CDRL A002 TECHNICAL DIRECTIVES REPORT H-53 v1.pdf
PDF 263 KB Posted
- Attached to
- H-53E Aircraft Maintenance and Repair Services
- Solicitation number
- N6264920R0003
About this file
This document contains a Contract Data Requirements List (CDRL) and details of a related federal contract opportunity.
The CDRL outlines reporting requirements for incorporated technical directives for H-53E aircraft maintenance and repair services. It requires the contractor to submit a report within seven work days of aircraft completion listing all technical directives incorporated during maintenance, to the Fleet Readiness Center Western Pacific via email. The report format and submission frequency are specified.
The related federal contract opportunity is a solicitation for H-53E aircraft maintenance, repair, and overhaul services to support the United States Marine Corps and Navy aircraft operating in the Western Pacific region. The Fleet Readiness Center Western Pacific will provide depot-level maintenance through planned maintenance interval and in-service repair requirements. Interested contractors must have significant H-53E experience. The solicitation was posted by Fleet Logistics Center Yokosuka on behalf of the Department of the Navy Naval Supply Systems Command.
The documents provide requirements for reporting technical directives and solicit proposals for H-53E aircraft maintenance and repair services to support military operations in the Western Pacific.
View the file
Other files
Show 40 more
Latest 50 of 56 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 2 Pages Reset
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY: X
TDP TM OTHER
D. SYSTEM/ITEM
H-53E PMID AIRCRAFT
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
TECHNICAL DIRECTIVES REPORT H-53E
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS
6. REQUIRING OFFICE
FRCWP Production
7. DD 250 REQ
NO
9. DIST STATEMENT
REQUIRED
None
10. FREQUENCY
BLK 16
12. DATE OF FIRST SUBMISSION
BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
BLK 16
13. DATE OF SUBSEQUENT
SUBMISSION
BLK 16 Draft
Final
Reg Repro
16. REMARKS
(1) Description: Report all incorporated Technical Directives within seven work days after aircraft completion.
(2) Purpose: To report aircraft configuration change to Naval Aviation Logistics Data Analysis (NALDA) system.
(3) Format: Sample document attached.
(4) Frequency: Within seven (7) work-days after each PMI aircraft is completed.
Shall be emailed to FRCWP at: usn.atsugi.frcwp.mbx.h53-contract@mail.mil.
Subject line of email shall include CDRL Number and Title
(5) Acceptance: The Government shall have five working days for review and acceptance/rejection of each submission. No response will indicate acceptance.
FRCWP Prod 1 FRCWP Bus Ops 1
DCMA 1
15. TOTAL 0 3 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
17. PRICE GROUP
mailto:usn.atsugi.frcwp.mbx.h53-contract@mail.mil
TECHNICAL DIRECTIVES REPORT
FROM: CONTRACTOR
TO: FRCWP PRODUCTION
VIA: DCMA
1. FOLLOWING TDS WERE INCORPORATED DURING IMC OR DRIVE-IN MOD. T/M/S--- BUNO----
TD CODE BASIC INTERIM REV AMND PART KIT WUC M/H INC DATE TYPE OF MOD REMARKS
50 0433 A 06 A7 26E20 16 07/98 IMC
50 0376 02 A4 29Qll 36 07/98 IMC
74 0338 00 15129 3 07/98 IMC
Data Element Data coding instructions
T/M/S
BUNO
TD CODE
BASIC
INTERIM
REV
AMND
PART
KIT
wuc M/H
INC DATE
TYPE OF MOD
REMARKS
Enter valid Type Model.
Enter 6 numeric characters for Aircraft Bureau numbers.
Enter a valid TD code, e.g. 50 for AFC, 61 for AYC, 74 for AFB.
Enter TD number.
If Interim, enter "I".
If Revision, enter alphabetic characters.
If Amendment, enter numeric Amendment.
If TD has multiple parts, enter numeric character.
Enter type of kit, e.g. Al, A2.
Enter up to 7 numeric characters.
Enter installation man hours.
Enter TD completion date.
Enter SDLM mod or Drive-in mod.
Note remarks.
A0002
File details come from the government source that posted it. Updated .