H-53E_Att_13_Past_Performance_Questionnaire_(2020-01-09).docx

DOCX document 19 KB Posted

Attached to
H-53E Aircraft Maintenance and Repair Services
Solicitation number
N6264920R0003
Issued by

About this file

This document contains a past performance questionnaire and details of a related federal contract opportunity for H-53E aircraft maintenance and repair services. The Navy is seeking proposals from contractors with experience maintaining CH/MH-53E helicopters deployed in the Western Pacific region. Under the terms of the contract, awardees will provide depot-level maintenance, repair, and overhaul services to support the Marine Corps and Navy's H-53E aircraft. Services will include planned maintenance interval depot events conducted under Naval Air Systems Command's integrated maintenance program, as well as in-service repair requirements. Proposals are due by response dates specified in solicitation N6264920R0003. The contract will be awarded by the Department of the Navy Naval Supply Systems Command to maintain H-53E aircraft operating from bases in the Western Pacific area.

View the file

Other files

File Type Posted
N6264920R0003 AMD 0004.docx DOCX document
N6264920R0003 AMD 0004 CONFORMED.docx DOCX document
ANSWERS H-53E_Q_AND_A_23MAR2020.xlsx XLSX spreadsheet
N6264920R0003_AMD_0003.pdf PDF
N6264920R0003 AMD 0002.pdf PDF
CDRL C002 PRESENTATION DOCUMENTATION H-53 v2.pdf PDF
Q and A N6264920R0003 AMD 0002.pdf PDF
N6264920R0003 AMD 0002 CONFORMED.docx DOCX document
H-53E Att 01 Performance Work Statement (PWS) (2020-01-21).docx DOCX document
N6264920R0003 MOD 0001.docx DOCX document
CDRL A002 TECHNICAL DIRECTIVES REPORT H-53 v1.pdf PDF
N6264920R0003 MOD 0001 Conformed.docx DOCX document
CDRL C002 PRESENTATION DOCUMENTATION H-53 v1.pdf PDF
CDRL D002 TRANSITION STATUS REPORT H-53 v1.pdf PDF
CDRL A003 TDC KIT RECEIPT AND REPORTING OF KIT DISCREPANCY REPORT H-53 v1.pdf PDF
CDRL A010 MAINTENANCE HISTORY SUMMARY REPORT H-53 v1.pdf PDF
H-53E Att 06 LMR Process at Contractor Facilities (2020-01-09).docx DOCX document
CDRL G001 MONTHLY MATERIAL EXPENSE REPORT H-53 v1.pdf PDF
CDRL B004 RECEIPT REPORT H-53 v1.pdf PDF
CDRL D004 CONTRACTOR TRAINING PLAN H-53 v1.pdf PDF
CDRL F001 INTEGRATED MASTER SCHEDULE H-53 v1.pdf PDF
N6264920R0003 H-53 RFP.docx DOCX document
H-53E Att 10 GFP List (2020-01-09).xlsx XLSX spreadsheet
CDRL B003 AIRCRAFT AWAITING PARTS (AWP) REPORT H-53 v1.pdf PDF
CDRL B012 COST PER BUNO REPORT H-53 v1.pdf PDF
CDRL B005 SUPPLY EFFECTIVENESS REPORT H-53 v1.pdf PDF
CDRL B008 SUPPORT EQUIPMENT (SE) MAINTENANCE HISTORY REPORT H-53 v1.pdf PDF
CDRL L001 TECHNICAL DATA INVENTORY LIST H-53 v1.pdf PDF
H-53E Att 09 Fac and AF Req (2020-01-09).docx DOCX document
H-53E Att 08 PEMA Specs (2020-01-09).docx DOCX document
H-53E_Att_14_Price_Summary_Spreadsheet_(2020-01-09).xlsx XLSX spreadsheet
H-53E Att 12 H-53E PMID Induction Schedule (2020-01-29).xlsx XLSX spreadsheet
CDRL D001 PHASE-IN TRANSITION PLAN H-53 v1.pdf PDF
CDRL C001 MEETING MINUTES H-53 v1.pdf PDF
CDRL A008 EXAMINATION & EVALUATION (E&E) DISCREPANCY REPORT H-53 v1.pdf PDF
CDRL B011 SUPPORT EQUIPMENT (SE) MAINTENANCE AND CALIBRATION REPORT H-53 v1.pdf PDF
H-53E Att 07 TEI Process at Contarctor Facilities (2020-01-09).docx DOCX document
H-53E Att 02 Gov Relationships&Resp (2020-01-09).docx DOCX document
CDRL B013 PARTS REQUIRED REPORT (PRR) H-53 v1.pdf PDF
H-53E Att 03 QASP (2020-01-09).docx DOCX document
CDRL A006 SCHEDULED REMOVAL CARDS H-53 v1.pdf PDF
CDRL B010 ANNUAL PHYSICAL INVENTORY H-53 v1.pdf PDF
CDRL B001 DAILY REQUISITION REPORT (DRR) H-53 v1.pdf PDF
CDRL B007 FINAL MATERIAL CONSUMPTION REPORT H-53 v1.pdf PDF
CDRL A005 NOTIFICATION OF AIRCRAFT DELAY H-53 v1.pdf PDF
H-53E Att 04 OSH and Env (2020-01-16).docx DOCX document
CDRL A001 TECHNICAL DIRECTIVES REPORT 10 DAY REPORT H-53 v1.pdf PDF
CDRL A009 NOTED BUT NOT CORRECTED (NBNC) REPORT H-53 v1.pdf PDF
CDRL B006 ACTIVE ITEM REPORT H-53 v1.pdf PDF
CDRL D003 TRANSITION INVENTORY PLAN (STAND-DOWN) H-53 v1.pdf PDF
Show 40 more

Latest 50 of 56 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N6264920R0003 Attachment 13 – Past Performance Questionnaire

Past Performance Questionnaire

Offeror:

Point of Contact

Your Company/Organization Name:

Your Name:

Position Title:

Telephone:

E-mail:

General Contract Information

a. Contract Number:

Type of contact:

☐ Firm-Fixed-Price

☐ Cost-Reimbursement

b. Brief Description of Work:

c. Location of Work:

e. Contract Performance:

From: Click here to enter a date.

To: Click here to enter a date.

f. Total Contract Value (USD):

Quality

How do you assess the contractor’s conformance to contract requirements, statements of work, and standards of good workmanship (i.e. commonly accepted technical, professional, and quality standards)?

☐ Exceptional
☐ Very Good
☐ Satisfactory
☐ Marginal
☐ Unacceptable

Reasoning / Comments:

(Please provide a detailed, elaborative response. Recommend a minimum of one full paragraph.)

How do you assess the contractor’s processes to solve contract performance problems?

☐ Exceptional
☐ Very Good
☐ Satisfactory
☐ Marginal
☐ Unacceptable

Reasoning / Comments:

Schedule

How do you assess the contractor’s timeliness in meeting contract delivery schedules?

☐ Exceptional
☐ Very Good
☐ Satisfactory
☐ Marginal
☐ Unacceptable

Reasoning / Comments:

How do you assess the contractor’s processes to solve schedule performance problems?

☐ Exceptional
☐ Very Good
☐ Satisfactory
☐ Marginal
☐ Unacceptable

Reasoning / Comments:

Safety

How do you assess the contractor’s adherence to safety requirement (including safety of flight, workplace safety, and adherence to environmental regulations)?

☐ Exceptional
☐ Very Good
☐ Satisfactory
☐ Marginal
☐ Unacceptable

Reasoning / Comments:

How do you assess the contractor’s processes to solve issues and deficiencies involving safety of flight, workplace safety, and adherence to environmental regulations?
☐ Exceptional
☐ Very Good
☐ Satisfactory
☐ Marginal
☐ Unacceptable

Reasoning / Comments:

Additional Comments

Please select your overall level of customer satisfaction, considering contract work performed, promptness, completeness, follow up to correct errors, and documentation and history of reasonable and cooperative behavior.

☐ Exceptional

☐ Very Good
☐ Satisfactory
☐ Marginal
☐ Unacceptable

Reasoning / Comments:

Wrap-up Question

All things considered, would you recommend this Contractor for performance on another contract?

☐ Yes
☐ No

We greatly appreciate your cooperation in this matter.

File details come from the government source that posted it. Updated .