N6264920R0003 MOD 0001.docx

DOCX document 34 KB Posted

Attached to
H-53E Aircraft Maintenance and Repair Services
Solicitation number
N6264920R0003
Issued by

About this file

This solicitation requests proposals for H-53E aircraft maintenance and repair services. The Naval Supply Systems Command Fleet Logistics Center Yokosuka is seeking a contractor with significant CH/MH-53E experience to provide depot-level maintenance, repair, and overhaul products and services in support of United States Marine Corps and Navy H-53E aircraft forward deployed or operating in the Western Pacific region. Services will include Planned Maintenance Interval Depot events and In-Service Repair requirements performed under the Naval Air Systems Command's Integrated Maintenance Program. The solicitation contains attachments outlining requirements such as the performance work statement, quality assurance plan, facility requirements, government furnished property, and contract data requirements listings. Interested offerors should respond with pricing and past performance information for evaluation.

View the file

Other files

File Type Posted
N6264920R0003 AMD 0004.docx DOCX document
N6264920R0003 AMD 0004 CONFORMED.docx DOCX document
ANSWERS H-53E_Q_AND_A_23MAR2020.xlsx XLSX spreadsheet
N6264920R0003_AMD_0003.pdf PDF
N6264920R0003 AMD 0002.pdf PDF
CDRL C002 PRESENTATION DOCUMENTATION H-53 v2.pdf PDF
Q and A N6264920R0003 AMD 0002.pdf PDF
N6264920R0003 AMD 0002 CONFORMED.docx DOCX document
H-53E Att 01 Performance Work Statement (PWS) (2020-01-21).docx DOCX document
CDRL A002 TECHNICAL DIRECTIVES REPORT H-53 v1.pdf PDF
N6264920R0003 MOD 0001 Conformed.docx DOCX document
CDRL C002 PRESENTATION DOCUMENTATION H-53 v1.pdf PDF
CDRL D002 TRANSITION STATUS REPORT H-53 v1.pdf PDF
CDRL A003 TDC KIT RECEIPT AND REPORTING OF KIT DISCREPANCY REPORT H-53 v1.pdf PDF
CDRL A010 MAINTENANCE HISTORY SUMMARY REPORT H-53 v1.pdf PDF
H-53E Att 06 LMR Process at Contractor Facilities (2020-01-09).docx DOCX document
CDRL G001 MONTHLY MATERIAL EXPENSE REPORT H-53 v1.pdf PDF
CDRL B004 RECEIPT REPORT H-53 v1.pdf PDF
CDRL D004 CONTRACTOR TRAINING PLAN H-53 v1.pdf PDF
CDRL F001 INTEGRATED MASTER SCHEDULE H-53 v1.pdf PDF
N6264920R0003 H-53 RFP.docx DOCX document
H-53E Att 10 GFP List (2020-01-09).xlsx XLSX spreadsheet
CDRL B003 AIRCRAFT AWAITING PARTS (AWP) REPORT H-53 v1.pdf PDF
CDRL B012 COST PER BUNO REPORT H-53 v1.pdf PDF
CDRL B005 SUPPLY EFFECTIVENESS REPORT H-53 v1.pdf PDF
CDRL B008 SUPPORT EQUIPMENT (SE) MAINTENANCE HISTORY REPORT H-53 v1.pdf PDF
CDRL L001 TECHNICAL DATA INVENTORY LIST H-53 v1.pdf PDF
H-53E Att 09 Fac and AF Req (2020-01-09).docx DOCX document
H-53E Att 08 PEMA Specs (2020-01-09).docx DOCX document
H-53E_Att_14_Price_Summary_Spreadsheet_(2020-01-09).xlsx XLSX spreadsheet
H-53E Att 12 H-53E PMID Induction Schedule (2020-01-29).xlsx XLSX spreadsheet
CDRL D001 PHASE-IN TRANSITION PLAN H-53 v1.pdf PDF
CDRL C001 MEETING MINUTES H-53 v1.pdf PDF
H-53E_Att_13_Past_Performance_Questionnaire_(2020-01-09).docx DOCX document
CDRL A008 EXAMINATION & EVALUATION (E&E) DISCREPANCY REPORT H-53 v1.pdf PDF
CDRL B011 SUPPORT EQUIPMENT (SE) MAINTENANCE AND CALIBRATION REPORT H-53 v1.pdf PDF
H-53E Att 07 TEI Process at Contarctor Facilities (2020-01-09).docx DOCX document
H-53E Att 02 Gov Relationships&Resp (2020-01-09).docx DOCX document
CDRL B013 PARTS REQUIRED REPORT (PRR) H-53 v1.pdf PDF
H-53E Att 03 QASP (2020-01-09).docx DOCX document
CDRL A006 SCHEDULED REMOVAL CARDS H-53 v1.pdf PDF
CDRL B010 ANNUAL PHYSICAL INVENTORY H-53 v1.pdf PDF
CDRL B001 DAILY REQUISITION REPORT (DRR) H-53 v1.pdf PDF
CDRL B007 FINAL MATERIAL CONSUMPTION REPORT H-53 v1.pdf PDF
CDRL A005 NOTIFICATION OF AIRCRAFT DELAY H-53 v1.pdf PDF
H-53E Att 04 OSH and Env (2020-01-16).docx DOCX document
CDRL A001 TECHNICAL DIRECTIVES REPORT 10 DAY REPORT H-53 v1.pdf PDF
CDRL A009 NOTED BUT NOT CORRECTED (NBNC) REPORT H-53 v1.pdf PDF
CDRL B006 ACTIVE ITEM REPORT H-53 v1.pdf PDF
CDRL D003 TRANSITION INVENTORY PLAN (STAND-DOWN) H-53 v1.pdf PDF
Show 40 more

Latest 50 of 56 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N6264920R0003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

LIST OF DOCUMENTS AND EXHIBITS

Attachments Attachment (1) Performance Work Statement Attachment (2) Government Relationships and Responsibilities Attachment (3) Quality Assurance Surveillance Plan (QASP) Attachment (4) Occupational Safety, Health and Environmental Provisions Attachment (5) Repairable Items Process Attachment (6) Drafting and Processing Local Manufacturing Requests (LMR) at Contractor Maintenance Facilities Attachment (7) Drafting and Processing Temporary Engineering Instruction at Contractor Maintenance Facilities Attachment (8) PEMA Specifications Attachment (9) Facility Requirements and Airfield Requirement Attachment (10) List of Government Furnished Property Attachment (11) RESERVED Attachment (12) Projected Induction Schedule Attachment (13) Past Performance Questionnaire Attachment (14) Price Summary Spreadsheet Exhibits - CDRLS

Exhibit A

A001Technical Directives Requirements 10-Day Report H-53E
A002Technical Directives Report H-53E
A003TDC Kit Receipt and Report of Kit Discrepancy H-53E
A004Production Plan H-53E
A005Notification of Aircraft Delay H-53E
A006Scheduled Removal Cards H-53E
A007Situation Summary Report / RESET Production Report H-53E
A008Examination and Evaluation Discrepancy Report H-53E
A009Noted But Not Corrected (NBNC) Report H-53E
A010Maintenance History Summary (MHS) Report H-53E

Exhibit B

B001Daily Requisition Report (DRR) H-53E
B002AVDLR Tracker Report H-53E
B003Aircraft Awaiting Parts (AWP) Report H-53E
B004Receipt Report H-53E
B005Supply Effectiveness Report H-53E
B006Active Item Report H-53E
B007Final Material Consumption Report H-53E
B008Support Equipment (SE) Maintenance History Records H-53E
B009Excess Material Report H-53E
B010Annual Physical Inventory H-53E
B011Support Equipment (SE) Maintenance and Calibration Report H-53E
B012Cost per BUNO Report H-53E
B013Parts Required Report (PRR) H-53E
B014Discrepant Part on Induction Report H-53E

Exhibit C

C001Meeting Minutes H-53E
C002Presentation Documentation H-53E

Exhibit D

D001Phase-In Transition Plan H-53E
D002Transition Status Report H-53E
D003Transition Inventory Plan (Stand-Down) H-53E
D004Contractor Training Plan H-53E

Exhibit F F001 Integrated Master Schedule (IMS) H-53E

Exhibit G G001 Material Expense Report H-53E

Exhibit L L001 Technical Data Inventory Listing H-53E

(End of Summary of Changes) image1.wmf

File details come from the government source that posted it. Updated .