H-53E Att 04 OSH and Env (2020-01-16).docx

DOCX document 23 KB Posted

Attached to
H-53E Aircraft Maintenance and Repair Services
Solicitation number
N6264920R0003
Issued by

About this file

This solicitation requests proposals for planned and unplanned depot-level maintenance, repair, and overhaul services for CH/MH-53E aircraft operated by the United States Marine Corps and Navy in the Western Pacific region. Fleet Readiness Center Western Pacific will provide these services through Planned Maintenance Interval Depot events and In-Service Repair requirements under the Naval Air Systems Command's Integrated Maintenance Program. Interested contractors must have significant experience maintaining CH/MH-53E aircraft and be capable of supporting aircraft forward deployed or operating in the Western Pacific region. The solicitation was issued by Fleet Logistics Center Yokosuka on behalf of the Department of the Navy Naval Supply Systems Command and contains the request for proposals, fourteen attachments, and contracting data requirements lists.

View the file

Other files

File Type Posted
N6264920R0003 AMD 0004.docx DOCX document
N6264920R0003 AMD 0004 CONFORMED.docx DOCX document
ANSWERS H-53E_Q_AND_A_23MAR2020.xlsx XLSX spreadsheet
N6264920R0003_AMD_0003.pdf PDF
N6264920R0003 AMD 0002.pdf PDF
CDRL C002 PRESENTATION DOCUMENTATION H-53 v2.pdf PDF
Q and A N6264920R0003 AMD 0002.pdf PDF
N6264920R0003 AMD 0002 CONFORMED.docx DOCX document
H-53E Att 01 Performance Work Statement (PWS) (2020-01-21).docx DOCX document
N6264920R0003 MOD 0001.docx DOCX document
CDRL A002 TECHNICAL DIRECTIVES REPORT H-53 v1.pdf PDF
N6264920R0003 MOD 0001 Conformed.docx DOCX document
CDRL C002 PRESENTATION DOCUMENTATION H-53 v1.pdf PDF
CDRL D002 TRANSITION STATUS REPORT H-53 v1.pdf PDF
CDRL A003 TDC KIT RECEIPT AND REPORTING OF KIT DISCREPANCY REPORT H-53 v1.pdf PDF
CDRL A010 MAINTENANCE HISTORY SUMMARY REPORT H-53 v1.pdf PDF
H-53E Att 06 LMR Process at Contractor Facilities (2020-01-09).docx DOCX document
CDRL G001 MONTHLY MATERIAL EXPENSE REPORT H-53 v1.pdf PDF
CDRL B004 RECEIPT REPORT H-53 v1.pdf PDF
CDRL D004 CONTRACTOR TRAINING PLAN H-53 v1.pdf PDF
CDRL F001 INTEGRATED MASTER SCHEDULE H-53 v1.pdf PDF
N6264920R0003 H-53 RFP.docx DOCX document
H-53E Att 10 GFP List (2020-01-09).xlsx XLSX spreadsheet
CDRL B003 AIRCRAFT AWAITING PARTS (AWP) REPORT H-53 v1.pdf PDF
CDRL B012 COST PER BUNO REPORT H-53 v1.pdf PDF
CDRL B005 SUPPLY EFFECTIVENESS REPORT H-53 v1.pdf PDF
CDRL B008 SUPPORT EQUIPMENT (SE) MAINTENANCE HISTORY REPORT H-53 v1.pdf PDF
CDRL L001 TECHNICAL DATA INVENTORY LIST H-53 v1.pdf PDF
H-53E Att 09 Fac and AF Req (2020-01-09).docx DOCX document
H-53E Att 08 PEMA Specs (2020-01-09).docx DOCX document
H-53E_Att_14_Price_Summary_Spreadsheet_(2020-01-09).xlsx XLSX spreadsheet
H-53E Att 12 H-53E PMID Induction Schedule (2020-01-29).xlsx XLSX spreadsheet
CDRL D001 PHASE-IN TRANSITION PLAN H-53 v1.pdf PDF
CDRL C001 MEETING MINUTES H-53 v1.pdf PDF
H-53E_Att_13_Past_Performance_Questionnaire_(2020-01-09).docx DOCX document
CDRL A008 EXAMINATION & EVALUATION (E&E) DISCREPANCY REPORT H-53 v1.pdf PDF
CDRL B011 SUPPORT EQUIPMENT (SE) MAINTENANCE AND CALIBRATION REPORT H-53 v1.pdf PDF
H-53E Att 07 TEI Process at Contarctor Facilities (2020-01-09).docx DOCX document
H-53E Att 02 Gov Relationships&Resp (2020-01-09).docx DOCX document
CDRL B013 PARTS REQUIRED REPORT (PRR) H-53 v1.pdf PDF
H-53E Att 03 QASP (2020-01-09).docx DOCX document
CDRL A006 SCHEDULED REMOVAL CARDS H-53 v1.pdf PDF
CDRL B010 ANNUAL PHYSICAL INVENTORY H-53 v1.pdf PDF
CDRL B001 DAILY REQUISITION REPORT (DRR) H-53 v1.pdf PDF
CDRL B007 FINAL MATERIAL CONSUMPTION REPORT H-53 v1.pdf PDF
CDRL A005 NOTIFICATION OF AIRCRAFT DELAY H-53 v1.pdf PDF
CDRL A001 TECHNICAL DIRECTIVES REPORT 10 DAY REPORT H-53 v1.pdf PDF
CDRL A009 NOTED BUT NOT CORRECTED (NBNC) REPORT H-53 v1.pdf PDF
CDRL B006 ACTIVE ITEM REPORT H-53 v1.pdf PDF
CDRL D003 TRANSITION INVENTORY PLAN (STAND-DOWN) H-53 v1.pdf PDF
Show 40 more

Latest 50 of 56 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N6264920R0003 Attachment (4) 16 January 2020

Attachment (4): Occupational Safety, Health and Environmental Provisions For H-53E Integrated Maintenance Plan (IMP) Planned Maintenance Interval Depot (PMID)

SECTION I - GENERAL SAFETY, HEALTH, AND ENVIRONMENTAL REQUIREMENTS

1. The Contractor, and its sub-contractors, shall comply with the provisions as set forth in the instructions of the U.S. Government in the performance of this contract as specified within the SOW, its attachments, and its references.

1.1 The Contractor shall be responsible for developing and maintaining a detailed Industrial Safety, Health, and Environmental Program that includes:

1.1.1. Policy, organization, responsibilities, surveillance, enforcement, and training.

1.1.2. Fire protection/prevention and emergency response. The contractor shall identify specific plans for fire protection/prevention along with coordination of external activities that support these requirements for response to emergencies to include fire, chemical spill, accident, terrorist threat, adverse weather, natural disaster, etc. This item includes joint participation with external agencies in emergency response drills and training exercises.

1.1.3. Specific methods of compliance with the requirements of this section.

1.1.4. Compliance with applicable technical manual for each type, model, series aircraft.

2. The Contractor shall submit to the Administrative Contracting Officer (ACO), Government Flight Representative (GFR), and Contracting Officer’s Representative (COR) a copy of his Industrial Safety, Health and Environmental (ISHE) plan for review prior to execution, when changed and annually thereafter as part of this contract. The plan submitted shall be in English and provide a detailed description of the Contractor’s ISHE program.

3. In addition to the Mishap/Incident Reporting and Investigation requirements of DCMA INST 8210.1, Contractor's Flight and Ground Procedures, the Contractor shall comply with the following:

3.1. The Contractor shall report, to the GFR and PMTR Government representative by telephone, any hazardous material spill, occupational injury and/or illness(es) to contractor personnel, and/or damage to Government property as well as aircraft and/or explosive-related incidents within one (1) hour of its identification/occurrence.

3.2. The contractor shall submit a written investigation report detailing all available facts relating to each case of material spill, personnel injury or damage to Government property to the GFR and PMTR within 24 hours of the incident.

4. The contractor’s Aviation Safety Council shall promote a program of accident prevention, accept action items, provide safety expertise, implement changes as required, and address company mishaps for trend analysis and recommendations and operate as a focal point for ISHE within the company. These meetings shall be held on a regular basis (minimum 10 times per contract year).

SECTION II - INDUSTRIAL SAFETY REQUIREMENTS

1. The contractor shall document program specific plans for hazard control that ensures for compliance identified by specific standards within the following operations:

1.1. Lifting Devices

1.2. Aircraft Jacking Operations

1.3. Handling, Storing, and Transporting Compressed Gas Cylinders

1.4. Parked Aircraft

1.5. Moving or Tie-Down of Aircraft

1.6. Emergency Procedures to Safeguard Parked Aircraft During Severe Weather Conditions

1.7. Storage of Work Stands, Loose Aircraft Parts and Materials not Required for In-Progress Work

1.8. Aircraft Towing, Parking, Mooring

1.9. Fuel/Defuel, Fuel Tank/Cell Repair Operations

1.10. Removal of Hangared Fueled Aircraft

1.11. Aircraft Cleaning/Paint Removal/Painting

1.12. Handling, Storage and Use of Flammable Liquids

1.13. Housekeeping

1.14. Foreign Object Damage (FOD) Prevention

1.15. Welding

1.16. Fire Protection/Prevention

1.17. Personal Protective Equipment

1.18. Respiratory Protection

1.19. Lockout/Tagout (Energy Control)

1.20. Storage and Disposal of Hazardous Waste

1.21. Material Spills and Spill Response Procedures

1.22. Fall Protection

SECTION III - ADDITIONAL REQUIREMENTS –

None

BIBLIOGRAPHY

The Contractor shall be responsible for compliance with all applicable portions of the documents listed below:

NUMBER TITLE

DCMA 8210.1C Change 1 Contractor’s Flight and Ground Operations /NAVAIRINST 3710.1 (Series)

NAS 3306 version 3 (current) Facility Requirements for Aircraft Operations

NAVAIR 01-1A-35Aircraft Fuel Cells and Tanks
NAVAIR 17-1-114Inspection and Proofload Testing of Lifting Slings for Aircraft and Related Components
NAVAIR 19-70-521Operation and Intermediate Maintenance with Illustrated Parts Breakdown, Aircraft Jacks
NAVAIR 19-600-135-6-1Preoperational Checklist Aircraft Hydraulic Jacks, All Types GLCA
NAVAIR 19-600-135-6-2Periodic Maintenance Requirements Manuals Hydraulic Aircraft Jacks
NAVSUPINST 4440.128 (Series)Storage and Handling of Liquefied and Gaseous
Compressed Gasses and Their Full and Empty
Cylinders

DOD 4145.19 (Series) Storage and Material Handling

NFPA 407 (Series) Standard for Aircraft Fuel Servicing