H-53E Att 09 Fac and AF Req (2020-01-09).docx

DOCX document 24 KB Posted

Attached to
H-53E Aircraft Maintenance and Repair Services
Solicitation number
N6264920R0003
Issued by

About this file

This Request for Proposals solicits maintenance, repair, and overhaul services for CH/MH-53E aircraft. The contractor shall provide Planned Maintenance Interval Depot services at its facility to support United States Marine Corps and Navy H-53E aircraft forward deployed or operating in the Western Pacific region. Key requirements include allowing drop-off and departure of aircraft Monday through Friday between 0700-1630 hours, using a strip and paint facility meeting H-53E specifications, and providing office space, utilities, and equipment for up to 15 government personnel performing contract administration on-site. The contractor's airfield must support various transport aircraft used for cargo, passengers, and parts transport under this contract. Services such as fueling, towing, and hangar space for emergency repairs are also required and will be charged as additional costs. The soliciting agency is the Department of the Navy Naval Supply Systems Command.

View the file

Other files

File Type Posted
N6264920R0003 AMD 0004.docx DOCX document
N6264920R0003 AMD 0004 CONFORMED.docx DOCX document
ANSWERS H-53E_Q_AND_A_23MAR2020.xlsx XLSX spreadsheet
N6264920R0003_AMD_0003.pdf PDF
N6264920R0003 AMD 0002.pdf PDF
CDRL C002 PRESENTATION DOCUMENTATION H-53 v2.pdf PDF
Q and A N6264920R0003 AMD 0002.pdf PDF
N6264920R0003 AMD 0002 CONFORMED.docx DOCX document
H-53E Att 01 Performance Work Statement (PWS) (2020-01-21).docx DOCX document
N6264920R0003 MOD 0001.docx DOCX document
CDRL A002 TECHNICAL DIRECTIVES REPORT H-53 v1.pdf PDF
N6264920R0003 MOD 0001 Conformed.docx DOCX document
CDRL C002 PRESENTATION DOCUMENTATION H-53 v1.pdf PDF
CDRL D002 TRANSITION STATUS REPORT H-53 v1.pdf PDF
CDRL A003 TDC KIT RECEIPT AND REPORTING OF KIT DISCREPANCY REPORT H-53 v1.pdf PDF
CDRL A010 MAINTENANCE HISTORY SUMMARY REPORT H-53 v1.pdf PDF
H-53E Att 06 LMR Process at Contractor Facilities (2020-01-09).docx DOCX document
CDRL G001 MONTHLY MATERIAL EXPENSE REPORT H-53 v1.pdf PDF
CDRL B004 RECEIPT REPORT H-53 v1.pdf PDF
CDRL D004 CONTRACTOR TRAINING PLAN H-53 v1.pdf PDF
CDRL F001 INTEGRATED MASTER SCHEDULE H-53 v1.pdf PDF
N6264920R0003 H-53 RFP.docx DOCX document
H-53E Att 10 GFP List (2020-01-09).xlsx XLSX spreadsheet
CDRL B003 AIRCRAFT AWAITING PARTS (AWP) REPORT H-53 v1.pdf PDF
CDRL B012 COST PER BUNO REPORT H-53 v1.pdf PDF
CDRL B005 SUPPLY EFFECTIVENESS REPORT H-53 v1.pdf PDF
CDRL B008 SUPPORT EQUIPMENT (SE) MAINTENANCE HISTORY REPORT H-53 v1.pdf PDF
CDRL L001 TECHNICAL DATA INVENTORY LIST H-53 v1.pdf PDF
H-53E Att 08 PEMA Specs (2020-01-09).docx DOCX document
H-53E_Att_14_Price_Summary_Spreadsheet_(2020-01-09).xlsx XLSX spreadsheet
H-53E Att 12 H-53E PMID Induction Schedule (2020-01-29).xlsx XLSX spreadsheet
CDRL D001 PHASE-IN TRANSITION PLAN H-53 v1.pdf PDF
CDRL C001 MEETING MINUTES H-53 v1.pdf PDF
H-53E_Att_13_Past_Performance_Questionnaire_(2020-01-09).docx DOCX document
CDRL A008 EXAMINATION & EVALUATION (E&E) DISCREPANCY REPORT H-53 v1.pdf PDF
CDRL B011 SUPPORT EQUIPMENT (SE) MAINTENANCE AND CALIBRATION REPORT H-53 v1.pdf PDF
H-53E Att 07 TEI Process at Contarctor Facilities (2020-01-09).docx DOCX document
H-53E Att 02 Gov Relationships&Resp (2020-01-09).docx DOCX document
CDRL B013 PARTS REQUIRED REPORT (PRR) H-53 v1.pdf PDF
H-53E Att 03 QASP (2020-01-09).docx DOCX document
CDRL A006 SCHEDULED REMOVAL CARDS H-53 v1.pdf PDF
CDRL B010 ANNUAL PHYSICAL INVENTORY H-53 v1.pdf PDF
CDRL B001 DAILY REQUISITION REPORT (DRR) H-53 v1.pdf PDF
CDRL B007 FINAL MATERIAL CONSUMPTION REPORT H-53 v1.pdf PDF
CDRL A005 NOTIFICATION OF AIRCRAFT DELAY H-53 v1.pdf PDF
H-53E Att 04 OSH and Env (2020-01-16).docx DOCX document
CDRL A001 TECHNICAL DIRECTIVES REPORT 10 DAY REPORT H-53 v1.pdf PDF
CDRL A009 NOTED BUT NOT CORRECTED (NBNC) REPORT H-53 v1.pdf PDF
CDRL B006 ACTIVE ITEM REPORT H-53 v1.pdf PDF
CDRL D003 TRANSITION INVENTORY PLAN (STAND-DOWN) H-53 v1.pdf PDF
Show 40 more

Latest 50 of 56 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N6264920R0003 Attachment (9) 09 January 2020

ATTACHMENT (9): Facility and Airfield Requirements For H-53E Integrated Maintenance Plan (IMP) Planned Maintenance Interval Depot (PMID)

Facility Requirements

· The Contractor shall allow drop-off and departure of PMI aircraft at its facility from 0700 to 1630, Monday through Friday.[footnoteRef:1] [1: The Contractor shall allow drop off and departure of PMI aircraft outside these hours when notified at least 24 hours in advance by the ACO. ]

· The Contractor’s shall use a strip and paint facility that meets all requirements for performing H-53 strip and paint according to the H-53E PMID Specification.

· The Contractor shall provide all necessary common hand-tools, Personnel Protective Equipment (PPE) and Confined Space detection equipment in order to comply with H-53E PMID Specification.

· The Contractor shall provide office spaces for Government personnel (DCMA and FRCWP) performing Contract Administration Services (CAS) and supply at its aircraft maintenance facility. The spaces provided for the Government personnel should be large enough that personnel are able to enter, exit, and work in the space comfortably, and be arranged to provide a collaborative environment for Government personnel. The contractor-provided spaces shall meet the following criteria:

· Located inside the Contractor's H-53E PMI facility, minimum of 1,000 square feet of floor space, fully segregated from any Contractor work spaces;

· Securable using a Contractor-provided cipher lock system, with access by Government personnel 24 hours per day, 7 days per week;

· Environmentally controlled (air conditioning and heating);

· Access to adequate restroom facilities and potable water;

· Custodial services (trash removal, dusting and floor cleaning/maintenance) coinciding with the Contractor's schedule for similar services;

· Minimum of ten (10) work stations equipped with power outlets capable of supporting at least two (2) 90W AC power adapters;

· Each work station provided with hard-wired access to a local commercial Internet Service Provider (ISP) at each workstation;

· Local ISP capable of supporting unrestricted access to Virtual Private Network (VPN) in the United States;

· Each work station provided with access to commercial telephone networks[footnoteRef:2]; [2: The Government will procure telecommunications and internet hardware, installation and services for the office spaces under separate contracts.]

· Telephones with access to the Defense Switch Network (DSN), if the capability exists

· The Contractor shall formally request changes to the Government’s workspaces to the PCO via DCMA. Such requests shall provide details of the requested facility changes required to accommodate the Government personnel, to include a cost estimate. The Contractor shall receive written approval from the PCO before incurring any costs associated with such workspace alterations, modifications or changes.

· When required, the Contractor shall provide temporary work space accommodations for up to 15 government personnel for meetings, FCF crew, etc.

Airfield Requirements The Contractor’s airfield and associated services shall meet the following minimum requirements:

· The Contractor shall provide access to an annually certified compass rose.

· Support all aircraft arrivals and departures performed in connection with this contract.

· Support all C-5, AN-124, C-17 and equivalent transport aircraft arrivals and departures in connection with this contract.[footnoteRef:3] [3: The Contractor shall ensure that AN-124 aircrew (Government or commercial) are cleared through Host Nation Customs and Immigration upon arrival to the Contractor’s facility.]

· Support all aircraft arrivals and departures (whether Government or commercial) for transporting passengers, cargo and parts in connection with this contract.

· The Contractor shall provide heavy equipment and qualified operators to support aircraft loading and offloading operations in connection with this contract.[footnoteRef:4] [4: The Contractor shall charge heavy equipment support for loading/off-loading as Over and Above. ]

· The Contractor shall provide airfield services (defueling/storage/fueling, towing, etc.) of all aircraft used to support this contract.[footnoteRef:5] [5: The Contractor shall charge airfield services as Over and Above. ]

· The Contractor shall provide towing services and hangar space for the Government’s emergency repairs of all aircraft used to support this contact.[footnoteRef:6] [6: The Contractor shall charge emergency towing and hangar space use as Over and Above.]

· The Contractor’s airfield shall allow unlimited access and use by FCF aircraft under this contract.

· The Contractor’s airfield shall allow unlimited access and use by transport aircraft under this contract.

The following tables provide general characteristic of aircraft that the Government may use to deliver H-53’s to the Contractor’s facility:

Transport aircraft general characteristics (C-5B/C-5M)

Length
247 ft 10 in
75.54 m
Height at tail
65 ft 1 in
19.85 m
Max. takeoff weight
837,000 lb
379,657 kg
Takeoff distance (fully loaded)
12,200 ft
3,720 m
Landing distance
4,900 ft
1,494 m
Wingspan
222 ft 9 in
67.88 m
Wingarea
6,200 sq ft
575.98 sq m
Cargo compartment height
13 ft 6 in
4.1 m
Cargo width
19 ft
5.76 m
Crew
Six(Pilot, Co-pilot, (2) Flight Engineers (2) Loadmasters)
Engines
4 General Electric TF39-GE-1C high-bypass turbofan (C-5B) 4 General Electric CF-80C2 turbofan (C-5M)

Transport aircraft general characteristics (C-17)

Length
174 ft
53 m
Height at tail
55 ft 1 in
16.8 m
Max. takeoff weight
585,000 lb
265,350 kg
Takeoff distance (fully loaded)
7,600 ft
2,316 m
Landing distance
3,500 ft
1,060 m
Wingspan
169 ft 8 in
51.75 m
Wingarea
3,800 sq ft
353 sq m

Cargo compartment height (fwd of wing)

12 ft 3 in
3.76 m

Cargo compartment height (aft of wing)

14 ft 8 in
4.5 m
Cargo floor length
68.2 ft
20.78 m
Cargo width
18 ft
5.49 m
Crew
three(Pilot, Co-pilot, and (1) Loadmaster)
Engines
4 Pratt & Whitney F117-PW-100 turbofans

Transport aircraft general characteristics (AN-124)

Length
226 ft 3 in
68.96 m
Height at tail
68 ft 2 in
20.78 m
Max. takeoff weight
893,000 lb
405,000 kg
Takeoff distance (fully loaded)
9,843 ft
3,000 m
Landing distance
2,953 ft
900 m
Wingspan
240 ft 5 in
73.3 m
Wingarea
6,760 sq ft
628 sq m
Cargo compartment height
14 ft 4 in
4.4 m
Cargo width
21 ft
6.4 m
Cargo floor length
119.7 ft
36.5 m
Crew
Six(Pilot, Co-pilot, (2) Flight Engineers (2) Loadmasters)
Engines
4A-Lotarev D-18T Turbofans

CH-53E

Length:
99 ft 1/2 in /
30.2 m
Length Folded: Rotors and Pylon
60 ft 6 in
Rotor diameter:
79 ft
24 m
Height:
29 ft 5 in
Height: Folded
18 ft 7 in
Empty weight:
33,226 lb
15,071 kg
Max takeoff weight:
73,500 lb
33,300 kg
Width (fuselage):
15 ft 5 in
Width (stub wings):
28 ft 4 in
8.64 m

Rotor systems: 7 blades on main rotor, 4 blades on anti-torque tail rotor

Ref: NAVAIR 00-110AH53-6

MH-53E

Length:
99 ft 1/2 in
30.2 m
Length Folded: Rotors and Pylon
60 ft 6 in
Rotor diameter:
79 ft
24 m
Height:
29 ft 5 in
8.46 m
Height: Folded
18 ft 7 in
Empty weight:
36147 lb
Max takeoff weight:
73,500 lb
33,300 kg
Width (stub wings):
28 ft 3 in
Width (fuselage):
15 ft 5 in

Rotor systems: 7 blades on main rotor, 4 blades on anti-torque tail rotor

Ref: NAVAIR 00-110AH53-5

File details come from the government source that posted it. Updated .