAL PHYSICAL INVENTORY H-53 v1.pdf PDF
CDRL B001 DAILY REQUISITION REPORT (DRR) H-53 v1.pdf PDF
CDRL B007 FINAL MATERIAL CONSUMPTION REPORT H-53 v1.pdf PDF
CDRL A005 NOTIFICATION OF AIRCRAFT DELAY H-53 v1.pdf PDF
H-53E Att 04 OSH and Env (2020-01-16).docx DOCX document
CDRL A001 TECHNICAL DIRECTIVES REPORT 10 DAY REPORT H-53 v1.pdf PDF
CDRL A009 NOTED BUT NOT CORRECTED (NBNC) REPORT H-53 v1.pdf PDF
CDRL B006 ACTIVE ITEM REPORT H-53 v1.pdf PDF
Show 40 more

Latest 50 of 56 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

data_item: A007
title: SITUATION SUMMARY REPORT / RESET PRODUCTION REPORT H-53E
sub:
auth:
ref: PWS
req_ofc: FRCWP PRODUCTION
dd250: NO
appcode: N/A
dist: NONE
freq: BLOCK 16
asof: BLOCK 16
firstsub: BLOCK 16
subsub: BLOCK 16
addressee1: FRCWP PMTR
draft1:
reg1: 1
repro1:
addressee2: DCMA
draft2:
reg2: 1
repro2:
addressee3: FRCWP Production
draft3:
reg3: 1
repro3:
addressee4: FRCWP Business Ops
draft4:
reg4: 1
repro4:
addressee5: FRCWP Comptroller
draft5:
reg5: 1
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_reg: 5
total_repro: 0
remarks: (1) Description: Contractor shall submit a Situation Summary Report and RESET Production Report. The RESET Production report is only required where RESET is being performed on the subject aircraft. FRCWP H-53 PMTR will prepare smooth copies for transmission to required addressees listed in NAVAIR H-53E PMID Section 6-2.

(2) Purpose: This report shall advise all concerned on the status of the aircraft.

(3) Format: Situation Summary Report shall be submitted in Microsoft Excel in accordance with USG provided format for PMI Situation Summary. Where RESET is applicable, RESET Production Report shall also be submitted in USG provided format. The Contractor shall integrate Concurrent RESET with PMI in a manner that maximizes efficiency, and shall reflect such integration in this CDRL submission. Frequency of submission for the RESET Production Report, where applicable, and PMI Situation Summary shall be in accordance with Remark (4) of this CDRL.

(4) Frequency/Requirements:

(a) The initial file(s) shall be submitted with the Contractor’s response to the Government’s Induction Package for each Aircraft. For the initial submission of the PMI Situation Summary, the contractor is only required to complete Tables A, B, C, E, and F. It is understood that information requiring the completion of the Evaluation and Inspection (E&I) Phase will not be completed in Tables E and F due to unknown status at the time of induction. For the initial submission of the RESET Production Report, where applicable, all known information at the time of this submission shall be completed.

(b) Revised file(s) shall be submitted within 5 work days from completion of the E&I Phase (completion of combined PMI/RESET E&I Phases where RESET is applicable) to include the submission and need by dates for all Temporary Engineering Instructions (TEIs). For the Situation Summary Report, this submission shall complete all data known to date for Tables E and F to include "Post Evaluation Start/Completion Date Plans". For the RESET Production Report, this submission should include a completed"Estimated Completion Date" in the appropriate field.

group: EMPOR
total_price:
prep_name:
line_item: 0005
exhibit: A
xtdp: Off
xtm: Off
othercat: X
system: H-53E PMI AIRCRAFT
ctr_no:
contr:
remarksb:

(c) Updated file(s) to include all Tables/fields on the Situation Summary Report and RESET Production Report, as applicable, shall be submitted on a weekly frequency.

Shall be emailed to FRCWP at email: usn.atsugi.frcwp.mbx.h53-contract@mail.mil.

Subject line of email shall include CDRL Number and Title

(5) Acceptance: The Government shall have five working days for review and acceptance/rejection of each submission. No response will indicate acceptance.

Page2: 2
Reset:
prep_date:
app_by:
app_date:
Page: 1
of_pages: 2
app: Adobe Professional 8.0

File details come from the government source that posted it. Updated .