Q and A N6264920R0003 AMD 0002.pdf

PDF 71 KB Posted

Attached to
H-53E Aircraft Maintenance and Repair Services
Solicitation number
N6264920R0003
Issued by

About this file

This document contains questions and answers related to a federal solicitation for H-53E aircraft maintenance and repair services. The Navy is seeking contractors with experience maintaining CH/MH-53E aircraft to provide depot-level maintenance, repair, and overhaul products and services in support of Marine Corps and Navy H-53E aircraft operating in the Western Pacific region. Services will include Planned Maintenance Interval Depot events and In-Service Repair requirements performed under the Naval Air Systems Command's Integrated Maintenance Program. Questions addressed include the timeline for notifying the contractor of any defects covered by the warranty of service, and requirements for conducting operational checkouts of mission-essential subsystems prior to aircraft delivery, with answers clarifying inspection criteria contractors should follow.

View the file

Other files

File Type Posted
N6264920R0003 AMD 0004.docx DOCX document
N6264920R0003 AMD 0004 CONFORMED.docx DOCX document
ANSWERS H-53E_Q_AND_A_23MAR2020.xlsx XLSX spreadsheet
N6264920R0003_AMD_0003.pdf PDF
N6264920R0003 AMD 0002.pdf PDF
CDRL C002 PRESENTATION DOCUMENTATION H-53 v2.pdf PDF
N6264920R0003 AMD 0002 CONFORMED.docx DOCX document
H-53E Att 01 Performance Work Statement (PWS) (2020-01-21).docx DOCX document
N6264920R0003 MOD 0001.docx DOCX document
CDRL A002 TECHNICAL DIRECTIVES REPORT H-53 v1.pdf PDF
N6264920R0003 MOD 0001 Conformed.docx DOCX document
CDRL C002 PRESENTATION DOCUMENTATION H-53 v1.pdf PDF
CDRL D002 TRANSITION STATUS REPORT H-53 v1.pdf PDF
CDRL A003 TDC KIT RECEIPT AND REPORTING OF KIT DISCREPANCY REPORT H-53 v1.pdf PDF
CDRL A010 MAINTENANCE HISTORY SUMMARY REPORT H-53 v1.pdf PDF
H-53E Att 06 LMR Process at Contractor Facilities (2020-01-09).docx DOCX document
CDRL G001 MONTHLY MATERIAL EXPENSE REPORT H-53 v1.pdf PDF
CDRL B004 RECEIPT REPORT H-53 v1.pdf PDF
CDRL D004 CONTRACTOR TRAINING PLAN H-53 v1.pdf PDF
CDRL F001 INTEGRATED MASTER SCHEDULE H-53 v1.pdf PDF
N6264920R0003 H-53 RFP.docx DOCX document
H-53E Att 10 GFP List (2020-01-09).xlsx XLSX spreadsheet
CDRL B003 AIRCRAFT AWAITING PARTS (AWP) REPORT H-53 v1.pdf PDF
CDRL B012 COST PER BUNO REPORT H-53 v1.pdf PDF
CDRL B005 SUPPLY EFFECTIVENESS REPORT H-53 v1.pdf PDF
CDRL B008 SUPPORT EQUIPMENT (SE) MAINTENANCE HISTORY REPORT H-53 v1.pdf PDF
CDRL L001 TECHNICAL DATA INVENTORY LIST H-53 v1.pdf PDF
H-53E Att 09 Fac and AF Req (2020-01-09).docx DOCX document
H-53E Att 08 PEMA Specs (2020-01-09).docx DOCX document
H-53E_Att_14_Price_Summary_Spreadsheet_(2020-01-09).xlsx XLSX spreadsheet
H-53E Att 12 H-53E PMID Induction Schedule (2020-01-29).xlsx XLSX spreadsheet
CDRL D001 PHASE-IN TRANSITION PLAN H-53 v1.pdf PDF
CDRL C001 MEETING MINUTES H-53 v1.pdf PDF
H-53E_Att_13_Past_Performance_Questionnaire_(2020-01-09).docx DOCX document
CDRL A008 EXAMINATION & EVALUATION (E&E) DISCREPANCY REPORT H-53 v1.pdf PDF
CDRL B011 SUPPORT EQUIPMENT (SE) MAINTENANCE AND CALIBRATION REPORT H-53 v1.pdf PDF
H-53E Att 07 TEI Process at Contarctor Facilities (2020-01-09).docx DOCX document
H-53E Att 02 Gov Relationships&Resp (2020-01-09).docx DOCX document
CDRL B013 PARTS REQUIRED REPORT (PRR) H-53 v1.pdf PDF
H-53E Att 03 QASP (2020-01-09).docx DOCX document
CDRL A006 SCHEDULED REMOVAL CARDS H-53 v1.pdf PDF
CDRL B010 ANNUAL PHYSICAL INVENTORY H-53 v1.pdf PDF
CDRL B001 DAILY REQUISITION REPORT (DRR) H-53 v1.pdf PDF
CDRL B007 FINAL MATERIAL CONSUMPTION REPORT H-53 v1.pdf PDF
CDRL A005 NOTIFICATION OF AIRCRAFT DELAY H-53 v1.pdf PDF
H-53E Att 04 OSH and Env (2020-01-16).docx DOCX document
CDRL A001 TECHNICAL DIRECTIVES REPORT 10 DAY REPORT H-53 v1.pdf PDF
CDRL A009 NOTED BUT NOT CORRECTED (NBNC) REPORT H-53 v1.pdf PDF
CDRL B006 ACTIVE ITEM REPORT H-53 v1.pdf PDF
CDRL D003 TRANSITION INVENTORY PLAN (STAND-DOWN) H-53 v1.pdf PDF
Show 40 more

Latest 50 of 56 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS AND ANSWERS

FOR

H-53

N6264920R0003

NO. KEYWORD 1 QUESTIONS ANSWERS

1 RFP Section I, Page 164 52.246-20

WARRANTY OF

SERVICE (MAY 2001)

- (b) states that "The Contractign Officer shall give written notice of any defect or nonconformance to the Contractor ( blank )".

Could you define the timeline of ( blank )?

within one (1) year from the date of acceptance signature on the DD250 or designated acceptance document by the Government

2 Technical Data

A1-H53CE-MRC-300

CARD 148.1, 148.5

Mission-Essential Subsystems Matrix/Matrices

(MESM)

- CARD 148.1 says that prior to induction, squadron objectives include "Mission-Essential Subsystems Matrix/Matrices (MESM) operational checkouts."

'- CARD 148.5 says that ground/operational checkout phase includes conduct final "Mission-Essential Subsystems Matrix/Matrices (MESM) operational checkouts." operational checkouts .

Please provide the requirement of MESM operational checkout with applicable TM reference.

The requirement for MESM operational checkouts are to ensure that the Contractor delivers a Full Mission Capable (FMC) aircraft back to the custodian. Most of the applicable references are in the - 200 category of the H-53 TMs which contain testing and troubleshooting information. However, the Technical Manuals (TMs) do not have operational checkouts for every component on the aircraft.

For example, the windscreen does not have an operational checkout section in the manual. It would just need to be inspected, (probably based on the daily deck, A1-H53CE-MRC-200) for cracks, signs of crazing, ect. The same could be said for other items on the list like cargo rollers, fuselage and litters. Some items will require a simple visual inspection and/or ensuring items such as first aid kits and fire extinguishers aren’t expired. Likewise, the Contractor is not going to find testing and troubleshooting information for all components. Moreover, some systems will require checks that cannot be fully completed on the ground. For example, item 67 BAROMETRIC ALTIMETER HOLD SYSTEM will need to be checked in-flight during the FCF by the pilots even though there’s a TM listed. The Contractor will need to develop processes that ensures all of these items are fully checked out (ground & air) prior to delivery. For the other simple components/systems, the Contractor could potentially base its checks on inspection criteria listed in any H-53 publication that is appropriate and relevant to ensuring serviceability.